| title = IR 05000397/2015003, July 1, 2015 through September 30, 2015, Columbia Generating Station Exercise of Enforcement Discretion
| title = IR 05000397/2015003, July 1, 2015 Through September 30, 2015, Columbia Generating Station Exercise of Enforcement Discretion
| author name = Pruett T W
| author name = Pruett T
| author affiliation = NRC/RGN-IV/DRP
| author affiliation = NRC/RGN-IV/DRP
| addressee name = Reddemann M E
| addressee name = Reddemann M
| addressee affiliation = Energy Northwest
| addressee affiliation = Energy Northwest
| docket = 05000397
| docket = 05000397
Line 15: Line 15:
| page count = 62
| page count = 62
}}
}}
See also: [[followed by::IR 05000397/2015003]]
See also: [[see also::IR 05000397/2015003]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::November 12, 2015]]
                            NUCLEAR REGULATORY COMMISSION
                                                REGION IV
                                            1600 E. LAMAR BLVD.
                                          ARLINGTON, TX 76011-4511
                                          November 12, 2015
EA-15-202
Mr. M.E. Reddemann
Chief Executive Officer
Energy Northwest
P.O. Box 968, Mail Drop 1023
Richland, WA 99352-0968
SUBJECT:        COLUMBIA GENERATING STATION - NRC INTEGRATED INSPECTION
                REPORT 05000397/2015003 AND EXERCISE OF ENFORCEMENT
                DISCRETION
Dear Mr. Reddemann,
On September 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an
inspection at your Columbia Generating Station. On October 1, 2015, the NRC inspectors
discussed the results of this inspection with Mr. W.G. Hettel, Chief Operating Officer and Chief
Nuclear Officer, and other members of your staff. The inspectors documented the results of this
inspection in the enclosed inspection report.
NRC inspectors documented five findings of very low safety significance (Green) in this report.
Four of these findings involved violations of NRC requirements. The NRC is treating these
violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the NRC
Enforcement Policy.
Additionally, a violation involving the failure to maintain the operability of secondary containment
during Operations with a Potential to Drain the Reactor Vessel (OPDRV) was identified.
Specifically, from May 13, 2015, through June 13, 2015, Columbia Generating Station
performed five OPDRV activities with secondary containment inoperable in violation of
Technical Specification (TS) 3.6.4.1, Secondary Containment. The NRC issued EGM 11-003,
Enforcement Guidance Memorandum on Dispositioning Boiling Water Reactor Licensee
Noncompliance with Technical Specification Containment Requirements During Operations with
a Potential for Draining the Reactor Vessel, Revision 2, on December 13, 2013, allowing for the
exercise of enforcement discretion for OPDRV-related TS violations, when certain criteria are
met. The NRC concluded that Columbia Generating Station met these criteria. Because the
violation was identified during the discretion period described in EGM 11-003, the NRC is
exercising enforcement discretion in accordance with Section 3.5, Violations Involving Special
Circumstances, of the NRC Enforcement Policy and, therefore, will not issue enforcement
action for this violation, subject to a timely license amendment request being submitted.
If you contest the violations or significance of these NCVs, you should provide a response within
30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with


EA-15-202 Mr. Chief Executive Officer Energy Northwest P.O. Box 968, Mail Drop 1023 Richland, WA 99352-0968
M. Reddemann                                      -2-
copies to the Regional Administrator, Region IV; the Director, Office of Enforcement,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident
inspector at the Columbia Generating Station.
If you disagree with a cross-cutting aspect assignment or a finding not associated with a
regulatory requirement in this report, you should provide a response within 30 days of the date
of this inspection report, with the basis for your disagreement, to the Regional Administrator,
Region IV; and the NRC resident inspector at the Columbia Generating Station.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, a copy of this letter, its enclosure, and your
response (if any) will be available electronically for public inspection in the NRCs Public
Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
                                                Sincerely,
                                                /RA/
                                                Troy W. Pruett
                                                Director
                                                Division of Reactor Projects
Docket Nos. 50-397
License Nos. NPF-21
Enclosure: Inspection Report 05000397/2015003
              w/ Attachment: Supplemental
              Information
cc w/ encl: Electronic Distribution


SUBJECT: COLUMBIA GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000397/2015003 AND EXERCISE OF ENFORCEMENT DISCRETION


==Dear Mr. Reddemann,==
ML15316A834
On September 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Columbia Generating Station. On October 1, 2015, the NRC inspectors discussed the results of this inspection with Mr. W.G. Hettel, Chief Operating Officer and Chief Nuclear Officer, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report. NRC inspectors documented five findings of very low safety significance (Green) in this report. Four of these findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the NRC Enforcement Policy. Additionally, a violation involving the failure to maintain the operability of secondary containment during Operations with a Potential to Drain the Reactor Vessel (OPDRV) was identified. Specifically, from May 13, 2015, through June 13, 2015, Columbia Generating Station performed five OPDRV activities with secondary containment inoperable in violation of Technical Specification (TS) 3.6.4.1, "Secondary Containment." The NRC issued EGM 11-003, "Enforcement Guidance Memorandum on Dispositioning Boiling Water Reactor Licensee Noncompliance with Technical Specification Containment Requirements During Operations with a Potential for Draining the Reactor Vessel," Revision 2, on December 13, 2013, allowing for the exercise of enforcement discretion for OPDRV-related TS violations, when certain criteria are met. The NRC concluded that Columbia Generating Station met these criteria. Because the violation was identified during the discretion period described in EGM 11-003, the NRC is exercising enforcement discretion in accordance with Section 3.5, "Violations Involving Special Circumstances," of the NRC Enforcement Policy and, therefore, will not issue enforcement action for this violation, subject to a timely license amendment request being submitted. If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Columbia Generating Station. If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC resident inspector at the Columbia Generating Station.
  SUNSI Review            Non-Sensitive            Publicly Available                Keyword:
  By: JRG                    Sensitive                Non-Publicly Available
  OFFICE        RIV/DRP    RIV/DRP      RIV/DRP      RIV/DRS      RIV/DRS      RIV/DRS  RIV/DRS
  NAME          DBradley    JGroom      RAlexander    TFarnholtz    VGaddy      MHaire  HGepford
  SIGNATURE /RA/ via E      /RA/ via E  /RA/          /RA/          /RA/        /RA/    /RA/
                                                                    KClayton for
  DATE          11/3/15    11/3/15      11/5/15      11/4/15      11/5/15      11/5/15  11/2/15
  OFFICE        RIV/DRS    RIV/TSS      RIV/ACES      RIV/DRP      RIV/DRP
  NAME          GWerner    ERuesch      JKramer      RSmith        TPruett
  SIGNATURE    /RA/        /RA/        /RA/ via E    /RA/          /RA/
                ERuesch for
  DATE          11/6/15    11/6/15      11/3/15      11/6/15      11/12/15
                                       
M. Reddemann                                   -3-
Letter to M.E. Reddemann from T. Pruett dated November 12, 2015
SUBJECT:        COLUMBIA GENERATING STATION - NRC INTEGRATED INSPECTION
                REPORT 05000397/2015003 AND EXERCISE OF ENFORCEMENT
                DISCRETION
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Jeremy.Groom@nrc.gov)
Resident Inspector (Dan.Bradley@nrc.gov)
Site Administrative Assistant (Vacant)
Incoming Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)
Acting Branch Chief, DRP/A (Rich.Smith@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Project Engineer (Thomas.Sullivan@nrc.gov)
Project Engineer (Mathew.Kirk@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
ROP Reports (ROPreports.Resource@nrc.gov)
ROP Assessment Resource (ROPassessment.Resource@nrc.gov)


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
            U.S. NUCLEAR REGULATORY COMMISSION
                              REGION IV
Docket:    05000397
License:    NPF-21
Report:    05000397/2015003
Licensee:  Energy Northwest
Facility:  Columbia Generating Station
Location:  North Power Plant Loop
            Richland, WA 99354
Dates:      July 1, 2015 through September 30, 2015
Inspectors: D. Bradley, Resident Inspector
            L. Carson, Senior Health Physicist
            N. Greene, PhD, Health Physicist
            J. Groom, Senior Resident Inspector
            J. ODonnell, CHP, Health Physicist
            M. Phalen, Senior Health Physicist
            C. Stott, Project Engineer
Approved    Richard Smith
    By:    Acting Chief, Projects Branch A
            Division of Reactor Projects
                                  -1-             Enclosure


Sincerely,/RA/ Troy W. Pruett Director Division of Reactor Projects Docket Nos. 50-397 License Nos. NPF-21
                                              SUMMARY
IR 05000397/2015003; 07/01/2015 - 09/30/2015; Columbia Generating Station; Equipment
Alignment, Licensed Operator Performance, Radioactive Solid Waste Processing.
The inspection activities described in this report were performed between July 1 and September
30, 2015, by the resident inspectors at Columbia Generating Station and inspectors from the
NRCs Region IV office. Five findings of very low safety significance (Green) are documented in
this report. Four of these findings involved violations of NRC requirements. The significance of
inspection findings is indicated by their color (Green, White, Yellow, or Red), which is
determined using Inspection Manual Chapter 0609, Significance Determination Process. Their
cross-cutting aspects are determined using Inspection Manual Chapter 0310, Aspects within
the Cross-Cutting Areas. Violations of NRC requirements are dispositioned in accordance with
the NRC Enforcement Policy. The NRCs program for overseeing the safe operation of
commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process.
Cornerstone: Mitigating Systems
*  Green. The inspectors identified a finding associated with the licensees failure to maintain
    seismic instrumentation functional as required by Licensee Controlled Specification 1.3.7.2,
    Seismic Monitoring Instrumentation. Specifically, because of inadequate calibration
    procedures, several as-left setpoints for the seismic response spectrum recorders indicating
    lights were non-conservative relative to their function to alert operators of ground motion
    exceeding the operating basis earthquake (OBE). Following discovery of this issue, the
    licensee recalibrated the seismic response spectrum recorders using OBE ground motions
    as the upper tolerance. The licensee entered this issue into their corrective action program
    as Action Request 333996.
    The performance deficiency was more than minor because it affected the configuration
    control attribute of the Mitigating Systems Cornerstone objective and adversely affected the
    cornerstone objective to ensure the availability, reliability, and capability of systems that
    respond to initiating events to prevent undesirable consequences. Specifically, the
    performance deficiency resulted in seismic instruments calibrations that were non-
    conservative relative to their function to alert plant operators that a shutdown is required.
    NRC regulations require a plant shutdown since systems necessary for continued operation
    without undue risk to the health and safety of the public are not designed to remain
    functional, in all cases, following an OBE. The inspector performed the initial significance
    determination using NRC Inspection Manual Chapter 0609, Appendix A, Exhibit 2,
    Mitigating Systems Screening Questions. The inspectors determined that the finding was
    of very low safety significance because (1) the finding was not a deficiency affecting the
    design or qualification of a mitigating system; (2) the finding did not represent a loss of
    system and/or function; (3) the finding did not represent an actual loss of function of a single
    train for greater than its technical specification allowed outage time; and (4) the finding does
    not represent an actual loss of function of one or more non-technical specification trains of
    equipment designated as high safety-significant in accordance with the licensees
    maintenance rule program for greater than 24 hours. Additionally, the finding did not involve
    the loss or degradation of equipment or function specifically designed to mitigate a seismic,
    flooding, or severe weather initiating event. The finding does not have a cross-cutting
    aspect since the configuration control error is associated with an instrument setpoint change
    request from 1990 and therefore not reflective of current licensee performance.
    (Section 1R04)
                                                  -2-


===Enclosure:===
* Green. The inspectors identified a non-cited violation of Technical Specification 5.4.1.a,
Inspection Report 05000397/2015003 w/  
  Procedures, for the failure to maintain an adequate abnormal procedure for earthquakes.
  Specifically, the licensee failed to establish appropriate shutdown criteria for earthquakes
  that exhibit ground motion exceeding the operating basis earthquake (OBE). The licensees
  shutdown criteria would allow for continued operations if ground motion at a single
  frequency exceeded the design response spectrum. In response to this issue, the licensee
  initiated corrective actions to change the stations earthquake abnormal procedure to
  provide shutdown criteria consistent with the original licensing basis of the facility. The
  licensee entered this issue into their corrective action program as Action Request 336875.
  The performance deficiency was more than minor because it affected the procedural
  adequacy attribute of the Mitigating Systems Cornerstone objective and adversely affected
  the cornerstone objective to ensure the availability, reliability, and capability of systems that
  respond to initiating events to prevent undesirable consequences. Specifically, the
  performance deficiency resulted in shutdown criteria that would allow for continued
  operations following events where ground motion at a single frequency exceeded the design
  response spectra. NRC regulations require a plant shutdown since systems necessary for
  continued operation without undue risk to the health and safety of the public are not
  designed to remain functional, in all cases, following an OBE. The inspector performed the
  initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A,
  Exhibit 2, Mitigating Systems Screening Questions. The inspectors determined that the
  finding was of very low safety significance because (1) the finding was not a deficiency
  affecting the design or qualification of a mitigating system; (2) the finding did not represent a
  loss of system and/or function; (3) the finding did not represent an actual loss of function of
  a single train for greater than its technical specification allowed outage time; and (4) the
  finding does not represent an actual loss of function of one or more non-technical
  specification trains of equipment designated as high safety-significant in accordance with
  the licensees maintenance rule program for greater than 24 hours. Additionally, the finding
  did not involve the loss or degradation of equipment or function specifically designed to
  mitigate a seismic, flooding, or severe weather initiating event. The finding does not have a
  cross-cutting aspect since the procedure error is associated with a 1996 change to the
  licensing basis and therefore not reflective of current licensee performance. (Section 1R04)
* Green. The inspectors identified a non-cited violation of 10 CFR 50, Appendix B, Criterion
  III, Design Control, for the licensees failure to verify the adequacy of the design of the
  control room HVAC system. Specifically, the licensee failed to demonstrate the ability of
  control room HVAC design to maintain the temperatures in the main control room below
  habitability and environmental qualification limits, for the duration of all accident scenarios.
  The licensee initiated Action Request 332565 to document the concern, issued night order
  1662 to communicate the issue, aligned both control room air handling units to their
  respective chillers, created a quick card procedure to perform the chiller reset actions, and
  validated the quick card actions could be accomplished within 10 minutes. Additionally, the
  licensee determined that operators could restore the chillers during accident conditions
  within 90 minutes to prevent temperatures from exceeding equipment operability limits.
  The performance deficiency was more than minor because it adversely affected the design
  control attribute of the Mitigating Systems Cornerstone objective to ensure the availability,
  reliability, and capability of systems that respond to initiating events to prevent undesirable
  consequences. Using NRC Inspection Manual Chapter 0609, Appendix A, Exhibit 2,
  Mitigating Systems Screening Questions, the inspectors determined the finding was of
                                                -3-


===Attachment:===
  very low safety significance because (1) the finding was not a deficiency affecting the design
Supplemental Information cc w/ encl: Electronic Distribution
  or qualification of a mitigating system; (2) the finding did not represent a loss of system
  and/or function; (3) the finding did not represent an actual loss of function of a single train for
  greater than its technical specification allowed outage time; and (4) the finding does not
  represent an actual loss of function of one or more non-technical specification trains of
  equipment designated as high safety-significant in accordance with the licensees
  maintenance rule program for greater than 24 hours. This finding had a cross-cutting aspect
  in the area of problem identification and resolution, evaluation, in that the licensee did not
  thoroughly evaluate issues to ensure that resolutions address causes and extent of
  conditions commensurate with their safety significance. Specifically, the licensee did not
  thoroughly evaluate the extent of condition from NRC-identified NCV 05000397/2013002-04,
  Failure to Obtain NRC Approval for Changes to Control Room HVAC Requirements, for
  the effect of this change on other station calculations [P.2]. (Section 1R04)
*  Green. The inspectors identified a non-cited violation of Technical Specification 5.4.1.a,
  Procedures, for the licensees failure to ensure operators could perform time-critical steps
  for fire events. Specifically, on July 4, 2015, the licensee failed to implement written
  procedures to ensure that an equipment operator can complete certain post-fire safe-
  shutdown actions within 10 minutes. In response to this conclusion, the licensee initiated
  Action Request 332747 to document the inability to meet the post-fire safe-shutdown actions
  in accordance with procedure PPM 1.3.1, Operating Policy, Programs, and Practices,
  Revision 119. Additionally, the licensee issued Night Order 1655, reminding all operating
  crews of the requirements of procedure PPM 1.3.1 for leaving the protected area.
  This performance deficiency was more than minor because it was associated with the
  protection against external factors attribute of the Mitigating System Cornerstone and
  affected the cornerstones objective to ensure the availability, reliability, and capability of
  systems that respond to initiating events to prevent undesirable consequences. A senior
  reactor analyst performed a detailed significance determination process review using NRC
  Inspection Manual Chapter 0609, Appendix F, Fire Protection Significance Determination,
  dated September 20, 2013 and NRC Inspection Manual 0308, Attachment 3, Appendix F,
  Technical Basis Fire Protection Significance Determination Process (Supplemental
  Guidance for Implementing IMC 0609, Appendix F) At Power Operations, dated February
  28, 2005. The senior reactor analyst determined that the failure of the equipment operator
  to perform the certain post-fire safe-shutdown actions within 10 minutes would not adversely
  affect a quantitative risk assessment, and therefore this finding was of very low safety
  significance (Green). This finding has a cross-cutting aspect in the area of Human
  Performance, Teamwork, because the licensee failed to communicate and to coordinate
  their activities within and across organizational boundaries to ensure nuclear safety is
  maintained. Specifically, the equipment operator spoke with the shift technical advisor
  about the need to exit the protected area at the morning turnover meeting but neither
  individual spoke with the control room supervisor. Communication was ineffective in that the
  Equipment Operator believed permission was granted and proceeded to exit the protected
  area [H.4]. (Section 1R11)
Cornerstone: Public Radiation Safety
*  Green. The inspectors reviewed a self-revealing, non-cited violation of Technical
  Specification 5.4.1.a, Procedures, for the licensees failure to follow their Process Control
  Program as implemented by their solid radioactive waste system procedures. Specifically,
  the licensee failed to reduce the free standing liquid in a condensate filter demineralizer
                                                -4-


=SUMMARY=
resin disposal package (Liner 14-033-L) to less than the required 0.5 percent of the total
IR 05000397/2015003; 07/01/2015 - 09/30/2015; Columbia Generating Station; Equipment Alignment, Licensed Operator Performance, Radioactive Solid Waste Processing. The inspection activities described in this report were performed between July 1 and September 30, 2015, by the resident inspectors at Columbia Generating Station and inspectors from the NRC's Region IV office. Five findings of very low safety significance (Green) are documented in this report. Four of these findings involved violations of NRC requirements. The significance of inspection findings is indicated by their color (Green, White, Yellow, or Red), which is determined using Inspection Manual Chapter 0609, "Significance Determination Process."  Their cross-cutting aspects are determined using Inspection Manual Chapter 0310, "Aspects within the Cross-Cutting Areas."  Violations of NRC requirements are dispositioned in accordance with the NRC Enforcement Policy. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process."
waste volume. Corrective actions included retrieving the packages from waste shipment 14-
32, testing each liner for free standing liquid content, and removing additional water as
necessary. The licensee documented this issue in their corrective action program as Action
Requests 00316555 and 00316676.
The failure to follow the Process Control Program, resulting in the inadequate dewatering of
radioactive waste liner contents, was a performance deficiency. The inspectors determined
that the performance deficiency was more than minor, because it adversely affected the
Public Radiation Safety cornerstone objective to ensure adequate protection of public health
and safety from exposure to radioactive materials released in the public domain.
Specifically, the failure to ensure that the free standing liquid in the radioactive waste liner
shipped to US Ecology did not exceed 0.5 percent of the total waste volume subjected the
disposal facility to the possibility of improper handling of the waste. Using Inspection
Manual Chapter 0609, Appendix D, Public Radiation Safety Significance Determination
Process, dated February 12, 2008, the inspectors determined the violation was of very low
safety significance (Green) because: (1) radiation limits were not exceeded, (2) there was
no breach of the package during transit, (3) there were no Certificate of Compliance issues,
and (4) the low level burial ground nonconformance did not involve a 10 CFR 61.55 waste
under-classification. The inspectors determined that the finding has a design margin cross-
cutting aspect in the area of human performance, because the licensee failed to operate and
maintain the radioactive waste dewatering system within the vendor design margins when
changes were made to the operating procedures [H.6]. (Section 2RS8)
                                              -5-


===Cornerstone: Mitigating Systems===
                                          PLANT STATUS
: '''Green.'''
The plant began the inspection period at approximately 65 percent power while troubleshooting
The inspectors identified a finding associated with the licensee's failure to maintain seismic instrumentation functional as required by Licensee Controlled Specification 1.3.7.2, "Seismic Monitoring Instrumentation."  Specifically, because of inadequate calibration procedures, several as-left setpoints for the seismic response spectrum recorders indicating lights were non-conservative relative to their function to alert operators of ground motion exceeding the operating basis earthquake (OBE). Following discovery of this issue, the licensee recalibrated the seismic response spectrum recorders using OBE ground motions as the upper tolerance. The licensee entered this issue into their corrective action program as Action Request 333996. The performance deficiency was more than minor because it affected the configuration control attribute of the Mitigating Systems Cornerstone objective and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the performance deficiency resulted in seismic instruments calibrations that were non-conservative relative to their function to alert plant operators that a shutdown is required. NRC regulations require a plant shutdown since systems necessary for continued operation without undue risk to the health and safety of the public are not designed to remain functional, in all cases, following an OBE. The inspector performed the initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A, Exhibit 2,
a non-safety feedwater valve. On July 23, 2015, the plant returned to 100 percent power. On
"Mitigating Systems Screening Questions."  The inspectors determined that the finding was of very low safety significance because (1) the finding was not a deficiency affecting the design or qualification of a mitigating system; (2) the finding did not represent a loss of system and/or function; (3) the finding did not represent an actual loss of function of a single train for greater than its technical specification allowed outage time; and (4) the finding does not represent an actual loss of function of one or more non-technical specification trains of equipment designated as high safety-significant in accordance with the licensee's maintenance rule program for greater than 24 hours. Additionally, the finding did not involve the loss or degradation of equipment or function specifically designed to mitigate a seismic, flooding, or severe weather initiating event. The finding does not have a cross-cutting aspect since the configuration control error is associated with an instrument setpoint change request from 1990 and therefore not reflective of current licensee performance. (Section 1R04)
July 24, 2015, the plant experienced a loss of the B recirculation pump and power was reduced
: '''Green.'''
to approximately 34 percent. Following repair to a non-safety cooling system supporting the
The inspectors identified a non-cited violation of Technical Specification 5.4.1.a, "Procedures," for the failure to maintain an adequate abnormal procedure for earthquakes. Specifically, the licensee failed to establish appropriate shutdown criteria for earthquakes that exhibit ground motion exceeding the operating basis earthquake (OBE). The licensee's shutdown criteria would allow for continued operations if ground motion at a single frequency exceeded the design response spectrum. In response to this issue, the licensee initiated corrective actions to change the station's earthquake abnormal procedure to provide shutdown criteria consistent with the original licensing basis of the facility. The licensee entered this issue into their corrective action program as Action Request 336875. The performance deficiency was more than minor because it affected the procedural adequacy attribute of the Mitigating Systems Cornerstone objective and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the performance deficiency resulted in shutdown criteria that would allow for continued operations following events where ground motion at a single frequency exceeded the design response spectra. NRC regulations require a plant shutdown since systems necessary for continued operation without undue risk to the health and safety of the public are not designed to remain functional, in all cases, following an OBE. The inspector performed the initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A, Exhibit 2, "Mitigating Systems Screening Questions."  The inspectors determined that the finding was of very low safety significance because (1) the finding was not a deficiency affecting the design or qualification of a mitigating system; (2) the finding did not represent a loss of system and/or function; (3) the finding did not represent an actual loss of function of a single train for greater than its technical specification allowed outage time; and (4) the finding does not represent an actual loss of function of one or more non-technical specification trains of equipment designated as high safety-significant in accordance with the licensee's maintenance rule program for greater than 24 hours. Additionally, the finding did not involve the loss or degradation of equipment or function specifically designed to mitigate a seismic, flooding, or severe weather initiating event. The finding does not have a cross-cutting aspect since the procedure error is associated with a 1996 change to the licensing basis and therefore not reflective of current licensee performance. (Section 1R04)
recirculation pump, the plant returned to 100 percent power on July 26, 2015. The plant
: '''Green.'''
remained at 100 percent power for the remainder of the inspection period.
The inspectors identified a non-cited violation of 10 CFR 50, Appendix B, Criterion III, "Design Control," for the licensee's failure to verify the adequacy of the design of the control room HVAC system. Specifically, the licensee failed to demonstrate the ability of control room HVAC design to maintain the temperatures in the main control room below habitability and environmental qualification limits, for the duration of all accident scenarios. The licensee initiated Action Request 332565 to document the concern, issued night order 1662 to communicate the issue, aligned both control room air handling units to their respective chillers, created a quick card procedure to perform the chiller reset actions, and validated the quick card actions could be accomplished within 10 minutes. Additionally, the licensee determined that operators could restore the chillers during accident conditions within 90 minutes to prevent temperatures from exceeding equipment operability limits. The performance deficiency was more than minor because it adversely affected the design control attribute of the Mitigating Systems Cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Using NRC Inspection Manual Chapter 0609, Appendix A, Exhibit 2, "Mitigating Systems Screening Questions,"  the inspectors determined the finding was of very low safety significance because (1) the finding was not a deficiency affecting the design or qualification of a mitigating system; (2) the finding did not represent a loss of system and/or function; (3) the finding did not represent an actual loss of function of a single train for greater than its technical specification allowed outage time; and (4) the finding does not represent an actual loss of function of one or more non-technical specification trains of equipment designated as high safety-significant in accordance with the licensee's maintenance rule program for greater than 24 hours. This finding had a cross-cutting aspect in the area of problem identification and resolution, evaluation, in that the licensee did not thoroughly evaluate issues to ensure that resolutions address causes and extent of conditions commensurate with their safety significance. Specifically, the licensee did not thoroughly evaluate the extent of condition from NRC-identified NCV 05000397/2013002-04, "Failure to Obtain NRC Approval for Changes to Control Room HVAC Requirements," for the effect of this change on other station calculations [P.2]. (Section 1R04)
                                        REPORT DETAILS
: '''Green.'''
1.     REACTOR SAFETY
The inspectors identified a non-cited violation of Technical Specification 5.4.1.a, "Procedures," for the licensee's failure to ensure operators could perform time-critical steps for fire events. Specifically, on July 4, 2015, the licensee failed to implement written procedures to ensure that an equipment operator can complete certain post-fire safe-shutdown actions within 10 minutes. In response to this conclusion, the licensee initiated Action Request 332747 to document the inability to meet the post-fire safe-shutdown actions in accordance with procedure PPM 1.3.1, "Operating Policy, Programs, and Practices," Revision 119. Additionally, the licensee issued Night Order 1655, reminding all operating crews of the requirements of procedure PPM 1.3.1 for leaving the protected area.
        Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity
1R01 Adverse Weather Protection (71111.01)
.1      Readiness for Seasonal Extreme Weather Conditions
  a.   Inspection Scope
        On July 22, 2015, the inspectors completed an inspection of the stations readiness for
        seasonal extreme weather conditions. The inspectors reviewed the licensees adverse
        weather procedures for seasonal high temperatures and evaluated the licensees
        implementation of these procedures. The inspectors verified that prior to the onset of
        hot weather, the licensee had corrected weather-related equipment deficiencies
        identified during the previous season.
        The inspectors selected three risk-significant systems that were required to be protected
        from seasonal high temperatures:
            *    emergency diesel generators including support ventilation systems
            *    standby service water system
            *    high pressure core spray system
        The inspectors reviewed the licensees procedures and design information to ensure the
        systems would remain functional when challenged by adverse weather. The inspectors
        verified that operator actions described in the licensees procedures were adequate to
        maintain readiness of these systems. The inspectors walked down portions of these
        systems to verify the physical condition of the adverse weather protection features.
        These activities constituted one sample of readiness for seasonal adverse weather, as
        defined in Inspection Procedure 71111.01.
  b.   Findings
        No findings were identified.
                                                -6-


This performance deficiency was more than minor because it was associated with the protection against external factors attribute of the Mitigating System Cornerstone and affected the cornerstone's objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. A senior reactor analyst performed a detailed significance determination process review using NRC Inspection Manual Chapter 0609, Appendix F, "Fire Protection Significance Determination," dated September 20, 2013 and NRC Inspection Manual 0308, Attachment 3, Appendix F, "Technical Basis Fire Protection Significance Determination Process (Supplemental Guidance for Implementing IMC 0609, Appendix F) At Power Operations," dated February 28, 2005. The senior reactor analyst determined that the failure of the equipment operator to perform the certain post-fire safe-shutdown actions within 10 minutes would not adversely affect a quantitative risk assessment, and therefore this finding was of very low safety significance (Green). This finding has a cross-cutting aspect in the area of Human Performance, Teamwork, because the licensee failed to communicate and to coordinate their activities within and across organizational boundaries to ensure nuclear safety is maintained. Specifically, the equipment operator spoke with the shift technical advisor about the need to exit the protected area at the morning turnover meeting but neither individual spoke with the control room supervisor. Communication was ineffective in that the Equipment Operator believed permission was granted and proceeded to exit the protected area [H.4]. (Section 1R11) 
.2      Readiness for Impending Adverse Weather Conditions
  a.  Inspection Scope
        On August 20, 2015, the inspectors completed an inspection of the stations readiness
        for impending adverse weather conditions involving high winds. The inspectors
        reviewed plant design features, the licensees procedures to respond to tornadoes and
        high winds, and the licensees potential implementation of these procedures. The
        inspectors evaluated operator staffing and accessibility of controls and indications for
        those systems required to control the plant.
        These activities constituted one sample of readiness for impending adverse weather
        conditions, as defined in Inspection Procedure 71111.01.
  b.  Findings
        No findings were identified.
1R04 Equipment Alignment (71111.04)
.1      Partial Walkdown
  aInspection Scope
        The inspectors performed partial system walk-downs of the following risk-significant
        systems:
            *  July 2, 2015, control room emergency chillers
            *  July 20, 2015, seismic instrumentation
            *  July 28, 2015, standby liquid control system
            *  September 14, 2015, standby gas treatment system
        The inspectors reviewed the licensees procedures and system design information to
        determine the correct lineup for the systems. They visually verified that critical portions
        of the systems were correctly aligned for the existing plant configuration.
        These activities constituted four partial system walk-down samples as defined in
        Inspection Procedure 71111.04.
  b.  Findings
    .1 Failure to Maintain Seismic Instrumentation Functional to Alert Plant Operators of
        Ground Motions Exceeding the Operating Basis Earthquake
        Introduction. The inspectors identified a Green finding associated with the licensees
        failure to maintain seismic instrumentation functional as required by Licensee Controlled
        Specification (LCS) 1.3.7.2, Seismic Monitoring Instrumentation. Specifically, because
        of inadequate calibration procedures, several as-left setpoints for the seismic response
                                                -7-


===Cornerstone: Public Radiation Safety===
spectrum recorders indicating lights were non-conservative relative to their function to
: '''Green.'''
alert operators of ground motion exceeding the operating basis earthquake.
The inspectors reviewed a self-revealing, non-cited violation of Technical Specification 5.4.1.a, "Procedures," for the licensee's failure to follow their Process Control Program as implemented by their solid radioactive waste system procedures. Specifically, the licensee failed to reduce the free standing liquid in a condensate filter demineralizer resin disposal package (Liner 14-033-L) to less than the required 0.5 percent of the total waste volume. Corrective actions included retrieving the packages from waste shipment 14-32, testing each liner for free standing liquid content, and removing additional water as necessary. The licensee documented this issue in their corrective action program as Action Requests 00316555 and 00316676. The failure to follow the Process Control Program, resulting in the inadequate dewatering of radioactive waste liner contents, was a performance deficiency. The inspectors determined that the performance deficiency was more than minor, because it adversely affected the Public Radiation Safety cornerstone objective to ensure adequate protection of public health and safety from exposure to radioactive materials released in the public domain.
Description. On July 20, 2015, the inspectors reviewed the design and calibration
settings for the Columbia Generating Station seismic triaxial response spectrum
recorders, designated SEIS-RSRT-1/1, 1/2 and 1/3. The seismic RSRTs consist of three
units, two horizontal and one vertical, each containing twelve frequency sensitive reeds
used to passively record earthquake ground motions. The RSRTs have a secondary
function to provide visual warnings to operators of exceedances of pre-determined
ground acceleration limits. The RSRTs include red lights to indicate that operating basis
earthquake (OBE) ground motions have been exceeded at certain frequencies.
Licensee Control Specification 1.3.7.2 requires that the seismic instrumentation,
including the triaxial response spectra recorders, remain functional to ensure the
capability to promptly determine the magnitude of a seismic event and initiate evaluation
of the seismic response features important to safety. In particular, the RSRTs red
indicating lights are described in Columbia Generating Station FSAR, Section 3.7.4.4, as
equipment used to alert plant operators that a shutdown is required. Title 10 CFR Part
100, Appendix A, Seismic and Geologic Siting Criteria for Nuclear Power Plants,
requires a plant shutdown if vibratory ground motion exceeding the OBE occurs. The
OBE is defined as the earthquake which produces the vibratory ground motion where
features of the nuclear power plant necessary for continued operation without undue risk
to the health and safety of the public are designed to remain functional.
The inspectors reviewed calculation CE-02-90-21, Setpoints for Response Spectrum
Indicating Lights, Revision 0, used to establish the ground acceleration levels where the
RSRT red indicating lights illuminate. The calculation determined target acceleration
values for the RSRT red indicating lights based on the most conservative OBE seismic
response spectra for the reactor building base mat. This setpoint methodology was
consistent with Regulatory Guide 1.12, Nuclear Power Plant Instrumentation for
Earthquakes, Revision 1, and American Nuclear Society ANS Standard 2.2,
Earthquake Instrumentation Criteria for Nuclear Power Plants, 1978. This regulatory
guidance provided acceptable methods for meeting the seismic instrumentation
requirements in 10 CFR Part 100, Appendix A and recommended a response spectrum
recorder with setpoints established at OBE ground motions.
The inspectors compared the setpoints established in calculation CE-02-90-21 to the
setpoints found in calibration implementing procedure ISP-SEIS-X304, Seismic System
Reactor Building Foundation Triaxial Response - Spectrum Recorder - CC, Revision 1.
Instrument Setpoint Change Request 979, dated April 30, 1990, established allowable
setpoints and included an upper and lower tolerance of approximately 5-10 percent from
the nominal setpoints established in calculation CE-02-90-21. The inspectors compared
the setpoints against the design basis earthquake and concluded that since the nominal
setpoint exactly matched the OBE ground motion values, the upper tolerance would, in
all cases, result in setpoints that exceed the OBE seismic ground motion response
spectra at the reactor building base mat.
The inspector reviewed the as-left setpoints for SEIS-RSRT-1/1, 1/2 and 1/3 and
identified 12 of 36 setpoints that exceeded the nominal target accelerations established
in calculation CE-02-90-21, resulting in red indicating lights that would not illuminate until
after OBE seismic ground motions were exceeded. The inspectors concluded that these
as-left setpoints were non-conservative relative to their LCS required function to alert
                                        -8-


Specifically, the failure to ensure that the free standing liquid in the radioactive waste liner shipped to US Ecology did not exceed 0.5 percent of the total waste volume subjected the disposal facility to the possibility of improper handling of the waste. Using Inspection Manual Chapter 0609, Appendix D, "Public Radiation Safety Significance Determination Process," dated February 12, 2008, the inspectors determined the violation was of very low safety significance (Green) because(1) radiation limits were not exceeded, (2) there was no breach of the package during transit, (3) there were no Certificate of Compliance issues, and (4) the low level burial ground nonconformance did not involve a 10 CFR 61.55 waste under-classification. The inspectors determined that the finding has a design margin cross-cutting aspect in the area of human performance, because the licensee failed to operate and maintain the radioactive waste dewatering system within the vendor design margins when changes were made to the operating procedures [H.6]. (Section 2RS8)    
  plant operators of the need for a plant shutdown as required by 10 CFR 100 and the
  Columbia Generating Station FSAR.
  On August 3, 2015, plant operators declared SEIS-RSRT-1/1, 1/2 and 1/3 non-functional
  due to non-conservative setpoints for the systems red indicating lights and entered LCS
  1.3.7.2, Condition A. During the period that SEIS-RSRT-1/1, 1/2 and 1/3 were non-
  functional, the passive features of the seismic monitoring system were still available for
  earthquake evaluation. On August 10, 2015, the licensee established new setpoints for
  SEIS-RSRT-1/1, 1/2 and 1/3 using OBE ground motions as the upper tolerance. On
  August 18, 2015, the licensee completed a calibration using the revised setpoints and
  exited LCS 1.3.7.2, Condition A. The licensee entered this issue into their corrective
  action program as Action Request 333996.
  Analysis. The failure to maintain seismic instruments functional to provide indications of
  exceeding the OBE seismic ground motion response spectra was a performance
  deficiency. The performance deficiency was more than minor because it affected the
  configuration control attribute of the Mitigating Systems Cornerstone objective and
  adversely affected the cornerstone objective to ensure the availability, reliability, and
  capability of systems that respond to initiating events to prevent undesirable
  consequences. Specifically, the performance deficiency resulted in seismic instrument
  calibrations that were non-conservative relative to their function to alert plant operators
  that a shutdown is required. NRC regulations require a plant shutdown since systems
  necessary for continued operation without undue risk to the health and safety of the
  public are not designed to remain functional, in all cases, following an OBE. The
  inspector performed the initial significance determination using NRC Inspection Manual
  Chapter 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions. The
  inspectors determined that the finding was of very low safety significance because
  (1) the finding was not a deficiency affecting the design or qualification of a mitigating
  system; (2) the finding did not represent a loss of system and/or function; (3) the finding
  did not represent an actual loss of function of a single train for greater than its technical
  specification allowed outage time; and (4) the finding does not represent an actual loss
  of function of one or more non-technical specification trains of equipment designated as
  high safety-significant in accordance with the licensees maintenance rule program for
  greater than 24 hours. Additionally, the finding did not involve the loss or degradation of
  equipment or function specifically designed to mitigate a seismic, flooding, or severe
  weather initiating event. The finding does not have a cross-cutting aspect since the
  configuration control error is associated with an instrument setpoint change request from
  1990 and therefore not reflective of current licensee performance.
  Enforcement. Enforcement action does not apply because the performance deficiency
  did not involve a violation of regulatory requirements. The finding is of very low safety
  significance and the issue was entered into the licensee's corrective action program as
  Action Request 333996. (FIN 05000397/2015003-01, Failure to Maintain Seismic
  Instrumentation Functional to Alert Plant Operators of Ground Motions Exceeding the
  Operating Basis Earthquake)
.2 Non-Conservative Shutdown Criteria in Earthquake Abnormal Procedure
  Introduction. The inspectors identified a Green, non-cited violation of Technical
  Specification 5.4.1.a, Procedures, for the failure to maintain an adequate abnormal
   procedure for earthquakes. Specifically, the licensee failed to establish appropriate
                                            -9-


==PLANT STATUS==
shutdown criteria for earthquakes that exhibit ground motion exceeding the OBE.
The plant began the inspection period at approximately 65 percent power while troubleshooting a non-safety feedwater valve. On July 23, 2015, the plant returned to 100 percent power. On July 24, 2015, the plant experienced a loss of the 'B' recirculation pump and power was reduced to approximately 34 percent. Following repair to a non-safety cooling system supporting the recirculation pump, the plant returned to 100 percent power on July 26, 2015. The plant remained at 100 percent power for the remainder of the inspection period.
Description. On July 20, 2015, the inspectors performed a review of the Columbia
Generating Station seismic instrumentation and monitoring (SEIS) system. The SEIS
system, described in the Final Safety Analysis Report, Section 3.7.4, Seismic
Instrumentation, consists of multiple passive and active subsystems used to record
earthquake ground motion and to alert plant operators that design response spectra
have been exceeded. One of those subsystems are the triaxial response-spectrum
recorders used for comparison of measured and predicted earthquake responses. Final
Safety Analysis Report, Section 3.7.4.4 provides guidance that if an earthquake is felt in
the control room and the spectra experienced at the foundation of the reactor building
exceeds the OBE acceleration levels as indicated on two or more response spectra
indicating lights, the plant will be shut down pending permission to resume operations.
The shutdown criteria in abnormal procedure ABN-Earthquake, Revisions 0-13,
reflected the shutdown criteria found in FSAR Section 3.7.4.4.
The inspectors questioned the need for two or more response spectra indicating lights to
indicate that operating basis earthquake acceleration levels were exceeded prior to
initiating a plant shutdown. The inspectors reviewed 10 CFR Part 100, Appendix A,
which states, in part, that if vibratory ground motion exceeding that of the OBE occurs,
shutdown of the nuclear power plant will be required. The inspectors determined that
the licensees shutdown criteria in Final Safety Analysis Report, Section 3.7.4.4 and
incorporated into abnormal procedure ABN-Earthquake was contrary to 10 CFR
Part 100, Appendix A. Specifically, the licensees shutdown criteria would allow for
continued operations if ground motion at a single frequency exceeded the design
response spectrum. The inspectors reviewed historical licensing basis for Columbia
Generating Station and found that FSAR Amendment 33, in effect when the full power
operating license was issued for the station, provided the following:
        If the Instrumentation shows that the peak acceleration or the response spectra
        experienced at the foundation of the reactor building exceeds the operating basis
        earthquake acceleration levels or response spectra, the plant will be shut down
        pending permission to resume operations.
The inspector discovered that the licensee changed FSAR Section 3.7.4.4 under
licensing document change notice LDCN 96-079, dated December 12, 1996. This
LDCNs purpose was to strike a balance between ensuring that actions are not taken on
a spurious signal and taking conservative actions following an earthquake. The
inspectors agreed that shutdown of the plant due to a spurious signal was not desirable
but that in the case of a single, valid indication that the OBE design response spectra
was exceeded, shutdown of the nuclear power plant was required. The inspectors
determined that the change implemented in LDCN 96-079 resulted in a non-conservative
shutdown criteria compared to the regulatory requirements in 10 CFR Part 100,
Appendix A.
In response to this issue, the licensee initiated corrective actions to change abnormal
procedure ABN-Earthquake to provide a shutdown criteria consistent with the original
licensing basis of the facility. The licensee entered this issue into their corrective action
program as AR 336875.
                                          - 10 -


=REPORT DETAILS=
  Analysis. The failure to establish appropriate shutdown criteria in abnormal procedures
  for earthquakes was a performance deficiency. The performance deficiency was more
  than minor because it affected the procedural adequacy attribute of the Mitigating
  Systems Cornerstone objective and adversely affected the cornerstone objective to
  ensure the availability, reliability, and capability of systems that respond to initiating
  events to prevent undesirable consequences. Specifically, the performance deficiency
  resulted in shutdown criteria that would allow for continued operations following events
  where ground motion at a single frequency exceeded the design response spectra.
  NRC regulations require a plant shutdown since systems necessary for continued
  operation without undue risk to the health and safety of the public are not designed to
  remain functional, in all cases, following an OBE. The inspector performed the initial
  significance determination using NRC Inspection Manual Chapter 0609, Appendix A,
  Exhibit 2, Mitigating Systems Screening Questions. The inspectors determined that
  the finding was of very low safety significance because (1) the finding was not a
  deficiency affecting the design or qualification of a mitigating system; (2) the finding did
  not represent a loss of system and/or function; (3) the finding did not represent an actual
  loss of function of a single train for greater than its technical specification allowed outage
  time; and (4) the finding does not represent an actual loss of function of one or more
  non-technical specification trains of equipment designated as high safety-significant in
  accordance with the licensees maintenance rule program for greater than 24 hours.
  Additionally, the finding did not involve the loss or degradation of equipment or function
  specifically designed to mitigate a seismic, flooding, or severe weather initiating event.
  The finding does not have a cross-cutting aspect since the procedure error is associated
  with a 1996 change to the licensing basis and therefore not reflective of current licensee
  performance.
  Enforcement. Technical Specification 5.4.1.a, Procedures, requires, in part, that written
  procedures be established, implemented, and maintained as recommended in
  Regulatory Guide 1.33, Revision 2, Appendix A, dated February 1978. Paragraph 6.w.
  of Regulatory Guide 1.33, Appendix A, requires specific procedures for acts of Nature
  (e.g., tornado, flood, dam failure, earthquakes). Licensee Procedure ABN-Earthquake,
  Earthquake, Revision 0-13, is a procedure, required by Paragraph 6.w. of Regulatory
  Guide 1.33, Appendix A for earthquakes. Contrary to the above, from August 8, 2005 to
  the present, the licensee failed to maintain an adequate procedure as recommended in
  Regulatory Guide 1.33, Revision 2, Appendix A, Paragraph 6.w. Specifically, the
  shutdown criteria specified in Step 4.4 of procedure ABN-Earthquake, Revisions 0-13
  was non-conservative relative to the shutdown criteria in 10 CFR 100, Appendix A
  because it would allow for continued operations if ground motion at a single frequency
  exceeded the design response spectrum. The licensee initiated corrective actions to
  change abnormal procedure ABN-Earthquake to provide a shutdown criteria consistent
  with the original licensing basis of the facility. Because this finding is of very low safety
  significance and entered into the licensees corrective action program as Action Request
  336875, the violation is being treated as a non-cited violation consistent with Section
  2.3.2.a of the NRC Enforcement Policy. (NCV 05000397/2015003-02,
  Non-Conservative Shutdown Criteria in Earthquake Abnormal Procedure)
.3 Failure to Provide Design Control Measures for Control Room Emergency Chillers
  Introduction. The inspectors identified a Green, non-cited violation of 10 CFR 50,
  Appendix B, Criterion III, Design Control, for the licensees failure to verify the
  adequacy of the design of the control room HVAC system. Specifically, the licensee
                                              - 11 -


==REACTOR SAFETY==
failed to demonstrate the ability of control room HVAC design to maintain the
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity
temperatures in the main control room below habitability and environmental qualification
{{a|1R01}}
limits, for the duration of all accident scenarios.
==1R01 Adverse Weather Protection==
Description. On July 2, 2015, the inspectors performed a review of the control room
{{IP sample|IP=IP 71111.01}}
HVAC system with a focus on the control room emergency chillers. The Final Safety
===.1 Readiness for Seasonal Extreme Weather Conditions===
Analysis Report, Section 9.4.1.1, Design Basis states, in part, that the design of the
control room HVAC system is such that in an emergency condition, the control room
temperature will be maintained within the habitability limit (85°F) by the control room
chilled water. Service water can maintain the control room temperature limit of 85°F
during colder weather. Service water will maintain the control room within the
environmental qualification temperature limit for control room equipment (104°F).
The inspectors noted that the vendor manuals for the control room emergency chillers
described an automatic trip feature that required local resetting. Specifically, the
manufacturer states the following in the Normal Operating Sequence section of the
manual:
          Shutdown where the unit cannot automatically restartShutdown on a power
          failure produces the same results as for a safety shutdown except relay 14R is
          de-energizedIt is necessary to depress the STOP-RESET button to energize
          relay 14R when power is restored after interruption.
The inspectors reviewed relevant electrical diagrams and confirmed that operation of the
control room emergency chillers required a local reset of relay 14R following a loss of
power. The alignment of the control room HVAC system is such that the division 1 air
handling unit, WMA-AH-51A, is aligned to standby service water and the division 2 air
handling unit, WMA-AH-51B, is aligned to chill water. Because of the design feature
involving the relay 14R and the alignment of the air-handling units, the inspectors
identified that:
1) Following any event that resulted in a loss of offsite power with a single-failure of the
    Division 1 emergency diesel generator, the control room would not receive cooling
    via WMA-AH-51B, the only operable air handling unit, until the local chiller reset
    pushbutton was depressed. The control room would remain without cooling until this
    manual reset was accomplished since relay 14R would be de-energized.
2) Following certain events involving a loss of offsite power with a single-failure of the
    Division 2 emergency diesel generator, the control room would experience reduced,
    and in some instances, no external cooling. In particular, when ambient conditions
    would not allow service water alone to maintain the control room below the 85°F
    habitability limit, operators would be prompted to secure standby service water
    cooling to WMA-AH-51A and realign cooling from the control room emergency
    chillers system. The inspectors noted that during the shift between standby service
    water and control room emergency chill water, there would be a brief period when
    the control room would receive no external cooling.
For each of the above scenarios, temperatures in the control room could exceed 85°F or
104°F due to times necessary for system realignment or local resetting manual actions.
At the time of the inspection, procedure OI-69, Time Critical Operator Actions,
Revision 5, did not identify any required manual actions associated with local reset or
                                          - 12 -


====a. Inspection Scope====
realignment of the control room HVAC system. This procedure defines a time critical
On July 22, 2015, the inspectors completed an inspection of the station's readiness for seasonal extreme weather conditions. The inspectors reviewed the licensee's adverse weather procedures for seasonal high temperatures and evaluated the licensee's implementation of these procedures. The inspectors verified that prior to the onset of hot weather, the licensee had corrected weather-related equipment deficiencies identified during the previous season. The inspectors selected three risk-significant systems that were required to be protected from seasonal high temperatures:  emergency diesel generators including support ventilation systems  standby service water system  high pressure core spray system  The inspectors reviewed the licensee's procedures and design information to ensure the systems would remain functional when challenged by adverse weather. The inspectors verified that operator actions described in the licensee's procedures were adequate to maintain readiness of these systems. The inspectors walked down portions of these systems to verify the physical condition of the adverse weather protection features. These activities constituted one sample of readiness for seasonal adverse weather, as defined in Inspection Procedure 71111.01.
action as a manual action, or series of actions that must be completed within a specified
time to meet the plant-licensing basis.
The inspectors reviewed calculation ME-02-92-43, Room Temperature Calculation for
DG Building, Reactor Building, Radwaste Building, and Service Water, Revision 10, and
noted that this calculation covers the control room air-handling units but only considers
steady-state conditions for heat exchanger performance. There is no discussion in
ME-02-92-43 for transient scenarios where the control room would receive no external
cooling, such as those involving local resetting of control room emergency chillers or
during required shifts between standby service water and control room emergency chill
water.
The inspectors requested a design analysis that demonstrated the ability of control room
HVAC design to maintain the temperatures in the main control room below habitability
and environmental qualification limits during these transient situations. The licensee
was unable to locate a design verification that demonstrated the ability of the control
room HVAC system during transient scenarios following a loss of power and could not
determine the peak control room temperature nor the impact to habitability or equipment
qualification in these scenarios.
The inspectors reviewed previous inspection reports for the station and noted one
related finding: NRC-identified NCV 05000397/2013002-04, Failure to Obtain NRC
Approval for Changes to Control Room HVAC Requirements. This NCV identified an
incorrect value for the control room temperature limit and resulted in the current value as
found in the licensees design basis. The inspectors determined that the extent of
condition review from this 2013 finding did not adequately consider the effects of
lowering a design habitability temperature for the control room from 104°F to 85°F,
necessitating the need for the control room emergency chillers. Specifically, when
evaluating the correct habitability limit of 85°F, the licensee only considered the steady
state cooling needs of the control room and not the transient effects experienced
because of the chiller design.
In response to the NRCs conclusions, the licensee initiated Action Request 332565 to
document the concern, issued night order 1662 to communicate the issue, aligned both
control room air handling units to their respective chillers, created a quick card
procedure to perform the chiller reset actions, and validated the quick card actions could
be accomplished within 10 minutes. Additionally, the licensee determined that operators
could restore the chillers during accident conditions within 90 minutes to prevent
temperatures from exceeding equipment operability limits.
Analysis. The failure to provide design control measures to verify the adequacy of the
design of the control room emergency chillers was a performance deficiency. The
performance deficiency was more than minor because it adversely affected the design
control attribute of the Mitigating Systems Cornerstone objective to ensure the
availability, reliability, and capability of systems that respond to initiating events to
prevent undesirable consequences. Specifically, the licensee failed to demonstrate the
ability of control room HVAC design to maintain the temperatures in the main control
room below habitability and environmental qualification limits, for the duration of all
accident scenarios. Using NRC Inspection Manual Chapter 0609, Appendix A, Exhibit 2,
Mitigating Systems Screening Questions, the inspectors determined the finding was of
                                            - 13 -


====b. Findings====
very low safety significance because (1) the finding was not a deficiency affecting the
No findings were identified.
design or qualification of a mitigating system; (2) the finding did not represent a loss of
system and/or function; (3) the finding did not represent an actual loss of function of a
single train for greater than its technical specification allowed outage time; and (4) the
finding does not represent an actual loss of function of one or more non-technical
specification trains of equipment designated as high safety-significant in accordance with
the licensees maintenance rule program for greater than 24 hours. This finding had a
cross-cutting aspect in the area of problem identification and resolution, evaluation, in
that the licensee did not thoroughly evaluate issues to ensure that resolutions address
causes and extent of conditions commensurate with their safety significance.
Specifically, the licensee did not thoroughly evaluate the extent of condition from
NRC-identified NCV 05000397/2013002-04, Failure to Obtain NRC Approval for
Changes to Control Room HVAC Requirements, for the effect of this change on other
station calculations [P.2].
Enforcement. Title 10 CFR Part 50, Appendix B, Criterion III, Design Control, requires,
in part, that design control measures shall provide for verifying or checking the adequacy
of design, such as by the performance of design reviews, by the use of alternate or
simplified calculational methods, or by the performance of a suitable testing program.
Final Safety Analysis Report, Section 9.4.1.1, Design Basis, established the design of
the control room HVAC system and specified, in part, that during emergency conditions,
the control room temperature will be maintained within the habitability limit (85°F) by the
control room chilled water. Service water can maintain the control room temperature
limit of 85°F during colder weather. Service water will maintain the control room within
the environmental qualification temperature limit for control room equipment (104°F).
Contrary to the above, prior to July 2, 2015, the licensee failed to implement design
control measures for verifying or checking the adequacy of design, such as by the
performance of design reviews, by the use of alternate or simplified calculational
methods, or by the performance of a suitable testing program. Specifically, the licensee
failed to verify the adequacy of the design of the control room emergency chillers
involving loss of offsite power scenarios that result in transient losses of control room
cooling such that the design basis, established in Final Safety Analysis Report, Section
9.4.1.1 was ensured.
The licensee initiated Action Request 332565 to document the concern, issued night
order 1662 to communicate the issue, aligned both control room air handling units to
their respective chillers, created a quick card procedure to perform the chiller reset
actions, and validated the quick card actions could be accomplished within 10 minutes.
Because the finding is of very low safety significance (Green) and has been entered into
the licensees corrective action program, this violation is being treated as a non-cited
violation, consistent with Section 2.3.2.a of the NRC Enforcement Policy. (NCV
05000397/2015003-03, Failure to Provide Design Control Measures for Control Room
Emergency Chillers)
                                        - 14 -


===.2 Readiness for Impending Adverse Weather Conditions===
1R05 Fire Protection (71111.05)
.1    Quarterly Inspection
  a. Inspection Scope
      The inspectors evaluated the licensees fire protection program for operational status
      and material condition. The inspectors focused their inspection on four plant areas
      important to safety:
          *  July 1, 2015, Fire Areas RC-4, 5, 6, 7, 8, and 9 and RC-14, radioactive waste
              building 467 elevation vital island
          *  July 14, 2015, Fire Area R-8, low pressure core spray pump room
          *  July 15, 2015, Fire Area RC-11, 12 and 13, radioactive waste building 525
              elevation
          *  August 13, 2015, Fire Area R-5, residual heat removal train A pump room
      For each area, the inspectors evaluated the fire plan against defined hazards and
      defense-in-depth features in the licensees fire protection program. The inspectors
      evaluated control of transient combustibles and ignition sources, fire detection and
      suppression systems, manual firefighting equipment and capability, passive fire
      protection features, and compensatory measures for degraded conditions.
      These activities constituted four quarterly inspection samples, as defined in Inspection
      Procedure 71111.05.
  b. Findings
      No findings were identified.
1R06 Flood Protection Measures (71111.06)
  a. Inspection Scope
      On July 21, 2015, the inspectors completed an inspection of underground bunkers
      susceptible to flooding. The inspectors selected one underground vault, electrical
      manhole E-MH-08, that contained risk-significant or multiple-train cables whose failure
      could disable risk-significant equipment.
      The inspectors observed the material condition of the cables and splices contained in
      the bunkers vaults and looked for evidence of cable degradation due to water intrusion.
      The inspectors verified that the cables and vaults met design requirements.
      These activities constitute completion of one bunker/manhole sample, as defined in
      Inspection Procedure 71111.06.
                                                - 15 -


====a. Inspection Scope====
  b. Findings
On August 20, 2015, the inspectors completed an inspection of the station's readiness for impending adverse weather conditions involving high winds. The inspectors reviewed plant design features, the licensee's procedures to respond to tornadoes and high winds, and the licensee's potential implementation of these procedures. The inspectors evaluated operator staffing and accessibility of controls and indications for those systems required to control the plant.
      No findings were identified.
1R11 Licensed Operator Requalification Program and Licensed Operator Performance
      (71111.11)
.1    Review of Licensed Operator Requalification
  a. Inspection Scope
      On July 29, 2015, the inspectors observed an evaluated simulator scenario performed
      by an operating crew. The inspectors assessed the performance of the operators and
      the evaluators critique of their performance. The inspectors also assessed the modeling
      and performance of the simulator during the requalification activities.
      These activities constitute completion of one quarterly licensed operator requalification
      program sample, as defined in Inspection Procedure 71111.11.
  b. Findings
      No findings were identified.
.2    Review of Licensed Operator Performance
  a. Inspection Scope
      On August 5, 2015, the inspectors observed the performance of on-shift licensed
      operators in the plants main control room. At the time of the observations, the plant was
      in a period of heightened risk due to an unplanned orange risk window for Bonneville
      Power Administrations emergent work on the 230 kV switchyard. The inspectors
      observed the operators performance of the following activities:
          *  Leak repair on the digital electro-hydraulic system under WO 02086051,
              including the pre-job brief
      In addition, the inspectors assessed the operators adherence to plant procedures,
      including procedure PPM 1.3.1, Operating Policy, Programs, and Practices, Revision
      119 and other operations department policies.
      These activities constitute completion of one quarterly licensed operator performance
      sample, as defined in Inspection Procedure 71111.11.
  b. Findings
      Introduction. The inspectors identified a Green, non-cited violation of Technical
      Specification 5.4.1.a, Procedures, for the licensees failure to ensure operators could
      perform time-critical steps for fire events. Specifically, the licensee failed to implement
      written procedures to ensure that Category 2 personnel, needed for post-fire safe
      shutdown, can complete required actions within 10 minutes.
                                              - 16 -


These activities constituted one sample of readiness for impending adverse weather conditions, as defined in Inspection Procedure 71111.01.
Description. During a log review, the inspectors identified that an equipment operator
(OPS3) left the protected area (PA) to compile equipment logs on July 4, 2015, at 8:57
AM and again at 4:37 PM. Licensee procedure PPM 1.3.1, Operating Policy, Programs,
and Practices, Revision 119, classifies watch positions as either Category 1 or
Category 2. Category 1 personnel include the shift technical advisor (STA) and
emergency action level notifier. Category 2 personnel include the shift manager (SM),
all three reactor operators, the control room supervisor (CRS), and the OPS2 and OPS3
equipment operator positions. Procedure PPM 1.3.1 states that while Category 1
personnel may leave the PA with a risk evaluation and permission of the shift manager,
Category 2 personnel should not leave the protected area unless an emergent condition
is jeopardizing the plant and they respond to an event that requires action within 10
minutes. The OPS3 equipment operator is a Category 2 watchstander because in the
event of a control room fire, they must trip the condensate and condensate booster
pumps within 10 minutes. These actions are proceduralized in ABN-CR-EVAC, Control
Room Evacuation and Remote Cooldown, Revision 33.
The inspectors questioned the ability of OPS3 to move from outside the PA to their
required station in a timely manner. The inspectors noted that the licensee performed a
timed walkthrough of post-fire safe-shutdown actions for OPS3 for a similar issue in
2014. Specifically, the evaluation for NRC-identified NCV 05000397/2014003-02,
Failure to Implement Procedures That Ensure Operators Could Perform Time Critical
Steps for Fire Events concluded that OPS3 was not able to complete certain post-fire
safe-shutdown actions within 10 minutes when initially located outside the PA. Instead,
the equipment operator completed the required actions within 11 minutes and 33
seconds. The inspectors determined that this previous walkthrough from 2014 is
representative of the issue identified on July 4, 2015 and no additional timed
walkthrough was required.
The inspectors concluded that by allowing Category 2 personnel to leave the PA, the
licensee had not preserved the assumptions of available personnel in ABN-CR-EVAC to
reach safe-shutdown conditions for a control room fire. Therefore, the licensee was not
implementing written procedures for plant fires and responsibilities for safe operation as
required by Technical Specification 5.4.1.a through Appendix A of Regulatory Guide
1.33, Quality Assurance Program Requirements (Operation), Revision 2.
In response to this conclusion, the licensee initiated AR 332747 to document the inability
to meet the post-fire safe-shutdown actions in accordance with procedure PPM 1.3.1.
Additionally, the licensee issued Night Order 1655, reminding all operating crews of the
requirements of procedure PPM 1.3.1 for leaving the PA. Through interviews, the
licensee determined that the equipment operator discussed the need to leave the PA
with the STA. Neither individual, however, discussed the situation with CRS, SM, or
reviewed the relevant PPM 1.3.1 procedure.
Analysis. The failure to implement written procedures to ensure that Category 2
personnel can complete certain post-fire safe-shutdown actions within 10 minutes was a
performance deficiency. This performance deficiency was more than minor because it
was associated with the protection against external factors attribute of the Mitigating
System Cornerstone and affected the cornerstones objective to ensure the availability,
reliability, and capability of systems that respond to initiating events to prevent
undesirable consequences. Specifically, by allowing Category 2 personnel to leave the
protected area, the licensee had not preserved the assumptions of available personnel
                                        - 17 -


====b. Findings====
in ABN-CR-EVAC to reach safe-shutdown conditions for a control room fire. The
No findings were identified.
inspectors screened the finding in accordance with NRC Manual Chapter IMC 0609,
{{a|1R04}}
Attachment 4, Initial Characterization of Findings. In table 3, the inspectors answered
==1R04 Equipment Alignment==
yes to question E.2 because the finding affects the ability to reach and maintain safe
{{IP sample|IP=IP 71111.04}}
shutdown conditions in case of a fire. Therefore, to assess this finding, a senior reactor
===.1 Partial Walkdown===
analyst used NRC IMC 0609, Appendix F, Fire Protection Significance Determination,
dated September 20, 2013. The analyst noted that the degradation rating examples in
Attachment 2 of that appendix were not well suited for this finding. Therefore, the
analyst used the generic guidance from NRC IMC 0308, Attachment 3, Appendix F,
Technical Basis Fire Protection Significance Determination Process (Supplemental
Guidance for Implementing IMC 0609, Appendix F) At Power Operations, dated
February 28, 2005. This guidance stated, in part:
        the definition of low degradation implies that the performance and/or reliability
        of the fire protection feature is not substantially impacted by the noted
        degradation finding. Hence, the feature would be given essentially full credit in
        the PRA-based analysis. In this case, the risk change is essentially zero, and the
        finding should be screened to Green.
For this finding, procedure ABN-CR-EVAC directed operator OPS3 to trip the
condensate and condensate booster pumps within 10 minutes, but due to this finding,
that action could be delayed to the 11.5 minute point. The subject action was intended
to prevent taking the plant to a solid (completely filled) condition. However, the analyst
noted that the failure to take this action would not increase the core damage probability
(overfilling events at boiling water reactors soon after shutdown should not drive core
damage and are not included in the probabilistic risk assessment model). Instead, this
action is a desired step that was intended to establish positive control over reactor
vessel pressure and level. In addition, the exposure period for this finding was very
short (less than one day). Since the failure to perform this action within 10 minutes
would not adversely affect a quantitative assessment, this finding was of very low safety
significance (Green). This finding has a cross-cutting aspect in the area of Human
Performance, Teamwork, because the licensee failed to communicate and to coordinate
their activities within and across organizational boundaries to ensure nuclear safety is
maintained. Specifically, the equipment operator spoke with the STA about the need to
exit the PA at the morning turnover meeting but neither individual spoke with the CRS.
Communication was ineffective in that the equipment operator believed permission was
granted and proceeded to exit the PA [H.4].
Enforcement. Technical Specification 5.4.1.a, Procedures requires, in part, that written
procedures shall be established, implemented, and maintained for activities described in
Appendix A of the Regulatory Guide 1.33, Revision 2, February 1978. Regulatory Guide
1.33, Appendix A, Section 1.b requires administrative procedures for authorities and
responsibilities for safe operation and shutdown. Licensee procedure PPM 1.3.1,
Operating Policy, Programs, and Practices, Revision 119, a procedure required by
Section 1.b of Regulatory Guide 1.33, Appendix A, establishes authorities and
responsibilities for safe operation and shutdown, and states that Category 2 personnel
should not leave the protected area unless an emergent condition is jeopardizing the
plant and they respond to an event that requires action within 10 minutes. Contrary to
this requirement, on July 4, 2015, Category 2 personnel (i.e., an equipment operator) left
the protected area when no emergent condition jeopardizing the plant existed and
therefore was unable to respond to an event that requires action within 10 minutes.
                                          - 18 -


====a. Inspection Scope====
    Specifically, the operator would not be able to complete certain time-critical operator
The inspectors performed partial system walk-downs of the following risk-significant systems:   July 2, 2015, control room emergency chillers July 20, 2015, seismic instrumentation  July 28, 2015, standby liquid control system September 14, 2015, standby gas treatment system  The inspectors reviewed the licensee's procedures and system design information to determine the correct lineup for the systems. They visually verified that critical portions of the systems were correctly aligned for the existing plant configuration. These activities constituted four partial system walk-down samples as defined in Inspection Procedure 71111.04.
    actions associated with fire events as required by procedure ABN-CR-EVAC, Control
    Room Evacuation and Remote Cooldown, Revision 33.
    The licensee initiated Action Request 332747 to document the non-compliance with
    PPM 1.3.1. Additionally, the licensee issued Night Order 1655 reminding all operating
    crews of the requirements of PPM 1.3.1 for leaving the Protected Area. Because this
    violation was of very low safety significance and was entered into the licensees
    corrective action program, this violation is being treated as a non-cited violation,
    consistent with Section 2.3.2.a of the Enforcement Policy. (NCV 05000397/2015003-04,
    Failure to Implement Procedures to Ensure Availability of Safe Shutdown Personnel)
1R12 Maintenance Effectiveness (71111.12)
  a. Inspection Scope
    The inspectors reviewed two instances of degraded performance or condition of safety-
    related structures, systems, and components (SSCs):
        *    July 10, 2015, system review of control room emergency chillers including
              maintenance history of system rupture discs
        *    September 10, 2015, main steam level indicating switches including maintenance
              history involving internal binding failures documented in AR 332078
    The inspectors reviewed the extent of condition of possible common cause SSC failures
    and evaluated the adequacy of the licensees corrective actions. The inspectors
    reviewed the licensees work practices to evaluate whether these may have played a
    role in the degradation of the SSCs. The inspectors assessed the licensees
    characterization of the degradation in accordance with 10 CFR 50.65 (the Maintenance
    Rule), and verified that the licensee was appropriately tracking degraded performance
    and conditions in accordance with the Maintenance Rule.
    These activities constituted completion of two maintenance effectiveness samples, as
    defined in Inspection Procedure 71111.12.
  b. Findings
    No findings were identified.
1R13 Maintenance Risk Assessments and Emergent Work Control (71111.13)
  a. Inspection Scope
    The inspectors reviewed two risk assessments performed by the licensee prior to
    changes in plant configuration and the risk management actions taken by the licensee in
    response to elevated risk:
        *    August 20, 2015, planned yellow risk for a diesel generator 2 monthly
              surveillance under Work Order 02068579
                                              - 19 -


====b. Findings====
        *  September 15, 2015, planned yellow risk for a reactor core isolation cooling
===.1 Failure to Maintain Seismic Instrumentation Functional to Alert Plant Operators of Ground Motions Exceeding the Operating Basis Earthquake
            system work window under Work Order 02078715
    The inspectors verified that these risk assessments were performed timely and in
    accordance with the requirements of 10 CFR 50.65 (the Maintenance Rule) and plant
    procedures. The inspectors reviewed the accuracy and completeness of the licensees
    risk assessments and verified that the licensee implemented appropriate risk
    management actions based on the result of the assessments.
    Additionally, on September 28, 2015, the inspectors observed the operators response to
    emergent work activities that resulted in unplanned unavailability of emergency diesel
    generator 2. The inspectors verified that the licensee took precautions to minimize the
    impact of the work activities on unaffected SSCs.
    These activities constitute completion of three maintenance risk assessments and
    emergent work control inspection samples, as defined in Inspection Procedure 71111.13.
  b. Findings
    No findings were identified.
1R15 Operability Determinations and Functionality Assessments (71111.15)
  a. Inspection Scope
    The inspectors reviewed four operability determinations that the licensee performed for
    degraded or nonconforming SSCs:
        *  July 1, 2015, AR 332078, documenting reactor vessel water level indicating
            switches MS-LIS-24A and C indicating abnormally high
        *  July 1, 2015, AR 332326, documenting concerns related to residual heat removal
            system operability during venting operations
        *  July 22, 2015, AR 333334, documenting a slow opening time for main steam
            isolation valve MS-V-22D
        *  August 13, 2015, AR 334459, documenting concerns related to required manual
            actions for the control room HVAC system emergency chillers
    The inspectors reviewed the timeliness and technical adequacy of the licensees
    evaluations. Where the licensee determined the degraded SSC to be operable, the
    inspectors verified that the licensees compensatory measures were appropriate to
    provide reasonable assurance of operability. The inspectors verified that the licensee
    had considered the effect of other degraded conditions on the operability of the
    degraded SSC.
    These activities constitute completion of four operability and functionality review samples
    as defined in Inspection Procedure 71111.15.
                                            - 20 -


=====Introduction.=====
  b. Findings
===
    No findings were identified.
The inspectors identified a Green finding associated with the licensee's failure to maintain seismic instrumentation functional as required by Licensee Controlled Specification (LCS) 1.3.7.2, "Seismic Monitoring Instrumentation."  Specifically, because of inadequate calibration procedures, several as-left setpoints for the seismic response spectrum recorders indicating lights were non-conservative relative to their function to alert operators of ground motion exceeding the operating basis earthquake.  
1R18 Plant Modifications (71111.18)
  a. Inspection Scope
    On July 1, 2015, the inspectors reviewed a temporary modification of reactor feedwater
    valve RFW-V-102A under Engineering Change EC14111. The inspectors verified that
    the licensee had installed this temporary modification in accordance with technically
    adequate design documents. The inspectors verified that this modification did not
    adversely impact the operability or availability of affected SSCs. The inspectors
    reviewed design documentation and plant procedures affected by the modification to
    verify the licensee maintained configuration control.
    These activities constitute completion of one sample of temporary modifications, as
    defined in Inspection Procedure 71111.18.
  b. Findings
    No findings were identified.
1R19 Post-Maintenance Testing (71111.19)
  a. Inspection Scope
    The inspectors reviewed four post-maintenance testing activities that affected risk-
    significant SSCs:
        *    August 5, 2015, post-maintenance test for service water temperature control
              valve SW-TCV-11A, following maintenance under WO 02075767
        *    August 26, 2015, post-maintenance test for the Division 3 diesel mixed air
              system, following maintenance under WO 02066727
        *    September 16, 2015, post-maintenance test for reactor core isolation cooling
              system, following maintenance under Work Order 02078715
        *    September 28, 2015, post-maintenance test for the Division 2 diesel generator,
              following replacement of shutdown relays under Work Order 02002258
    The inspectors reviewed licensing- and design-basis documents for the SSCs and the
    maintenance and post-maintenance test procedures. The inspectors observed the
    performance of the post-maintenance tests to verify that the licensee performed the tests
    in accordance with approved procedures, satisfied the established acceptance criteria,
    and restored the operability of the affected SSCs.
    These activities constitute completion of four post-maintenance testing inspection
    samples, as defined in Inspection Procedure 71111.19.
                                            - 21 -


=====Description.=====
  b. Findings
On July 20, 2015, the inspectors reviewed the design and calibration settings for the Columbia Generating Station seismic triaxial response spectrum recorders, designated SEIS-RSRT-1/1, 1/2 and 1/3. The seismic RSRTs consist of three units, two horizontal and one vertical, each containing twelve frequency sensitive reeds used to passively record earthquake ground motions. The RSRTs have a secondary function to provide visual warnings to operators of exceedances of pre-determined ground acceleration limits. The RSRTs include red lights to indicate that operating basis earthquake (OBE) ground motions have been exceeded at certain frequencies. Licensee Control Specification 1.3.7.2 requires that the seismic instrumentation, including the triaxial response spectra recorders, remain functional to ensure the capability to promptly determine the magnitude of a seismic event and initiate evaluation of the seismic response features important to safety. In particular, the RSRTs red indicating lights are described in Columbia Generating Station FSAR, Section 3.7.4.4, as equipment used to alert plant operators that a shutdown is required. Title 10 CFR Part 100, Appendix A, "Seismic and Geologic Siting Criteria for Nuclear Power Plants," requires a plant shutdown if vibratory ground motion exceeding the OBE occurs. The OBE is defined as the earthquake which produces the vibratory ground motion where features of the nuclear power plant necessary for continued operation without undue risk to the health and safety of the public are designed to remain functional. The inspectors reviewed calculation CE-02-90-21, "Setpoints for Response Spectrum Indicating Lights," Revision 0, used to establish the ground acceleration levels where the RSRT red indicating lights illuminate. The calculation determined target acceleration values for the RSRT red indicating lights based on the most conservative OBE seismic response spectra for the reactor building base mat. This setpoint methodology was consistent with Regulatory Guide 1.12, "Nuclear Power Plant Instrumentation for Earthquakes," Revision 1, and American Nuclear Society ANS Standard 2.2, "Earthquake Instrumentation Criteria for Nuclear Power Plants," 1978. This regulatory guidance provided acceptable methods for meeting the seismic instrumentation requirements in 10 CFR Part 100, Appendix A and recommended a response spectrum recorder with setpoints established at OBE ground motions. The inspectors compared the setpoints established in calculation CE-02-90-21 to the setpoints found in calibration implementing procedure ISP-SEIS-X304, "Seismic System Reactor Building Foundation Triaxial Response - Spectrum Recorder - CC," Revision 1. Instrument Setpoint Change Request 979, dated April 30, 1990, established allowable setpoints and included an upper and lower tolerance of approximately 5-10 percent from the nominal setpoints established in calculation CE-02-90-21. The inspectors compared the setpoints against the design basis earthquake and concluded that since the nominal setpoint exactly matched the OBE ground motion values, the upper tolerance would, in all cases, result in setpoints that exceed the OBE seismic ground motion response spectra at the reactor building base mat.
      No findings were identified.
1R22 Surveillance Testing (71111.22)
  a. Inspection Scope
      The inspectors observed three risk-significant surveillance tests and reviewed test
      results to verify that these tests adequately demonstrated that the SSCs were capable of
      performing their safety functions:
      Routine tests:
          * August 6, 2015, procedure OSP-DO/IST-Q701, DO-P-1A Operability, Revision
              14, including a surveillance for the diesel generator fuel oil transfer pump
      In-service tests:
          * September 8, 2015, procedure OSP-LPCS/IST-Q702, LPCS System Operability
              Test, Revision 39
      Reactor coolant system leak detection tests:
          * September 16, 2015, procedure OSP-INST-H101, Shift and Daily Instrument
              Checks Modes 1, 2, 3 Revision 85, including reactor coolant system leakage
              calculation
      The inspectors verified that these tests met technical specification requirements, that the
      licensee performed the tests in accordance with their procedures, and that the results of
      the test satisfied appropriate acceptance criteria. The inspectors verified that the
      licensee restored the operability of the affected SSCs following testing.
      These activities constitute completion of three surveillance testing inspection samples,
      as defined in Inspection Procedure 71111.22.
  b. Findings
      No findings were identified.
      Cornerstone: Emergency Preparedness
1EP6 Drill Evaluation (71114.06)
.1   Emergency Preparedness Drill Observation
  a. Inspection Scope
      The inspectors observed an emergency preparedness drill on July 7, 2015, to verify the
      adequacy and capability of the licensees assessment of drill performance. The
      inspectors reviewed the drill scenario, observed the drill from the simulator, technical
      support center, operations support center and emergency operations facility, and
      attended the post-drill critique. The inspectors verified that the licensees emergency
      classifications, off-site notifications, and protective action recommendations were
                                                - 22 -


The inspector reviewed the as-left setpoints for SEIS-RSRT-1/1, 1/2 and 1/3 and identified 12 of 36 setpoints that exceeded the nominal target accelerations established in calculation CE-02-90-21, resulting in red indicating lights that would not illuminate until after OBE seismic ground motions were exceeded. The inspectors concluded that these as-left setpoints were non-conservative relative to their LCS required function to alert plant operators of the need for a plant shutdown as required by 10 CFR 100 and the Columbia Generating Station FSAR. On August 3, 2015, plant operators declared SEIS-RSRT-1/1, 1/2 and 1/3 non-functional due to non-conservative setpoints for the system's red indicating lights and entered LCS 1.3.7.2, Condition A. During the period that SEIS-RSRT-1/1, 1/2 and 1/3 were non-functional, the passive features of the seismic monitoring system were still available for earthquake evaluation. On August 10, 2015, the licensee established new setpoints for SEIS-RSRT-1/1, 1/2 and 1/3 using OBE ground motions as the upper tolerance. On August 18, 2015, the licensee completed a calibration using the revised setpoints and exited LCS 1.3.7.2, Condition A. The licensee entered this issue into their corrective action program as Action Request 333996.
        appropriate and timely. The inspectors verified that any emergency preparedness
        weaknesses were appropriately identified by the licensee in the post-drill critique and
        entered into the corrective action program for resolution.
        These activities constitute completion of one emergency preparedness drill observation
        sample, as defined in Inspection Procedure 71114.06.
  b.  Findings
        No findings were identified.
2.      RADIATION SAFETY
        Cornerstones: Occupational Radiation Safety and Public Radiation Safety
2RS5 Radiation Monitoring Instrumentation (71124.05)
  a.   Inspection Scope
        The inspectors evaluated the accuracy and operability of the radiation monitoring
        equipment used by the licensee (1) to monitor areas, materials, and workers to ensure a
        radiologically safe work environment, and (2) to detect and quantify radioactive process
        streams and effluent releases. The inspectors interviewed licensee personnel, walked
        down various portions of the plant, and reviewed licensee performance in the following
        areas:
            *  Selected plant configurations and alignments of process, post-accident, and
              effluent monitors with descriptions in the Final Safety Analysis Report and the
              offsite dose calculation manual
            *  Selected instrumentation, including effluent monitoring instrument, portable
              survey instruments, area radiation monitors, continuous air monitors, personnel
              contamination monitors, portal monitors, and small article monitors to examine
              their configurations and source checks
            *  Calibration and testing of process and effluent monitors, laboratory
              instrumentation, whole body counters, post-accident monitoring instrumentation,
              portal monitors, personnel contamination monitors, small article monitors,
              portable survey instruments, area radiation monitors, electronic dosimetry, air
              samplers, and continuous air monitors
            *  Audits, self-assessments, and corrective action documents related to radiation
              monitoring instrumentation since the last inspection
    These activities constitute completion of one sample of radiation monitoring instrumentation
    as defined in Inspection Procedure 71124.05.
  b.   Findings
        No findings were identified.
                                              - 23 -


=====Analysis.=====
2RS6 Radioactive Gaseous and Liquid Effluent Treatment (71124.06)
The failure to maintain seismic instruments functional to provide indications of exceeding the OBE seismic ground motion response spectra was a performance deficiency. The performance deficiency was more than minor because it affected the configuration control attribute of the Mitigating Systems Cornerstone objective and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the performance deficiency resulted in seismic instrument calibrations that were non-conservative relative to their function to alert plant operators that a shutdown is required. NRC regulations require a plant shutdown since systems necessary for continued operation without undue risk to the health and safety of the public are not designed to remain functional, in all cases, following an OBE. The inspector performed the initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A, Exhibit 2, "Mitigating Systems Screening Questions.The inspectors determined that the finding was of very low safety significance because (1) the finding was not a deficiency affecting the design or qualification of a mitigating system; (2) the finding did not represent a loss of system and/or function; (3) the finding did not represent an actual loss of function of a single train for greater than its technical specification allowed outage time; and (4) the finding does not represent an actual loss of function of one or more non-technical specification trains of equipment designated as high safety-significant in accordance with the licensee's maintenance rule program for greater than 24 hours. Additionally, the finding did not involve the loss or degradation of equipment or function specifically designed to mitigate a seismic, flooding, or severe weather initiating event. The finding does not have a cross-cutting aspect since the configuration control error is associated with an instrument setpoint change request from 1990 and therefore not reflective of current licensee performance.
  a. Inspection Scope
    The inspectors evaluated whether the licensee maintained gaseous and liquid effluent
    processing systems and properly mitigated, monitored, and evaluated radiological
    discharges with respect to public exposure. The inspectors verified that abnormal
    radioactive gaseous or liquid discharges and conditions, when effluent radiation monitors
    are out-of-service, were controlled in accordance with the applicable regulatory
    requirements and licensee procedures. The inspectors verified that the licensees
    quality control program ensured radioactive effluent sampling and analysis adequately
    quantified and evaluated discharges of radioactive materials. The inspectors verified the
    adequacy of public dose projections resulting from radioactive effluent discharges. The
    inspectors interviewed licensee personnel and reviewed or observed the following items:
        *  Radiological effluent release reports since the previous inspection and reports
            related to the effluent program issued since the previous inspection
        *  Effluent program implementing procedures, including sampling, monitor setpoint
            determinations and dose calculations
        *  Equipment configuration and flow paths of selected gaseous and liquid discharge
            system components, filtered ventilation system material condition, and significant
            changes to their effluent release points, if any, and associated 10 CFR 50.59
            reviews
        *  Selected portions of the routine processing and discharge of radioactive gaseous
            and liquid effluents (including sample collection and analysis)
        *  Controls used to ensure representative sampling and appropriate compensatory
            sampling
        *  Results of the inter-laboratory comparison program
        *  Effluent stack flow rates
        *  Surveillance test results of technical specification-required ventilation effluent
            discharge systems since the previous inspection
        *  Significant changes in reported dose values
        *  A selection of radioactive liquid and gaseous waste discharge permits
        *  Part 61 analyses and methods used to determine which isotopes are included in
            the source term
        *  Offsite dose calculation manual changes
        *  Meteorological dispersion and deposition factors
                                              - 24 -


=====Enforcement.=====
          *  Latest land use census
Enforcement action does not apply because the performance deficiency did not involve a violation of regulatory requirements. The finding is of very low safety significance and the issue was entered into the licensee's corrective action program as Action Request 333996. (FIN 05000397/2015003-01, Failure to Maintain Seismic Instrumentation Functional to Alert Plant Operators of Ground Motions Exceeding the Operating Basis Earthquake)
          *  Records of abnormal gaseous or liquid tank discharges
          *  Groundwater monitoring results
          *  Changes to the licensees written program for identifying and controlling
            contaminated spills/leaks to groundwater
          *  Identified leakage or spill events and entries made into 10 CFR 50.75(g) records,
            if any, and associated evaluations of the extent of the contamination and the
            radiological source term
          *  Offsite notifications, and reports of events associated with spills, leaks, and
            groundwater monitoring results
          *  Audits, self-assessments, reports, and corrective action documents related to
            radioactive gaseous and liquid effluent treatment since the last inspection
    These activities constitute completion of one sample of radioactive gaseous and liquid
    effluent treatment, as defined in Inspection Procedure 71124.06.
  b. Findings
    No findings were identified.
2RS7 Radiological Environmental Monitoring Program (71124.07)
  a. Inspection Scope
    The inspectors evaluated whether the licensees radiological environmental monitoring
    program quantified the impact of radioactive effluent releases to the environment and
    sufficiently validated the integrity of the radioactive gaseous and liquid effluent release
    program. The inspectors verified that the radiological environmental monitoring program
    was implemented consistent with the licensees technical specifications and offsite dose
    calculation manual, and that the radioactive effluent release program met the design
    objective in Appendix I to 10 CFR Part 50. The inspectors verified that the licensees
    radiological environmental monitoring program monitored non-effluent exposure
    pathways, was based on sound principles and assumptions, and validated that doses to
    members of the public were within regulatory dose limits. The inspectors reviewed or
    observed the following items:
          *  Annual environmental monitoring reports and offsite dose calculation manual
          *  Selected air sampling and dosimeter monitoring stations
          *  Collection and preparation of environmental samples
          *  Operability, calibration, and maintenance of meteorological instruments
                                              - 25 -


===.2 Non-Conservative Shutdown Criteria in Earthquake Abnormal Procedure
        *  Selected events documented in the annual environmental monitoring report
            which involved a missed sample, inoperable sampler, lost dosimeter, or
            anomalous measurement
        *  Selected structures, systems, or components that may contain licensed material
            and has a credible mechanism for licensed material to reach ground water
        *  Records required by 10 CFR 50.75(g)
        *  Significant changes made by the licensee to the offsite dose calculation manual
            as the result of changes to the land census or sampler station modifications since
            the last inspection
        *  Calibration and maintenance records for selected air samplers, composite water
            samplers, and environmental sample radiation measurement instrumentation
        *  Inter-laboratory comparison program results
        *  Audits, self-assessments, reports, and corrective action documents related to the
            radiological environmental monitoring program since the last inspection
    These activities constitute completion of one sample of radiological environmental
    monitoring program as defined in Inspection Procedure 71124.07.
  b. Findings
    No findings were identified.
2RS8 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage,
    and Transportation (71124.08)
  a. Inspection Scope
    The inspectors evaluated the effectiveness of the licensees programs for processing,
    handling, storage, and transportation of radioactive material. The inspectors interviewed
    licensee personnel and reviewed the following items:
        *  The solid radioactive waste system description, process control program, and the
            scope of the licensees audit program
        *  Control of radioactive waste storage areas including container labeling/marking
            and monitoring containers for deformation or signs of waste decomposition
        *  Changes to the liquid and solid waste processing system configuration including
            a review of waste processing equipment that is not operational or abandoned in
            place
        *  Radio-chemical sample analysis results for radioactive waste streams and use of
            scaling factors and calculations to account for difficult-to-measure radionuclides
                                            - 26 -


=====Introduction.=====
      *    Processes for waste classification including use of scaling factors and
===
            10 CFR Part 61 analysis
The inspectors identified a Green, non-cited violation of Technical Specification 5.4.1.a, "Procedures," for the failure to maintain an adequate abnormal procedure for earthquakes. Specifically, the licensee failed to establish appropriate shutdown criteria for earthquakes that exhibit ground motion exceeding the OBE.  
      *    Shipment packaging, surveying, labeling, marking, placarding, vehicle checking,
            driver instructing, and preparation of the disposal manifest
      *    Audits, self-assessments, reports, and corrective action reports radioactive solid
            waste processing, and radioactive material handling, storage, and transportation
            performed since the last inspection
  These activities constitute completion of one sample of radioactive solid waste
  processing, and radioactive material handling, storage, and transportation as defined in
  Inspection Procedure 71124.08.
b. Findings
  Introduction. The inspectors reviewed a Green, self-revealing, non-cited violation of
  Technical Specification 5.4.1.a, Procedures, for the licensees failure to follow their
  Process Control Program as implemented by their solid radioactive waste system
  procedures. The licensee shipped a radioactive shipment of condensate filter
  demineralizer resin waste for disposal to US Ecology of Washington with free standing
  liquid in excess of 0.5 percent of the total waste volume.
  Description. On August 11, 2014, the licensee completed dewatering and drying of resin
  for a condensate demineralizer filter waste liner (14-033-L). On October 9, 2014,
  radioactive waste liner 14-033-L was shipped to US Ecology for disposal at their low
  level radioactive waste burial site near Richland, Washington. The liner was part of
  radioactive waste shipment #14-32 and manifested as a Class A Unstable waste form.
  On October 23, 2014, liner 14-033-L was randomly selected by the burial site for
  inspection to ensure compliance with the disposal sites license conditions. US Ecology
  punctured the bottom of the liner and determined that the liner contained free standing
  liquid, as evidenced by a slurry mix (150 ml) that drained from the puncture hole. On
  October 27, 2014, US Ecology continued their inspection of liner 14-033-L by fully
  opening the liner lid and sampling for additional free standing liquid. The inspection
  results revealed that over 8.5 gallons of free standing liquid was contained within the
  liner. This represented approximately 0.75 percent of the total waste volume (1132
  gallons) and was in excess of the 0.5 percent free standing liquid requirement for
  unstable waste form. US Ecology contacted the licensee and informed them of the
  burial site noncompliance.
  The licensee retrieved the packages (i.e., liners) contained in shipment #14-32 from US
  Ecology. Each liner was then tested for free standing liquid content and additional water
  was removed as necessary. This issue was entered into the licensees corrective action
  program as Action Request 00316676, and an apparent cause evaluation was
  performed.
  The inspectors reviewed selected licensee, vendor, and burial site information related to
  this issue and interviewed selected knowledgeable plant staff. The inspectors
  determined that the licensee failed to maintain the appropriate operating procedures and
  dewatering components for the resin drying and dewatering system used for the
  condensate filter demineralizer waste liners. Specifically, in 1999 and 2012, changes
                                            - 27 -


=====Description.=====
were made to the Process Control Program via modifications to the resin drying system
On July 20, 2015, the inspectors performed a review of the Columbia Generating Station seismic instrumentation and monitoring (SEIS) system. The SEIS system, described in the Final Safety Analysis Report, Section 3.7.4, "Seismic Instrumentation," consists of multiple passive and active subsystems used to record earthquake ground motion and to alert plant operators that design response spectra have been exceeded. One of those subsystems are the triaxial response-spectrum recorders used for comparison of measured and predicted earthquake responses. Final Safety Analysis Report, Section 3.7.4.4 provides guidance that if an earthquake is felt in the control room and the spectra experienced at the foundation of the reactor building exceeds the OBE acceleration levels as indicated on two or more response spectra indicating lights, the plant will be shut down pending permission to resume operations.
process. These modifications were different from the approved operations and
specifications under NRC-approved Topical Report, TP-02-P-A, Covering Nuclear
Packaging, Inc. Dewatering System, approved September 6, 1985. In 1999, the
specific change made was to open the valve to the lowest set of filter laterals in order to
allow the use of these filters throughout the dewatering process for the condensate filter
demineralizers. In 2011, following a condenser change-out, the carbon steel
components of the new condenser introduced iron oxide into the resin drying system.
This high iron oxide content coated the bottom filter laterals in the resin drying system
and caused discoloration of the resin water. In 2012, additional changes to the Process
Control Program instructed the resin drying system operators to declare the bottom filter
laterals as damaged if they saw a discoloration in the resin drying system viewing
window. These changes were not in accordance with vendor specifications.
The inspectors determined that the licensee performed an inadequate technical review
for the resin drying and dewatering system when changes were made to the Process
Control Program. Additionally, the inspectors reviewed the 10 CFR 50.59 screening,
dated July 6, 2010, and determined that the licensee performed an inadequate technical
review to assess potential adverse impacts of the condenser change-out on the plants
radioactive waste processing system. Consequently, the inspectors concluded that
between 1999 and 2013, the licensee failed to maintain the vendor procedures and
appropriate design margins for the resin drying system. This resulted in inadequate
dewatering of the resin for condensate filter demineralizers in liner 14-033-L.
Analysis. The failure to follow the Process Control Program, resulting in the inadequate
dewatering of radioactive waste liner contents, was a performance deficiency.
Inspectors determined that the performance deficiency was more than minor, because it
adversely affected the Public Radiation Safety cornerstone objective to ensure adequate
protection of public health and safety from exposure to radioactive materials released in
the public domain. Specifically, the failure to ensure that the free standing liquid in the
radioactive waste liner shipped to US Ecology did not exceed 0.5 percent of the total
waste volume subjected the disposal facility to the possibility of improper handling of the
waste. Using Inspection Manual Chapter 0609, Appendix D, Public Radiation Safety
Significance Determination Process, dated February 12, 2008, the inspectors
determined the violation was of very low safety significance (Green) because:
(1) radiation limits were not exceeded, (2) there was no breach of the package during
transit, (3) there were no Certificate of Compliance issues, and (4) the low level burial
ground nonconformance did not involve a 10 CFR 61.55 waste under classification. The
inspectors determined that the finding has a design margin cross-cutting aspect in the
area of human performance, because the licensee failed to operate and maintain the
radioactive waste dewatering system within the vendor design margins when changes
were made to the operating procedures [H.6].
Enforcement. Technical Specification 5.4.1.a, Procedures, requires, in part, that
written procedures be established, implemented, and maintained for activities described
in Regulatory Guide 1.33, Quality Assurance Program Requirements, Revision 2,
Appendix A, dated February 1978. Regulatory Guide 1.33, Section 7.b.(2) requires
procedures for the Solid Waste System - Spent Resins and Filter Sludge Handling. The
licensees Process Control Program procedure, SWP-RMP-02, The Radioactive Waste
Process Control Program, implements this requirement. Section 2.2.1.a of Procedure
SWP-RMP-02, Revision 5, states, in part, that The [resin dewatering and drying]
                                        - 28 -


The shutdown criteria in abnormal procedure "ABN-Earthquake," Revisions 0-13, reflected the shutdown criteria found in FSAR Section 3.7.4.4. The inspectors questioned the need for two or more response spectra indicating lights to indicate that operating basis earthquake acceleration levels were exceeded prior to initiating a plant shutdown. The inspectors reviewed 10 CFR Part 100, Appendix A, which states, in part, that if vibratory ground motion exceeding that of the OBE occurs, shutdown of the nuclear power plant will be required. The inspectors determined that the licensee's shutdown criteria in Final Safety Analysis Report, Section 3.7.4.4 and incorporated into abnormal procedure "ABN-Earthquake" was contrary to 10 CFR Part 100, Appendix A. Specifically, the licensee's shutdown criteria would allow for continued operations if ground motion at a single frequency exceeded the design response spectrum. The inspectors reviewed historical licensing basis for Columbia Generating Station and found that FSAR Amendment 33, in effect when the full power operating license was issued for the station, provided the following:    If the Instrumentation shows that the peak acceleration or the response spectra    experienced at the foundation of the reactor building exceeds the operating basis    earthquake acceleration levels or response spectra, the plant will be shut down   pending permission to resume operations. The inspector discovered that the licensee changed FSAR Section 3.7.4.4 under licensing document change notice LDCN 96-079, dated December 12, 1996. This LDCN's purpose was to "strike a balance between ensuring that actions are not taken on a spurious signal and taking conservative actions following an earthquake.The inspectors agreed that shutdown of the plant due to a spurious signal was not desirable but that in the case of a single, valid indication that the OBE design response spectra was exceeded, shutdown of the nuclear power plant was required. The inspectors determined that the change implemented in LDCN 96-079 resulted in a non-conservative shutdown criteria compared to the regulatory requirements in 10 CFR Part 100, Appendix A. In response to this issue, the licensee initiated corrective actions to change abnormal procedure ABN-Earthquake to provide a shutdown criteria consistent with the original licensing basis of the facility. The licensee entered this issue into their corrective action program as AR 336875.
      process is designed to reduce the free water, by disposal package volume, to less than
      0.5 percent when waste is packaged in an unstable waste form. Contrary to the
      above, on August 11, 2014, the licensees resin dewatering and drying process failed to
      reduce the free water, by disposal package volume, to less than 0.5 percent when waste
      was packaged in an unstable waste form. Specifically, condensate filter demineralizer
      resin liner 14-033-L contained approximately 0.75 percent free standing liquid when it
      was received by US Ecology for disposal. Corrective actions included retrieving the
      packages from waste shipment (#14-32), and testing each liner for free standing liquid
      content, removing additional water as necessary. Because this violation is of very low
      safety significance and has been entered into the licensees corrective action program
      as Action Request 00316676, it is being treated as a NCV, consistent with Section 2.3.2
      of the NRC Enforcement Policy. (NCV 05000397/2015003-05, Failure to Reduce the
      Free Water in a Class A Unstable Resin Disposal Package to Less than 0.5 Percent of
      Waste Volume)
4.   OTHER ACTIVITIES
      Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity, Emergency
      Preparedness, Public Radiation Safety, Occupational Radiation Safety, and
      Security
4OA1 Performance Indicator Verification (71151)
.1    Mitigating Systems Performance Index: Emergency AC Power Systems (MS06), High
      Pressure Injection Systems (MS07), Residual Heat Removal Systems (MS09),
  a. Inspection Scope
      The inspectors reviewed the licensees mitigating system performance index data for the
      period of July 2014 through June 2015 to verify the accuracy and completeness of the
      reported data. The inspectors used definitions and guidance contained in Nuclear
      Energy Institute Document 99-02, Regulatory Assessment Performance Indicator
      Guideline, Revision 7, to determine the accuracy of the reported data.
      These activities constituted verification of the mitigating system performance index for
      emergency ac power systems, high pressure injection systems, and residual heat
      removal systems as defined in Inspection Procedure 71151.
   b. Findings
      No findings were identified.
.2    Reactor Coolant System Specific Activity (BI01)
  a. Inspection Scope
      The inspectors reviewed the licensees reactor coolant system chemistry sample
      analyses for the period of July 2014 through June 2015 to verify the accuracy and
      completeness of the reported data. The inspectors observed a chemistry technician
      obtain and analyze a reactor coolant system sample on September 1, 2015. The
      inspectors used definitions and guidance contained in Nuclear Energy Institute
                                              - 29 -


=====Analysis.=====
      Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7,
The failure to establish appropriate shutdown criteria in abnormal procedures for earthquakes was a performance deficiency. The performance deficiency was more than minor because it affected the procedural adequacy attribute of the Mitigating Systems Cornerstone objective and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the performance deficiency resulted in shutdown criteria that would allow for continued operations following events where ground motion at a single frequency exceeded the design response spectra. NRC regulations require a plant shutdown since systems necessary for continued operation without undue risk to the health and safety of the public are not designed to remain functional, in all cases, following an OBE. The inspector performed the initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A, Exhibit 2, "Mitigating Systems Screening Questions."  The inspectors determined that the finding was of very low safety significance because (1) the finding was not a deficiency affecting the design or qualification of a mitigating system; (2) the finding did not represent a loss of system and/or function; (3) the finding did not represent an actual loss of function of a single train for greater than its technical specification allowed outage time; and (4) the finding does not represent an actual loss of function of one or more non-technical specification trains of equipment designated as high safety-significant in accordance with the licensee's maintenance rule program for greater than 24 hours.
      to determine the accuracy of the reported data.
      These activities constituted verification of the reactor coolant system specific activity
      performance indicator, as defined in Inspection Procedure 71151.
  b.  Findings
      No findings were identified.
4OA2 Problem Identification and Resolution (71152)
.1    Routine Review
    a. Inspection Scope
      Throughout the inspection period, the inspectors performed daily reviews of items
      entered into the licensees corrective action program and periodically attended the
      licensees condition report screening meetings. The inspectors verified that licensee
      personnel were identifying problems at an appropriate threshold and entering these
      problems into the corrective action program for resolution. The inspectors verified that
      the licensee developed and implemented corrective actions commensurate with the
      significance of the problems identified. The inspectors also reviewed the licensees
      problem identification and resolution activities during the performance of the other
      inspection activities documented in this report.
    b. Findings
      No findings were identified.
4OA3 Follow-up of Events and Notices of Enforcement Discretion (71153)
.1    (Closed) Licensee Event Report 05000397/2015-002-00, Inadequately Fused Non-
      Class 1E Circuit on Division 1 120/240 VAC Bus
      On April 29, 2015, the licensee determined that Division 1 120/240 VAC vital
      instrumentation bus was inadequately protected for all conditions. Specifically, the Class
      1E electrical panel E-PP-7AA did not have adequate electrical separation for scenarios
      involving a loss of offsite power coincident with a short circuit in a Non-Class 1E cooling
      fan. This issue was dispositioned as a licensee identified violation in Section 4OA7 of
      NRC Integrated Inspection Report 05000397/2015002, dated August 7, 2015
      (ML15219A143). No additional performance deficiencies were identified. This licensee
      event report is closed.
.2     (Closed) Licensee Event Report 05000397/2015-003-00, Implementation of
      Enforcement Guidance Memorandum (EGM) 11-003, Revision 2
      During Refueling Outage 22 in May - June 2015, Columbia Generating Station
      implemented the guidance of Enforcement Guidance Memorandum (EGM) 11-003,
      Revision 2, Dispositioning Boiling Water Reactor Licensee Noncompliance with
      Technical Specification Containment Requirements during Operations with a Potential
      for Draining the Reactor Vessel, dated December 13, 2013. Consistent with
                                                - 30 -


Additionally, the finding did not involve the loss or degradation of equipment or function specifically designed to mitigate a seismic, flooding, or severe weather initiating event.
EGM 11-003, Revision 2, secondary containment operability was not maintained during
operations with a potential for draining the reactor vessel activities, and required
action C.2 of Technical Specification 3.6.4.1 was not completed.
The inspectors reviewed this licensee event report for potential performance deficiencies
and violations of regulatory requirements. The inspectors reviewed the stations
implementation of the EGM 11-003, Revision 2, during operations with a potential for
draining the reactor vessel. Specific observations included:
1.    The inspectors observed that the operations logged all potential for draining the
      reactor vessel activities in the control room narrative logs, and that the log entry
      appropriately recorded the standby source of makeup designated for the evolutions.
2.    The inspectors noted that the licensee maintained reactor vessel water level at least
      greater than 21 feet above the top of the reactor pressure vessel flange as required
      by Technical Specification 3.9.6. The inspectors also verified that at least one
      safety-related pump was the standby source of makeup designed in the control
      room narrative logs for the evolutions. The inspectors confirmed that the worst case
      estimated time to drain the reactor cavity to the reactor pressure vessel flange was
      greater than 24 hours.
3.    The inspectors verified that the operations with a potential for draining the reactor
      vessels were not conducted in Mode 4 and that the licensee did not move irradiated
      fuel during the operations with a potential for draining the reactor vessels. The
      inspectors verified that two independent means of measuring reactor pressure
      vessel water level were available for identifying the onset of loss of inventory
      events.
Technical Specification 3.6.4.1, Secondary Containment requires, in part, that
secondary containment shall be operable during operations with a potential for draining
the reactor vessel. Technical Specification 3.6.4.1, Condition C, requires the licensee to
initiate actions to suspend operations with a potential for draining the reactor vessel
immediately when secondary containment is inoperable. Contrary to the above, from
May 13 - June 13, 2015, Columbia Generating Station performed a total of five
operations with a potential for draining the reactor vessel activities while in Mode 5
without an operable secondary containment. These conditions were reported as
conditions prohibited by Technical Specifications. The licensee entered this issue into
its corrective action program as Action Request 329328.
Since this violation occurred during the discretion period described in EGM 11-003,
Revision 2, the NRC is exercising enforcement discretion in accordance with Section
3.5, Violations Involving Special Circumstances, of the NRC Enforcement Policy, and,
therefore, will not issue enforcement action for this violation. In accordance with
EGM 11-003, Revision 2, each licensee that receives discretion must submit a license
amendment request (LAR) to resolve the issue for its plant which the NRC staff LAR
acceptance review finds acceptable in accordance with LIC-109, Acceptance Review
Procedures. The generic solution will be a generic change to the Standard Technical
Specifications, and the NRC will publish a notice of availability (NOA) for the TS solution
in the Federal Register. Each licensee that receives discretion must submit its
amendment request within 12 months of the NRC staffs issuance of the NOA.
                                          - 31 -


The finding does not have a cross-cutting aspect since the procedure error is associated with a 1996 change to the licensing basis and therefore not reflective of current licensee performance.  
      Licensees may submit LARs to adopt the NRC-approved approach or to propose an
      alternative approach for their plants.
      This licensee event report is closed.
.3    (Closed) Licensee Event Report 05000397/2015-004-00, Unplanned Loss of 4.16KV
      Bus 7 Switchgear Revision 0
      On May 22, 2015, the licensee momentarily lost the division 1 vital bus, SM-7, due to a
      human performance error during maintenance. Specifically, a licensee electrician
      connected a multi-meter test lead to the wrong port on the instrument which caused an
      electrical short on SM-7. The SM-7 bus automatically divorced from the startup
      transformer due to a sensed phase-to-phase short, the short was isolated by a blown
      fuse, and SM-7 was rapidly repowered by the backup transformer via automatic transfer.
      The division 1 emergency diesel generator also auto-started from the loss of SM-7 and
      was secured. At the time of this transient, the plant was in a refueling outage in Mode 5
      and crediting division 2 components for safety functions. The inspectors reviewed the
      licensee event report associated with this event and determined that the report
      adequately documented the summary of the event including the cause of the event and
      potential safety consequences. Required components for electrical power, inventory
      control, and decay heat removal were available and not challenged during the transient.
      Since this human performance error occurred while the plant was shutdown with division
      1 components inoperable for testing, the inspectors did not identify any more than minor
      performance deficiencies. This licensee event report is closed.
These activities constitute completion of three event follow-up samples, as defined in Inspection
Procedure 71153.
4OA6 Meetings, Including Exit
Exit Meeting Summary
On September 24, 2015, the inspectors presented the radiation safety inspection results to
Mr. W.G. Hettel, Chief Operating Officer and Chief Nuclear Officer, and other members of the
licensee staff. The inspection results were re-exited telephonically on October 7, 2015, to
update the licensee on enforcement specifics of the non-cited violation. The licensee
acknowledged the issues presented. The licensee confirmed that any proprietary information
reviewed by the inspectors had been returned or destroyed.
On October 1, 2015, the inspectors presented the inspection results to Mr. W.G. Hettel, Chief
Operating Officer and Chief Nuclear Officer, and other members of the licensee staff. The
licensee acknowledged the issues presented. The licensee confirmed that any proprietary
information reviewed by the inspectors had been returned or destroyed.
                                              - 32 -


=====Enforcement.=====
                              SUPPLEMENTAL INFORMATION
Technical Specification 5.4.1.a, "Procedures," requires, in part, that written procedures be established, implemented, and maintained as recommended in Regulatory Guide 1.33, Revision 2, Appendix A, dated February 1978. Paragraph 6.w. of Regulatory Guide 1.33, Appendix A, requires specific procedures for acts of Nature (e.g., tornado, flood, dam failure, earthquakes). Licensee Procedure ABN-Earthquake, "Earthquake", Revision 0-13, is a procedure, required by Paragraph 6.w. of Regulatory Guide 1.33, Appendix A for earthquakes. Contrary to the above, from August 8, 2005 to the present, the licensee failed to maintain an adequate procedure as recommended in Regulatory Guide 1.33, Revision 2, Appendix A, Paragraph 6.w. Specifically, the shutdown criteria specified in Step 4.4 of procedure ABN-Earthquake, Revisions 0-13 was non-conservative relative to the shutdown criteria in 10 CFR 100, Appendix A because it would allow for continued operations if ground motion at a single frequency exceeded the design response spectrum. The licensee initiated corrective actions to change abnormal procedure ABN-Earthquake to provide a shutdown criteria consistent with the original licensing basis of the facility. Because this finding is of very low safety significance and entered into the licensee's corrective action program as Action Request 336875, the violation is being treated as a non-cited violation consistent with Section 2.3.2.a of the NRC Enforcement Policy. (NCV 05000397/2015003-02, Non-Conservative Shutdown Criteria in Earthquake Abnormal Procedure)
                                  KEY POINTS OF CONTACT
Licensee Personnel
S. Abney, Assistant Manager, Operations
P. Allen, System Engineer, System Engineering
D. Brown, Manager, System Engineering
S. Clizbe, Manager, Emergency Preparedness
M. Davis, Manager, Chemistry/Radiation Protection
E. Dumlao, Senior Engineer
D. Gregoire, Manager, Regulatory Affairs
J. Hauger, System Engineering
G. Hettel, Chief Nuclear Officer and Chief Operating Officer
G. Higgs, Manager, Maintenance
M. Hummer, Licensing Engineer
A. Javorik, Vice President, Engineering
M. Laudisio, Manager, Radiation Protection
C. Moon, Manager, Quality
R. Prewett, Plant General Manager
G. Pierce, Manager, Training
A. Rice, Manager, Chemistry
B. Schuetz, Vice President, Operations
D. Stevens, Operations Manager
G. Strong, Electrical Design Supervisor
D. Suarez, Regulatory Compliance Engineer
J. Tansy, Reactor Engineering Supervisor
J. Trautvetter, Compliance Supervisor, Regulatory Affairs
L. Williams, Licensing Supervisor
D. Wolfgramm, Compliance Engineering
NRC Personnel
G. Replogle, Senior Reactor Analyst
                    LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened and Closed
05000397/2015003-01 FIN          Failure to Maintain Seismic Instrumentation Functional to Alert
                                  Plant Operators of Ground Motions Exceeding the Operating
                                  Basis Earthquake (Section 1R04)
  05000397/2015003-02 NCV          Non-Conservative Shutdown Criteria in Earthquake Abnormal
                                  Procedure (Section 1R04)
05000397/2015003-03 NCV          Failure to Provide Design Control Measures for Control Room
                                  Emergency Chillers (Section 1R04)
05000397/2015003-04 NCV          Failure to Implement Procedures to Ensure Availability of Safe
                                  Shutdown Personnel (Section 1R11)
                                                A-1                                  Attachment


===.3 Failure to Provide Design Control Measures for Control Room Emergency Chillers
Opened and Closed
05000397/2015003-05 NCV        Failure to Reduce the Free Water in a Class A Unstable Resin
                                Disposal Package to Less than 0.5 Percent of Waste Volume
                                (Section 2RS8)
Closed
05000397/2015-002-      LER    Inadequately Fused Non- Class 1E Circuit on Division 1 120/240
00                              VAC Bus (Section 4OA3)
05000397/2015-003-      LER    Implementation of Enforcement Guidance Memorandum (EGM)
00                              11-003, Revision 2 (Section 4OA3)
05000397/2015-004-      LER    Unplanned Loss of 4.16KV Bus 7 Switchgear (Section 4OA3)
00
                            LIST OF DOCUMENTS REVIEWED
Section 1R01: Adverse Weather Protection
Procedures
Number            Title                                                      Revision
ABN-WIND          Tornado/High Winds                                          27
SOP-              Hot Weather Operations                                      6
HOTWEATHER-
OPS
SOP-              Warm Weather Operations                                    11
WARMWEATHER-
OPS
SOP-SW-LU          Standby Service Water System Valve & Breaker Lineup        6
Action Requests (ARs)
293549            293878              299646            300923            300999
304714            308167              312775            333418            334819
Section 1R04: Equipment Alignment
Procedures
Number            Title                                                        Revision
1.3.66            Operability and Functionality Evaluation                    32
5.0.12            Station Blackout and Extended Loss of AC Power Basis        0
                                            A-2


=====Introduction.=====
Procedures
===
Number        Title                                                    Revision
The inspectors identified a Green, non-cited violation of 10 CFR 50, Appendix B, Criterion III, "Design Control," for the licensee's failure to verify the adequacy of the design of the control room HVAC system. Specifically, the licensee failed to demonstrate the ability of control room HVAC design to maintain the temperatures in the main control room below habitability and environmental qualification limits, for the duration of all accident scenarios.
ABN-Earthquake Earthquake                                              13
ABN-HVAC      HVAC Trouble                                            12
ISP-SEIS-S402  Triaxial Seismic Switch Model SP-1/TS-3 - CFT            3
ISP-SEIS-S403  Seismic System Reactor Building Foundation Triaxial      1
              Response - Spectrum Recorders - CFT
ISP-SEIS-X304  Seismic System Reactor Building Foundation Triaxial      2
              Response - Spectrum Recorders - CC
OI-69          Time Critical Operator Actions                          4
OSP-CCH/IST-   Control Room Emergency Chiller System B Operability      35
M702
SOP-HVAC/CR-  Control, Cable, and Critical Switchgear Rooms HVAC      1
LU            Lineup
SOP-HVAC/CR-  Control, Cable, and Critical Switchgear Rooms HVAC Start 10
START
SOP-HVAC/CR-  Control, Cable, and Critical Switchgear Rooms HVAC       19
OPS            Operation
SOP-RCC-LU    RCC System Valve and Breaker Line-Up                    1
SOP-SW-LU      Standby Service Water System Valve & Breaker Lineup      6
TSP-DG2/LOCA- Standby Diesel Generator DG2 LOCA Test                    26
B501
SOP-SLC-LU    SLC System Valve and Breaker Lineup                      0
SOP-SGT-LU    Standby Gas Treatment System Lineup                      0
Calculations
Number        Title                                                    Revision
CE-02-90-21    Calculation for Set Points Response Spectrum Indicating  0
              Lights
ME-02-92-43    Room Temperature Calculation for DG Building, Reactor    10
              Building, Radwaste Building and Service Water
                                          A-3


=====Description.=====
Drawings
On July 2, 2015, the inspectors performed a review of the control room HVAC system with a focus on the control room emergency chillers. The Final Safety Analysis Report, Section 9.4.1.1, "Design Basis" states, in part, that the design of the control room HVAC system is such that in an emergency condition, "the control room temperature will be maintained within the habitability limit (85°F) by the control room chilled water. Service water can maintain the control room temperature limit of 85°F during colder weather. Service water will maintain the control room within the environmental qualification temperature limit for control room equipment (104°F)."
Number            Title                                                      Revision
EWO-101E-008      Electrical Wiring Diagram Heat Trace SLC Pump Suction      2
                  Piping
M522              Flow Diagram Standby Liquid Control System                  39
Miscellaneous
Number            Title                                                      Revision/
                                                                              Date
C92-0020          Component Classification Evaluation Record                  0
E555-HT-HTP-      Fuse Detail Report                                         December
8B/A                                                                          15, 2008
ISCR 979          Instrument Setpoint Change Request SEIS-RSRT-1/1, 1/2,     April 30,
                  1/3                                                        1990
LDCN-11-001,     Columbia Generating Station Final Safety Analysis Report    61
11-013
Work Orders
02041736          02075766
Action Requests (ARs)
046497            298184            302392          304002            304040
307688            307703            308892          311384            313567
313883            313960            318811          319542            323891
325520            330741            333996
Section 1R05: Fire Protection
Drawings
Number            Title                                                      Revision
E503-1            Motor Control Center General Notes, MCC and Starter        86
                  Index
E535-49A          Connection Wiring Diagram Motor Control Center E-MC-7F      23
E535-49B          Connection Wiring Diagram Motor Control Center E-MC-7F      23
E753              Radwaste and Control Building Elevation 525-0 Power      41
                  Conduit and Tray Plans
PFSS-1            Appendix R Post Fire Safe Shutdown (PFSS) Division 1        10
                  Boundaries One Line Diagram
                                            A-4


The inspectors noted that the vendor manuals for the control room emergency chillers described an automatic trip feature that required local resetting. Specifically, the manufacturer states the following in the "Normal Operating Sequence" section of the manual:  Shutdown where the unit cannot automatically restart-Shutdown on a power failure produces the same results as for a safety shutdown except relay 14R is de-energized-It is necessary to depress the "STOP-RESET" button to energize relay 14R when power is restored after interruption. The inspectors reviewed relevant electrical diagrams and confirmed that operation of the control room emergency chillers required a local reset of relay 14R following a loss of power. The alignment of the control room HVAC system is such that the division 1 air handling unit, WMA-AH-51A, is aligned to standby service water and the division 2 air handling unit, WMA-AH-51B, is aligned to chill water. Because of the design feature involving the relay 14R and the alignment of the air-handling units, the inspectors identified that: 1) Following any event that resulted in a loss of offsite power with a single-failure of the Division 1 emergency diesel generator, the control room would not receive cooling via WMA-AH-51B, the only operable air handling unit, until the local chiller reset pushbutton was depressed. The control room would remain without cooling until this manual reset was accomplished since relay 14R would be de-energized. 2) Following certain events involving a loss of offsite power with a single-failure of the Division 2 emergency diesel generator, the control room would experience reduced, and in some instances, no external cooling. In particular, when ambient conditions would not allow service water alone to maintain the control room below the 85°F habitability limit, operators would be prompted to secure standby service water cooling to WMA-AH-51A and realign cooling from the control room emergency chillers system. The inspectors noted that during the shift between standby service water and control room emergency chill water, there would be a brief period when the control room would receive no external cooling.
Procedures
Number            Title                                              Revision
1.3.10A            Control of Ignition Sources                        15
FPP-1.6            Combustible Loading Calculation Control            2
FPP-2.2.12        Annual Fire Door Operability Test                  4
FPP-2.2.7          Fire Protection Water System Inspections            5
Fire Protection Pre-Plans
Number            Title                                              Revision
PFP-RB-422        Reactor 422                                        5
PFP-RW-467        Radwaste 467                                        5
PFP-RW-484-        Radwaste 484-487                                    5
487
PFP-RW-525        Radwaste 525                                        5
Section 1R11: Licensed Operator Requalification Program and Licensed Operator
Performance
Procedures
Number            Title                                              Revision
OI-9              Operations Standards and Expectation                62
OI-45              Color Banding of Control Room Instrumentation      6
OI-53              Offsite Power                                      14
1.3.67            Operational Decision Making Process                14
1.3.84            Reactivity Management Control                      2
13.1.1            Classifying the Emergency                          47
5.1.1              RPV Control                                        20
5.2.1              Primary Containment Control                        22
5.3.1              Secondary Containment Control                      19
Action Requests (ARs)
332747              333692
                                              A-5


For each of the above scenarios, temperatures in the control room could exceed 85°F or 104°F due to times necessary for system realignment or local resetting manual actions. At the time of the inspection, procedure OI-69, "Time Critical Operator Actions," Revision 5, did not identify any required manual actions associated with local reset or realignment of the control room HVAC system. This procedure defines a time critical action as a manual action, or series of actions that must be completed within a specified time to meet the plant-licensing basis.
Section 1R12: Maintenance Effectiveness
Procedures
Number            Title                                                          Revision
1.5.11            Maintenance Rule Program                                        13
MOT-CHILL-1-1    Chiller Maintenance Scope and Basis Document                    7
MOT-PRV-1-1      Pressure Relief Valve Maintenance Scope and Basis              6
                  Document
Miscellaneous
Number            Title                                                          Revision/
                                                                                  Date
                  Maintenance Rule Evaluations CCH System                        June 30,
                                                                                  2015
                  CCH System Performance Improvement Plan                        4
51182            Reactor Operating Events-Event Notification Report              June 25,
                                                                                  2015
CVI 531-00,1,1    Differential Pressure Indicating Switches, Unit, Calibration    3
                  and Parts List
GEP-6013          Preparation and Installation of the ULTRX Rupture Disc          2008
                  Assembly
IMDS              Instrument Master Data Sheets DMA-TIS-32A/B                    7
Action Requests (ARs)
020602            020829            122680              132812              135119
195492            195876            226018              284341              298184
304040            307688            307703              307863              307897
308892            308950            311597              313567              313883
318811            319542            320707              332078              332096
332617            332889            334369              334438
Section 1R13: Maintenance Risk Assessments and Emergent Work Control
Procedures
Number            Title                                                          Revision
ABN-CR-EVAC      Control Room Evacuation and Remote Cooldown                    33
                                              A-6


The inspectors reviewed calculation ME-02-92-43, "Room Temperature Calculation for DG Building, Reactor Building, Radwaste Building, and Service Water," Revision 10, and noted that this calculation covers the control room air-handling units but only considers steady-state conditions for heat exchanger performance. There is no discussion in ME-02-92-43 for transient scenarios where the control room would receive no external cooling, such as those involving local resetting of control room emergency chillers or during required shifts between standby service water and control room emergency chill water.
Procedures
Number            Title                                                    Revision
OI-14            Columbia Generating Station Operational Challenges and    13
                  Risk Program
OI-69            Time Critical Operator Actions                            4
1.3.1            Operating Policies, Programs, and Practices              119
1.3.76            Integrated Risk Management                                44
Action Requests (ARs)
302053            306204            309005            311964          314936
314983            319661            321848            322776          323263
323364            329491            333025            333041          333041
333622            333731            334749
Work Orders (WOs)
02082634
Miscellaneous
Number            Title                                                    Date
                  Protected Equipment Tracking Sheet                        August 20,
                                                                            2015
                  Protected Equipment Tracking Sheet                        September
                                                                            13, 2015
                  Protected Equipment Tracking Sheet                        September
                                                                            26, 2015
Section 1R15: Operability Determinations and Functionality Assessments
Procedures
Number            Title                                                    Revision
1.3.66            Operability and Functionality Evaluation                  32
4.601.A2          601.A2 Annunciator Panel Alarms                          27
5.0.12            Station Blackout and Extended Loss of AC Power Basis      0
ABN-HVAC          HVAC Trouble                                              12
OI-69            Time Critical Operator Actions                            4
OI-9              Operations Standards and Expectation                      62
                                            A-7


The inspectors requested a design analysis that demonstrated the ability of control room HVAC design to maintain the temperatures in the main control room below habitability and environmental qualification limits during these transient situations. The licensee was unable to locate a design verification that demonstrated the ability of the control room HVAC system during transient scenarios following a loss of power and could not determine the peak control room temperature nor the impact to habitability or equipment qualification in these scenarios. The inspectors reviewed previous inspection reports for the station and noted one related finding: NRC-identified NCV 05000397/2013002-04, "Failure to Obtain NRC Approval for Changes to Control Room HVAC Requirements."  This NCV identified an incorrect value for the control room temperature limit and resulted in the current value as found in the licensee's design basis. The inspectors determined that the extent of condition review from this 2013 finding did not adequately consider the effects of lowering a design habitability temperature for the control room from 104°F to 85°F, necessitating the need for the control room emergency chillers. Specifically, when evaluating the correct habitability limit of 85°F, the licensee only considered the steady state cooling needs of the control room and not the transient effects experienced because of the chiller design. In response to the NRC's conclusions, the licensee initiated Action Request 332565 to document the concern, issued night order 1662 to communicate the issue, aligned both control room air handling units to their respective chillers, created a quick card procedure to perform the chiller reset actions, and validated the quick card actions could be accomplished within 10 minutes. Additionally, the licensee determined that operators could restore the chillers during accident conditions within 90 minutes to prevent temperatures from exceeding equipment operability limits.
Procedures
Number            Title                                                        Revision
OSP-CCH/IST-      Control Room Emergency Chiller System B Operability          35
M702
SOP-              Hot Weather Operations                                      6
HOTWEATHER-
OPS
SOP-HVAC/CR-      Control, Cable, and Critical Switchgear Rooms HVAC          1
LU                Lineup
SOP-HVAC/CR-      Control, Cable, and Critical Switchgear Rooms HVAC          19
OPS              Operation
SOP-HVAC/CR-     Control, Cable, and Critical Switchgear Rooms HVAC Start    10
START
Calculations
Number            Title                                                        Revision
ME-02-89-49      Calculation for Main Steam Isolation Valve Actuator Force    0
                  Balance
NE-02-85-19      Calculation Post-Fire Safe Shutdown (PFSS) Analysis          7
Miscellaneous
Number            Title                                                        Revision/
                                                                              Date
531-00,1,1        Barton Differential Pressure Indicating Switches, Unit,     3
                  Calibration and Parts List
IMDS              Instrument Master Data Sheets MS-LIS-24A/C                  16
NO 1419          Night Order                                                  October 27,
                                                                              2012
NO 1653          Night Order                                                  July 8, 2015
TM-2150          Mission Time of Emergency Safety Features                    0
Action Requests (ARs)
273129            332823              332326            332330            332078
032562            332096              021535            028598            333334
334459
                                            A-8


=====Analysis.=====
Section 1R18: Plant Modifications
The failure to provide design control measures to verify the adequacy of the design of the control room emergency chillers was a performance deficiency. The performance deficiency was more than minor because it adversely affected the design control attribute of the Mitigating Systems Cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the licensee failed to demonstrate the ability of control room HVAC design to maintain the temperatures in the main control room below habitability and environmental qualification limits, for the duration of all accident scenarios. Using NRC Inspection Manual Chapter 0609, Appendix A, Exhibit 2, "Mitigating Systems Screening Questions,"  the inspectors determined the finding was of very low safety significance because (1) the finding was not a deficiency affecting the design or qualification of a mitigating system; (2) the finding did not represent a loss of system and/or function; (3) the finding did not represent an actual loss of function of a single train for greater than its technical specification allowed outage time; and (4) the finding does not represent an actual loss of function of one or more non-technical specification trains of equipment designated as high safety-significant in accordance with the licensee's maintenance rule program for greater than 24 hours. This finding had a cross-cutting aspect in the area of problem identification and resolution, evaluation, in that the licensee did not thoroughly evaluate issues to ensure that resolutions address causes and extent of conditions commensurate with their safety significance. Specifically, the licensee did not thoroughly evaluate the extent of condition from NRC-identified NCV 05000397/2013002-04, "Failure to Obtain NRC Approval for Changes to Control Room HVAC Requirements," for the effect of this change on other station calculations [P.2].
Miscellaneous
Number            Title                                                  Revision
EC14111          RFW-V-102A Push Rod Assembly                          0
Section 1R19: Post-Maintenance Testing
Procedures
Number            Title                                                  Revision
OSP-CCH/IST-      Control Room Emergency Chiller System A Operability    38
M701
OSP-RCIC/IST-    RCIC Operability Test                                  56
Q701
OSP-ELEC-S702 Diesel Generator 2 Semi-Annual Operability Test            55
SOP-DG2-          Emergency Diesel Generator (DIV 2) Start              26
START
Work Orders
02059527          02066727          02069655        02066726        02070167
02075767
Miscellaneous
Number            Title                                                  Revision
IMDS              Instrument Master Data Sheets DMA-TIS-32A/B            7
Action Requests (ARs)
298184            314814            319542          320386          321294
323891            324941            325599          331175          332159
335270            335441            336314          336431          336485
Section 1R22: Surveillance Testing
Procedures
Number            Title                                                  Revision
OSP-INST-H101 Shift and Daily Instrument Checks Modes 1, 2, 3            85
OSP-DO/IST-      DO-P-1A Operability                                    14
Q701
                                          A-9


=====Enforcement.=====
Procedures
Title 10 CFR Part 50, Appendix B, Criterion III, "Design Control," requires, in part, that design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. Final Safety Analysis Report, Section 9.4.1.1, "Design Basis," established the design of the control room HVAC system and specified, in part, that during emergency conditions, the control room temperature will be maintained within the habitability limit (85°F) by the control room chilled water. Service water can maintain the control room temperature limit of 85°F during colder weather. Service water will maintain the control room within the environmental qualification temperature limit for control room equipment (104°F). Contrary to the above, prior to July 2, 2015, the licensee failed to implement design control measures for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. Specifically, the licensee failed to verify the adequacy of the design of the control room emergency chillers involving loss of offsite power scenarios that result in transient losses of control room cooling such that the design basis, established in Final Safety Analysis Report, Section 9.4.1.1 was ensured. The licensee initiated Action Request 332565 to document the concern, issued night order 1662 to communicate the issue, aligned both control room air handling units to their respective chillers, created a quick card procedure to perform the chiller reset actions, and validated the quick card actions could be accomplished within 10 minutes. Because the finding is of very low safety significance (Green) and has been entered into the licensee's corrective action program, this violation is being treated as a non-cited violation, consistent with Section 2.3.2.a of the NRC Enforcement Policy. (NCV 05000397/2015003-03, Failure to Provide Design Control Measures for Control Room Emergency Chillers)
Number            Title                                                     Revision
{{a|1R05}}
OSP-LPCS/IST-    LPCS System Operability Test                              39
==1R05 Fire Protection==
Q702
{{IP sample|IP=IP 71111.05}}
Action Requests (ARs)
===.1 Quarterly Inspection===
316238            326038              332078              332833          335006
335144
Section 1EP6: Drill Evaluation
Procedures
Number            Title                                                      Revision
5.1.1             RPV Control                                                20
5.2.1            Primary Containment Control                                22
5.3.1             Secondary Containment Control                              19
13.1.1            Classifying the Emergency                                  47
Action Requests (ARs)
332756            333042
Miscellaneous
Number            Title                                                      Date
                  ERO Team A Drill Guide                                    July 7, 2015
                  ERO Team A Drill Report - After Action Improvement Plan    July 30, 2015
Section 2RS5: Radiation Monitoring Instrumentation
Procedures
Number            Title                                                Revision
CI-13.10          Canberra iSolo Alpha/Beta Counting System            04
CI-13.12          Global Value Gamma Ray Analyzer System                03
CI-13.6          ORTEC Gamma Ray Analyzer System                      03
CI-13.9          Tri-Carb Liquid Scintillation Counting System        03
HPI-12.100        Calibration of the SAM12 Small Article Monitor        03
HPI-5.6          FastScan Whole Body Count System                      07
                                              A-10


====a. Inspection Scope====
Procedures
The inspectors evaluated the licensee's fire protection program for operational status and material condition. The inspectors focused their inspection on four plant areas important to safety:  July 1, 2015, Fire Areas RC-4, 5, 6, 7, 8, and 9 and RC-14, radioactive waste building 467' elevation vital island July 14, 2015, Fire Area R-8, low pressure core spray pump room  July 15, 2015, Fire Area RC-11, 12 and 13, radioactive waste building 525' elevation  August 13, 2015, Fire Area R-5, residual heat removal train A pump room  For each area, the inspectors evaluated the fire plan against defined hazards and defense-in-depth features in the licensee's fire protection program. The inspectors evaluated control of transient combustibles and ignition sources, fire detection and suppression systems, manual firefighting equipment and capability, passive fire protection features, and compensatory measures for degraded conditions. These activities constituted four quarterly inspection samples, as defined in Inspection Procedure 71111.05.
Number              Title                                              Revision
HPI-7.5            Eberline Model RO-2 and RO-2A Calibration          10
PPM 16.1.2          Stack Monitor Low Range Detector                    14
PPM 16.2.1         TEA Low Range Noble Gas Monitor Channel 1          10
PPM 16.4.4          OFFGAS Post Treatment Radiation Monitor CH A        16
PPM 16.7.2          FDR-RIS-606, Liquid Radwaste Effluent Monitor      08
PPM 16.7.4          Liquid Radwaste Effluent Line Flow Rate            07
Action Requests (ARs)
00307356            00308226          00308390          00308468        00309073
00309410            00310348          00312551          00319190        00319873
00325863            00326107          00334647
Audits and Self-Assessments
Number              Title                                              Date
301869              Snapshot Self-Assessment Report - Radiation        July 25, 2015
                    Instruments
AU-CH-14            Quality Services Audit Report - Chemistry/REMP/Non- October 23, 2014
                    Rad & Rad Effluents/ODCM Program
Installed Radiation Instrument Calibration Records
WO Number          Title                                              Date
01167050            TEA Low Range Noble Gas Monitor Channel 1          April 3, 2014
02043785            OFFGAS Post Treatment Radiation Monitor CH A        May 23, 2015
02047822            CC/RC Secondary Containment Isolation Reactor      March 26, 2014
                    Building Vent Radiation Channel D
02051142            Liquid Radwaste Flow Instrument                    June 13, 2014
02051815            MSL High Radiation Channel A                        June 27, 2014
02053216            Stack Monitor Low Range Noble Gas Monitor          July 17, 2014
02062579            Liquid Radwaste Effluent Radiation Monitor          March 3, 2015
02066745            Plant Blowdown Discharge Line Flow Rate            July 3, 2015
                                            A-11


====b. Findings====
Portable Radiation Instrument Calibration Records
No findings were identified.
Number            Title                                              Date
{{a|1R06}}
3891              Victoreen Model 570 R-Chamber Set                  January 20, 2014
==1R06 Flood Protection Measures==
F112              Ludlum Model 177 Frisker                          April 1, 2015
{{IP sample|IP=IP 71111.06}}
NO17              Eberline ASP-1 w/ NRD Neutron Detector            April 8, 2015
RO196              Eberline RO-2                                      April 24, 2015
RO237              Ludlum Model 14C                                  July 23, 2015
RS26              Thermo/Bicron Micro-Rem Meter                      April 30, 2015
RV07              Victoreen 451B                                    April 2, 2015
T070              Teletector Model 6112M                            May 20, 2015
Stationary Radiation Instrument Calibration Records
Number            Title                                              Date
36797              iSolo Calibration                                  September 23,
                                                                      2015
HP-EQ-42712        SAM12 Small Article Monitor                        September 23,
                                                                      2015
HP-EQ-42734        GEM-5                                              July 19, 2015
HP-EQ-42747        GEM-5                                              September 3,
                                                                      2015
HP-EQ-42783        ARGOS-5 A/B                                        July 14, 2015
HP-EQ-42813        SAM12 Small Article Monitor                        April 20, 2015
HP-EQ-C015122 IPM-8                                                  May 8, 2015
Ortec #5          Efficiency Verification Worksheet                  September 23,
                  Calibration of 47 mm Filter Shelf 1                2015
Ortec #5          Efficiency Verification Worksheet                  September 23,
                  Calibration of 250 ml Polybottle - Shelf 1        2015
WBC#2              FastScan Calibration                              July 29, 2015
WO 02062192        Annual Tritium Quench Curve Calibration            June 10, 2015
Miscellaneous Documents
Number            Title                                              Revision/Date
                  Offsite Dose Calculation Manual                    53
                  Calibration Lab Irradiator Periodic Dose Rate Decay July 7, 2015
                  Adjustment
                                              A-12


====a. Inspection Scope====
Miscellaneous Documents
On July 21, 2015, the inspectors completed an inspection of underground bunkers susceptible to flooding. The inspectors selected one underground vault, electrical manhole E-MH-08, that contained risk-significant or multiple-train cables whose failure could disable risk-significant equipment. The inspectors observed the material condition of the cables and splices contained in the bunkers vaults and looked for evidence of cable degradation due to water intrusion. The inspectors verified that the cables and vaults met design requirements. These activities constitute completion of one bunker/manhole sample, as defined in Inspection Procedure 71111.06.
Number            Title                                                    Revision/Date
15-02            Calculation of the Activity for K40 Daily Check Source    June 23, 2015
                  Used with SAM 9/11/12 and BM 285 Monitors
                  (Revises Calculation No. 04-1)
Section 2RS6: Radioactive Gaseous and Liquid Effluent Treatment
Procedures
Number            Title                                                    Revision
1.11.12            Removal of Liquids from RCA                              11
11.2.15.7          Release of Material from Radiologically Controlled      21
                  Area
TSP-BOP/ISOL-     Balance of Plant Isolation Logic System Functional      07
B501              Test
TSP-SGT-B501      Standby Gas Treatment System Functional Test            08
10.2.8            Carbon Filter In Place Testing                          08
10.2.82            HEPA Filter In Place Testing                            07
12.4.21            The Sampling and Determination of Tritium                25
12.5.8            Gaseous Effluent Discharge Sampling                      23
12.5.28            Sampling and Analysis for Unrestricted Release          12
16.11.1            Monthly Grab Gas Samples                                10
16.11.6            Weekly Iodine, Particulate, and Tritium Analysis Results 15
MSP-SGT-B102      Standby Gas Treatment System Unit B HEPA Filter Test 04
MSP-SGT-B103      Standby Gas Treatment Filtration System - Unit A        10
                  Carbon Adsorber Test
MSP-SGT-B104      Standby Gas Treatment Filtration System - Unit B        08
                  Carbon Adsorber Test
9.3.32            Fuel Integrity Monitoring                                12
Action Requests (ARs)
00297561          00301591            00310348            00315360        00315492
00320966          00321016            00321365            00323071        00323632
00326490          00331287            00331587            00331588        00331589
00334641          00291084
                                              A-13


====b. Findings====
Audits, Self-Assessments, and Surveillances
No findings were identified.
Number          Title                                                  Date
{{a|1R11}}
AU-CH-14        Chemistry-REMP-Non-Rad and Rad Effluents-ODCM          October 16, 2014
==1R11 Licensed Operator Requalification Program and Licensed Operator Performance==
                Program Audit
{{IP sample|IP=IP 71111.11}}
AU-RP-RW-13 Radiation Protection and Process Control                    November 16, 2013
===.1 Review of Licensed Operator Requalification===
23748A          NUPIC Audit NCS Corporation                            September 3, 2014
23748B          NUPIC Audit AEP Audit No. PA-14-12                      November 25, 2014
Air Cleaning System Surveillance Test Records
Number          Title                                                    Date
WO 2004423      Standby Gas Treatment Filtration System - Unit A Carbon  July 15, 2013
                Adsorber Test
WO 2046928      Standby Gas Treatment System Unit B HEPA Filter Test    April 28, 2014
WO 2046928      Standby Gas Treatment Filtration System - Unit B Carbon April 28, 2014
                Adsorber Test
Title                                                                    Date
2013 Annual Radioactive Effluent Release Report                          April 2014
2014 Annual Radioactive Effluent Release Report                          April 2015
Cross-Check Program 2013 Summary Report                                  February 2014
Cross-Check Program 2014 Summary Report                                  February 2015
Section 2RS7: Radiological Environmental Monitoring Program
Procedures
Number              Title                                                Revision
SWP-CHE-01          Groundwater Protection Program                        03
PPM 1.11.1          REMP Implementation Procedure                        -
REMP 5.11          Use and Maintenance of Automatic Composite            02
                    Samplers
REMP 9.10          Environmental TLD Calculations                        01
REMP 11.01          Milk Sampling                                        06
                                            A-14


====a. Inspection Scope====
Procedures
On July 29, 2015, the inspectors observed an evaluated simulator scenario performed by an operating crew. The inspectors assessed the performance of the operators and the evaluators' critique of their performance. The inspectors also assessed the modeling and performance of the simulator during the requalification activities.
Number              Title                                                  Revision
REMP 11.02          Soil and Sediment Sampling                              03
REMP 11.06          Fish Collection and Preparation                        01
REMP 11.07          REMP Water Sample Collection                            06
REMP 11.09          REMP Air Sample Collection                              05
REMP 12.06          Quality Assurance for the Radiological Laboratory      01
REMP 12.07          Radiological Laboratory Measurement Assurance          01
                    Program
SOP 11.09r05        REMP Air Sample Collection                              05
Audits, Self-Assessments, and Surveillances
Number          Title                                                      Date
AR 291084        Perform a Self-Assessment of SWP-CHE-01, Groundwater January, 2014
                Protection Program Against the Requirements of NEI 07-07
15-A-08          Energy Northwest Audit Report 15-A-08 of Mission Support March 9, 2015
                Alliance - Radiological Site Services
AU-RP/RW-13 Quality Services Audit Report; Radiation Protection and          November 2013
                Process Control program
AR-SA:305111 Focused Self-Assessment Report; Radioactive Gaseous            June 19, 2015
                and Liquid Effluents; Radiological Environmental Monitoring
                Program; and Radioactive Solid Waste Processing,
                Radioactive Material Handling, Storage, and Transportation
Action Requests (ARs)
00320966            00303414          00335039            00331779        00300634
00317136            00333542          00318632            00320309        00316091
00321365            00325192          00329806            00331590        0033106
00333286            00299745          00334171            00334146        00303414
                                              A-15


These activities constitute completion of one quarterly licensed operator requalification program sample, as defined in Inspection Procedure 71111.11.
Miscellaneous Documents
Title                                                                      Revision/Date
Plant Meteorological Tower Data Availability Records, 2013, 2015 and 2015  September 2015
(Year to Date)
Plant Specific Logs for Licensee Compliance to Title 10 Part 50.75.g. (Year September 2015
to Date)
2013 Annual Radiological Environmental Operating Report                    May 2014
2014 Annual Radiological Environmental Operating Report                    May 2015
Offsite Dose Calculation Manual                                            June 1991
Offsite Dose Calculation Manual                                            53
Section 2RS8: Radioactive Solid Waste Processing, and Radioactive Material Handling,
Storage, and Transportation
Procedures
Number          Title                                                      Revision
1.10.1          Notifications and Reportable Events                        37
11.2.23.1        Shipping Radioactive Materials and Waste                  15
11.2.23.2        Computerized Radioactive Waste and Material                19
                Characterization
11.2.23.4        Packaging Radioactive Material and Waste                  23
11.2.23.14      Sampling of Radioactive Waste Streams                      12
11.2.23.19      Operation of The Pacific Nuclear Resin Drying System      07, 13, 14
11.2.23.29      LSA Contaminated Laundry Shipments                        11
11.2.23.37      Use of the 14D-2.0 Type A Transportation Cask              05
RW000103        Waste Characterizing Computer Code                        00
RW000115        WNP-2 Radwaste Procedure Training                          00
RW000116        NRC Packaging and Shipping Regulations                    00
RW000117        DOT Packaging and Shipping Regulations                    00
RW000118        Burial Site Disposal Requirements                          00
SWP-CHE-02      Chemical Process Management and Control                    24
                                              A-16


====b. Findings====
Procedures
No findings were identified.
Number          Title                                                      Revision
SWP-RMP-02      Radioactive Waste Process Control Program                  05
Audits, Self-Assessments, and Surveillances
Number          Title                                                    Date
AU-RP/RW-13 Quality Services Audit Report: Radiation Protection and        December 3,
                Process Control Program                                  2013
AU-CH-14        Quality Service Audit Report: Chemistry/REMP/Non-Rad and October 23, 2014
                Rad Effluents/ODCM Program
30511            Focused Self-Assessment Report: Radioactive Gaseous and June 19, 2015
                Liquid Effluents; Radiological Environmental Monitoring
                Program; Radioactive Solid Waste Processing, Radioactive
                Material Handling, Storage, and Transportation
Action Requests (ARs)
00297650            00300182          00308527          00316555        00316676
00316835            00316913          00320373          00323678        00323841
00325137            00332690          00332758          00333434        00333463
00333590
Radioactive Material and Waste Shipments
Number          Title                                                    Date
13-07            RWCU Resin (Non-DOT)                                      March 26, 2013
13-39            12 Boxes of Dry Active Waste (LSA II)                    June 11, 2013
13-46            12 Boxes of Dry Active Waste (LSA II)                    June 27, 2013
13-50            Resin Bead, 1 PDX, 8 Boxes of Dry Active Waste (LSA II)  August 27, 2013
14-03            RHR-P-2B (Type A)                                        January 16, 2014
14-10            4 Condensate F/D Resins, 2 Boxes Dry Active Waste        May 20, 2014
                (LSA II)
14-16            EDDR/FDR F/D Resins (LSA II)                              June 11, 2014
                                              A-17


===.2 Review of Licensed Operator Performance===
Radioactive Material and Waste Shipments
Number          Title                                                    Date
14-32          Condensate F/D Resins - 5 liners (RETURNED) (LSA II)    October 9, 2014
14-38          EDR/FDR Resin Condensate (LSA II)                        December 15,
                                                                        2014
15-01          Condensate F/D Resins; 4 Boxes Dry Active Waste (LSA II) January 20, 2015
15-43          One 20 C-Van with Dry Active Waste (LSA II)            June 4, 2015
Radiation Work Permits
Number          Title                                                    Revision
30003514        2015 RW 437 Waste Processing NUPAC Cage - LHRA          00
30003520        2015 RW NUPAC Cage Processing - LHRA High Risk          00
30003498        NRC Tours and Inspections - HRA                          00
Radiological Surveys
Number          Title                                                    Date
4435            ISFSI Building 105                                      July 27, 2015
4497            Building 167 & C-Vans                                    August 3, 2015
4500            Warehouse 5 (Building 80)                                August 3, 2015
4710            Building 13 Laundry                                      August 21, 2015
4874            LSA Pad                                                  September 8,
                                                                        2015
5057            Radwaste 437 NUPAC Cage                                September 23,
                                                                        2015
                                            A-18


====a. Inspection Scope====
Miscellaneous Documents
On August 5, 2015, the inspectors observed the performance of on-shift licensed operators in the plant's main control room. At the time of the observations, the plant was in a period of heightened risk due to an unplanned orange risk window for Bonneville Power Administration's emergent work on the 230 kV switchyard. The inspectors observed the operators' performance of the following activities:  Leak repair on the digital electro-hydraulic system under WO 02086051, including the pre-job brief  In addition, the inspectors assessed the operators' adherence to plant procedures, including procedure PPM 1.3.1, "Operating Policy, Programs, and Practices," Revision 119 and other operations department policies.
Number        Title                                                      Revision/Date
ODCM LEP      Columbia Generating Station Offsite Dose Calculation Manual 53
              Columbia Generating Station Final Safety Analysis Report - 57
              Chapter 11.4, Solid Waste Management System
              2013 Annual Radioactive Effluent Release Report            April 30, 2014
DIC 1554.58  Columbia Generating Station Scaling Factor Determination    March 24, 2015
              Package
              2014 Annual Radioactive Effluent Release Report            April 30, 2015
              10 CFR 61 Scaling Factor Determination                      September 17,
                                                                          2015
Section 4OA1: Performance Indicator Verification
Procedures
Number            Title                                                  Revision
CI-10.17          Iodine                                                  12
CSP-I131-W101      Reactor Coolant Isotopic Analysis for I-131 Dose        9
                  Equivalent
Miscellaneous
Number            Title                                                  Revision
MSPI-01-BD-001 MSPI Basis Document                                        17
286838              286894            332833              333421
Work Orders
02069131
Section 4OA2: Problem Identification and Resolution
Procedures
Number            Title                                                  Revision
SWP-CAP-06        Condition Report Review                                22
                                            A-19


These activities constitute completion of one quarterly licensed operator performance sample, as defined in Inspection Procedure 71111.11.
Action Requests (ARs)
329576            333690            334108
Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion
Procedures
Number            Title                                                  Revision
3.4.1            Minimizing the Potential of Draining the Reactor Vessel 19
Action Requests (ARs)
323625            326336            326573              328051          328312
328726            329328
                                            A-20


====b. Findings====
                            The following items are requested for the
                                Public Radiation Safety Inspection
                                              Columbia
                                      September 21-24, 2015
                                    Integrated Report 2015003
Inspection areas are listed in the attachments below.
Please provide the requested information on or before August 31, 2015.
Please submit this information using the same lettering system as below. For example, all
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled
1- A, applicable organization charts in file/folder 1- B, etc.
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at
least 30 days later than the onsite inspection dates, so the inspectors will have access to the
information while writing the report.
In addition to the corrective action document lists provided for each inspection procedure listed
below, please provide updated lists of corrective action documents at the entrance meeting.
The dates for these lists should range from the end dates of the original lists to the day of the
entrance meeting.
If more than one inspection procedure is to be conducted and the information requests appear
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
file the information can be found.
If you have any questions or comments, please contact Martin Phalen at (817) 200-1158 or
martin.phalen@nrc.gov.
                        PAPERWORK REDUCTION ACT STATEMENT
  This letter does not contain new or amended information collection requirements subject
    to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
      collection requirements were approved by the Office of Management and Budget,
                                  control number 3150-0011.
                                                  A-21


=====Introduction.=====
1.     Radiation Monitoring Instrumentation (71124.05)
The inspectors identified a Green, non-cited violation of Technical Specification 5.4.1.a, "Procedures," for the licensee's failure to ensure operators could perform time-critical steps for fire events. Specifically, the licensee failed to implement written procedures to ensure that Category 2 personnel, needed for post-fire safe shutdown, can complete required actions within 10 minutes.
      Date of Last Inspection:        November 8, 2013
A.    List of contacts and telephone numbers for the following areas:
      1. Effluent monitor calibration
      2. Radiation protection instrument calibration
      3. Installed instrument calibrations
      4. Count room and Laboratory instrument calibrations
B.    Applicable organization charts
C.     Copies of audits, self-assessments, vendor or NUPIC audits for contractor support and
      LERs, written since date of last inspection, related to:
      1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey
          instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,
          or whole body counters
      2. Installed radiation monitors
D.    Procedure index for:
      1. Calibration, use and operation of continuous air monitors, criticality monitors,
          portable survey instruments, temporary area radiation monitors, electronic
          dosimeters, teledosimetry, personnel contamination monitors, and whole body
          counters.
      2. Calibration of installed radiation monitors
E.    Please provide specific procedures related to the following areas noted below.
      Additional Specific Procedures will be requested by number after the inspector reviews
      the procedure indexes.
      1. Calibration of portable radiation detection instruments (for portable ion chambers)
      2. Whole body counter calibration
      3. Laboratory instrumentation quality control
F.    A summary list of corrective action documents (including corporate and sub-tiered
      systems) written since date of last inspection, related to the following programs:
      1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey
          instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,
          whole body counters,
      2. Installed radiation monitors,
      3. Effluent radiation monitors
      4. Count room radiation instruments
NOTE: The lists should indicate the significance level of each issue and the search criteria
used. Please provide in document formats which are searchable so that the inspector can
perform word searches.
G.    Offsite dose calculation manual, technical requirements manual, or licensee controlled
      specifications which lists the effluent monitors and calibration requirements.
H.    Current calibration data for the whole body counters.
I.    Primary to secondary source calibration correlation for effluent monitors.
J.    A list of the point of discharge effluent monitors with the two most recent calibration
      dates and the work order numbers associated with the calibrations.
K.    Radiation Monitoring System health report for the previous 12 months
                                                A-22


=====Description.=====
2.     Radioactive Gaseous and Liquid Effluent Treatment (71124.06)
During a log review, the inspectors identified that an equipment operator (OPS3) left the protected area (PA) to compile equipment logs on July 4, 2015, at 8:57 AM and again at 4:37 PM. Licensee procedure PPM 1.3.1, "Operating Policy, Programs, and Practices," Revision 119, classifies watch positions as either Category 1 or Category 2. Category 1 personnel include the shift technical advisor (STA) and emergency action level notifier. Category 2 personnel include the shift manager (SM), all three reactor operators, the control room supervisor (CRS), and the OPS2 and OPS3 equipment operator positions. Procedure PPM 1.3.1 states that while Category 1 personnel may leave the PA with a risk evaluation and permission of the shift manager, Category 2 personnel "should not leave the protected area unless an emergent condition is jeopardizing the plant" and they "respond to an event that requires action within 10 minutes."  The OPS3 equipment operator is a Category 2 watchstander because in the event of a control room fire, they must trip the condensate and condensate booster pumps within 10 minutes. These actions are proceduralized in ABN-CR-EVAC, "Control Room Evacuation and Remote Cooldown," Revision 33. The inspectors questioned the ability of OPS3 to move from outside the PA to their required station in a timely manner. The inspectors noted that the licensee performed a timed walkthrough of post-fire safe-shutdown actions for OPS3 for a similar issue in 2014. Specifically, the evaluation for NRC-identified NCV 05000397/2014003-02, "Failure to Implement Procedures That Ensure Operators Could Perform Time Critical Steps for Fire Events" concluded that OPS3 was not able to complete certain post-fire safe-shutdown actions within 10 minutes when initially located outside the PA. Instead, the equipment operator completed the required actions within 11 minutes and 33 seconds. The inspectors determined that this previous walkthrough from 2014 is representative of the issue identified on July 4, 2015 and no additional timed walkthrough was required. The inspectors concluded that by allowing Category 2 personnel to leave the PA, the licensee had not preserved the assumptions of available personnel in ABN-CR-EVAC to reach safe-shutdown conditions for a control room fire. Therefore, the licensee was not implementing written procedures for plant fires and responsibilities for safe operation as required by Technical Specification 5.4.1.a through Appendix A of Regulatory Guide 1.33, "Quality Assurance Program Requirements (Operation)," Revision 2.
      Date of Last Inspection:        November 8, 2013
A.    List of contacts and telephone numbers for the following areas:
      1. Radiological effluent control
      2. Engineered safety feature air cleaning systems
B.     Applicable organization charts
C.     Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs
      written since date of last inspection, related to:
      1. Radioactive effluents
      2. Engineered Safety Feature Air cleaning systems
D.    Procedure indexes for the following areas
      1. Radioactive effluents
      2. Engineered Safety Feature Air cleaning systems
E.    Please provide specific procedures related to the following areas noted below.
      Additional Specific Procedures will be requested by number after the inspector reviews
      the procedure indexes.
      1. Sampling of radioactive effluents
      2. Sample analysis
      3. Generating radioactive effluent release permits
      4. Laboratory instrumentation quality control
      5. In-place testing of HEPA filters and charcoal adsorbers
      6. New or applicable procedures for effluent programs (e.g., including ground water
          monitoring programs)
F.     List of corrective action documents (including corporate and sub-tiered systems) written
      since date of last inspection, associated with:
      1. Radioactive effluents
      2. Effluent radiation monitors
      3. Engineered Safety Feature Air cleaning systems
NOTE: The lists should indicate the significance level of each issue and the search criteria
used. Please provide in document formats which are searchable so that the inspector can
perform word searches.
G.    2013 and 2014 Annual Radioactive Effluent Release Report or the two most recent
      reports
H.     Current Copy of the Offsite Dose Calculation Manual
I.     Copy of the 2013 and 2014 interlaboratory comparison results for laboratory quality
      control performance of effluent sample analysis, or the two most recent results.
J.     Effluent sampling schedule for the week of the inspection
K.     New entries into 10 CFR 50.75(g) files since date of last inspection
L.     Operations department (or other responsible dept.) log records for effluent monitors
      removed from service or out of service
M.     Listing or log of liquid and gaseous release permits since date of last inspection
                                                A-23


In response to this conclusion, the licensee initiated AR 332747 to document the inability to meet the post-fire safe-shutdown actions in accordance with procedure PPM 1.3.1. Additionally, the licensee issued Night Order 1655, reminding all operating crews of the requirements of procedure PPM 1.3.1 for leaving the PA. Through interviews, the licensee determined that the equipment operator discussed the need to leave the PA with the STA. Neither individual, however, discussed the situation with CRS, SM, or reviewed the relevant PPM 1.3.1 procedure.
N. A list of the technical specification-required air cleaning systems with the two most
  recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal
  adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers
  associated with the surveillances
O. System Health Report for radiation monitoring instrumentation. Also, please provide a
  specific list of all effluent radiation monitors that were considered inoperable for 7 days
  or more since November 2011. If applicable, please provide the relative Special Report
  and condition report(s) moreover
P. A list of all radiation monitors that are considered §50.65/Maintenance Rule equipment.
Q. A list of all significant changes made to the Gaseous and Liquid Effluent Process
  Monitoring System since the last inspection. If applicable, please provide the
  corresponding UFSAR section in which this change was documented.
R. A list of any occurrences in which a non-radioactive system was contaminated by a
  radioactive system. Please include any relative condition report(s).
3. Radiological Environmental Monitoring Program (71124.07)
  Date of Last Inspection:          November 8, 2013
A. List of contacts and telephone numbers for the following areas:
  1. Radiological environmental monitoring
  2. Meteorological monitoring
B. Applicable organization charts
C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs
  written since date of last inspection, related to:
  1. Radiological environmental monitoring program (including contractor environmental
        laboratory audits, if used to perform environmental program functions)
  2. Environmental TLD processing facility
  3. Meteorological monitoring program
D. Procedure index for the following areas:
  1. Radiological environmental monitoring program
  2. Meteorological monitoring program
E. Please provide specific procedures related to the following areas noted below.
  Additional Specific Procedures will be requested by number after the inspector reviews
  the procedure indexes.
  1. Environmental Program Description
  2. Sampling, collection and preparation of environmental samples
  3. Sample analysis (if applicable)
  4. Laboratory instrumentation quality control
  5. Procedures associated with the Offsite Dose Calculation Manual
  6. Appropriate QA Audit and program procedures, and/or sections of the stations QA
      manual (which pertain to the REMP)
F. A summary list of corrective action documents (including corporate and sub-tiered
  systems) written since date of last inspection, related to the following programs:
  1. Radiological environmental monitoring
                                              A-24


=====Analysis.=====
      2. Meteorological monitoring
The failure to implement written procedures to ensure that Category 2 personnel can complete certain post-fire safe-shutdown actions within 10 minutes was a performance deficiency. This performance deficiency was more than minor because it was associated with the protection against external factors attribute of the Mitigating System Cornerstone and affected the cornerstone's objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, by allowing Category 2 personnel to leave the protected area, the licensee had not preserved the assumptions of available personnel in ABN-CR-EVAC to reach safe-shutdown conditions for a control room fire. The inspectors screened the finding in accordance with NRC Manual Chapter IMC 0609, Attachment 4, "Initial Characterization of Findings."  In table 3, the inspectors answered "yes" to question E.2 because the finding affects the ability to reach and maintain safe shutdown conditions in case of a fire. Therefore, to assess this finding, a senior reactor analyst used NRC IMC 0609, Appendix F, "Fire Protection Significance Determination," dated September 20, 2013. The analyst noted that the degradation rating examples in Attachment 2 of that appendix were not well suited for this finding. Therefore, the analyst used the generic guidance from NRC IMC 0308, Attachment 3, Appendix F, "Technical Basis Fire Protection Significance Determination Process (Supplemental Guidance for Implementing IMC 0609, Appendix F) At Power Operations," dated February 28, 2005. This guidance stated, in part:   -the definition of "low degradation" implies that the performance and/or reliability of the fire protection feature is not substantially impacted by the noted degradation finding. Hence, the feature would be given essentially full credit in the PRA-based analysis. In this case, the risk change is essentially zero, and the finding should be screened to Green.
NOTE: The lists should indicate the significance level of each issue and the search criteria
used. Please provide in document formats which are searchable so that the inspector can
perform word searches.
G.    Wind Rose data and evaluations used for establishing environmental sampling locations
H.     Copies of the 2 most recent calibration packages for the meteorological tower
      instruments
I.    Copy of the 2013 and 2014 Annual Radiological Environmental Operating Report and
      Land Use Census, and current revision of the Offsite Dose Calculation Manual, or the
      two most recent reports.
J.     Copy of the environmental laboratorys interlaboratory comparison program results for
      2013 and 2014, or the two most recent results, if not included in the annual radiological
      environmental operating report
K.     Data from the environmental laboratory documenting the analytical detection sensitivities
      for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)
L.    Quality Assurance audits (e.g., NUPIC) for contracted services
M.    Current NEI Groundwater Initiative Plan and status
N.     Technical requirements manual or licensee controlled specifications which lists the
      meteorological instruments calibration requirements
O.    A list of Regulatory Guides and/or NUREGs that you are currently committed to relative
      to the Radiological Environmental Monitoring Program. Please include the revision
      and/or date for the committed item and where this can be located in your current
      licensing basis/UFSAR.
P.     If applicable, per NEI 07-07, provide any reports that document any spills/leaks to
      groundwater since the last inspection
4.    Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,
      and Transportation (71124.08)
      Date of Last Inspection:      November 8, 2013
A.     List of contacts and telephone numbers for the following areas:
      1. Solid Radioactive waste processing
      2. Transportation of radioactive material/waste
B.    Applicable organization charts (and list of personnel involved in solid radwaste
      processing, transferring, and transportation of radioactive waste/materials)
C.    Copies of audits, department self-assessments, and LERs written since date of last
      inspection related to:
      1. Solid radioactive waste management
      2. Radioactive material/waste transportation program
D.    Procedure index for the following areas:
      1. Solid radioactive waste management
      2. Radioactive material/waste transportation
                                              A-25


For this finding, procedure ABN-CR-EVAC directed operator OPS3 to trip the condensate and condensate booster pumps within 10 minutes, but due to this finding, that action could be delayed to the 11.5 minute point. The subject action was intended to prevent taking the plant to a "solid" (completely filled) condition. However, the analyst noted that the failure to take this action would not increase the core damage probability (overfilling events at boiling water reactors soon after shutdown should not drive core damage and are not included in the probabilistic risk assessment model). Instead, this action is a desired step that was intended to establish positive control over reactor vessel pressure and level. In addition, the exposure period for this finding was very short (less than one day). Since the failure to perform this action within 10 minutes would not adversely affect a quantitative assessment, this finding was of very low safety significance (Green). This finding has a cross-cutting aspect in the area of Human Performance, Teamwork, because the licensee failed to communicate and to coordinate their activities within and across organizational boundaries to ensure nuclear safety is maintained. Specifically, the equipment operator spoke with the STA about the need to exit the PA at the morning turnover meeting but neither individual spoke with the CRS. Communication was ineffective in that the equipment operator believed permission was granted and proceeded to exit the PA [H.4].
E.     Please provide specific procedures related to the following areas noted below.
 
      Additional Specific Procedures will be requested by number after the inspector reviews
=====Enforcement.=====
      the procedure indexes.
Technical Specification 5.4.1.a, "Procedures" requires, in part, that written procedures shall be established, implemented, and maintained for activities described in Appendix A of the Regulatory Guide 1.33, Revision 2, February 1978. Regulatory Guide 1.33, Appendix A, Section 1.b requires administrative procedures for authorities and responsibilities for safe operation and shutdown. Licensee procedure PPM 1.3.1, "Operating Policy, Programs, and Practices," Revision 119, a procedure required by Section 1.b of Regulatory Guide 1.33, Appendix A, establishes authorities and responsibilities for safe operation and shutdown, and states that Category 2 personnel should not leave the protected area unless an emergent condition is jeopardizing the plant and they respond to an event that requires action within 10 minutes. Contrary to this requirement, on July 4, 2015, Category 2 personnel (i.e., an equipment operator) left the protected area when no emergent condition jeopardizing the plant existed and therefore was unable to respond to an event that requires action within 10 minutes.
      1. Process control program
 
      2. Solid and liquid radioactive waste processing
Specifically, the operator would not be able to complete certain time-critical operator actions associated with fire events as required by procedure ABN-CR-EVAC, "Control Room Evacuation and Remote Cooldown," Revision 33.
      3. Radioactive material/waste shipping
 
      4. Methodology used for waste concentration averaging, if applicable
The licensee initiated Action Request 332747 to document the non-compliance with PPM 1.3.1. Additionally, the licensee issued Night Order 1655 reminding all operating crews of the requirements of PPM 1.3.1 for leaving the Protected Area. Because this violation was of very low safety significance and was entered into the licensee's corrective action program, this violation is being treated as a non-cited violation, consistent with Section 2.3.2.a of the Enforcement Policy. (NCV 05000397/2015003-04, Failure to Implement Procedures to Ensure Availability of Safe Shutdown Personnel)
      5. Waste stream sampling and analysis
{{a|1R12}}
F.    A summary list of corrective action documents (including corporate and subtiered
==1R12 Maintenance Effectiveness==
      systems) written since date of last inspection related to:
{{IP sample|IP=IP 71111.12}}
      1. Solid radioactive waste
 
      2. Transportation of radioactive material/waste
====a. Inspection Scope====
NOTE: The lists should indicate the significance level of each issue and the search criteria
The inspectors reviewed two instances of degraded performance or condition of safety-related structures, systems, and components (SSCs):  July 10, 2015, system review of control room emergency chillers including maintenance history of system rupture discs  September 10, 2015, main steam level indicating switches including maintenance history involving internal binding failures documented in AR 332078  The inspectors reviewed the extent of condition of possible common cause SSC failures and evaluated the adequacy of the licensee's corrective actions. The inspectors reviewed the licensee's work practices to evaluate whether these may have played a role in the degradation of the SSCs. The inspectors assessed the licensee's characterization of the degradation in accordance with 10 CFR 50.65 (the Maintenance Rule), and verified that the licensee was appropriately tracking degraded performance and conditions in accordance with the Maintenance Rule.
used. Please provide in document formats which are searchable so that the inspector can
 
perform word searches.
These activities constituted completion of two maintenance effectiveness samples, as defined in Inspection Procedure 71111.12.
G.     Copies of training lesson plans for 49CFR172 subpart H, for radwaste processing,
 
      packaging, and shipping
====b. Findings====
H.     A summary of radioactive material and radioactive waste shipments made from date of
No findings were identified.
      last inspection to present
{{a|1R13}}
I.    Waste stream sample analyses results and resulting scaling factors for 2013, 2014,
==1R13 Maintenance Risk Assessments and Emergent Work Control==
      and 2915, or the two most recent results
{{IP sample|IP=IP 71111.13}}
J.     Waste classification reports if performed by vendors (such as for irradiated hardware)
 
K.     A listing of all onsite radwaste storage facilities. Please include a summary or listing of
====a. Inspection Scope====
      the items stored in each facility, including the total amount of radioactivity and the
The inspectors reviewed two risk assessments performed by the licensee prior to changes in plant configuration and the risk management actions taken by the licensee in response to elevated risk:  August 20, 2015, planned yellow risk for a diesel generator 2 monthly surveillance under Work Order 02068579 September 15, 2015, planned yellow risk for a reactor core isolation cooling system work window under Work Order 02078715  The inspectors verified that these risk assessments were performed timely and in accordance with the requirements of 10 CFR 50.65 (the Maintenance Rule) and plant procedures. The inspectors reviewed the accuracy and completeness of the licensee's risk assessments and verified that the licensee implemented appropriate risk management actions based on the result of the assessments. Additionally, on September 28, 2015, the inspectors observed the operators response to emergent work activities that resulted in unplanned unavailability of emergency diesel generator 2. The inspectors verified that the licensee took precautions to minimize the impact of the work activities on unaffected SSCs. These activities constitute completion of three maintenance risk assessments and emergent work control inspection samples, as defined in Inspection Procedure 71111.13.
      highest general area dose rate
 
Although it is not necessary to compile the following information, the inspector will also review:
====b. Findings====
L.     Training, and qualifications records of personnel responsible for the conduct of
No findings were identified.
      radioactive waste processing, package preparation, and shipping
{{a|1R15}}
                                                A-26
==1R15 Operability Determinations and Functionality Assessments==
{{IP sample|IP=IP 71111.15}}
 
====a. Inspection Scope====
The inspectors reviewed four operability determinations that the licensee performed for degraded or nonconforming SSCs:  July 1, 2015, AR 332078, documenting reactor vessel water level indicating switches MS-LIS-24A and C indicating abnormally high  July 1, 2015, AR 332326, documenting concerns related to residual heat removal system operability during venting operations  July 22, 2015, AR 333334, documenting a slow opening time for main steam isolation valve MS-V-22D  August 13, 2015, AR 334459, documenting concerns related to required manual actions for the control room HVAC system emergency chillers  The inspectors reviewed the timeliness and technical adequacy of the licensee's evaluations. Where the licensee determined the degraded SSC to be operable, the inspectors verified that the licensee's compensatory measures were appropriate to provide reasonable assurance of operability. The inspectors verified that the licensee had considered the effect of other degraded conditions on the operability of the degraded SSC.
 
These activities constitute completion of four operability and functionality review samples as defined in Inspection Procedure 71111.15.
 
====b. Findings====
No findings were identified.
{{a|1R18}}
==1R18 Plant Modifications==
{{IP sample|IP=IP 71111.18}}
 
====a. Inspection Scope====
On July 1, 2015, the inspectors reviewed a temporary modification of reactor feedwater valve RFW-V-102A under Engineering Change EC14111. The inspectors verified that the licensee had installed this temporary modification in accordance with technically adequate design documents. The inspectors verified that this modification did not adversely impact the operability or availability of affected SSCs. The inspectors reviewed design documentation and plant procedures affected by the modification to verify the licensee maintained configuration control.
 
These activities constitute completion of one sample of temporary modifications, as defined in Inspection Procedure 71111.18.
 
====b. Findings====
No findings were identified.
{{a|1R19}}
==1R19 Post-Maintenance Testing==
{{IP sample|IP=IP 71111.19}}
 
====a. Inspection Scope====
The inspectors reviewed four post-maintenance testing activities that affected risk-significant SSCs:  August 5, 2015, post-maintenance test for service water temperature control valve SW-TCV-11A, following maintenance under WO 02075767  August 26, 2015, post-maintenance test for the Division 3 diesel mixed air system, following maintenance under WO 02066727  September 16, 2015, post-maintenance test for reactor core isolation cooling system, following maintenance under Work Order 02078715  September 28, 2015, post-maintenance test for the Division 2 diesel generator, following replacement of shutdown relays under Work Order 02002258  The inspectors reviewed licensing- and design-basis documents for the SSCs and the maintenance and post-maintenance test procedures. The inspectors observed the performance of the post-maintenance tests to verify that the licensee performed the tests in accordance with approved procedures, satisfied the established acceptance criteria, and restored the operability of the affected SSCs.
 
These activities constitute completion of four post-maintenance testing inspection samples, as defined in Inspection Procedure 71111.19.
 
====b. Findings====
No findings were identified.
{{a|1R22}}
==1R22 Surveillance Testing==
{{IP sample|IP=IP 71111.22}}
 
====a. Inspection Scope====
The inspectors observed three risk-significant surveillance tests and reviewed test results to verify that these tests adequately demonstrated that the SSCs were capable of performing their safety functions:  Routine tests:  August 6, 2015, procedure OSP-DO/IST-Q701, "DO-P-1A Operability," Revision 14, including a surveillance for the diesel generator fuel oil transfer pump  In-service tests:  September 8, 2015, procedure OSP-LPCS/IST-Q702, "LPCS System Operability Test," Revision 39  Reactor coolant system leak detection tests:  September 16, 2015, procedure OSP-INST-H101, "Shift and Daily Instrument Checks Modes 1, 2, 3" Revision 85, including reactor coolant system leakage calculation  The inspectors verified that these tests met technical specification requirements, that the licensee performed the tests in accordance with their procedures, and that the results of the test satisfied appropriate acceptance criteria. The inspectors verified that the licensee restored the operability of the affected SSCs following testing.
 
These activities constitute completion of three surveillance testing inspection samples, as defined in Inspection Procedure 71111.22.
 
====b. Findings====
No findings were identified.
 
===Cornerstone:===
Emergency Preparedness
{{a|1EP6}}
==1EP6 Drill Evaluation==
{{IP sample|IP=IP 71114.06}}
===.1 Emergency Preparedness Drill Observation===
 
====a. Inspection Scope====
The inspectors observed an emergency preparedness drill on July 7, 2015, to verify the adequacy and capability of the licensee's assessment of drill performance. The inspectors reviewed the drill scenario, observed the drill from the simulator, technical support center, operations support center and emergency operations facility, and attended the post-drill critique. The inspectors verified that the licensee's emergency classifications, off-site notifications, and protective action recommendations were appropriate and timely. The inspectors verified that any emergency preparedness weaknesses were appropriately identified by the licensee in the post-drill critique and entered into the corrective action program for resolution. These activities constitute completion of one emergency preparedness drill observation sample, as defined in Inspection Procedure 71114.06.
 
====b. Findings====
No findings were identified.
 
==RADIATION SAFETY==
Cornerstones: Occupational Radiation Safety and Public Radiation Safety
{{a|2RS5}}
==2RS5 Radiation Monitoring Instrumentation==
{{IP sample|IP=IP 71124.05}}
 
====a. Inspection Scope====
The inspectors evaluated the accuracy and operability of the radiation monitoring equipment used by the licensee (1) to monitor areas, materials, and workers to ensure a radiologically safe work environment, and (2) to detect and quantify radioactive process streams and effluent releases. The inspectors interviewed licensee personnel, walked down various portions of the plant, and reviewed licensee performance in the following areas:    Selected plant configurations and alignments of process, post-accident, and effluent monitors with descriptions in the Final Safety Analysis Report and the offsite dose calculation manual    Selected instrumentation, including effluent monitoring instrument, portable survey instruments, area radiation monitors, continuous air monitors, personnel contamination monitors, portal monitors, and small article monitors to examine their configurations and source checks  Calibration and testing of process and effluent monitors, laboratory instrumentation, whole body counters, post-accident monitoring instrumentation, portal monitors, personnel contamination monitors, small article monitors, portable survey instruments, area radiation monitors, electronic dosimetry, air samplers, and continuous air monitors  Audits, self-assessments, and corrective action documents related to radiation monitoring instrumentation since the last inspection  These activities constitute completion of one sample of radiation monitoring instrumentation as defined in Inspection Procedure 71124.05.
 
====b. Findings====
No findings were identified.
{{a|2RS6}}
==2RS6 Radioactive Gaseous and Liquid Effluent Treatment==
{{IP sample|IP=IP 71124.06}}
 
====a. Inspection Scope====
The inspectors evaluated whether the licensee maintained gaseous and liquid effluent processing systems and properly mitigated, monitored, and evaluated radiological discharges with respect to public exposure. The inspectors verified that abnormal radioactive gaseous or liquid discharges and conditions, when effluent radiation monitors are out-of-service, were controlled in accordance with the applicable regulatory requirements and licensee procedures. The inspectors verified that the licensee's quality control program ensured radioactive effluent sampling and analysis adequately quantified and evaluated discharges of radioactive materials. The inspectors verified the adequacy of public dose projections resulting from radioactive effluent discharges. The inspectors interviewed licensee personnel and reviewed or observed the following items:  Radiological effluent release reports since the previous inspection and reports related to the effluent program issued since the previous inspection  Effluent program implementing procedures, including sampling, monitor setpoint determinations and dose calculations  Equipment configuration and flow paths of selected gaseous and liquid discharge system components, filtered ventilation system material condition, and significant changes to their effluent release points, if any, and associated 10 CFR 50.59 reviews  Selected portions of the routine processing and discharge of radioactive gaseous and liquid effluents (including sample collection and analysis)  Controls used to ensure representative sampling and appropriate compensatory sampling    Results of the inter-laboratory comparison program Effluent stack flow rates Surveillance test results of technical specification-required ventilation effluent discharge systems  since the previous inspection Significant changes in reported dose values A selection of radioactive liquid and gaseous waste discharge permits    Part 61 analyses and methods used to determine which isotopes are included in the source term    Offsite dose calculation manual changes Meteorological dispersion and deposition factors Latest land use census    Records of abnormal gaseous or liquid tank discharges Groundwater monitoring results Changes to the licensee's written program for identifying and controlling contaminated spills/leaks to groundwater Identified leakage or spill events and entries made into 10 CFR 50.75(g) records, if any, and associated evaluations of the extent of the contamination and the radiological source term  Offsite notifications, and reports of events associated with spills, leaks, and groundwater monitoring results  Audits, self-assessments, reports, and corrective action documents related to radioactive gaseous and liquid effluent treatment since the last inspection  These activities constitute completion of one sample of radioactive gaseous and liquid effluent treatment, as defined in Inspection Procedure 71124.06.
 
====b. Findings====
No findings were identified.
{{a|2RS7}}
==2RS7 Radiological Environmental Monitoring Program==
{{IP sample|IP=IP 71124.07}}
 
====a. Inspection Scope====
The inspectors evaluated whether the licensee's radiological environmental monitoring program quantified the impact of radioactive effluent releases to the environment and sufficiently validated the integrity of the radioactive gaseous and liquid effluent release program. The inspectors verified that the radiological environmental monitoring program was implemented consistent with the licensee's technical specifications and offsite dose calculation manual, and that the radioactive effluent release program met the design objective in Appendix I to 10 CFR Part 50. The inspectors verified that the licensee's radiological environmental monitoring program monitored non-effluent exposure pathways, was based on sound principles and assumptions, and validated that doses to members of the public were within regulatory dose limits. The inspectors reviewed or observed the following items:  Annual environmental monitoring reports and offsite dose calculation manual    Selected air sampling and dosimeter monitoring stations Collection and preparation of environmental samples Operability, calibration, and maintenance of meteorological instruments Selected events documented in the annual environmental monitoring report which involved a missed sample, inoperable sampler, lost dosimeter, or anomalous measurement  Selected structures, systems, or components that may contain licensed material and has a credible mechanism for licensed material to reach ground water  Records required by 10 CFR 50.75(g)
Significant changes made by the licensee to the offsite dose calculation manual as the result of changes to the land census or sampler station modifications since the last inspection  Calibration and maintenance records for selected air samplers, composite water samplers, and environmental sample radiation measurement instrumentation Inter-laboratory comparison program results Audits, self-assessments, reports, and corrective action documents related to the radiological environmental monitoring program since the last inspection  These activities constitute completion of one sample of radiological environmental monitoring program as defined in Inspection Procedure 71124.07.
 
====b. Findings====
No findings were identified.
{{a|2RS8}}
==2RS8 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation==
{{IP sample|IP=IP 71124.08}}
 
====a. Inspection Scope====
The inspectors evaluated the effectiveness of the licensee's programs for processing, handling, storage, and transportation of radioactive material. The inspectors interviewed licensee personnel and reviewed the following items:  The solid radioactive waste system description, process control program, and the scope of the licensee's audit program  Control of radioactive waste storage areas including container labeling/marking and monitoring containers for deformation or signs of waste decomposition  Changes to the liquid and solid waste processing system configuration including a review of waste processing equipment that is not operational or abandoned in place  Radio-chemical sample analysis results for radioactive waste streams and use of scaling factors and calculations to account for difficult-to-measure radionuclides Processes for waste classification including use of scaling factors and 10 CFR Part 61 analysis  Shipment packaging, surveying, labeling, marking, placarding, vehicle checking, driver instructing, and preparation of the disposal manifest  Audits, self-assessments, reports, and corrective action reports radioactive solid waste processing, and radioactive material handling, storage, and transportation  performed since the last inspection  These activities constitute completion of one sample of radioactive solid waste processing, and radioactive material handling, storage, and transportation as defined in Inspection Procedure 71124.08.
 
====b. Findings====
 
=====Introduction.=====
The inspectors reviewed a Green, self-revealing, non-cited violation of Technical Specification 5.4.1.a, "Procedures," for the licensee's failure to follow their Process Control Program as implemented by their solid radioactive waste system procedures. The licensee shipped a radioactive shipment of condensate filter demineralizer resin waste for disposal to US Ecology of Washington with free standing liquid in excess of 0.5 percent of the total waste volume.
 
=====Description.=====
On August 11, 2014, the licensee completed dewatering and drying of resin for a condensate demineralizer filter waste liner (14-033-L). On October 9, 2014, radioactive waste liner 14-033-L was shipped to US Ecology for disposal at their low level radioactive waste burial site near Richland, Washington. The liner was part of radioactive waste shipment #14-32 and manifested as a Class A Unstable waste form. On October 23, 2014, liner 14-033-L was randomly selected by the burial site for inspection to ensure compliance with the disposal site's license conditions. US Ecology punctured the bottom of the liner and determined that the liner contained free standing liquid, as evidenced by a slurry mix (150 ml) that drained from the puncture hole. On October 27, 2014, US Ecology continued their inspection of liner 14-033-L by fully opening the liner lid and sampling for additional free standing liquid. The inspection results revealed that over 8.5 gallons of free standing liquid was contained within the liner. This represented approximately 0.75 percent of the total waste volume (1132 gallons) and was in excess of the 0.5 percent free standing liquid requirement for unstable waste form. US Ecology contacted the licensee and informed them of the burial site noncompliance.
 
The licensee retrieved the packages (i.e., liners) contained in shipment #14-32 from US Ecology. Each liner was then tested for free standing liquid content and additional water was removed as necessary. This issue was entered into the licensee's corrective action program as Action Request 00316676, and an apparent cause evaluation was performed. The inspectors reviewed selected licensee, vendor, and burial site information related to this issue and interviewed selected knowledgeable plant staff. The inspectors determined that the licensee failed to maintain the appropriate operating procedures and dewatering components for the resin drying and dewatering system used for the condensate filter demineralizer waste liners. Specifically, in 1999 and 2012, changes were made to the Process Control Program via modifications to the resin drying system process. These modifications were different from the approved operations and specifications under NRC-approved Topical Report, TP-02-P-A, "Covering Nuclear Packaging, Inc. Dewatering System," approved September 6, 1985. In 1999, the specific change made was to open the valve to the lowest set of filter laterals in order to allow the use of these filters throughout the dewatering process for the condensate filter demineralizers. In 2011, following a condenser change-out, the carbon steel components of the new condenser introduced iron oxide into the resin drying system.
 
This high iron oxide content coated the bottom filter laterals in the resin drying system and caused discoloration of the resin water. In 2012, additional changes to the Process Control Program instructed the resin drying system operators to declare the bottom filter laterals as damaged if they saw a discoloration in the resin drying system viewing window. These changes were not in accordance with vendor specifications.
 
The inspectors determined that the licensee performed an inadequate technical review for the resin drying and dewatering system when changes were made to the Process Control Program. Additionally, the inspectors reviewed the 10 CFR 50.59 screening, dated July 6, 2010, and determined that the licensee performed an inadequate technical review to assess potential adverse impacts of the condenser change-out on the plant's radioactive waste processing system. Consequently, the inspectors concluded that between 1999 and 2013, the licensee failed to maintain the vendor procedures and appropriate design margins for the resin drying system. This resulted in inadequate dewatering of the resin for condensate filter demineralizers in liner 14-033-L.
 
=====Analysis.=====
The failure to follow the Process Control Program, resulting in the inadequate dewatering of radioactive waste liner contents, was a performance deficiency. Inspectors determined that the performance deficiency was more than minor, because it adversely affected the Public Radiation Safety cornerstone objective to ensure adequate protection of public health and safety from exposure to radioactive materials released in the public domain. Specifically, the failure to ensure that the free standing liquid in the radioactive waste liner shipped to US Ecology did not exceed 0.5 percent of the total waste volume subjected the disposal facility to the possibility of improper handling of the waste. Using Inspection Manual Chapter 0609, Appendix D, "Public Radiation Safety Significance Determination Process," dated February 12, 2008, the inspectors determined the violation was of very low safety significance (Green) because: (1) radiation limits were not exceeded, (2) there was no breach of the package during transit, (3) there were no Certificate of Compliance issues, and (4) the low level burial ground nonconformance did not involve a 10 CFR 61.55 waste under classification. The inspectors determined that the finding has a design margin cross-cutting aspect in the area of human performance, because the licensee failed to operate and maintain the radioactive waste dewatering system within the vendor design margins when changes were made to the operating procedures [H.6].
 
=====Enforcement.=====
Technical Specification 5.4.1.a, "Procedures," requires, in part, that written procedures be established, implemented, and maintained for activities described in Regulatory Guide 1.33, "Quality Assurance Program Requirements," Revision 2, Appendix A, dated February 1978. Regulatory Guide 1.33, Section 7.b.(2) requires procedures for the Solid Waste System - Spent Resins and Filter Sludge Handling. The licensee's Process Control Program procedure, SWP-RMP-02, "The Radioactive Waste Process Control Program," implements this requirement. Section 2.2.1.a of Procedure SWP-RMP-02, Revision 5, states, in part, that "The [resin dewatering and drying]
process is designed to reduce the free water, by disposal package volume, to less than - 0.5 percent when waste is packaged in an unstable waste form."  Contrary to the above, on August 11, 2014, the licensee's resin dewatering and drying process failed to reduce the free water, by disposal package volume, to less than 0.5 percent when waste was packaged in an unstable waste form. Specifically, condensate filter demineralizer resin liner 14-033-L contained approximately 0.75 percent free standing liquid when it was received by US Ecology for disposal. Corrective actions included retrieving the packages from waste shipment (#14-32), and testing each liner for free standing liquid content, removing additional water as necessary. Because this violation is of very low safety significance and has been entered into the licensee's corrective action program as Action Request 00316676, it is being treated as a NCV, consistent with Section 2.3.2 of the NRC Enforcement Policy.  (NCV 05000397/2015003-05, Failure to Reduce the Free Water in a Class A Unstable Resin Disposal Package to Less than 0.5 Percent of Waste Volume)
 
==OTHER ACTIVITIES==
Cornerstones:  Initiating Events, Mitigating Systems, Barrier Integrity, Emergency Preparedness, Public Radiation Safety, Occupational Radiation Safety, and Security
{{a|4OA1}}
==4OA1 Performance Indicator Verification==
{{IP sample|IP=IP 71151}}
===.1 Mitigating Systems Performance Index: Emergency AC Power Systems (MS06), High===
Pressure Injection Systems (MS07), Residual Heat Removal Systems (MS09),
 
====a. Inspection Scope====
The inspectors reviewed the licensee's mitigating system performance index data for the period of July 2014 through June 2015 to verify the accuracy and completeness of the reported data. The inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, to determine the accuracy of the reported data. These activities constituted verification of the mitigating system performance index for emergency ac power systems, high pressure injection systems, and residual heat removal systems as defined in Inspection Procedure 71151.
 
====b. Findings====
No findings were identified.
 
===.2 Reactor Coolant System Specific Activity (BI01)===
 
====a. Inspection Scope====
The inspectors reviewed the licensee's reactor coolant system chemistry sample analyses for the period of July 2014 through June 2015 to verify the accuracy and completeness of the reported data. The inspectors observed a chemistry technician obtain and analyze a reactor coolant system sample on September 1, 2015. The inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, to determine the accuracy of the reported data. These activities constituted verification of the reactor coolant system specific activity performance indicator, as defined in Inspection Procedure 71151.
 
====b. Findings====
No findings were identified.
{{a|4OA2}}
==4OA2 Problem Identification and Resolution==
{{IP sample|IP=IP 71152}}
===.1 Routine Review===
 
====a. Inspection Scope====
Throughout the inspection period, the inspectors performed daily reviews of items entered into the licensee's corrective action program and periodically attended the licensee's condition report screening meetings. The inspectors verified that licensee personnel were identifying problems at an appropriate threshold and entering these problems into the corrective action program for resolution. The inspectors verified that the licensee developed and implemented corrective actions commensurate with the significance of the problems identified. The inspectors also reviewed the licensee's problem identification and resolution activities during the performance of the other inspection activities documented in this report.
 
====b. Findings====
No findings were identified.
{{a|4OA3}}
==4OA3 Follow-up of Events and Notices of Enforcement Discretion==
{{IP sample|IP=IP 71153}}
===.1 (Closed) Licensee Event Report 05000397/2015-002-00, "Inadequately Fused Non- Class 1E Circuit on Division 1 120/240 VAC Bus"===
On April 29, 2015, the licensee determined that Division 1 120/240 VAC vital instrumentation bus was inadequately protected for all conditions. Specifically, the Class 1E electrical panel E-PP-7AA did not have adequate electrical separation for scenarios involving a loss of offsite power coincident with a short circuit in a Non-Class 1E cooling fan. This issue was dispositioned as a licensee identified violation in Section
{{a|4OA7}}
==4OA7 of NRC Integrated Inspection Report 05000397/2015002, dated August 7, 2015 (ML15219A143).==
No additional performance deficiencies were identified. This licensee event report is closed.
 
===.2 (Closed) Licensee Event Report 05000397/2015-003-00, "Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 2" During Refueling Outage 22 in May - June 2015, Columbia Generating Station implemented the guidance of Enforcement Guidance Memorandum (EGM) 11-003, Revision 2, "Dispositioning Boiling Water Reactor Licensee Noncompliance with Technical Specification Containment Requirements during Operations with a Potential for Draining the Reactor Vessel," dated December 13, 2013.===
Consistent with EGM 11-003, Revision 2, secondary containment operability was not maintained during operations with a potential for draining the reactor vessel activities, and required action C.2 of Technical Specification 3.6.4.1 was not completed. The inspectors reviewed this licensee event report for potential performance deficiencies and violations of regulatory requirements. The inspectors reviewed the station's implementation of the EGM 11-003, Revision 2, during operations with a potential for draining the reactor vessel. Specific observations included: 
 
===1. The inspectors observed that the operations logged all potential for draining the reactor vessel activities in the control room narrative logs, and that the log entry ===
 
appropriately recorded the standby source of makeup designated for the evolutions. 2. The inspectors noted that the licensee maintained reactor vessel water level at least greater than 21 feet above the top of the reactor pressure vessel flange as required by Technical Specification 3.9.6. The inspectors also verified that at least one safety-related pump was the standby source of makeup designed in the control room narrative logs for the evolutions. The inspectors confirmed that the worst case estimated time to drain the reactor cavity to the reactor pressure vessel flange was greater than 24 hours. 3. The inspectors verified that the operations with a potential for draining the reactor vessels were not conducted in Mode 4 and that the licensee did not move irradiated fuel during the operations with a potential for draining the reactor vessels. The inspectors verified that two independent means of measuring reactor pressure vessel water level were available for identifying the onset of loss of inventory events. Technical Specification 3.6.4.1, "Secondary Containment" requires, in part, that secondary containment shall be operable during operations with a potential for draining the reactor vessel. Technical Specification 3.6.4.1, Condition C, requires the licensee to initiate actions to suspend operations with a potential for draining the reactor vessel immediately when secondary containment is inoperable. Contrary to the above, from May 13 - June 13, 2015, Columbia Generating Station performed a total of five operations with a potential for draining the reactor vessel activities while in Mode 5 without an operable secondary containment. These conditions were reported as conditions prohibited by Technical Specifications. The licensee entered this issue into its corrective action program as Action Request 329328. Since this violation occurred during the discretion period described in EGM 11-003, Revision 2, the NRC is exercising enforcement discretion in accordance with Section 3.5, "Violations Involving Special Circumstances," of the NRC Enforcement Policy, and, therefore, will not issue enforcement action for this violation. In accordance with EGM 11-003, Revision 2, each licensee that receives discretion must submit a license amendment request (LAR) to resolve the issue for its plant which the NRC staff LAR acceptance review finds acceptable in accordance with LIC-109, "Acceptance Review Procedures." The generic solution will be a generic change to the Standard Technical Specifications, and the NRC will publish a notice of availability (NOA) for the TS solution in the Federal Register. Each licensee that receives discretion must submit its amendment request within 12 months of the NRC staff's issuance of the NOA.
 
Licensees may submit LARs to adopt the NRC-approved approach or to propose an alternative approach for their plants. This licensee event report is closed.
 
===.3 (Closed) Licensee Event Report 05000397/2015-004-00, "Unplanned Loss of 4.16KV Bus 7 Switchgear" Revision 0===
On May 22, 2015, the licensee momentarily lost the division 1 vital bus, SM-7, due to a human performance error during maintenance. Specifically, a licensee electrician connected a multi-meter test lead to the wrong port on the instrument which caused an electrical short on SM-7. The SM-7 bus automatically divorced from the startup transformer due to a sensed phase-to-phase short, the short was isolated by a blown fuse, and SM-7 was rapidly repowered by the backup transformer via automatic transfer. The division 1 emergency diesel generator also auto-started from the loss of SM-7 and was secured. At the time of this transient, the plant was in a refueling outage in Mode 5 and crediting division 2 components for safety functions. The inspectors reviewed the licensee event report associated with this event and determined that the report adequately documented the summary of the event including the cause of the event and potential safety consequences. Required components for electrical power, inventory control, and decay heat removal were available and not challenged during the transient. Since this human performance error occurred while the plant was shutdown with division 1 components inoperable for testing, the inspectors did not identify any more than minor performance deficiencies. This licensee event report is closed. These activities constitute completion of three event follow-up samples, as defined in Inspection Procedure 71153.
{{a|4OA6}}
==4OA6 Meetings, Including Exit Exit Meeting Summary On September 24, 2015, the inspectors presented the radiation safety inspection results to Mr. W.G. Hettel, Chief Operating Officer and Chief Nuclear Officer, and other members of the licensee staff.==
The inspection results were re-exited telephonically on October 7, 2015, to update the licensee on enforcement specifics of the non-cited violation. The licensee acknowledged the issues presented. The licensee confirmed that any proprietary information reviewed by the inspectors had been returned or destroyed. On October 1, 2015, the inspectors presented the inspection results to Mr. W.G. Hettel, Chief Operating Officer and Chief Nuclear Officer, and other members of the licensee staff. The licensee acknowledged the issues presented. The licensee confirmed that any proprietary information reviewed by the inspectors had been returned or destroyed.
 
A-1 Attachment
 
=SUPPLEMENTAL INFORMATION=
 
==KEY POINTS OF CONTACT==
 
===Licensee Personnel===
: [[contact::S. Abney]], Assistant Manager, Operations
: [[contact::P. Allen]], System Engineer, System Engineering
: [[contact::D. Brown]], Manager, System Engineering
: [[contact::S. Clizbe]], Manager, Emergency Preparedness
: [[contact::M. Davis]], Manager, Chemistry/Radiation Protection
: [[contact::E. Dumlao]], Senior Engineer
: [[contact::D. Gregoire]], Manager, Regulatory Affairs
: [[contact::J. Hauger]], System Engineering
: [[contact::G. Hettel]], Chief Nuclear Officer and Chief Operating Officer
: [[contact::G. Higgs]], Manager, Maintenance
: [[contact::M. Hummer]], Licensing Engineer
: [[contact::A. Javorik]], Vice President, Engineering
: [[contact::M. Laudisio]], Manager, Radiation Protection
: [[contact::C. Moon]], Manager, Quality
: [[contact::R. Prewett]], Plant General Manager
: [[contact::G. Pierce]], Manager, Training
: [[contact::A. Rice]], Manager, Chemistry
: [[contact::B. Schuetz]], Vice President, Operations
: [[contact::D. Stevens]], Operations Manager
: [[contact::G. Strong]], Electrical Design Supervisor
: [[contact::D. Suarez]], Regulatory Compliance Engineer
: [[contact::J. Tansy]], Reactor Engineering Supervisor
: [[contact::J. Trautvetter]], Compliance Supervisor, Regulatory Affairs
: [[contact::L. Williams]], Licensing Supervisor 
: [[contact::D. Wolfgramm]], Compliance Engineering 
===NRC Personnel===
: [[contact::G. Replogle]], Senior Reactor Analyst 
 
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
 
===Opened and Closed===
: 05000397/2015003-01 FIN Failure to Maintain Seismic Instrumentation Functional to Alert Plant Operators of Ground Motions Exceeding the Operating Basis Earthquake (Section 1R04)
: 05000397/2015003-02 NCV Non-Conservative Shutdown Criteria in Earthquake Abnormal Procedure (Section 1R04)
: 05000397/2015003-03 NCV Failure to Provide Design Control Measures for Control Room Emergency Chillers (Section 1R04)
: 05000397/2015003-04 NCV Failure to Implement Procedures to Ensure Availability of Safe Shutdown Personnel (Section 1R11) 
 
===Opened and Closed===
: 05000397/2015003-05 NCV Failure to Reduce the Free Water in a Class A Unstable Resin Disposal Package to Less than 0.5 Percent of Waste Volume (Section 2RS8) 
===Closed===
: [[Closes LER::05000397/LER-2015-002]]-00 LER Inadequately Fused Non- Class 1E Circuit on Division 1 120/240 VAC Bus (Section 4OA3)
: [[Closes LER::05000397/LER-2015-003]]-00 LER Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 2 (Section 4OA3)
: [[Closes LER::05000397/LER-2015-004]]-00 LER Unplanned Loss of 4.16KV Bus 7 Switchgear (Section 4OA3) 
==LIST OF DOCUMENTS REVIEWED==
==Section 1R01: Adverse Weather Protection==
 
===Procedures===
: Number Title Revision
: ABN-WIND Tornado/High Winds 27
: SOP-HOTWEATHER-OPS Hot Weather Operations 6
: SOP-WARMWEATHER-OPS Warm Weather Operations 11
: SOP-SW-LU Standby Service Water System Valve & Breaker Lineup 6
===Action Requests===
(ARs)
: 293549
: 293878
: 299646
: 300923
: 300999
: 304714
: 308167
: 312775
: 333418 334819
 
==Section 1R04: Equipment Alignment==
 
===Procedures===
: Number Title Revision 1.3.66 Operability and Functionality Evaluation 32 5.0.12 Station Blackout and Extended Loss of AC Power Basis 0
===Procedures===
: Number Title Revision
: ABN-Earthquake Earthquake 13
: ABN-HVAC HVAC Trouble 12
: ISP-SEIS-S402 Triaxial Seismic Switch Model
: SP-1/TS-3 - CFT 3
: ISP-SEIS-S403 Seismic System Reactor Building Foundation Triaxial Response - Spectrum Recorders - CFT 1
: ISP-SEIS-X304 Seismic System Reactor Building Foundation Triaxial Response - Spectrum Recorders - CC 2
: OI-69 Time Critical Operator Actions 4
: OSP-CCH/IST-M702 Control Room Emergency Chiller System B Operability 35
: SOP-HVAC/CR-LU Control, Cable, and Critical Switchgear Rooms HVAC Lineup 1
: SOP-HVAC/CR-START Control, Cable, and Critical Switchgear Rooms HVAC Start 10
: SOP-HVAC/CR-OPS Control, Cable, and Critical Switchgear Rooms HVAC Operation 19
: SOP-RCC-LU RCC System Valve and Breaker Line-Up 1
: SOP-SW-LU Standby Service Water System Valve & Breaker Lineup 6
: TSP-DG2/LOCA-B501 Standby Diesel Generator DG2 LOCA Test 26
: SOP-SLC-LU SLC System Valve and Breaker Lineup 0
: SOP-SGT-LU Standby Gas Treatment System Lineup 0
===Calculations===
: Number Title Revision
: CE-02-90-21 Calculation for Set Points Response Spectrum Indicating Lights 0
: ME-02-92-43 Room Temperature Calculation for DG Building, Reactor Building, Radwaste Building and Service Water 10
===Drawings===
: Number Title Revision
: EWO-101E-008 Electrical Wiring Diagram Heat Trace SLC Pump Suction Piping 2 M522 Flow Diagram Standby Liquid Control System 39
===Miscellaneous===
: Number Title Revision/ Date C92-0020 Component Classification Evaluation Record 0 E555-HT-HTP-8B/A Fuse Detail Report December 15, 2008 ISCR 979 Instrument Setpoint Change Request
: SEIS-RSRT-1/1, 1/2, 1/3 April 30, 1990
: LDCN-11-001, 11-013 Columbia Generating Station Final Safety Analysis Report 61
===Work Orders===
: 02041736
: 02075766
===Action Requests===
(ARs)
: 046497
: 298184
: 302392
: 304002
: 304040
: 307688
: 307703
: 308892
: 311384
: 313567
: 313883
: 313960
: 318811
: 319542
: 323891
: 325520
: 330741 333996
 
==Section 1R05: Fire Protection==
 
===Drawings===
: Number Title Revision E503-1 Motor Control Center General Notes, MCC and Starter Index 86 E535-49A Connection Wiring Diagram Motor Control Center E-MC-7F 23 E535-49B Connection Wiring Diagram Motor Control Center E-MC-7F 23 E753 Radwaste and Control Building Elevation 525'-0" Power Conduit and Tray Plans 41
: PFSS-1 Appendix R Post Fire Safe Shutdown (PFSS) Division 1 Boundaries One Line Diagram 10
===Procedures===
: Number Title Revision 1.3.10A Control of Ignition Sources 15
: FPP-1.6 Combustible Loading Calculation Control 2
: FPP-2.2.12 Annual Fire Door Operability Test 4
: FPP-2.2.7 Fire Protection Water System Inspections 5
: Fire Protection Pre-Plans Number Title Revision
: PFP-RB-422 Reactor 422 5
: PFP-RW-467 Radwaste 467 5
: PFP-RW-484-487 Radwaste 484-487 5
: PFP-RW-525 Radwaste 525 5
 
==Section 1R11: Licensed Operator Requalification Program and Licensed Operator Performance==
 
===Procedures===
: Number Title Revision
: OI-9 Operations Standards and Expectation 62
: OI-45 Color Banding of Control Room Instrumentation 6
: OI-53 Offsite Power 14 1.3.67 Operational Decision Making Process 14 1.3.84 Reactivity Management Control 2 13.1.1 Classifying the Emergency 47 5.1.1 RPV Control 20 5.2.1 Primary Containment Control 22 5.3.1 Secondary Containment Control 19
===Action Requests===
(ARs)
: 332747 333692
 
==Section 1R12: Maintenance Effectiveness==
 
===Procedures===
: Number Title Revision 1.5.11 Maintenance Rule Program 13
: MOT-CHILL-1-1 Chiller Maintenance Scope and Basis Document 7
: MOT-PRV-1-1 Pressure Relief Valve Maintenance Scope and Basis Document 6
===Miscellaneous===
: Number Title Revision/ Date
: Maintenance Rule Evaluations CCH System June 30, 2015
: CCH System Performance Improvement Plan 4 51182 Reactor Operating Events-Event Notification Report June 25, 2015
: CVI 531-00,1,1 Differential Pressure Indicating Switches, Unit, Calibration and Parts List 3
: GEP-6013 Preparation and Installation of the ULTRX Rupture Disc Assembly 2008 IMDS Instrument Master Data Sheets
: DMA-TIS-32A/B 7
===Action Requests===
(ARs)
: 020602
: 020829
: 122680
: 132812
: 135119
: 195492
: 195876
: 226018
: 284341
: 298184
: 304040
: 307688
: 307703
: 307863
: 307897
: 308892
: 308950
: 311597
: 313567
: 313883
: 318811
: 319542
: 320707
: 332078
: 332096
: 332617
: 332889
: 334369 334438
 
==Section 1R13: Maintenance Risk Assessments and Emergent Work Control==
 
===Procedures===
: Number Title Revision
: ABN-CR-EVAC Control Room Evacuation and Remote Cooldown 33
===Procedures===
: Number Title Revision
: OI-14 Columbia Generating Station Operational Challenges and Risk Program 13
: OI-69 Time Critical Operator Actions 4 1.3.1 Operating Policies, Programs, and Practices 119 1.3.76 Integrated Risk Management 44
===Action Requests===
(ARs)
: 302053
: 306204
: 309005
: 311964
: 314936
: 314983
: 319661
: 321848
: 322776
: 323263
: 323364
: 329491
: 333025
: 333041
: 333041
: 333622
: 333731
: 334749
===Work Orders===
(WOs)
: 02082634
===Miscellaneous===
: Number Title Date
: Protected Equipment Tracking Sheet August 20, 2015
: Protected Equipment Tracking Sheet
: September 13, 2015
: Protected Equipment Tracking Sheet
: September 26, 2015
 
==Section 1R15: Operability Determinations and Functionality Assessments==
 
===Procedures===
: Number Title Revision 1.3.66 Operability and Functionality Evaluation 32 4.601.A2 601.A2 Annunciator Panel Alarms 27 5.0.12 Station Blackout and Extended Loss of AC Power Basis 0
: ABN-HVAC HVAC Trouble 12
: OI-69 Time Critical Operator Actions 4
: OI-9 Operations Standards and Expectation 62
===Procedures===
: Number Title Revision
: OSP-CCH/IST-M702 Control Room Emergency Chiller System B Operability 35
: SOP-HOTWEATHER-OPS Hot Weather Operations 6
: SOP-HVAC/CR-LU Control, Cable, and Critical Switchgear Rooms HVAC Lineup 1
: SOP-HVAC/CR-OPS Control, Cable, and Critical Switchgear Rooms HVAC Operation 19
: SOP-HVAC/CR-START Control, Cable, and Critical Switchgear Rooms HVAC Start 10
===Calculations===
: Number Title Revision
: ME-02-89-49 Calculation for Main Steam Isolation Valve Actuator Force Balance 0
: NE-02-85-19 Calculation Post-Fire Safe Shutdown (PFSS) Analysis 7
===Miscellaneous===
: Number Title Revision/ Date 531-00,1,1 Barton Differential Pressure Indicating Switches, Unit, Calibration and Parts List 3 IMDS Instrument Master Data Sheets
: MS-LIS-24A/C 16
: NO 1419 Night Order October 27, 2012
: NO 1653 Night Order July 8, 2015
: TM-2150 Mission Time of Emergency Safety Features 0
===Action Requests===
(ARs)
: 273129
: 332823
: 332326
: 332330
: 332078
: 032562
: 332096
: 021535
: 028598
: 333334 334459
 
==Section 1R18: Plant Modifications==
 
===Miscellaneous===
: Number Title Revision EC14111
: RFW-V-102A Push Rod Assembly 0
 
==Section 1R19: Post-Maintenance Testing==
 
===Procedures===
: Number Title Revision
: OSP-CCH/IST-M701 Control Room Emergency Chiller System A Operability 38
: OSP-RCIC/IST-Q701 RCIC Operability Test 56
: OSP-ELEC-S702 Diesel Generator 2 Semi-Annual Operability Test 55
: SOP-DG2-START Emergency Diesel Generator (DIV 2) Start 26
===Work Orders===
: 02059527
: 02066727
: 02069655
: 02066726
: 02070167
: 02075767
===Miscellaneous===
: Number Title Revision IMDS Instrument Master Data Sheets
: DMA-TIS-32A/B 7
===Action Requests===
(ARs)
: 298184
: 314814
: 319542
: 320386
: 321294
: 323891
: 324941
: 325599
: 331175
: 332159
: 335270
: 335441
: 336314
: 336431 336485
 
==Section 1R22: Surveillance Testing==
 
===Procedures===
: Number Title Revision
: OSP-INST-H101 Shift and Daily Instrument Checks Modes 1, 2, 3 85
: OSP-DO/IST-Q701
: DO-P-1A Operability 14
===Procedures===
: Number Title Revision
: OSP-LPCS/IST-Q702 LPCS System Operability Test 39
===Action Requests===
(ARs)
: 316238
: 326038
: 332078
: 332833
: 335006 335144
 
==Section 1EP6: Drill Evaluation==
 
===Procedures===
: Number Title Revision 5.1.1 RPV Control 20 5.2.1 Primary Containment Control 22 5.3.1 Secondary Containment Control 19 13.1.1 Classifying the Emergency 47
===Action Requests===
(ARs)
: 332756
: 333042
===Miscellaneous===
: Number Title Date
: ERO Team A Drill Guide July 7, 2015
: ERO Team A Drill Report - After Action Improvement Plan July 30, 2015
 
==Section 2RS5: Radiation Monitoring Instrumentation==
 
===Procedures===
: Number Title Revision
: CI-13.10 Canberra iSolo Alpha/Beta Counting System 04
: CI-13.12 Global Value Gamma Ray Analyzer System 03
: CI-13.6 ORTEC Gamma Ray Analyzer System 03
: CI-13.9 Tri-Carb Liquid Scintillation Counting System 03
: HPI-12.100 Calibration of the SAM12 Small Article Monitor 03
: HPI-5.6 FastScan Whole Body Count System 07
===Procedures===
: Number Title Revision
: HPI-7.5 Eberline Model
: RO-2 and
: RO-2A Calibration 10
: PPM 16.1.2 Stack Monitor Low Range Detector
: 14
: PPM 16.2.1 TEA Low Range Noble Gas Monitor Channel 1 10
: PPM 16.4.4 OFFGAS Post Treatment Radiation Monitor CH A
: 16
: PPM 16.7.2
: FDR-RIS-606, Liquid Radwaste Effluent Monitor 08
: PPM 16.7.4 Liquid Radwaste Effluent Line Flow Rate 07
===Action Requests===
(ARs)
: 00307356
: 00308226
: 00308390
: 00308468
: 00309073
: 00309410
: 00310348
: 00312551
: 00319190
: 00319873
: 00325863
: 00326107
: 00334647
: Audits and Self-Assessments Number Title Date
: 301869 Snapshot Self-Assessment Report - Radiation Instruments July 25, 2015
: AU-CH-14 Quality Services Audit Report - Chemistry/REMP/Non-Rad & Rad Effluents/ODCM Program October 23, 2014
: Installed Radiation Instrument Calibration Records WO Number Title Date
: 01167050 TEA Low Range Noble Gas Monitor Channel 1 April 3, 2014
: 02043785 OFFGAS Post Treatment Radiation Monitor CH A May 23, 2015
: 02047822 CC/RC Secondary Containment Isolation Reactor Building Vent Radiation Channel D March 26, 2014
: 02051142 Liquid Radwaste Flow Instrument June 13, 2014
: 02051815 MSL High Radiation Channel A
: June 27, 2014
: 02053216 Stack Monitor Low Range Noble Gas Monitor July 17, 2014
: 02062579 Liquid Radwaste Effluent Radiation Monitor March 3, 2015
: 02066745 Plant Blowdown Discharge Line Flow Rate July 3, 2015 
: Portable Radiation Instrument Calibration Records Number Title Date 3891 Victoreen Model 570 R-Chamber Set January 20, 2014 F112 Ludlum Model 177 Frisker April 1, 2015 NO17 Eberline
: ASP-1 w/ NRD Neutron Detector April 8, 2015 RO196 Eberline
: RO-2 April 24, 2015 RO237 Ludlum Model 14C July 23, 2015 RS26 Thermo/Bicron Micro-Rem Meter April 30, 2015 RV07 Victoreen 451B April 2, 2015 T070 Teletector Model 6112M May 20, 2015
: Stationary Radiation Instrument Calibration Records Number Title Date 36797 iSolo Calibration September 23, 2015
: HP-EQ-42712 SAM12 Small Article Monitor September 23, 2015
: HP-EQ-42734
: GEM-5 July 19, 2015
: HP-EQ-42747
: GEM-5 September 3, 2015
: HP-EQ-42783
: ARGOS-5 A/B July 14, 2015
: HP-EQ-42813 SAM12 Small Article Monitor April 20, 2015
: HP-EQ-C015122
: IPM-8 May 8, 2015 Ortec #5 Efficiency Verification Worksheet Calibration of 47 mm Filter Shelf 1 September 23, 2015 Ortec #5 Efficiency Verification Worksheet Calibration of 250 ml Polybottle - Shelf 1 September 23, 2015 WBC#2 FastScan Calibration July 29, 2015
: WO 02062192 Annual Tritium Quench Curve Calibration June 10, 2015
===Miscellaneous Documents===
: Number Title Revision/Date
: Offsite Dose Calculation Manual 53
: Calibration Lab Irradiator Periodic Dose Rate Decay Adjustment July 7, 2015
===Miscellaneous Documents===
: Number Title Revision/Date 15-02 Calculation of the Activity for K40 Daily Check Source Used with SAM 9/11/12 and
: BM 285 Monitors  (Revises Calculation No. 04-1) June 23, 2015
 
==Section 2RS6: Radioactive Gaseous and Liquid Effluent Treatment==
 
===Procedures===
: Number Title Revision 1.11.12 Removal of Liquids from
: RCA 11 11.2.15.7 Release of Material from Radiologically Controlled Area 21
: TSP-BOP/ISOL-B501 Balance of Plant Isolation Logic System Functional Test 07
: TSP-SGT-B501 Standby Gas Treatment System Functional Test 08 10.2.8 Carbon Filter In Place Testing 08 10.2.82 HEPA Filter In Place Testing
: 07 12.4.21 The Sampling and Determination of Tritium 25 12.5.8 Gaseous Effluent Discharge Sampling 23 12.5.28 Sampling and Analysis for Unrestricted Release 12 16.11.1 Monthly Grab Gas Samples 10 16.11.6 Weekly Iodine, Particulate, and Tritium Analysis Results 15
: MSP-SGT-B102 Standby Gas Treatment System Unit B HEPA Filter Test 04
: MSP-SGT-B103 Standby Gas Treatment Filtration System - Unit A Carbon Adsorber Test 10
: MSP-SGT-B104 Standby Gas Treatment Filtration System - Unit B Carbon Adsorber Test 08 9.3.32 Fuel Integrity Monitoring 12
===Action Requests===
(ARs)
: 00297561
: 00301591
: 00310348
: 00315360
: 00315492
: 00320966
: 00321016
: 00321365
: 00323071
: 00323632
: 00326490
: 00331287
: 00331587
: 00331588
: 00331589
: 00334641
: 00291084       
: Audits, Self-Assessments, and Surveillances Number Title Date
: AU-CH-14 Chemistry-REMP-Non-Rad and Rad Effluents-ODCM Program Audit October 16, 2014
: AU-RP-RW-13 Radiation Protection and Process Control November 16, 2013 23748A NUPIC Audit NCS Corporation September 3, 2014 23748B NUPIC Audit AEP Audit No.
: PA-14-12 November 25, 2014
 
==Section 2RS7: Radiological Environmental Monitoring Program==
 
===Procedures===
: Number Title Revision
: SWP-CHE-01 Groundwater Protection Program 03 PPM 1.11.1 REMP Implementation Procedure - REMP 5.11 Use and Maintenance of Automatic Composite Samplers 02 REMP 9.10 Environmental TLD Calculations 01 REMP 11.01 Milk Sampling 06 Air Cleaning System Surveillance Test Records Number Title Date
: WO 2004423 Standby Gas Treatment Filtration System - Unit A Carbon Adsorber Test July 15, 2013
: WO 2046928 Standby Gas Treatment System Unit B HEPA Filter Test April 28, 2014
: WO 2046928 Standby Gas Treatment Filtration System - Unit B Carbon Adsorber Test April 28, 2014 Title Date 2013 Annual Radioactive Effluent Release Report April 2014 2014 Annual Radioactive Effluent Release Report April 2015 Cross-Check Program 2013 Summary Report February 2014 Cross-Check Program 2014 Summary Report February 2015
===Procedures===
: Number Title Revision REMP 11.02 Soil and Sediment Sampling 03 REMP 11.06 Fish Collection and Preparation 01 REMP 11.07 REMP Water Sample Collection 06 REMP 11.09 REMP Air Sample Collection 05 REMP 12.06 Quality Assurance for the Radiological Laboratory 01 REMP 12.07 Radiological Laboratory Measurement Assurance Program 01
: SOP 11.09r05 REMP Air Sample Collection 05
: Audits, Self-Assessments, and Surveillances Number Title Date
: AR 291084 Perform a Self-Assessment of
: SWP-CHE-01, Groundwater Protection Program Against the Requirements of
: NEI 07-07 January, 2014 15-A-08 Energy Northwest Audit Report 15-A-08 of Mission Support Alliance - Radiological Site Services March 9, 2015
: AU-RP/RW-13 Quality Services Audit Report; Radiation Protection and Process Control program November 2013
: AR-SA:305111 Focused Self-Assessment Report; Radioactive Gaseous and Liquid Effluents; Radiological Environmental Monitoring Program; and Radioactive Solid Waste Processing, Radioactive Material Handling, Storage, and Transportation June 19, 2015
===Action Requests===
(ARs)
: 00320966
: 00303414
: 00335039
: 00331779
: 00300634
: 00317136
: 00333542
: 00318632
: 00320309
: 00316091
: 00321365
: 00325192
: 00329806
: 00331590
: 0033106
: 00333286
: 00299745
: 00334171
: 00334146
: 00303414
===Miscellaneous Documents===
 
==Section 2RS8: Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage, and Transportation==
 
===Procedures===
: Number Title Revision 1.10.1 Notifications and Reportable Events 37 11.2.23.1 Shipping Radioactive Materials and Waste 15 11.2.23.2 Computerized Radioactive Waste and Material Characterization 19 11.2.23.4 Packaging Radioactive Material and Waste 23 11.2.23.14 Sampling of Radioactive Waste Streams
: 12 11.2.23.19 Operation of The Pacific Nuclear Resin Drying System 07, 13, 14 11.2.23.29 LSA Contaminated Laundry Shipments 11 11.2.23.37 Use of the 14D-2.0 Type A Transportation Cask 05 RW000103 Waste Characterizing Computer Code 00 RW000115
: WNP-2 Radwaste Procedure Training 00 RW000116 NRC Packaging and Shipping Regulations 00 RW000117 DOT Packaging and Shipping Regulations 00 RW000118 Burial Site Disposal Requirements 00
: SWP-CHE-02 Chemical Process Management and Control 24 Title Revision/Date Plant Meteorological Tower Data Availability Records, 2013, 2015 and 2015 (Year to Date) September 2015 Plant Specific Logs for Licensee Compliance to Title 10
: Part 50.75.g. (Year to Date) September 2015 2013 Annual Radiological Environmental Operating Report May 2014 2014 Annual Radiological Environmental Operating Report May 2015 Offsite Dose Calculation Manual June 1991 Offsite Dose Calculation Manual 53
===Procedures===
: Number Title Revision
: SWP-RMP-02 Radioactive Waste Process Control Program 05
: Audits, Self-Assessments, and Surveillances Number Title Date
: AU-RP/RW-13 Quality Services Audit Report: Radiation Protection and Process Control Program
: December 3, 2013
: AU-CH-14 Quality Service Audit Report: Chemistry/REMP/Non-Rad and Rad Effluents/ODCM Program October 23, 2014 30511 Focused Self-Assessment Report: Radioactive Gaseous and Liquid Effluents; Radiological Environmental Monitoring Program; Radioactive Solid Waste Processing, Radioactive Material Handling, Storage, and Transportation June 19, 2015 Action Requests (ARs)
: 00297650
: 00300182
: 00308527
: 00316555
: 00316676
: 00316835
: 00316913
: 00320373
: 00323678
: 00323841
: 00325137
: 00332690
: 00332758
: 00333434
: 00333463
: 00333590
: Radioactive Material and Waste Shipments Number Title Date 13-07 RWCU Resin (Non-DOT) March 26, 2013 13-39 12 Boxes of Dry Active Waste (LSA II) June 11, 2013 13-46 12 Boxes of Dry Active Waste (LSA II) June 27, 2013 13-50 Resin Bead, 1 PDX, 8 Boxes of Dry Active Waste (LSA II) August 27, 2013 14-03
: RHR-P-2B (Type A) January 16, 2014 14-10 4 Condensate F/D Resins, 2 Boxes Dry Active Waste (LSA II) May 20, 2014 14-16 EDDR/FDR F/D Resins (LSA II) June 11, 2014 
: Radioactive Material and Waste Shipments Number Title Date 14-32 Condensate F/D Resins - 5 liners (RETURNED) (LSA II) October 9, 2014 14-38 EDR/FDR Resin Condensate (LSA II) December 15, 2014 15-01 Condensate F/D Resins; 4 Boxes Dry Active Waste (LSA II) January 20, 2015 15-43 One 20' C-Van with Dry Active Waste (LSA II) June 4, 2015
: Radiation Work Permits Number Title Revision
: 30003514 2015
: RW 437' Waste Processing NUPAC Cage - LHRA 00
: 30003520 2015 RW NUPAC Cage Processing - LHRA High Risk 00
: 30003498 NRC Tours and Inspections  -
: HRA 00
: Radiological Surveys Number Title Date 4435 ISFSI Building 105 July 27, 2015 4497 Building 167 & C-Vans August 3, 2015 4500 Warehouse 5 (Building 80) August 3, 2015 4710 Building 13 Laundry August 21, 2015 4874 LSA Pad September 8, 2015 5057 Radwaste 437' NUPAC Cage September 23, 2015
 
==Section 4OA1: Performance Indicator Verification==
 
===Procedures===
: Number Title Revision
: CI-10.17 Iodine 12
: CSP-I131-W101 Reactor Coolant Isotopic Analysis for I-131 Dose Equivalent 9
===Miscellaneous===
: Number Title Revision
: MSPI-01-BD-001 MSPI Basis Document 17
: 286838
: 286894
: 332833
: 333421
===Work Orders===
: 02069131
 
==Section 4OA2: Problem Identification and Resolution Procedures Number Title Revision==
: SWP-CAP-06 Condition Report Review 22
===Miscellaneous Documents===
: Number Title Revision/Date ODCM LEP Columbia Generating Station Offsite Dose Calculation Manual 53
: Columbia Generating Station Final Safety Analysis Report - Chapter 11.4, "Solid Waste Management System" 57
: 2013 Annual Radioactive Effluent Release Report April 30, 2014
: DIC 1554.58 Columbia Generating Station Scaling Factor Determination Package March 24, 2015
: 2014 Annual Radioactive Effluent Release Report April 30, 2015
: 10
: CFR 61 Scaling Factor Determination September 17, 2015
===Action Requests===
(ARs)
: 329576
: 333690 334108
 
==Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion==
 
===Procedures===
: Number Title Revision 3.4.1 Minimizing the Potential of Draining the Reactor Vessel 19
===Action Requests===
(ARs)
: 323625
: 326336
: 326573
: 328051
: 328312
: 328726
: 329328       
: The following items are requested for the Public Radiation Safety Inspection Columbia September 21-24, 2015 Integrated Report
: 2015003
: Inspection areas are listed in the attachments below.
: Please provide the requested information on or before August 31, 2015.
: Please submit this information using the same lettering system as below.
: For example, all contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled "1- A," applicable organization charts in file/folder "1- B," etc.
: If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the inspectors will have access to the information while writing the report.
: In addition to the corrective action document lists provided for each inspection procedure listed below, please provide updated lists of corrective action documents at the entrance meeting.
: The dates for these lists should range from the end dates of the original lists to the day of the entrance meeting.
: If more than one inspection procedure is to be conducted and the information requests appear to be redundant, there is no need to provide duplicate copies.
: Enter a note explaining in which file the information can be found.
: If you have any questions or comments, please contact Martin Phalen at (817) 200-1158 or martin.phalen@nrc.gov.
: PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.
: 1.
: Radiation Monitoring Instrumentation (71124.05) Date of Last Inspection: November 8, 2013
: A. List of contacts and telephone numbers for the following areas: 1. Effluent monitor calibration 2. Radiation protection instrument calibration 3. Installed instrument calibrations 4. Count room and Laboratory instrument calibrations B. Applicable organization charts C. Copies of audits, self-assessments, vendor or NUPIC audits for contractor support and LERs, written since date of last inspection, related to:
: 1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey instruments, electronic dosimeters, teledosimetry, personnel contamination monitors, or whole body counters
: 2. Installed radiation monitors D. Procedure index for: 1. Calibration, use and operation of continuous air monitors, criticality monitors, portable survey instruments, temporary area radiation monitors, electronic dosimeters, teledosimetry, personnel contamination monitors, and whole body counters. 2. Calibration of installed radiation monitors E. Please provide specific procedures related to the following areas noted below.
: Additional Specific Procedures will be requested by number after the inspector reviews the procedure indexes.
: 1. Calibration of portable radiation detection instruments (for portable ion chambers) 2. Whole body counter calibration 3. Laboratory instrumentation quality control F. A summary list of corrective action documents (including corporate and sub-tiered systems) written since date of last inspection, related to the following programs: 1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey instruments, electronic dosimeters, teledosimetry, personnel contamination monitors, whole body counters,
: 2. Installed radiation monitors,
: 3. Effluent radiation monitors 4. Count room radiation instruments NOTE: The lists should indicate the significance level of each issue and the search criteria used.
: Please provide in document formats which are "searchable" so that the inspector can perform word searches. G. Offsite dose calculation manual, technical requirements manual, or licensee controlled specifications which lists the effluent monitors and calibration requirements. H. Current calibration data for the whole body counter's. I. Primary to secondary source calibration correlation for effluent monitors. J.
: A list of the point of discharge effluent monitors with the two most recent calibration dates and the work order numbers associated with the calibrations. K. Radiation Monitoring System health report for the previous 12 months 
: 2. Radioactive Gaseous and Liquid Effluent Treatment (71124.06)
: Date of Last Inspection: November 8, 2013
: A. List of contacts and telephone numbers for the following areas: 1. Radiological effluent control 2. Engineered safety feature air cleaning systems B. Applicable organization charts C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs written since date of last inspection, related to: 1.
: Radioactive effluents 2.
: Engineered Safety Feature Air cleaning systems D. Procedure indexes for the following areas 1.
: Radioactive effluents 2.
: Engineered Safety Feature Air cleaning systems E. Please provide specific procedures related to the following areas noted below.
: Additional Specific Procedures will be requested by number after the inspector reviews the procedure indexes.
: 1. Sampling of radioactive effluents 2. Sample analysis 3. Generating radioactive effluent release permits 4. Laboratory instrumentation quality control 5. In-place testing of HEPA filters and charcoal adsorbers 6. New or applicable procedures for effluent programs (e.g., including ground water monitoring programs) F. List of corrective action documents (including corporate and sub-tiered systems) written since date of last inspection, associated with: 1.
: Radioactive effluents 2.
: Effluent radiation monitors 3.
: Engineered Safety Feature Air cleaning systems NOTE: The lists should indicate the significance level of each issue and the search criteria used.
: Please provide in document formats which are "searchable" so that the inspector can perform word searches. G. 2013 and 2014 Annual Radioactive Effluent Release Report or the two most recent reports H. Current Copy of the Offsite Dose Calculation Manual I. Copy of the 2013 and 2014 interlaboratory comparison results for laboratory quality control performance of effluent sample analysis, or the two most recent results.
: J. Effluent sampling schedule for the week of the inspection K. New entries into 10
: CFR 50.75(g) files since date of last inspection L. Operations department (or other responsible dept.) log records for effluent monitors removed from service or out of service M. Listing or log of liquid and gaseous release permits since date of last inspection 
: N. A list of the technical specification-required air cleaning systems with the two most recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers associated with the surveillances 
: O. System Health Report for radiation monitoring instrumentation.
: Also, please provide a specific list of all effluent radiation monitors that were considered inoperable for 7 days or more since November 2011.
: If applicable, please provide the relative Special Report and condition report(s) moreover 
: P. A list of all radiation monitors that are considered §50.65/Maintenance Rule equipment.
: Q. A list of all significant changes made to the Gaseous and Liquid Effluent Process Monitoring System since the last inspection.
: If applicable, please provide the corresponding UFSAR section in which this change was documented.
: R.
: A list of any occurrences in which a non-radioactive system was contaminated by a radioactive system.
: Please include any relative condition report(s).
: 3. Radiological Environmental Monitoring Program (71124.07)
: Date of Last Inspection: November 8, 2013 
: A. List of contacts and telephone numbers for the following areas: 1. Radiological environmental monitoring 2. Meteorological monitoring B. Applicable organization charts C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs written since date of last inspection, related to: 1. Radiological environmental monitoring program (including contractor environmental laboratory audits, if used to perform environmental program functions) 2. Environmental TLD processing facility 3. Meteorological monitoring program D. Procedure index for the following areas: 1. Radiological environmental monitoring program 2. Meteorological monitoring program E. Please provide specific procedures related to the following areas noted below.
: Additional Specific Procedures will be requested by number after the inspector reviews the procedure indexes.
: 1. Environmental Program Description 2. Sampling, collection and preparation of environmental samples 3. Sample analysis (if applicable)
: 4. Laboratory instrumentation quality control 5. Procedures associated with the Offsite Dose Calculation Manual 6. Appropriate QA Audit and program procedures, and/or sections of the station's QA manual (which pertain to the REMP) F. A summary list of corrective action documents (including corporate and sub-tiered systems) written since date of last inspection, related to the following programs: 1. Radiological environmental monitoring 
: 2. Meteorological monitoring
: NOTE: The lists should indicate the significance level of each issue and the search criteria used.
: Please provide in document formats which are "searchable" so that the inspector can perform word searches.
: G. Wind Rose data and evaluations used for establishing environmental sampling locations H. Copies of the 2 most recent calibration packages for the meteorological tower instruments
: I. Copy of the 2013 and 2014 Annual Radiological Environmental Operating Report and Land Use Census, and current revision of the Offsite Dose Calculation Manual, or the two most recent reports. J. Copy of the environmental laboratory's interlaboratory comparison program results for 2013 and 2014, or the two most recent results, if not included in the annual radiological environmental operating report K. Data from the environmental laboratory documenting the analytical detection sensitivities for the various environmental sample media (i.e., air, water, soil, vegetation, and milk) L. Quality Assurance audits (e.g., NUPIC) for contracted services
: M. Current NEI Groundwater Initiative Plan and status
: N.
: Technical requirements manual or licensee controlled specifications which lists the meteorological instruments calibration requirements
: O. A list of Regulatory Guides and/or NUREGs that you are currently committed to relative to the Radiological Environmental Monitoring Program.
: Please include the revision and/or date for the committed item and where this can be located in your current licensing basis/UFSAR.
: P. If applicable, per
: NEI 07-07, provide any reports that document any spills/leaks to groundwater since the last inspection
: 4. Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage, and Transportation (71124.08)
: Date of Last Inspection: November 8, 2013 
: A. List of contacts and telephone numbers for the following areas: 1. Solid Radioactive waste processing 2. Transportation of radioactive material/waste B. Applicable organization charts (and list of personnel involved in solid radwaste processing, transferring, and transportation of radioactive waste/materials) C. Copies of audits, department self-assessments, and LERs written since date of last inspection related to: 1. Solid radioactive waste management 2. Radioactive material/waste transportation program D. Procedure index for the following areas: 1. Solid radioactive waste management 2. Radioactive material/waste transportation 
: E. Please provide specific procedures related to the following areas noted below.
: Additional Specific Procedures will be requested by number after the inspector reviews the procedure indexes.
: 1. Process control program 2. Solid and liquid radioactive waste processing
: 3. Radioactive material/waste shipping
: 4. Methodology used for waste concentration averaging, if applicable 5. Waste stream sampling and analysis F. A summary list of corrective action documents (including corporate and subtiered systems) written since date of last inspection related to: 1. Solid radioactive waste 2. Transportation of radioactive material/waste NOTE: The lists should indicate the significance level of each issue and the search criteria used.
: Please provide in document formats which are "searchable" so that the inspector can perform word searches. G. Copies of training lesson plans for 49CFR172 subpart H, for radwaste processing, packaging, and shipping
: H. A summary of radioactive material and radioactive waste shipments made from date of last inspection to present
: I. Waste stream sample analyses results and resulting scaling factors for 2013, 2014, and 2915, or the two most recent results
: J. Waste classification reports if performed by vendors (such as for irradiated hardware)
: K. A listing of all onsite radwaste storage facilities.
: Please include a summary or listing of the items stored in each facility, including the total amount of radioactivity and the highest general area dose rate
: Although it is not necessary to compile the following information, the inspector will also review:
: L. Training, and qualifications records of personnel responsible for the conduct of radioactive waste processing, package preparation, and shipping
}}
}}

Latest revision as of 05:29, 31 October 2019

IR 05000397/2015003, July 1, 2015 Through September 30, 2015, Columbia Generating Station Exercise of Enforcement Discretion
ML15316A834
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/12/2015
From: Troy Pruett
NRC/RGN-IV/DRP
To: Reddemann M
Energy Northwest
Ryan Alexander
References
EA-15-202 IR 2015003
Download: ML15316A834 (62)


See also: IR 05000397/2015003

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

November 12, 2015

EA-15-202

Mr. M.E. Reddemann

Chief Executive Officer

Energy Northwest

P.O. Box 968, Mail Drop 1023

Richland, WA 99352-0968

SUBJECT: COLUMBIA GENERATING STATION - NRC INTEGRATED INSPECTION

REPORT 05000397/2015003 AND EXERCISE OF ENFORCEMENT

DISCRETION

Dear Mr. Reddemann,

On September 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an

inspection at your Columbia Generating Station. On October 1, 2015, the NRC inspectors

discussed the results of this inspection with Mr. W.G. Hettel, Chief Operating Officer and Chief

Nuclear Officer, and other members of your staff. The inspectors documented the results of this

inspection in the enclosed inspection report.

NRC inspectors documented five findings of very low safety significance (Green) in this report.

Four of these findings involved violations of NRC requirements. The NRC is treating these

violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the NRC

Enforcement Policy.

Additionally, a violation involving the failure to maintain the operability of secondary containment

during Operations with a Potential to Drain the Reactor Vessel (OPDRV) was identified.

Specifically, from May 13, 2015, through June 13, 2015, Columbia Generating Station

performed five OPDRV activities with secondary containment inoperable in violation of

Technical Specification (TS) 3.6.4.1, Secondary Containment. The NRC issued EGM 11-003,

Enforcement Guidance Memorandum on Dispositioning Boiling Water Reactor Licensee

Noncompliance with Technical Specification Containment Requirements During Operations with

a Potential for Draining the Reactor Vessel, Revision 2, on December 13, 2013, allowing for the

exercise of enforcement discretion for OPDRV-related TS violations, when certain criteria are

met. The NRC concluded that Columbia Generating Station met these criteria. Because the

violation was identified during the discretion period described in EGM 11-003, the NRC is

exercising enforcement discretion in accordance with Section 3.5, Violations Involving Special

Circumstances, of the NRC Enforcement Policy and, therefore, will not issue enforcement

action for this violation, subject to a timely license amendment request being submitted.

If you contest the violations or significance of these NCVs, you should provide a response within

30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with

M. Reddemann -2-

copies to the Regional Administrator, Region IV; the Director, Office of Enforcement,

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident

inspector at the Columbia Generating Station.

If you disagree with a cross-cutting aspect assignment or a finding not associated with a

regulatory requirement in this report, you should provide a response within 30 days of the date

of this inspection report, with the basis for your disagreement, to the Regional Administrator,

Region IV; and the NRC resident inspector at the Columbia Generating Station.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, a copy of this letter, its enclosure, and your

response (if any) will be available electronically for public inspection in the NRCs Public

Document Room or from the Publicly Available Records (PARS) component of the NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA/

Troy W. Pruett

Director

Division of Reactor Projects

Docket Nos. 50-397

License Nos. NPF-21

Enclosure: Inspection Report 05000397/2015003

w/ Attachment: Supplemental

Information

cc w/ encl: Electronic Distribution

ML15316A834

SUNSI Review Non-Sensitive Publicly Available Keyword:

By: JRG Sensitive Non-Publicly Available

OFFICE RIV/DRP RIV/DRP RIV/DRP RIV/DRS RIV/DRS RIV/DRS RIV/DRS

NAME DBradley JGroom RAlexander TFarnholtz VGaddy MHaire HGepford

SIGNATURE /RA/ via E /RA/ via E /RA/ /RA/ /RA/ /RA/ /RA/

KClayton for

DATE 11/3/15 11/3/15 11/5/15 11/4/15 11/5/15 11/5/15 11/2/15

OFFICE RIV/DRS RIV/TSS RIV/ACES RIV/DRP RIV/DRP

NAME GWerner ERuesch JKramer RSmith TPruett

SIGNATURE /RA/ /RA/ /RA/ via E /RA/ /RA/

ERuesch for

DATE 11/6/15 11/6/15 11/3/15 11/6/15 11/12/15

M. Reddemann -3-

Letter to M.E. Reddemann from T. Pruett dated November 12, 2015

SUBJECT: COLUMBIA GENERATING STATION - NRC INTEGRATED INSPECTION

REPORT 05000397/2015003 AND EXERCISE OF ENFORCEMENT

DISCRETION

DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeremy.Groom@nrc.gov)

Resident Inspector (Dan.Bradley@nrc.gov)

Site Administrative Assistant (Vacant)

Incoming Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)

Acting Branch Chief, DRP/A (Rich.Smith@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer (Thomas.Sullivan@nrc.gov)

Project Engineer (Mathew.Kirk@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)

ROP Reports (ROPreports.Resource@nrc.gov)

ROP Assessment Resource (ROPassessment.Resource@nrc.gov)

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Docket: 05000397

License: NPF-21

Report: 05000397/2015003

Licensee: Energy Northwest

Facility: Columbia Generating Station

Location: North Power Plant Loop

Richland, WA 99354

Dates: July 1, 2015 through September 30, 2015

Inspectors: D. Bradley, Resident Inspector

L. Carson, Senior Health Physicist

N. Greene, PhD, Health Physicist

J. Groom, Senior Resident Inspector

J. ODonnell, CHP, Health Physicist

M. Phalen, Senior Health Physicist

C. Stott, Project Engineer

Approved Richard Smith

By: Acting Chief, Projects Branch A

Division of Reactor Projects

-1- Enclosure

SUMMARY

IR 05000397/2015003; 07/01/2015 - 09/30/2015; Columbia Generating Station; Equipment

Alignment, Licensed Operator Performance, Radioactive Solid Waste Processing.

The inspection activities described in this report were performed between July 1 and September

30, 2015, by the resident inspectors at Columbia Generating Station and inspectors from the

NRCs Region IV office. Five findings of very low safety significance (Green) are documented in

this report. Four of these findings involved violations of NRC requirements. The significance of

inspection findings is indicated by their color (Green, White, Yellow, or Red), which is

determined using Inspection Manual Chapter 0609, Significance Determination Process. Their

cross-cutting aspects are determined using Inspection Manual Chapter 0310, Aspects within

the Cross-Cutting Areas. Violations of NRC requirements are dispositioned in accordance with

the NRC Enforcement Policy. The NRCs program for overseeing the safe operation of

commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process.

Cornerstone: Mitigating Systems

  • Green. The inspectors identified a finding associated with the licensees failure to maintain

seismic instrumentation functional as required by Licensee Controlled Specification 1.3.7.2,

Seismic Monitoring Instrumentation. Specifically, because of inadequate calibration

procedures, several as-left setpoints for the seismic response spectrum recorders indicating

lights were non-conservative relative to their function to alert operators of ground motion

exceeding the operating basis earthquake (OBE). Following discovery of this issue, the

licensee recalibrated the seismic response spectrum recorders using OBE ground motions

as the upper tolerance. The licensee entered this issue into their corrective action program

as Action Request 333996.

The performance deficiency was more than minor because it affected the configuration

control attribute of the Mitigating Systems Cornerstone objective and adversely affected the

cornerstone objective to ensure the availability, reliability, and capability of systems that

respond to initiating events to prevent undesirable consequences. Specifically, the

performance deficiency resulted in seismic instruments calibrations that were non-

conservative relative to their function to alert plant operators that a shutdown is required.

NRC regulations require a plant shutdown since systems necessary for continued operation

without undue risk to the health and safety of the public are not designed to remain

functional, in all cases, following an OBE. The inspector performed the initial significance

determination using NRC Inspection Manual Chapter 0609, Appendix A, Exhibit 2,

Mitigating Systems Screening Questions. The inspectors determined that the finding was

of very low safety significance because (1) the finding was not a deficiency affecting the

design or qualification of a mitigating system; (2) the finding did not represent a loss of

system and/or function; (3) the finding did not represent an actual loss of function of a single

train for greater than its technical specification allowed outage time; and (4) the finding does

not represent an actual loss of function of one or more non-technical specification trains of

equipment designated as high safety-significant in accordance with the licensees

maintenance rule program for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Additionally, the finding did not involve

the loss or degradation of equipment or function specifically designed to mitigate a seismic,

flooding, or severe weather initiating event. The finding does not have a cross-cutting

aspect since the configuration control error is associated with an instrument setpoint change

request from 1990 and therefore not reflective of current licensee performance.

(Section 1R04)

-2-

Procedures, for the failure to maintain an adequate abnormal procedure for earthquakes.

Specifically, the licensee failed to establish appropriate shutdown criteria for earthquakes

that exhibit ground motion exceeding the operating basis earthquake (OBE). The licensees

shutdown criteria would allow for continued operations if ground motion at a single

frequency exceeded the design response spectrum. In response to this issue, the licensee

initiated corrective actions to change the stations earthquake abnormal procedure to

provide shutdown criteria consistent with the original licensing basis of the facility. The

licensee entered this issue into their corrective action program as Action Request 336875.

The performance deficiency was more than minor because it affected the procedural

adequacy attribute of the Mitigating Systems Cornerstone objective and adversely affected

the cornerstone objective to ensure the availability, reliability, and capability of systems that

respond to initiating events to prevent undesirable consequences. Specifically, the

performance deficiency resulted in shutdown criteria that would allow for continued

operations following events where ground motion at a single frequency exceeded the design

response spectra. NRC regulations require a plant shutdown since systems necessary for

continued operation without undue risk to the health and safety of the public are not

designed to remain functional, in all cases, following an OBE. The inspector performed the

initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A,

Exhibit 2, Mitigating Systems Screening Questions. The inspectors determined that the

finding was of very low safety significance because (1) the finding was not a deficiency

affecting the design or qualification of a mitigating system; (2) the finding did not represent a

loss of system and/or function; (3) the finding did not represent an actual loss of function of

a single train for greater than its technical specification allowed outage time; and (4) the

finding does not represent an actual loss of function of one or more non-technical

specification trains of equipment designated as high safety-significant in accordance with

the licensees maintenance rule program for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Additionally, the finding

did not involve the loss or degradation of equipment or function specifically designed to

mitigate a seismic, flooding, or severe weather initiating event. The finding does not have a

cross-cutting aspect since the procedure error is associated with a 1996 change to the

licensing basis and therefore not reflective of current licensee performance. (Section 1R04)

III, Design Control, for the licensees failure to verify the adequacy of the design of the

control room HVAC system. Specifically, the licensee failed to demonstrate the ability of

control room HVAC design to maintain the temperatures in the main control room below

habitability and environmental qualification limits, for the duration of all accident scenarios.

The licensee initiated Action Request 332565 to document the concern, issued night order

1662 to communicate the issue, aligned both control room air handling units to their

respective chillers, created a quick card procedure to perform the chiller reset actions, and

validated the quick card actions could be accomplished within 10 minutes. Additionally, the

licensee determined that operators could restore the chillers during accident conditions

within 90 minutes to prevent temperatures from exceeding equipment operability limits.

The performance deficiency was more than minor because it adversely affected the design

control attribute of the Mitigating Systems Cornerstone objective to ensure the availability,

reliability, and capability of systems that respond to initiating events to prevent undesirable

consequences. Using NRC Inspection Manual Chapter 0609, Appendix A, Exhibit 2,

Mitigating Systems Screening Questions, the inspectors determined the finding was of

-3-

very low safety significance because (1) the finding was not a deficiency affecting the design

or qualification of a mitigating system; (2) the finding did not represent a loss of system

and/or function; (3) the finding did not represent an actual loss of function of a single train for

greater than its technical specification allowed outage time; and (4) the finding does not

represent an actual loss of function of one or more non-technical specification trains of

equipment designated as high safety-significant in accordance with the licensees

maintenance rule program for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This finding had a cross-cutting aspect

in the area of problem identification and resolution, evaluation, in that the licensee did not

thoroughly evaluate issues to ensure that resolutions address causes and extent of

conditions commensurate with their safety significance. Specifically, the licensee did not

thoroughly evaluate the extent of condition from NRC-identified NCV 05000397/2013002-04,

Failure to Obtain NRC Approval for Changes to Control Room HVAC Requirements, for

the effect of this change on other station calculations [P.2]. (Section 1R04)

Procedures, for the licensees failure to ensure operators could perform time-critical steps

for fire events. Specifically, on July 4, 2015, the licensee failed to implement written

procedures to ensure that an equipment operator can complete certain post-fire safe-

shutdown actions within 10 minutes. In response to this conclusion, the licensee initiated

Action Request 332747 to document the inability to meet the post-fire safe-shutdown actions

in accordance with procedure PPM 1.3.1, Operating Policy, Programs, and Practices,

Revision 119. Additionally, the licensee issued Night Order 1655, reminding all operating

crews of the requirements of procedure PPM 1.3.1 for leaving the protected area.

This performance deficiency was more than minor because it was associated with the

protection against external factors attribute of the Mitigating System Cornerstone and

affected the cornerstones objective to ensure the availability, reliability, and capability of

systems that respond to initiating events to prevent undesirable consequences. A senior

reactor analyst performed a detailed significance determination process review using NRC

Inspection Manual Chapter 0609, Appendix F, Fire Protection Significance Determination,

dated September 20, 2013 and NRC Inspection Manual 0308, Attachment 3, Appendix F,

Technical Basis Fire Protection Significance Determination Process (Supplemental

Guidance for Implementing IMC 0609, Appendix F) At Power Operations, dated February

28, 2005. The senior reactor analyst determined that the failure of the equipment operator

to perform the certain post-fire safe-shutdown actions within 10 minutes would not adversely

affect a quantitative risk assessment, and therefore this finding was of very low safety

significance (Green). This finding has a cross-cutting aspect in the area of Human

Performance, Teamwork, because the licensee failed to communicate and to coordinate

their activities within and across organizational boundaries to ensure nuclear safety is

maintained. Specifically, the equipment operator spoke with the shift technical advisor

about the need to exit the protected area at the morning turnover meeting but neither

individual spoke with the control room supervisor. Communication was ineffective in that the

Equipment Operator believed permission was granted and proceeded to exit the protected

area [H.4]. (Section 1R11)

Cornerstone: Public Radiation Safety

  • Green. The inspectors reviewed a self-revealing, non-cited violation of Technical

Specification 5.4.1.a, Procedures, for the licensees failure to follow their Process Control

Program as implemented by their solid radioactive waste system procedures. Specifically,

the licensee failed to reduce the free standing liquid in a condensate filter demineralizer

-4-

resin disposal package (Liner 14-033-L) to less than the required 0.5 percent of the total

waste volume. Corrective actions included retrieving the packages from waste shipment 14-

32, testing each liner for free standing liquid content, and removing additional water as

necessary. The licensee documented this issue in their corrective action program as Action

Requests 00316555 and 00316676.

The failure to follow the Process Control Program, resulting in the inadequate dewatering of

radioactive waste liner contents, was a performance deficiency. The inspectors determined

that the performance deficiency was more than minor, because it adversely affected the

Public Radiation Safety cornerstone objective to ensure adequate protection of public health

and safety from exposure to radioactive materials released in the public domain.

Specifically, the failure to ensure that the free standing liquid in the radioactive waste liner

shipped to US Ecology did not exceed 0.5 percent of the total waste volume subjected the

disposal facility to the possibility of improper handling of the waste. Using Inspection

Manual Chapter 0609, Appendix D, Public Radiation Safety Significance Determination

Process, dated February 12, 2008, the inspectors determined the violation was of very low

safety significance (Green) because: (1) radiation limits were not exceeded, (2) there was

no breach of the package during transit, (3) there were no Certificate of Compliance issues,

and (4) the low level burial ground nonconformance did not involve a 10 CFR 61.55 waste

under-classification. The inspectors determined that the finding has a design margin cross-

cutting aspect in the area of human performance, because the licensee failed to operate and

maintain the radioactive waste dewatering system within the vendor design margins when

changes were made to the operating procedures [H.6]. (Section 2RS8)

-5-

PLANT STATUS

The plant began the inspection period at approximately 65 percent power while troubleshooting

a non-safety feedwater valve. On July 23, 2015, the plant returned to 100 percent power. On

July 24, 2015, the plant experienced a loss of the B recirculation pump and power was reduced

to approximately 34 percent. Following repair to a non-safety cooling system supporting the

recirculation pump, the plant returned to 100 percent power on July 26, 2015. The plant

remained at 100 percent power for the remainder of the inspection period.

REPORT DETAILS

1. REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity

1R01 Adverse Weather Protection (71111.01)

.1 Readiness for Seasonal Extreme Weather Conditions

a. Inspection Scope

On July 22, 2015, the inspectors completed an inspection of the stations readiness for

seasonal extreme weather conditions. The inspectors reviewed the licensees adverse

weather procedures for seasonal high temperatures and evaluated the licensees

implementation of these procedures. The inspectors verified that prior to the onset of

hot weather, the licensee had corrected weather-related equipment deficiencies

identified during the previous season.

The inspectors selected three risk-significant systems that were required to be protected

from seasonal high temperatures:

The inspectors reviewed the licensees procedures and design information to ensure the

systems would remain functional when challenged by adverse weather. The inspectors

verified that operator actions described in the licensees procedures were adequate to

maintain readiness of these systems. The inspectors walked down portions of these

systems to verify the physical condition of the adverse weather protection features.

These activities constituted one sample of readiness for seasonal adverse weather, as

defined in Inspection Procedure 71111.01.

b. Findings

No findings were identified.

-6-

.2 Readiness for Impending Adverse Weather Conditions

a. Inspection Scope

On August 20, 2015, the inspectors completed an inspection of the stations readiness

for impending adverse weather conditions involving high winds. The inspectors

reviewed plant design features, the licensees procedures to respond to tornadoes and

high winds, and the licensees potential implementation of these procedures. The

inspectors evaluated operator staffing and accessibility of controls and indications for

those systems required to control the plant.

These activities constituted one sample of readiness for impending adverse weather

conditions, as defined in Inspection Procedure 71111.01.

b. Findings

No findings were identified.

1R04 Equipment Alignment (71111.04)

.1 Partial Walkdown

a. Inspection Scope

The inspectors performed partial system walk-downs of the following risk-significant

systems:

  • July 2, 2015, control room emergency chillers
  • July 20, 2015, seismic instrumentation

The inspectors reviewed the licensees procedures and system design information to

determine the correct lineup for the systems. They visually verified that critical portions

of the systems were correctly aligned for the existing plant configuration.

These activities constituted four partial system walk-down samples as defined in

Inspection Procedure 71111.04.

b. Findings

.1 Failure to Maintain Seismic Instrumentation Functional to Alert Plant Operators of

Ground Motions Exceeding the Operating Basis Earthquake

Introduction. The inspectors identified a Green finding associated with the licensees

failure to maintain seismic instrumentation functional as required by Licensee Controlled

Specification (LCS) 1.3.7.2, Seismic Monitoring Instrumentation. Specifically, because

of inadequate calibration procedures, several as-left setpoints for the seismic response

-7-

spectrum recorders indicating lights were non-conservative relative to their function to

alert operators of ground motion exceeding the operating basis earthquake.

Description. On July 20, 2015, the inspectors reviewed the design and calibration

settings for the Columbia Generating Station seismic triaxial response spectrum

recorders, designated SEIS-RSRT-1/1, 1/2 and 1/3. The seismic RSRTs consist of three

units, two horizontal and one vertical, each containing twelve frequency sensitive reeds

used to passively record earthquake ground motions. The RSRTs have a secondary

function to provide visual warnings to operators of exceedances of pre-determined

ground acceleration limits. The RSRTs include red lights to indicate that operating basis

earthquake (OBE) ground motions have been exceeded at certain frequencies.

Licensee Control Specification 1.3.7.2 requires that the seismic instrumentation,

including the triaxial response spectra recorders, remain functional to ensure the

capability to promptly determine the magnitude of a seismic event and initiate evaluation

of the seismic response features important to safety. In particular, the RSRTs red

indicating lights are described in Columbia Generating Station FSAR, Section 3.7.4.4, as

equipment used to alert plant operators that a shutdown is required. Title 10 CFR Part 100, Appendix A, Seismic and Geologic Siting Criteria for Nuclear Power Plants,

requires a plant shutdown if vibratory ground motion exceeding the OBE occurs. The

OBE is defined as the earthquake which produces the vibratory ground motion where

features of the nuclear power plant necessary for continued operation without undue risk

to the health and safety of the public are designed to remain functional.

The inspectors reviewed calculation CE-02-90-21, Setpoints for Response Spectrum

Indicating Lights, Revision 0, used to establish the ground acceleration levels where the

RSRT red indicating lights illuminate. The calculation determined target acceleration

values for the RSRT red indicating lights based on the most conservative OBE seismic

response spectra for the reactor building base mat. This setpoint methodology was

consistent with Regulatory Guide 1.12, Nuclear Power Plant Instrumentation for

Earthquakes, Revision 1, and American Nuclear Society ANS Standard 2.2,

Earthquake Instrumentation Criteria for Nuclear Power Plants, 1978. This regulatory

guidance provided acceptable methods for meeting the seismic instrumentation

requirements in 10 CFR Part 100, Appendix A and recommended a response spectrum

recorder with setpoints established at OBE ground motions.

The inspectors compared the setpoints established in calculation CE-02-90-21 to the

setpoints found in calibration implementing procedure ISP-SEIS-X304, Seismic System

Reactor Building Foundation Triaxial Response - Spectrum Recorder - CC, Revision 1.

Instrument Setpoint Change Request 979, dated April 30, 1990, established allowable

setpoints and included an upper and lower tolerance of approximately 5-10 percent from

the nominal setpoints established in calculation CE-02-90-21. The inspectors compared

the setpoints against the design basis earthquake and concluded that since the nominal

setpoint exactly matched the OBE ground motion values, the upper tolerance would, in

all cases, result in setpoints that exceed the OBE seismic ground motion response

spectra at the reactor building base mat.

The inspector reviewed the as-left setpoints for SEIS-RSRT-1/1, 1/2 and 1/3 and

identified 12 of 36 setpoints that exceeded the nominal target accelerations established

in calculation CE-02-90-21, resulting in red indicating lights that would not illuminate until

after OBE seismic ground motions were exceeded. The inspectors concluded that these

as-left setpoints were non-conservative relative to their LCS required function to alert

-8-

plant operators of the need for a plant shutdown as required by 10 CFR 100 and the

Columbia Generating Station FSAR.

On August 3, 2015, plant operators declared SEIS-RSRT-1/1, 1/2 and 1/3 non-functional

due to non-conservative setpoints for the systems red indicating lights and entered LCS

1.3.7.2, Condition A. During the period that SEIS-RSRT-1/1, 1/2 and 1/3 were non-

functional, the passive features of the seismic monitoring system were still available for

earthquake evaluation. On August 10, 2015, the licensee established new setpoints for

SEIS-RSRT-1/1, 1/2 and 1/3 using OBE ground motions as the upper tolerance. On

August 18, 2015, the licensee completed a calibration using the revised setpoints and

exited LCS 1.3.7.2, Condition A. The licensee entered this issue into their corrective

action program as Action Request 333996.

Analysis. The failure to maintain seismic instruments functional to provide indications of

exceeding the OBE seismic ground motion response spectra was a performance

deficiency. The performance deficiency was more than minor because it affected the

configuration control attribute of the Mitigating Systems Cornerstone objective and

adversely affected the cornerstone objective to ensure the availability, reliability, and

capability of systems that respond to initiating events to prevent undesirable

consequences. Specifically, the performance deficiency resulted in seismic instrument

calibrations that were non-conservative relative to their function to alert plant operators

that a shutdown is required. NRC regulations require a plant shutdown since systems

necessary for continued operation without undue risk to the health and safety of the

public are not designed to remain functional, in all cases, following an OBE. The

inspector performed the initial significance determination using NRC Inspection Manual

Chapter 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions. The

inspectors determined that the finding was of very low safety significance because

(1) the finding was not a deficiency affecting the design or qualification of a mitigating

system; (2) the finding did not represent a loss of system and/or function; (3) the finding

did not represent an actual loss of function of a single train for greater than its technical

specification allowed outage time; and (4) the finding does not represent an actual loss

of function of one or more non-technical specification trains of equipment designated as

high safety-significant in accordance with the licensees maintenance rule program for

greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Additionally, the finding did not involve the loss or degradation of

equipment or function specifically designed to mitigate a seismic, flooding, or severe

weather initiating event. The finding does not have a cross-cutting aspect since the

configuration control error is associated with an instrument setpoint change request from

1990 and therefore not reflective of current licensee performance.

Enforcement. Enforcement action does not apply because the performance deficiency

did not involve a violation of regulatory requirements. The finding is of very low safety

significance and the issue was entered into the licensee's corrective action program as

Action Request 333996. (FIN 05000397/2015003-01, Failure to Maintain Seismic

Instrumentation Functional to Alert Plant Operators of Ground Motions Exceeding the

Operating Basis Earthquake)

.2 Non-Conservative Shutdown Criteria in Earthquake Abnormal Procedure

Introduction. The inspectors identified a Green, non-cited violation of Technical

Specification 5.4.1.a, Procedures, for the failure to maintain an adequate abnormal

procedure for earthquakes. Specifically, the licensee failed to establish appropriate

-9-

shutdown criteria for earthquakes that exhibit ground motion exceeding the OBE.

Description. On July 20, 2015, the inspectors performed a review of the Columbia

Generating Station seismic instrumentation and monitoring (SEIS) system. The SEIS

system, described in the Final Safety Analysis Report, Section 3.7.4, Seismic

Instrumentation, consists of multiple passive and active subsystems used to record

earthquake ground motion and to alert plant operators that design response spectra

have been exceeded. One of those subsystems are the triaxial response-spectrum

recorders used for comparison of measured and predicted earthquake responses. Final

Safety Analysis Report, Section 3.7.4.4 provides guidance that if an earthquake is felt in

the control room and the spectra experienced at the foundation of the reactor building

exceeds the OBE acceleration levels as indicated on two or more response spectra

indicating lights, the plant will be shut down pending permission to resume operations.

The shutdown criteria in abnormal procedure ABN-Earthquake, Revisions 0-13,

reflected the shutdown criteria found in FSAR Section 3.7.4.4.

The inspectors questioned the need for two or more response spectra indicating lights to

indicate that operating basis earthquake acceleration levels were exceeded prior to

initiating a plant shutdown. The inspectors reviewed 10 CFR Part 100, Appendix A,

which states, in part, that if vibratory ground motion exceeding that of the OBE occurs,

shutdown of the nuclear power plant will be required. The inspectors determined that

the licensees shutdown criteria in Final Safety Analysis Report, Section 3.7.4.4 and

incorporated into abnormal procedure ABN-Earthquake was contrary to 10 CFR Part 100, Appendix A. Specifically, the licensees shutdown criteria would allow for

continued operations if ground motion at a single frequency exceeded the design

response spectrum. The inspectors reviewed historical licensing basis for Columbia

Generating Station and found that FSAR Amendment 33, in effect when the full power

operating license was issued for the station, provided the following:

If the Instrumentation shows that the peak acceleration or the response spectra

experienced at the foundation of the reactor building exceeds the operating basis

earthquake acceleration levels or response spectra, the plant will be shut down

pending permission to resume operations.

The inspector discovered that the licensee changed FSAR Section 3.7.4.4 under

licensing document change notice LDCN 96-079, dated December 12, 1996. This

LDCNs purpose was to strike a balance between ensuring that actions are not taken on

a spurious signal and taking conservative actions following an earthquake. The

inspectors agreed that shutdown of the plant due to a spurious signal was not desirable

but that in the case of a single, valid indication that the OBE design response spectra

was exceeded, shutdown of the nuclear power plant was required. The inspectors

determined that the change implemented in LDCN 96-079 resulted in a non-conservative

shutdown criteria compared to the regulatory requirements in 10 CFR Part 100,

Appendix A.

In response to this issue, the licensee initiated corrective actions to change abnormal

procedure ABN-Earthquake to provide a shutdown criteria consistent with the original

licensing basis of the facility. The licensee entered this issue into their corrective action

program as AR 336875.

- 10 -

Analysis. The failure to establish appropriate shutdown criteria in abnormal procedures

for earthquakes was a performance deficiency. The performance deficiency was more

than minor because it affected the procedural adequacy attribute of the Mitigating

Systems Cornerstone objective and adversely affected the cornerstone objective to

ensure the availability, reliability, and capability of systems that respond to initiating

events to prevent undesirable consequences. Specifically, the performance deficiency

resulted in shutdown criteria that would allow for continued operations following events

where ground motion at a single frequency exceeded the design response spectra.

NRC regulations require a plant shutdown since systems necessary for continued

operation without undue risk to the health and safety of the public are not designed to

remain functional, in all cases, following an OBE. The inspector performed the initial

significance determination using NRC Inspection Manual Chapter 0609, Appendix A,

Exhibit 2, Mitigating Systems Screening Questions. The inspectors determined that

the finding was of very low safety significance because (1) the finding was not a

deficiency affecting the design or qualification of a mitigating system; (2) the finding did

not represent a loss of system and/or function; (3) the finding did not represent an actual

loss of function of a single train for greater than its technical specification allowed outage

time; and (4) the finding does not represent an actual loss of function of one or more

non-technical specification trains of equipment designated as high safety-significant in

accordance with the licensees maintenance rule program for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Additionally, the finding did not involve the loss or degradation of equipment or function

specifically designed to mitigate a seismic, flooding, or severe weather initiating event.

The finding does not have a cross-cutting aspect since the procedure error is associated

with a 1996 change to the licensing basis and therefore not reflective of current licensee

performance.

Enforcement. Technical Specification 5.4.1.a, Procedures, requires, in part, that written

procedures be established, implemented, and maintained as recommended in

Regulatory Guide 1.33, Revision 2, Appendix A, dated February 1978. Paragraph 6.w.

of Regulatory Guide 1.33, Appendix A, requires specific procedures for acts of Nature

(e.g., tornado, flood, dam failure, earthquakes). Licensee Procedure ABN-Earthquake,

Earthquake, Revision 0-13, is a procedure, required by Paragraph 6.w. of Regulatory

Guide 1.33, Appendix A for earthquakes. Contrary to the above, from August 8, 2005 to

the present, the licensee failed to maintain an adequate procedure as recommended in

Regulatory Guide 1.33, Revision 2, Appendix A, Paragraph 6.w. Specifically, the

shutdown criteria specified in Step 4.4 of procedure ABN-Earthquake, Revisions 0-13

was non-conservative relative to the shutdown criteria in 10 CFR 100, Appendix A

because it would allow for continued operations if ground motion at a single frequency

exceeded the design response spectrum. The licensee initiated corrective actions to

change abnormal procedure ABN-Earthquake to provide a shutdown criteria consistent

with the original licensing basis of the facility. Because this finding is of very low safety

significance and entered into the licensees corrective action program as Action Request

336875, the violation is being treated as a non-cited violation consistent with Section

2.3.2.a of the NRC Enforcement Policy. (NCV 05000397/2015003-02,

Non-Conservative Shutdown Criteria in Earthquake Abnormal Procedure)

.3 Failure to Provide Design Control Measures for Control Room Emergency Chillers

Introduction. The inspectors identified a Green, non-cited violation of 10 CFR 50,

Appendix B, Criterion III, Design Control, for the licensees failure to verify the

adequacy of the design of the control room HVAC system. Specifically, the licensee

- 11 -

failed to demonstrate the ability of control room HVAC design to maintain the

temperatures in the main control room below habitability and environmental qualification

limits, for the duration of all accident scenarios.

Description. On July 2, 2015, the inspectors performed a review of the control room

HVAC system with a focus on the control room emergency chillers. The Final Safety

Analysis Report, Section 9.4.1.1, Design Basis states, in part, that the design of the

control room HVAC system is such that in an emergency condition, the control room

temperature will be maintained within the habitability limit (85°F) by the control room

chilled water. Service water can maintain the control room temperature limit of 85°F

during colder weather. Service water will maintain the control room within the

environmental qualification temperature limit for control room equipment (104°F).

The inspectors noted that the vendor manuals for the control room emergency chillers

described an automatic trip feature that required local resetting. Specifically, the

manufacturer states the following in the Normal Operating Sequence section of the

manual:

Shutdown where the unit cannot automatically restartShutdown on a power

failure produces the same results as for a safety shutdown except relay 14R is

de-energizedIt is necessary to depress the STOP-RESET button to energize

relay 14R when power is restored after interruption.

The inspectors reviewed relevant electrical diagrams and confirmed that operation of the

control room emergency chillers required a local reset of relay 14R following a loss of

power. The alignment of the control room HVAC system is such that the division 1 air

handling unit, WMA-AH-51A, is aligned to standby service water and the division 2 air

handling unit, WMA-AH-51B, is aligned to chill water. Because of the design feature

involving the relay 14R and the alignment of the air-handling units, the inspectors

identified that:

1) Following any event that resulted in a loss of offsite power with a single-failure of the

Division 1 emergency diesel generator, the control room would not receive cooling

via WMA-AH-51B, the only operable air handling unit, until the local chiller reset

pushbutton was depressed. The control room would remain without cooling until this

manual reset was accomplished since relay 14R would be de-energized.

2) Following certain events involving a loss of offsite power with a single-failure of the

Division 2 emergency diesel generator, the control room would experience reduced,

and in some instances, no external cooling. In particular, when ambient conditions

would not allow service water alone to maintain the control room below the 85°F

habitability limit, operators would be prompted to secure standby service water

cooling to WMA-AH-51A and realign cooling from the control room emergency

chillers system. The inspectors noted that during the shift between standby service

water and control room emergency chill water, there would be a brief period when

the control room would receive no external cooling.

For each of the above scenarios, temperatures in the control room could exceed 85°F or

104°F due to times necessary for system realignment or local resetting manual actions.

At the time of the inspection, procedure OI-69, Time Critical Operator Actions,

Revision 5, did not identify any required manual actions associated with local reset or

- 12 -

realignment of the control room HVAC system. This procedure defines a time critical

action as a manual action, or series of actions that must be completed within a specified

time to meet the plant-licensing basis.

The inspectors reviewed calculation ME-02-92-43, Room Temperature Calculation for

DG Building, Reactor Building, Radwaste Building, and Service Water, Revision 10, and

noted that this calculation covers the control room air-handling units but only considers

steady-state conditions for heat exchanger performance. There is no discussion in

ME-02-92-43 for transient scenarios where the control room would receive no external

cooling, such as those involving local resetting of control room emergency chillers or

during required shifts between standby service water and control room emergency chill

water.

The inspectors requested a design analysis that demonstrated the ability of control room

HVAC design to maintain the temperatures in the main control room below habitability

and environmental qualification limits during these transient situations. The licensee

was unable to locate a design verification that demonstrated the ability of the control

room HVAC system during transient scenarios following a loss of power and could not

determine the peak control room temperature nor the impact to habitability or equipment

qualification in these scenarios.

The inspectors reviewed previous inspection reports for the station and noted one

related finding: NRC-identified NCV 05000397/2013002-04, Failure to Obtain NRC

Approval for Changes to Control Room HVAC Requirements. This NCV identified an

incorrect value for the control room temperature limit and resulted in the current value as

found in the licensees design basis. The inspectors determined that the extent of

condition review from this 2013 finding did not adequately consider the effects of

lowering a design habitability temperature for the control room from 104°F to 85°F,

necessitating the need for the control room emergency chillers. Specifically, when

evaluating the correct habitability limit of 85°F, the licensee only considered the steady

state cooling needs of the control room and not the transient effects experienced

because of the chiller design.

In response to the NRCs conclusions, the licensee initiated Action Request 332565 to

document the concern, issued night order 1662 to communicate the issue, aligned both

control room air handling units to their respective chillers, created a quick card

procedure to perform the chiller reset actions, and validated the quick card actions could

be accomplished within 10 minutes. Additionally, the licensee determined that operators

could restore the chillers during accident conditions within 90 minutes to prevent

temperatures from exceeding equipment operability limits.

Analysis. The failure to provide design control measures to verify the adequacy of the

design of the control room emergency chillers was a performance deficiency. The

performance deficiency was more than minor because it adversely affected the design

control attribute of the Mitigating Systems Cornerstone objective to ensure the

availability, reliability, and capability of systems that respond to initiating events to

prevent undesirable consequences. Specifically, the licensee failed to demonstrate the

ability of control room HVAC design to maintain the temperatures in the main control

room below habitability and environmental qualification limits, for the duration of all

accident scenarios. Using NRC Inspection Manual Chapter 0609, Appendix A, Exhibit 2,

Mitigating Systems Screening Questions, the inspectors determined the finding was of

- 13 -

very low safety significance because (1) the finding was not a deficiency affecting the

design or qualification of a mitigating system; (2) the finding did not represent a loss of

system and/or function; (3) the finding did not represent an actual loss of function of a

single train for greater than its technical specification allowed outage time; and (4) the

finding does not represent an actual loss of function of one or more non-technical

specification trains of equipment designated as high safety-significant in accordance with

the licensees maintenance rule program for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This finding had a

cross-cutting aspect in the area of problem identification and resolution, evaluation, in

that the licensee did not thoroughly evaluate issues to ensure that resolutions address

causes and extent of conditions commensurate with their safety significance.

Specifically, the licensee did not thoroughly evaluate the extent of condition from

NRC-identified NCV 05000397/2013002-04, Failure to Obtain NRC Approval for

Changes to Control Room HVAC Requirements, for the effect of this change on other

station calculations [P.2].

Enforcement. Title 10 CFR Part 50, Appendix B, Criterion III, Design Control, requires,

in part, that design control measures shall provide for verifying or checking the adequacy

of design, such as by the performance of design reviews, by the use of alternate or

simplified calculational methods, or by the performance of a suitable testing program.

Final Safety Analysis Report, Section 9.4.1.1, Design Basis, established the design of

the control room HVAC system and specified, in part, that during emergency conditions,

the control room temperature will be maintained within the habitability limit (85°F) by the

control room chilled water. Service water can maintain the control room temperature

limit of 85°F during colder weather. Service water will maintain the control room within

the environmental qualification temperature limit for control room equipment (104°F).

Contrary to the above, prior to July 2, 2015, the licensee failed to implement design

control measures for verifying or checking the adequacy of design, such as by the

performance of design reviews, by the use of alternate or simplified calculational

methods, or by the performance of a suitable testing program. Specifically, the licensee

failed to verify the adequacy of the design of the control room emergency chillers

involving loss of offsite power scenarios that result in transient losses of control room

cooling such that the design basis, established in Final Safety Analysis Report, Section

9.4.1.1 was ensured.

The licensee initiated Action Request 332565 to document the concern, issued night

order 1662 to communicate the issue, aligned both control room air handling units to

their respective chillers, created a quick card procedure to perform the chiller reset

actions, and validated the quick card actions could be accomplished within 10 minutes.

Because the finding is of very low safety significance (Green) and has been entered into

the licensees corrective action program, this violation is being treated as a non-cited

violation, consistent with Section 2.3.2.a of the NRC Enforcement Policy. (NCV 05000397/2015003-03, Failure to Provide Design Control Measures for Control Room

Emergency Chillers)

- 14 -

1R05 Fire Protection (71111.05)

.1 Quarterly Inspection

a. Inspection Scope

The inspectors evaluated the licensees fire protection program for operational status

and material condition. The inspectors focused their inspection on four plant areas

important to safety:

  • July 1, 2015, Fire Areas RC-4, 5, 6, 7, 8, and 9 and RC-14, radioactive waste

building 467 elevation vital island

  • July 14, 2015, Fire Area R-8, low pressure core spray pump room
  • July 15, 2015, Fire Area RC-11, 12 and 13, radioactive waste building 525

elevation

For each area, the inspectors evaluated the fire plan against defined hazards and

defense-in-depth features in the licensees fire protection program. The inspectors

evaluated control of transient combustibles and ignition sources, fire detection and

suppression systems, manual firefighting equipment and capability, passive fire

protection features, and compensatory measures for degraded conditions.

These activities constituted four quarterly inspection samples, as defined in Inspection

Procedure 71111.05.

b. Findings

No findings were identified.

1R06 Flood Protection Measures (71111.06)

a. Inspection Scope

On July 21, 2015, the inspectors completed an inspection of underground bunkers

susceptible to flooding. The inspectors selected one underground vault, electrical

manhole E-MH-08, that contained risk-significant or multiple-train cables whose failure

could disable risk-significant equipment.

The inspectors observed the material condition of the cables and splices contained in

the bunkers vaults and looked for evidence of cable degradation due to water intrusion.

The inspectors verified that the cables and vaults met design requirements.

These activities constitute completion of one bunker/manhole sample, as defined in

Inspection Procedure 71111.06.

- 15 -

b. Findings

No findings were identified.

1R11 Licensed Operator Requalification Program and Licensed Operator Performance

(71111.11)

.1 Review of Licensed Operator Requalification

a. Inspection Scope

On July 29, 2015, the inspectors observed an evaluated simulator scenario performed

by an operating crew. The inspectors assessed the performance of the operators and

the evaluators critique of their performance. The inspectors also assessed the modeling

and performance of the simulator during the requalification activities.

These activities constitute completion of one quarterly licensed operator requalification

program sample, as defined in Inspection Procedure 71111.11.

b. Findings

No findings were identified.

.2 Review of Licensed Operator Performance

a. Inspection Scope

On August 5, 2015, the inspectors observed the performance of on-shift licensed

operators in the plants main control room. At the time of the observations, the plant was

in a period of heightened risk due to an unplanned orange risk window for Bonneville

Power Administrations emergent work on the 230 kV switchyard. The inspectors

observed the operators performance of the following activities:

  • Leak repair on the digital electro-hydraulic system under WO 02086051,

including the pre-job brief

In addition, the inspectors assessed the operators adherence to plant procedures,

including procedure PPM 1.3.1, Operating Policy, Programs, and Practices, Revision

119 and other operations department policies.

These activities constitute completion of one quarterly licensed operator performance

sample, as defined in Inspection Procedure 71111.11.

b. Findings

Introduction. The inspectors identified a Green, non-cited violation of Technical

Specification 5.4.1.a, Procedures, for the licensees failure to ensure operators could

perform time-critical steps for fire events. Specifically, the licensee failed to implement

written procedures to ensure that Category 2 personnel, needed for post-fire safe

shutdown, can complete required actions within 10 minutes.

- 16 -

Description. During a log review, the inspectors identified that an equipment operator

(OPS3) left the protected area (PA) to compile equipment logs on July 4, 2015, at 8:57

AM and again at 4:37 PM. Licensee procedure PPM 1.3.1, Operating Policy, Programs,

and Practices, Revision 119, classifies watch positions as either Category 1 or

Category 2. Category 1 personnel include the shift technical advisor (STA) and

emergency action level notifier. Category 2 personnel include the shift manager (SM),

all three reactor operators, the control room supervisor (CRS), and the OPS2 and OPS3

equipment operator positions. Procedure PPM 1.3.1 states that while Category 1

personnel may leave the PA with a risk evaluation and permission of the shift manager,

Category 2 personnel should not leave the protected area unless an emergent condition

is jeopardizing the plant and they respond to an event that requires action within 10

minutes. The OPS3 equipment operator is a Category 2 watchstander because in the

event of a control room fire, they must trip the condensate and condensate booster

pumps within 10 minutes. These actions are proceduralized in ABN-CR-EVAC, Control

Room Evacuation and Remote Cooldown, Revision 33.

The inspectors questioned the ability of OPS3 to move from outside the PA to their

required station in a timely manner. The inspectors noted that the licensee performed a

timed walkthrough of post-fire safe-shutdown actions for OPS3 for a similar issue in

2014. Specifically, the evaluation for NRC-identified NCV 05000397/2014003-02,

Failure to Implement Procedures That Ensure Operators Could Perform Time Critical

Steps for Fire Events concluded that OPS3 was not able to complete certain post-fire

safe-shutdown actions within 10 minutes when initially located outside the PA. Instead,

the equipment operator completed the required actions within 11 minutes and 33

seconds. The inspectors determined that this previous walkthrough from 2014 is

representative of the issue identified on July 4, 2015 and no additional timed

walkthrough was required.

The inspectors concluded that by allowing Category 2 personnel to leave the PA, the

licensee had not preserved the assumptions of available personnel in ABN-CR-EVAC to

reach safe-shutdown conditions for a control room fire. Therefore, the licensee was not

implementing written procedures for plant fires and responsibilities for safe operation as

required by Technical Specification 5.4.1.a through Appendix A of Regulatory Guide 1.33, Quality Assurance Program Requirements (Operation), Revision 2.

In response to this conclusion, the licensee initiated AR 332747 to document the inability

to meet the post-fire safe-shutdown actions in accordance with procedure PPM 1.3.1.

Additionally, the licensee issued Night Order 1655, reminding all operating crews of the

requirements of procedure PPM 1.3.1 for leaving the PA. Through interviews, the

licensee determined that the equipment operator discussed the need to leave the PA

with the STA. Neither individual, however, discussed the situation with CRS, SM, or

reviewed the relevant PPM 1.3.1 procedure.

Analysis. The failure to implement written procedures to ensure that Category 2

personnel can complete certain post-fire safe-shutdown actions within 10 minutes was a

performance deficiency. This performance deficiency was more than minor because it

was associated with the protection against external factors attribute of the Mitigating

System Cornerstone and affected the cornerstones objective to ensure the availability,

reliability, and capability of systems that respond to initiating events to prevent

undesirable consequences. Specifically, by allowing Category 2 personnel to leave the

protected area, the licensee had not preserved the assumptions of available personnel

- 17 -

in ABN-CR-EVAC to reach safe-shutdown conditions for a control room fire. The

inspectors screened the finding in accordance with NRC Manual Chapter IMC 0609,

Attachment 4, Initial Characterization of Findings. In table 3, the inspectors answered

yes to question E.2 because the finding affects the ability to reach and maintain safe

shutdown conditions in case of a fire. Therefore, to assess this finding, a senior reactor

analyst used NRC IMC 0609, Appendix F, Fire Protection Significance Determination,

dated September 20, 2013. The analyst noted that the degradation rating examples in

Attachment 2 of that appendix were not well suited for this finding. Therefore, the

analyst used the generic guidance from NRC IMC 0308, Attachment 3, Appendix F,

Technical Basis Fire Protection Significance Determination Process (Supplemental

Guidance for Implementing IMC 0609, Appendix F) At Power Operations, dated

February 28, 2005. This guidance stated, in part:

the definition of low degradation implies that the performance and/or reliability

of the fire protection feature is not substantially impacted by the noted

degradation finding. Hence, the feature would be given essentially full credit in

the PRA-based analysis. In this case, the risk change is essentially zero, and the

finding should be screened to Green.

For this finding, procedure ABN-CR-EVAC directed operator OPS3 to trip the

condensate and condensate booster pumps within 10 minutes, but due to this finding,

that action could be delayed to the 11.5 minute point. The subject action was intended

to prevent taking the plant to a solid (completely filled) condition. However, the analyst

noted that the failure to take this action would not increase the core damage probability

(overfilling events at boiling water reactors soon after shutdown should not drive core

damage and are not included in the probabilistic risk assessment model). Instead, this

action is a desired step that was intended to establish positive control over reactor

vessel pressure and level. In addition, the exposure period for this finding was very

short (less than one day). Since the failure to perform this action within 10 minutes

would not adversely affect a quantitative assessment, this finding was of very low safety

significance (Green). This finding has a cross-cutting aspect in the area of Human

Performance, Teamwork, because the licensee failed to communicate and to coordinate

their activities within and across organizational boundaries to ensure nuclear safety is

maintained. Specifically, the equipment operator spoke with the STA about the need to

exit the PA at the morning turnover meeting but neither individual spoke with the CRS.

Communication was ineffective in that the equipment operator believed permission was

granted and proceeded to exit the PA [H.4].

Enforcement. Technical Specification 5.4.1.a, Procedures requires, in part, that written

procedures shall be established, implemented, and maintained for activities described in

Appendix A of the Regulatory Guide 1.33, Revision 2, February 1978. Regulatory Guide 1.33, Appendix A, Section 1.b requires administrative procedures for authorities and

responsibilities for safe operation and shutdown. Licensee procedure PPM 1.3.1,

Operating Policy, Programs, and Practices, Revision 119, a procedure required by

Section 1.b of Regulatory Guide 1.33, Appendix A, establishes authorities and

responsibilities for safe operation and shutdown, and states that Category 2 personnel

should not leave the protected area unless an emergent condition is jeopardizing the

plant and they respond to an event that requires action within 10 minutes. Contrary to

this requirement, on July 4, 2015, Category 2 personnel (i.e., an equipment operator) left

the protected area when no emergent condition jeopardizing the plant existed and

therefore was unable to respond to an event that requires action within 10 minutes.

- 18 -

Specifically, the operator would not be able to complete certain time-critical operator

actions associated with fire events as required by procedure ABN-CR-EVAC, Control

Room Evacuation and Remote Cooldown, Revision 33.

The licensee initiated Action Request 332747 to document the non-compliance with

PPM 1.3.1. Additionally, the licensee issued Night Order 1655 reminding all operating

crews of the requirements of PPM 1.3.1 for leaving the Protected Area. Because this

violation was of very low safety significance and was entered into the licensees

corrective action program, this violation is being treated as a non-cited violation,

consistent with Section 2.3.2.a of the Enforcement Policy. (NCV 05000397/2015003-04,

Failure to Implement Procedures to Ensure Availability of Safe Shutdown Personnel)

1R12 Maintenance Effectiveness (71111.12)

a. Inspection Scope

The inspectors reviewed two instances of degraded performance or condition of safety-

related structures, systems, and components (SSCs):

  • July 10, 2015, system review of control room emergency chillers including

maintenance history of system rupture discs

  • September 10, 2015, main steam level indicating switches including maintenance

history involving internal binding failures documented in AR 332078

The inspectors reviewed the extent of condition of possible common cause SSC failures

and evaluated the adequacy of the licensees corrective actions. The inspectors

reviewed the licensees work practices to evaluate whether these may have played a

role in the degradation of the SSCs. The inspectors assessed the licensees

characterization of the degradation in accordance with 10 CFR 50.65 (the Maintenance

Rule), and verified that the licensee was appropriately tracking degraded performance

and conditions in accordance with the Maintenance Rule.

These activities constituted completion of two maintenance effectiveness samples, as

defined in Inspection Procedure 71111.12.

b. Findings

No findings were identified.

1R13 Maintenance Risk Assessments and Emergent Work Control (71111.13)

a. Inspection Scope

The inspectors reviewed two risk assessments performed by the licensee prior to

changes in plant configuration and the risk management actions taken by the licensee in

response to elevated risk:

  • August 20, 2015, planned yellow risk for a diesel generator 2 monthly

surveillance under Work Order 02068579

- 19 -

system work window under Work Order 02078715

The inspectors verified that these risk assessments were performed timely and in

accordance with the requirements of 10 CFR 50.65 (the Maintenance Rule) and plant

procedures. The inspectors reviewed the accuracy and completeness of the licensees

risk assessments and verified that the licensee implemented appropriate risk

management actions based on the result of the assessments.

Additionally, on September 28, 2015, the inspectors observed the operators response to

emergent work activities that resulted in unplanned unavailability of emergency diesel

generator 2. The inspectors verified that the licensee took precautions to minimize the

impact of the work activities on unaffected SSCs.

These activities constitute completion of three maintenance risk assessments and

emergent work control inspection samples, as defined in Inspection Procedure 71111.13.

b. Findings

No findings were identified.

1R15 Operability Determinations and Functionality Assessments (71111.15)

a. Inspection Scope

The inspectors reviewed four operability determinations that the licensee performed for

degraded or nonconforming SSCs:

switches MS-LIS-24A and C indicating abnormally high

system operability during venting operations

isolation valve MS-V-22D

  • August 13, 2015, AR 334459, documenting concerns related to required manual

actions for the control room HVAC system emergency chillers

The inspectors reviewed the timeliness and technical adequacy of the licensees

evaluations. Where the licensee determined the degraded SSC to be operable, the

inspectors verified that the licensees compensatory measures were appropriate to

provide reasonable assurance of operability. The inspectors verified that the licensee

had considered the effect of other degraded conditions on the operability of the

degraded SSC.

These activities constitute completion of four operability and functionality review samples

as defined in Inspection Procedure 71111.15.

- 20 -

b. Findings

No findings were identified.

1R18 Plant Modifications (71111.18)

a. Inspection Scope

On July 1, 2015, the inspectors reviewed a temporary modification of reactor feedwater

valve RFW-V-102A under Engineering Change EC14111. The inspectors verified that

the licensee had installed this temporary modification in accordance with technically

adequate design documents. The inspectors verified that this modification did not

adversely impact the operability or availability of affected SSCs. The inspectors

reviewed design documentation and plant procedures affected by the modification to

verify the licensee maintained configuration control.

These activities constitute completion of one sample of temporary modifications, as

defined in Inspection Procedure 71111.18.

b. Findings

No findings were identified.

1R19 Post-Maintenance Testing (71111.19)

a. Inspection Scope

The inspectors reviewed four post-maintenance testing activities that affected risk-

significant SSCs:

  • August 5, 2015, post-maintenance test for service water temperature control

valve SW-TCV-11A, following maintenance under WO 02075767

  • August 26, 2015, post-maintenance test for the Division 3 diesel mixed air

system, following maintenance under WO 02066727

system, following maintenance under Work Order 02078715

  • September 28, 2015, post-maintenance test for the Division 2 diesel generator,

following replacement of shutdown relays under Work Order 02002258

The inspectors reviewed licensing- and design-basis documents for the SSCs and the

maintenance and post-maintenance test procedures. The inspectors observed the

performance of the post-maintenance tests to verify that the licensee performed the tests

in accordance with approved procedures, satisfied the established acceptance criteria,

and restored the operability of the affected SSCs.

These activities constitute completion of four post-maintenance testing inspection

samples, as defined in Inspection Procedure 71111.19.

- 21 -

b. Findings

No findings were identified.

1R22 Surveillance Testing (71111.22)

a. Inspection Scope

The inspectors observed three risk-significant surveillance tests and reviewed test

results to verify that these tests adequately demonstrated that the SSCs were capable of

performing their safety functions:

Routine tests:

  • August 6, 2015, procedure OSP-DO/IST-Q701, DO-P-1A Operability, Revision

14, including a surveillance for the diesel generator fuel oil transfer pump

In-service tests:

  • September 8, 2015, procedure OSP-LPCS/IST-Q702, LPCS System Operability

Test, Revision 39

Reactor coolant system leak detection tests:

  • September 16, 2015, procedure OSP-INST-H101, Shift and Daily Instrument

Checks Modes 1, 2, 3 Revision 85, including reactor coolant system leakage

calculation

The inspectors verified that these tests met technical specification requirements, that the

licensee performed the tests in accordance with their procedures, and that the results of

the test satisfied appropriate acceptance criteria. The inspectors verified that the

licensee restored the operability of the affected SSCs following testing.

These activities constitute completion of three surveillance testing inspection samples,

as defined in Inspection Procedure 71111.22.

b. Findings

No findings were identified.

Cornerstone: Emergency Preparedness

1EP6 Drill Evaluation (71114.06)

.1 Emergency Preparedness Drill Observation

a. Inspection Scope

The inspectors observed an emergency preparedness drill on July 7, 2015, to verify the

adequacy and capability of the licensees assessment of drill performance. The

inspectors reviewed the drill scenario, observed the drill from the simulator, technical

support center, operations support center and emergency operations facility, and

attended the post-drill critique. The inspectors verified that the licensees emergency

classifications, off-site notifications, and protective action recommendations were

- 22 -

appropriate and timely. The inspectors verified that any emergency preparedness

weaknesses were appropriately identified by the licensee in the post-drill critique and

entered into the corrective action program for resolution.

These activities constitute completion of one emergency preparedness drill observation

sample, as defined in Inspection Procedure 71114.06.

b. Findings

No findings were identified.

2. RADIATION SAFETY

Cornerstones: Occupational Radiation Safety and Public Radiation Safety

2RS5 Radiation Monitoring Instrumentation (71124.05)

a. Inspection Scope

The inspectors evaluated the accuracy and operability of the radiation monitoring

equipment used by the licensee (1) to monitor areas, materials, and workers to ensure a

radiologically safe work environment, and (2) to detect and quantify radioactive process

streams and effluent releases. The inspectors interviewed licensee personnel, walked

down various portions of the plant, and reviewed licensee performance in the following

areas:

  • Selected plant configurations and alignments of process, post-accident, and

effluent monitors with descriptions in the Final Safety Analysis Report and the

offsite dose calculation manual

  • Selected instrumentation, including effluent monitoring instrument, portable

survey instruments, area radiation monitors, continuous air monitors, personnel

contamination monitors, portal monitors, and small article monitors to examine

their configurations and source checks

  • Calibration and testing of process and effluent monitors, laboratory

instrumentation, whole body counters, post-accident monitoring instrumentation,

portal monitors, personnel contamination monitors, small article monitors,

portable survey instruments, area radiation monitors, electronic dosimetry, air

samplers, and continuous air monitors

  • Audits, self-assessments, and corrective action documents related to radiation

monitoring instrumentation since the last inspection

These activities constitute completion of one sample of radiation monitoring instrumentation

as defined in Inspection Procedure 71124.05.

b. Findings

No findings were identified.

- 23 -

2RS6 Radioactive Gaseous and Liquid Effluent Treatment (71124.06)

a. Inspection Scope

The inspectors evaluated whether the licensee maintained gaseous and liquid effluent

processing systems and properly mitigated, monitored, and evaluated radiological

discharges with respect to public exposure. The inspectors verified that abnormal

radioactive gaseous or liquid discharges and conditions, when effluent radiation monitors

are out-of-service, were controlled in accordance with the applicable regulatory

requirements and licensee procedures. The inspectors verified that the licensees

quality control program ensured radioactive effluent sampling and analysis adequately

quantified and evaluated discharges of radioactive materials. The inspectors verified the

adequacy of public dose projections resulting from radioactive effluent discharges. The

inspectors interviewed licensee personnel and reviewed or observed the following items:

  • Radiological effluent release reports since the previous inspection and reports

related to the effluent program issued since the previous inspection

  • Effluent program implementing procedures, including sampling, monitor setpoint

determinations and dose calculations

  • Equipment configuration and flow paths of selected gaseous and liquid discharge

system components, filtered ventilation system material condition, and significant

changes to their effluent release points, if any, and associated 10 CFR 50.59

reviews

  • Selected portions of the routine processing and discharge of radioactive gaseous

and liquid effluents (including sample collection and analysis)

  • Controls used to ensure representative sampling and appropriate compensatory

sampling

  • Results of the inter-laboratory comparison program
  • Effluent stack flow rates
  • Surveillance test results of technical specification-required ventilation effluent

discharge systems since the previous inspection

  • Significant changes in reported dose values
  • A selection of radioactive liquid and gaseous waste discharge permits
  • Part 61 analyses and methods used to determine which isotopes are included in

the source term

  • Meteorological dispersion and deposition factors

- 24 -

  • Latest land use census
  • Records of abnormal gaseous or liquid tank discharges
  • Groundwater monitoring results
  • Changes to the licensees written program for identifying and controlling

contaminated spills/leaks to groundwater

  • Identified leakage or spill events and entries made into 10 CFR 50.75(g) records,

if any, and associated evaluations of the extent of the contamination and the

radiological source term

  • Offsite notifications, and reports of events associated with spills, leaks, and

groundwater monitoring results

  • Audits, self-assessments, reports, and corrective action documents related to

radioactive gaseous and liquid effluent treatment since the last inspection

These activities constitute completion of one sample of radioactive gaseous and liquid

effluent treatment, as defined in Inspection Procedure 71124.06.

b. Findings

No findings were identified.

2RS7 Radiological Environmental Monitoring Program (71124.07)

a. Inspection Scope

The inspectors evaluated whether the licensees radiological environmental monitoring

program quantified the impact of radioactive effluent releases to the environment and

sufficiently validated the integrity of the radioactive gaseous and liquid effluent release

program. The inspectors verified that the radiological environmental monitoring program

was implemented consistent with the licensees technical specifications and offsite dose

calculation manual, and that the radioactive effluent release program met the design

objective in Appendix I to 10 CFR Part 50. The inspectors verified that the licensees

radiological environmental monitoring program monitored non-effluent exposure

pathways, was based on sound principles and assumptions, and validated that doses to

members of the public were within regulatory dose limits. The inspectors reviewed or

observed the following items:

  • Selected air sampling and dosimeter monitoring stations
  • Collection and preparation of environmental samples
  • Operability, calibration, and maintenance of meteorological instruments

- 25 -

  • Selected events documented in the annual environmental monitoring report

which involved a missed sample, inoperable sampler, lost dosimeter, or

anomalous measurement

  • Selected structures, systems, or components that may contain licensed material

and has a credible mechanism for licensed material to reach ground water

as the result of changes to the land census or sampler station modifications since

the last inspection

  • Calibration and maintenance records for selected air samplers, composite water

samplers, and environmental sample radiation measurement instrumentation

  • Inter-laboratory comparison program results
  • Audits, self-assessments, reports, and corrective action documents related to the

radiological environmental monitoring program since the last inspection

These activities constitute completion of one sample of radiological environmental

monitoring program as defined in Inspection Procedure 71124.07.

b. Findings

No findings were identified.

2RS8 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage,

and Transportation (71124.08)

a. Inspection Scope

The inspectors evaluated the effectiveness of the licensees programs for processing,

handling, storage, and transportation of radioactive material. The inspectors interviewed

licensee personnel and reviewed the following items:

scope of the licensees audit program

  • Control of radioactive waste storage areas including container labeling/marking

and monitoring containers for deformation or signs of waste decomposition

  • Changes to the liquid and solid waste processing system configuration including

a review of waste processing equipment that is not operational or abandoned in

place

  • Radio-chemical sample analysis results for radioactive waste streams and use of

scaling factors and calculations to account for difficult-to-measure radionuclides

- 26 -

  • Processes for waste classification including use of scaling factors and

10 CFR Part 61 analysis

  • Shipment packaging, surveying, labeling, marking, placarding, vehicle checking,

driver instructing, and preparation of the disposal manifest

  • Audits, self-assessments, reports, and corrective action reports radioactive solid

waste processing, and radioactive material handling, storage, and transportation

performed since the last inspection

These activities constitute completion of one sample of radioactive solid waste

processing, and radioactive material handling, storage, and transportation as defined in

Inspection Procedure 71124.08.

b. Findings

Introduction. The inspectors reviewed a Green, self-revealing, non-cited violation of

Technical Specification 5.4.1.a, Procedures, for the licensees failure to follow their

Process Control Program as implemented by their solid radioactive waste system

procedures. The licensee shipped a radioactive shipment of condensate filter

demineralizer resin waste for disposal to US Ecology of Washington with free standing

liquid in excess of 0.5 percent of the total waste volume.

Description. On August 11, 2014, the licensee completed dewatering and drying of resin

for a condensate demineralizer filter waste liner (14-033-L). On October 9, 2014,

radioactive waste liner 14-033-L was shipped to US Ecology for disposal at their low

level radioactive waste burial site near Richland, Washington. The liner was part of

radioactive waste shipment #14-32 and manifested as a Class A Unstable waste form.

On October 23, 2014, liner 14-033-L was randomly selected by the burial site for

inspection to ensure compliance with the disposal sites license conditions. US Ecology

punctured the bottom of the liner and determined that the liner contained free standing

liquid, as evidenced by a slurry mix (150 ml) that drained from the puncture hole. On

October 27, 2014, US Ecology continued their inspection of liner 14-033-L by fully

opening the liner lid and sampling for additional free standing liquid. The inspection

results revealed that over 8.5 gallons of free standing liquid was contained within the

liner. This represented approximately 0.75 percent of the total waste volume (1132

gallons) and was in excess of the 0.5 percent free standing liquid requirement for

unstable waste form. US Ecology contacted the licensee and informed them of the

burial site noncompliance.

The licensee retrieved the packages (i.e., liners) contained in shipment #14-32 from US

Ecology. Each liner was then tested for free standing liquid content and additional water

was removed as necessary. This issue was entered into the licensees corrective action

program as Action Request 00316676, and an apparent cause evaluation was

performed.

The inspectors reviewed selected licensee, vendor, and burial site information related to

this issue and interviewed selected knowledgeable plant staff. The inspectors

determined that the licensee failed to maintain the appropriate operating procedures and

dewatering components for the resin drying and dewatering system used for the

condensate filter demineralizer waste liners. Specifically, in 1999 and 2012, changes

- 27 -

were made to the Process Control Program via modifications to the resin drying system

process. These modifications were different from the approved operations and

specifications under NRC-approved Topical Report, TP-02-P-A, Covering Nuclear

Packaging, Inc. Dewatering System, approved September 6, 1985. In 1999, the

specific change made was to open the valve to the lowest set of filter laterals in order to

allow the use of these filters throughout the dewatering process for the condensate filter

demineralizers. In 2011, following a condenser change-out, the carbon steel

components of the new condenser introduced iron oxide into the resin drying system.

This high iron oxide content coated the bottom filter laterals in the resin drying system

and caused discoloration of the resin water. In 2012, additional changes to the Process

Control Program instructed the resin drying system operators to declare the bottom filter

laterals as damaged if they saw a discoloration in the resin drying system viewing

window. These changes were not in accordance with vendor specifications.

The inspectors determined that the licensee performed an inadequate technical review

for the resin drying and dewatering system when changes were made to the Process

Control Program. Additionally, the inspectors reviewed the 10 CFR 50.59 screening,

dated July 6, 2010, and determined that the licensee performed an inadequate technical

review to assess potential adverse impacts of the condenser change-out on the plants

radioactive waste processing system. Consequently, the inspectors concluded that

between 1999 and 2013, the licensee failed to maintain the vendor procedures and

appropriate design margins for the resin drying system. This resulted in inadequate

dewatering of the resin for condensate filter demineralizers in liner 14-033-L.

Analysis. The failure to follow the Process Control Program, resulting in the inadequate

dewatering of radioactive waste liner contents, was a performance deficiency.

Inspectors determined that the performance deficiency was more than minor, because it

adversely affected the Public Radiation Safety cornerstone objective to ensure adequate

protection of public health and safety from exposure to radioactive materials released in

the public domain. Specifically, the failure to ensure that the free standing liquid in the

radioactive waste liner shipped to US Ecology did not exceed 0.5 percent of the total

waste volume subjected the disposal facility to the possibility of improper handling of the

waste. Using Inspection Manual Chapter 0609, Appendix D, Public Radiation Safety

Significance Determination Process, dated February 12, 2008, the inspectors

determined the violation was of very low safety significance (Green) because:

(1) radiation limits were not exceeded, (2) there was no breach of the package during

transit, (3) there were no Certificate of Compliance issues, and (4) the low level burial

ground nonconformance did not involve a 10 CFR 61.55 waste under classification. The

inspectors determined that the finding has a design margin cross-cutting aspect in the

area of human performance, because the licensee failed to operate and maintain the

radioactive waste dewatering system within the vendor design margins when changes

were made to the operating procedures [H.6].

Enforcement. Technical Specification 5.4.1.a, Procedures, requires, in part, that

written procedures be established, implemented, and maintained for activities described

in Regulatory Guide 1.33, Quality Assurance Program Requirements, Revision 2,

Appendix A, dated February 1978. Regulatory Guide 1.33, Section 7.b.(2) requires

procedures for the Solid Waste System - Spent Resins and Filter Sludge Handling. The

licensees Process Control Program procedure, SWP-RMP-02, The Radioactive Waste

Process Control Program, implements this requirement. Section 2.2.1.a of Procedure

SWP-RMP-02, Revision 5, states, in part, that The [resin dewatering and drying]

- 28 -

process is designed to reduce the free water, by disposal package volume, to less than

0.5 percent when waste is packaged in an unstable waste form. Contrary to the

above, on August 11, 2014, the licensees resin dewatering and drying process failed to

reduce the free water, by disposal package volume, to less than 0.5 percent when waste

was packaged in an unstable waste form. Specifically, condensate filter demineralizer

resin liner 14-033-L contained approximately 0.75 percent free standing liquid when it

was received by US Ecology for disposal. Corrective actions included retrieving the

packages from waste shipment (#14-32), and testing each liner for free standing liquid

content, removing additional water as necessary. Because this violation is of very low

safety significance and has been entered into the licensees corrective action program

as Action Request 00316676, it is being treated as a NCV, consistent with Section 2.3.2

of the NRC Enforcement Policy. (NCV 05000397/2015003-05, Failure to Reduce the

Free Water in a Class A Unstable Resin Disposal Package to Less than 0.5 Percent of

Waste Volume)

4. OTHER ACTIVITIES

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity, Emergency

Preparedness, Public Radiation Safety, Occupational Radiation Safety, and

Security

4OA1 Performance Indicator Verification (71151)

.1 Mitigating Systems Performance Index: Emergency AC Power Systems (MS06), High

Pressure Injection Systems (MS07), Residual Heat Removal Systems (MS09),

a. Inspection Scope

The inspectors reviewed the licensees mitigating system performance index data for the

period of July 2014 through June 2015 to verify the accuracy and completeness of the

reported data. The inspectors used definitions and guidance contained in Nuclear

Energy Institute Document 99-02, Regulatory Assessment Performance Indicator

Guideline, Revision 7, to determine the accuracy of the reported data.

These activities constituted verification of the mitigating system performance index for

emergency ac power systems, high pressure injection systems, and residual heat

removal systems as defined in Inspection Procedure 71151.

b. Findings

No findings were identified.

.2 Reactor Coolant System Specific Activity (BI01)

a. Inspection Scope

The inspectors reviewed the licensees reactor coolant system chemistry sample

analyses for the period of July 2014 through June 2015 to verify the accuracy and

completeness of the reported data. The inspectors observed a chemistry technician

obtain and analyze a reactor coolant system sample on September 1, 2015. The

inspectors used definitions and guidance contained in Nuclear Energy Institute

- 29 -

Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7,

to determine the accuracy of the reported data.

These activities constituted verification of the reactor coolant system specific activity

performance indicator, as defined in Inspection Procedure 71151.

b. Findings

No findings were identified.

4OA2 Problem Identification and Resolution (71152)

.1 Routine Review

a. Inspection Scope

Throughout the inspection period, the inspectors performed daily reviews of items

entered into the licensees corrective action program and periodically attended the

licensees condition report screening meetings. The inspectors verified that licensee

personnel were identifying problems at an appropriate threshold and entering these

problems into the corrective action program for resolution. The inspectors verified that

the licensee developed and implemented corrective actions commensurate with the

significance of the problems identified. The inspectors also reviewed the licensees

problem identification and resolution activities during the performance of the other

inspection activities documented in this report.

b. Findings

No findings were identified.

4OA3 Follow-up of Events and Notices of Enforcement Discretion (71153)

.1 (Closed) Licensee Event Report 05000397/2015-002-00, Inadequately Fused Non-

Class 1E Circuit on Division 1 120/240 VAC Bus

On April 29, 2015, the licensee determined that Division 1 120/240 VAC vital

instrumentation bus was inadequately protected for all conditions. Specifically, the Class

1E electrical panel E-PP-7AA did not have adequate electrical separation for scenarios

involving a loss of offsite power coincident with a short circuit in a Non-Class 1E cooling

fan. This issue was dispositioned as a licensee identified violation in Section 4OA7 of

NRC Integrated Inspection Report 05000397/2015002, dated August 7, 2015

(ML15219A143). No additional performance deficiencies were identified. This licensee

event report is closed.

.2 (Closed) Licensee Event Report 05000397/2015-003-00, Implementation of

Enforcement Guidance Memorandum (EGM) 11-003, Revision 2

During Refueling Outage 22 in May - June 2015, Columbia Generating Station

implemented the guidance of Enforcement Guidance Memorandum (EGM) 11-003,

Revision 2, Dispositioning Boiling Water Reactor Licensee Noncompliance with

Technical Specification Containment Requirements during Operations with a Potential

for Draining the Reactor Vessel, dated December 13, 2013. Consistent with

- 30 -

EGM 11-003, Revision 2, secondary containment operability was not maintained during

operations with a potential for draining the reactor vessel activities, and required

action C.2 of Technical Specification 3.6.4.1 was not completed.

The inspectors reviewed this licensee event report for potential performance deficiencies

and violations of regulatory requirements. The inspectors reviewed the stations

implementation of the EGM 11-003, Revision 2, during operations with a potential for

draining the reactor vessel. Specific observations included:

1. The inspectors observed that the operations logged all potential for draining the

reactor vessel activities in the control room narrative logs, and that the log entry

appropriately recorded the standby source of makeup designated for the evolutions.

2. The inspectors noted that the licensee maintained reactor vessel water level at least

greater than 21 feet above the top of the reactor pressure vessel flange as required

by Technical Specification 3.9.6. The inspectors also verified that at least one

safety-related pump was the standby source of makeup designed in the control

room narrative logs for the evolutions. The inspectors confirmed that the worst case

estimated time to drain the reactor cavity to the reactor pressure vessel flange was

greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3. The inspectors verified that the operations with a potential for draining the reactor

vessels were not conducted in Mode 4 and that the licensee did not move irradiated

fuel during the operations with a potential for draining the reactor vessels. The

inspectors verified that two independent means of measuring reactor pressure

vessel water level were available for identifying the onset of loss of inventory

events.

Technical Specification 3.6.4.1, Secondary Containment requires, in part, that

secondary containment shall be operable during operations with a potential for draining

the reactor vessel. Technical Specification 3.6.4.1, Condition C, requires the licensee to

initiate actions to suspend operations with a potential for draining the reactor vessel

immediately when secondary containment is inoperable. Contrary to the above, from

May 13 - June 13, 2015, Columbia Generating Station performed a total of five

operations with a potential for draining the reactor vessel activities while in Mode 5

without an operable secondary containment. These conditions were reported as

conditions prohibited by Technical Specifications. The licensee entered this issue into

its corrective action program as Action Request 329328.

Since this violation occurred during the discretion period described in EGM 11-003,

Revision 2, the NRC is exercising enforcement discretion in accordance with Section

3.5, Violations Involving Special Circumstances, of the NRC Enforcement Policy, and,

therefore, will not issue enforcement action for this violation. In accordance with

EGM 11-003, Revision 2, each licensee that receives discretion must submit a license

amendment request (LAR) to resolve the issue for its plant which the NRC staff LAR

acceptance review finds acceptable in accordance with LIC-109, Acceptance Review

Procedures. The generic solution will be a generic change to the Standard Technical

Specifications, and the NRC will publish a notice of availability (NOA) for the TS solution

in the Federal Register. Each licensee that receives discretion must submit its

amendment request within 12 months of the NRC staffs issuance of the NOA.

- 31 -

Licensees may submit LARs to adopt the NRC-approved approach or to propose an

alternative approach for their plants.

This licensee event report is closed.

.3 (Closed) Licensee Event Report 05000397/2015-004-00, Unplanned Loss of 4.16KV

Bus 7 Switchgear Revision 0

On May 22, 2015, the licensee momentarily lost the division 1 vital bus, SM-7, due to a

human performance error during maintenance. Specifically, a licensee electrician

connected a multi-meter test lead to the wrong port on the instrument which caused an

electrical short on SM-7. The SM-7 bus automatically divorced from the startup

transformer due to a sensed phase-to-phase short, the short was isolated by a blown

fuse, and SM-7 was rapidly repowered by the backup transformer via automatic transfer.

The division 1 emergency diesel generator also auto-started from the loss of SM-7 and

was secured. At the time of this transient, the plant was in a refueling outage in Mode 5

and crediting division 2 components for safety functions. The inspectors reviewed the

licensee event report associated with this event and determined that the report

adequately documented the summary of the event including the cause of the event and

potential safety consequences. Required components for electrical power, inventory

control, and decay heat removal were available and not challenged during the transient.

Since this human performance error occurred while the plant was shutdown with division

1 components inoperable for testing, the inspectors did not identify any more than minor

performance deficiencies. This licensee event report is closed.

These activities constitute completion of three event follow-up samples, as defined in Inspection

Procedure 71153.

4OA6 Meetings, Including Exit

Exit Meeting Summary

On September 24, 2015, the inspectors presented the radiation safety inspection results to

Mr. W.G. Hettel, Chief Operating Officer and Chief Nuclear Officer, and other members of the

licensee staff. The inspection results were re-exited telephonically on October 7, 2015, to

update the licensee on enforcement specifics of the non-cited violation. The licensee

acknowledged the issues presented. The licensee confirmed that any proprietary information

reviewed by the inspectors had been returned or destroyed.

On October 1, 2015, the inspectors presented the inspection results to Mr. W.G. Hettel, Chief

Operating Officer and Chief Nuclear Officer, and other members of the licensee staff. The

licensee acknowledged the issues presented. The licensee confirmed that any proprietary

information reviewed by the inspectors had been returned or destroyed.

- 32 -

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

S. Abney, Assistant Manager, Operations

P. Allen, System Engineer, System Engineering

D. Brown, Manager, System Engineering

S. Clizbe, Manager, Emergency Preparedness

M. Davis, Manager, Chemistry/Radiation Protection

E. Dumlao, Senior Engineer

D. Gregoire, Manager, Regulatory Affairs

J. Hauger, System Engineering

G. Hettel, Chief Nuclear Officer and Chief Operating Officer

G. Higgs, Manager, Maintenance

M. Hummer, Licensing Engineer

A. Javorik, Vice President, Engineering

M. Laudisio, Manager, Radiation Protection

C. Moon, Manager, Quality

R. Prewett, Plant General Manager

G. Pierce, Manager, Training

A. Rice, Manager, Chemistry

B. Schuetz, Vice President, Operations

D. Stevens, Operations Manager

G. Strong, Electrical Design Supervisor

D. Suarez, Regulatory Compliance Engineer

J. Tansy, Reactor Engineering Supervisor

J. Trautvetter, Compliance Supervisor, Regulatory Affairs

L. Williams, Licensing Supervisor

D. Wolfgramm, Compliance Engineering

NRC Personnel

G. Replogle, Senior Reactor Analyst

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened and Closed

05000397/2015003-01 FIN Failure to Maintain Seismic Instrumentation Functional to Alert

Plant Operators of Ground Motions Exceeding the Operating

Basis Earthquake (Section 1R04)05000397/2015003-02 NCV Non-Conservative Shutdown Criteria in Earthquake Abnormal

Procedure (Section 1R04)05000397/2015003-03 NCV Failure to Provide Design Control Measures for Control Room

Emergency Chillers (Section 1R04)05000397/2015003-04 NCV Failure to Implement Procedures to Ensure Availability of Safe

Shutdown Personnel (Section 1R11)

A-1 Attachment

Opened and Closed

05000397/2015003-05 NCV Failure to Reduce the Free Water in a Class A Unstable Resin

Disposal Package to Less than 0.5 Percent of Waste Volume

(Section 2RS8)

Closed

05000397/2015-002- LER Inadequately Fused Non- Class 1E Circuit on Division 1 120/240

00 VAC Bus (Section 4OA3)

05000397/2015-003- LER Implementation of Enforcement Guidance Memorandum (EGM)

00 11-003, Revision 2 (Section 4OA3)

05000397/2015-004- LER Unplanned Loss of 4.16KV Bus 7 Switchgear (Section 4OA3)

00

LIST OF DOCUMENTS REVIEWED

Section 1R01: Adverse Weather Protection

Procedures

Number Title Revision

ABN-WIND Tornado/High Winds 27

SOP- Hot Weather Operations 6

HOTWEATHER-

OPS

SOP- Warm Weather Operations 11

WARMWEATHER-

OPS

SOP-SW-LU Standby Service Water System Valve & Breaker Lineup 6

Action Requests (ARs)

293549 293878 299646 300923 300999

304714 308167 312775 333418 334819

Section 1R04: Equipment Alignment

Procedures

Number Title Revision

1.3.66 Operability and Functionality Evaluation 32

5.0.12 Station Blackout and Extended Loss of AC Power Basis 0

A-2

Procedures

Number Title Revision

ABN-Earthquake Earthquake 13

ABN-HVAC HVAC Trouble 12

ISP-SEIS-S402 Triaxial Seismic Switch Model SP-1/TS-3 - CFT 3

ISP-SEIS-S403 Seismic System Reactor Building Foundation Triaxial 1

Response - Spectrum Recorders - CFT

ISP-SEIS-X304 Seismic System Reactor Building Foundation Triaxial 2

Response - Spectrum Recorders - CC

OI-69 Time Critical Operator Actions 4

OSP-CCH/IST- Control Room Emergency Chiller System B Operability 35

M702

SOP-HVAC/CR- Control, Cable, and Critical Switchgear Rooms HVAC 1

LU Lineup

SOP-HVAC/CR- Control, Cable, and Critical Switchgear Rooms HVAC Start 10

START

SOP-HVAC/CR- Control, Cable, and Critical Switchgear Rooms HVAC 19

OPS Operation

SOP-RCC-LU RCC System Valve and Breaker Line-Up 1

SOP-SW-LU Standby Service Water System Valve & Breaker Lineup 6

TSP-DG2/LOCA- Standby Diesel Generator DG2 LOCA Test 26

B501

SOP-SLC-LU SLC System Valve and Breaker Lineup 0

SOP-SGT-LU Standby Gas Treatment System Lineup 0

Calculations

Number Title Revision

CE-02-90-21 Calculation for Set Points Response Spectrum Indicating 0

Lights

ME-02-92-43 Room Temperature Calculation for DG Building, Reactor 10

Building, Radwaste Building and Service Water

A-3

Drawings

Number Title Revision

EWO-101E-008 Electrical Wiring Diagram Heat Trace SLC Pump Suction 2

Piping

M522 Flow Diagram Standby Liquid Control System 39

Miscellaneous

Number Title Revision/

Date

C92-0020 Component Classification Evaluation Record 0

E555-HT-HTP- Fuse Detail Report December

8B/A 15, 2008

ISCR 979 Instrument Setpoint Change Request SEIS-RSRT-1/1, 1/2, April 30,

1/3 1990

LDCN-11-001, Columbia Generating Station Final Safety Analysis Report 61

11-013

Work Orders

02041736 02075766

Action Requests (ARs)

046497 298184 302392 304002 304040

307688 307703 308892 311384 313567

313883 313960 318811 319542 323891

325520 330741 333996

Section 1R05: Fire Protection

Drawings

Number Title Revision

E503-1 Motor Control Center General Notes, MCC and Starter 86

Index

E535-49A Connection Wiring Diagram Motor Control Center E-MC-7F 23

E535-49B Connection Wiring Diagram Motor Control Center E-MC-7F 23

E753 Radwaste and Control Building Elevation 525-0 Power 41

Conduit and Tray Plans

PFSS-1 Appendix R Post Fire Safe Shutdown (PFSS) Division 1 10

Boundaries One Line Diagram

A-4

Procedures

Number Title Revision

1.3.10A Control of Ignition Sources 15

FPP-1.6 Combustible Loading Calculation Control 2

FPP-2.2.12 Annual Fire Door Operability Test 4

FPP-2.2.7 Fire Protection Water System Inspections 5

Fire Protection Pre-Plans

Number Title Revision

PFP-RB-422 Reactor 422 5

PFP-RW-467 Radwaste 467 5

PFP-RW-484- Radwaste 484-487 5

487

PFP-RW-525 Radwaste 525 5

Section 1R11: Licensed Operator Requalification Program and Licensed Operator

Performance

Procedures

Number Title Revision

OI-9 Operations Standards and Expectation 62

OI-45 Color Banding of Control Room Instrumentation 6

OI-53 Offsite Power 14

1.3.67 Operational Decision Making Process 14

1.3.84 Reactivity Management Control 2

13.1.1 Classifying the Emergency 47

5.1.1 RPV Control 20

5.2.1 Primary Containment Control 22

5.3.1 Secondary Containment Control 19

Action Requests (ARs)

332747 333692

A-5

Section 1R12: Maintenance Effectiveness

Procedures

Number Title Revision

1.5.11 Maintenance Rule Program 13

MOT-CHILL-1-1 Chiller Maintenance Scope and Basis Document 7

MOT-PRV-1-1 Pressure Relief Valve Maintenance Scope and Basis 6

Document

Miscellaneous

Number Title Revision/

Date

Maintenance Rule Evaluations CCH System June 30,

2015

CCH System Performance Improvement Plan 4

51182 Reactor Operating Events-Event Notification Report June 25,

2015

CVI 531-00,1,1 Differential Pressure Indicating Switches, Unit, Calibration 3

and Parts List

GEP-6013 Preparation and Installation of the ULTRX Rupture Disc 2008

Assembly

IMDS Instrument Master Data Sheets DMA-TIS-32A/B 7

Action Requests (ARs)

020602 020829 122680 132812 135119

195492 195876 226018 284341 298184

304040 307688 307703 307863 307897

308892 308950 311597 313567 313883

318811 319542 320707 332078 332096

332617 332889 334369 334438

Section 1R13: Maintenance Risk Assessments and Emergent Work Control

Procedures

Number Title Revision

ABN-CR-EVAC Control Room Evacuation and Remote Cooldown 33

A-6

Procedures

Number Title Revision

OI-14 Columbia Generating Station Operational Challenges and 13

Risk Program

OI-69 Time Critical Operator Actions 4

1.3.1 Operating Policies, Programs, and Practices 119

1.3.76 Integrated Risk Management 44

Action Requests (ARs)

302053 306204 309005 311964 314936

314983 319661 321848 322776 323263

323364 329491 333025 333041 333041

333622 333731 334749

Work Orders (WOs)

02082634

Miscellaneous

Number Title Date

Protected Equipment Tracking Sheet August 20,

2015

Protected Equipment Tracking Sheet September

13, 2015

Protected Equipment Tracking Sheet September

26, 2015

Section 1R15: Operability Determinations and Functionality Assessments

Procedures

Number Title Revision

1.3.66 Operability and Functionality Evaluation 32

4.601.A2 601.A2 Annunciator Panel Alarms 27

5.0.12 Station Blackout and Extended Loss of AC Power Basis 0

ABN-HVAC HVAC Trouble 12

OI-69 Time Critical Operator Actions 4

OI-9 Operations Standards and Expectation 62

A-7

Procedures

Number Title Revision

OSP-CCH/IST- Control Room Emergency Chiller System B Operability 35

M702

SOP- Hot Weather Operations 6

HOTWEATHER-

OPS

SOP-HVAC/CR- Control, Cable, and Critical Switchgear Rooms HVAC 1

LU Lineup

SOP-HVAC/CR- Control, Cable, and Critical Switchgear Rooms HVAC 19

OPS Operation

SOP-HVAC/CR- Control, Cable, and Critical Switchgear Rooms HVAC Start 10

START

Calculations

Number Title Revision

ME-02-89-49 Calculation for Main Steam Isolation Valve Actuator Force 0

Balance

NE-02-85-19 Calculation Post-Fire Safe Shutdown (PFSS) Analysis 7

Miscellaneous

Number Title Revision/

Date

531-00,1,1 Barton Differential Pressure Indicating Switches, Unit, 3

Calibration and Parts List

IMDS Instrument Master Data Sheets MS-LIS-24A/C 16

NO 1419 Night Order October 27,

2012

NO 1653 Night Order July 8, 2015

TM-2150 Mission Time of Emergency Safety Features 0

Action Requests (ARs)

273129 332823 332326 332330 332078

032562 332096 021535 028598 333334

334459

A-8

Section 1R18: Plant Modifications

Miscellaneous

Number Title Revision

EC14111 RFW-V-102A Push Rod Assembly 0

Section 1R19: Post-Maintenance Testing

Procedures

Number Title Revision

OSP-CCH/IST- Control Room Emergency Chiller System A Operability 38

M701

OSP-RCIC/IST- RCIC Operability Test 56

Q701

OSP-ELEC-S702 Diesel Generator 2 Semi-Annual Operability Test 55

SOP-DG2- Emergency Diesel Generator (DIV 2) Start 26

START

Work Orders

02059527 02066727 02069655 02066726 02070167

02075767

Miscellaneous

Number Title Revision

IMDS Instrument Master Data Sheets DMA-TIS-32A/B 7

Action Requests (ARs)

298184 314814 319542 320386 321294

323891 324941 325599 331175 332159

335270 335441 336314 336431 336485

Section 1R22: Surveillance Testing

Procedures

Number Title Revision

OSP-INST-H101 Shift and Daily Instrument Checks Modes 1, 2, 3 85

OSP-DO/IST- DO-P-1A Operability 14

Q701

A-9

Procedures

Number Title Revision

OSP-LPCS/IST- LPCS System Operability Test 39

Q702

Action Requests (ARs)

316238 326038 332078 332833 335006

335144

Section 1EP6: Drill Evaluation

Procedures

Number Title Revision

5.1.1 RPV Control 20

5.2.1 Primary Containment Control 22

5.3.1 Secondary Containment Control 19

13.1.1 Classifying the Emergency 47

Action Requests (ARs)

332756 333042

Miscellaneous

Number Title Date

ERO Team A Drill Guide July 7, 2015

ERO Team A Drill Report - After Action Improvement Plan July 30, 2015

Section 2RS5: Radiation Monitoring Instrumentation

Procedures

Number Title Revision

CI-13.10 Canberra iSolo Alpha/Beta Counting System 04

CI-13.12 Global Value Gamma Ray Analyzer System 03

CI-13.6 ORTEC Gamma Ray Analyzer System 03

CI-13.9 Tri-Carb Liquid Scintillation Counting System 03

HPI-12.100 Calibration of the SAM12 Small Article Monitor 03

HPI-5.6 FastScan Whole Body Count System 07

A-10

Procedures

Number Title Revision

HPI-7.5 Eberline Model RO-2 and RO-2A Calibration 10

PPM 16.1.2 Stack Monitor Low Range Detector 14

PPM 16.2.1 TEA Low Range Noble Gas Monitor Channel 1 10

PPM 16.4.4 OFFGAS Post Treatment Radiation Monitor CH A 16

PPM 16.7.2 FDR-RIS-606, Liquid Radwaste Effluent Monitor 08

PPM 16.7.4 Liquid Radwaste Effluent Line Flow Rate 07

Action Requests (ARs)

00307356 00308226 00308390 00308468 00309073

00309410 00310348 00312551 00319190 00319873

00325863 00326107 00334647

Audits and Self-Assessments

Number Title Date

301869 Snapshot Self-Assessment Report - Radiation July 25, 2015

Instruments

AU-CH-14 Quality Services Audit Report - Chemistry/REMP/Non- October 23, 2014

Rad & Rad Effluents/ODCM Program

Installed Radiation Instrument Calibration Records

WO Number Title Date

01167050 TEA Low Range Noble Gas Monitor Channel 1 April 3, 2014

02043785 OFFGAS Post Treatment Radiation Monitor CH A May 23, 2015

02047822 CC/RC Secondary Containment Isolation Reactor March 26, 2014

Building Vent Radiation Channel D

02051142 Liquid Radwaste Flow Instrument June 13, 2014

02051815 MSL High Radiation Channel A June 27, 2014

02053216 Stack Monitor Low Range Noble Gas Monitor July 17, 2014

02062579 Liquid Radwaste Effluent Radiation Monitor March 3, 2015

02066745 Plant Blowdown Discharge Line Flow Rate July 3, 2015

A-11

Portable Radiation Instrument Calibration Records

Number Title Date

3891 Victoreen Model 570 R-Chamber Set January 20, 2014

F112 Ludlum Model 177 Frisker April 1, 2015

NO17 Eberline ASP-1 w/ NRD Neutron Detector April 8, 2015

RO196 Eberline RO-2 April 24, 2015

RO237 Ludlum Model 14C July 23, 2015

RS26 Thermo/Bicron Micro-Rem Meter April 30, 2015

RV07 Victoreen 451B April 2, 2015

T070 Teletector Model 6112M May 20, 2015

Stationary Radiation Instrument Calibration Records

Number Title Date

36797 iSolo Calibration September 23,

2015

HP-EQ-42712 SAM12 Small Article Monitor September 23,

2015

HP-EQ-42734 GEM-5 July 19, 2015

HP-EQ-42747 GEM-5 September 3,

2015

HP-EQ-42783 ARGOS-5 A/B July 14, 2015

HP-EQ-42813 SAM12 Small Article Monitor April 20, 2015

HP-EQ-C015122 IPM-8 May 8, 2015

Ortec #5 Efficiency Verification Worksheet September 23,

Calibration of 47 mm Filter Shelf 1 2015

Ortec #5 Efficiency Verification Worksheet September 23,

Calibration of 250 ml Polybottle - Shelf 1 2015

WBC#2 FastScan Calibration July 29, 2015

WO 02062192 Annual Tritium Quench Curve Calibration June 10, 2015

Miscellaneous Documents

Number Title Revision/Date

Offsite Dose Calculation Manual 53

Calibration Lab Irradiator Periodic Dose Rate Decay July 7, 2015

Adjustment

A-12

Miscellaneous Documents

Number Title Revision/Date

15-02 Calculation of the Activity for K40 Daily Check Source June 23, 2015

Used with SAM 9/11/12 and BM 285 Monitors

(Revises Calculation No. 04-1)

Section 2RS6: Radioactive Gaseous and Liquid Effluent Treatment

Procedures

Number Title Revision

1.11.12 Removal of Liquids from RCA 11

11.2.15.7 Release of Material from Radiologically Controlled 21

Area

TSP-BOP/ISOL- Balance of Plant Isolation Logic System Functional 07

B501 Test

TSP-SGT-B501 Standby Gas Treatment System Functional Test 08

10.2.8 Carbon Filter In Place Testing 08

10.2.82 HEPA Filter In Place Testing 07

12.4.21 The Sampling and Determination of Tritium 25

12.5.8 Gaseous Effluent Discharge Sampling 23

12.5.28 Sampling and Analysis for Unrestricted Release 12

16.11.1 Monthly Grab Gas Samples 10

16.11.6 Weekly Iodine, Particulate, and Tritium Analysis Results 15

MSP-SGT-B102 Standby Gas Treatment System Unit B HEPA Filter Test 04

MSP-SGT-B103 Standby Gas Treatment Filtration System - Unit A 10

Carbon Adsorber Test

MSP-SGT-B104 Standby Gas Treatment Filtration System - Unit B 08

Carbon Adsorber Test

9.3.32 Fuel Integrity Monitoring 12

Action Requests (ARs)

00297561 00301591 00310348 00315360 00315492

00320966 00321016 00321365 00323071 00323632

00326490 00331287 00331587 00331588 00331589

00334641 00291084

A-13

Audits, Self-Assessments, and Surveillances

Number Title Date

AU-CH-14 Chemistry-REMP-Non-Rad and Rad Effluents-ODCM October 16, 2014

Program Audit

AU-RP-RW-13 Radiation Protection and Process Control November 16, 2013

23748A NUPIC Audit NCS Corporation September 3, 2014

23748B NUPIC Audit AEP Audit No. PA-14-12 November 25, 2014

Air Cleaning System Surveillance Test Records

Number Title Date

WO 2004423 Standby Gas Treatment Filtration System - Unit A Carbon July 15, 2013

Adsorber Test

WO 2046928 Standby Gas Treatment System Unit B HEPA Filter Test April 28, 2014

WO 2046928 Standby Gas Treatment Filtration System - Unit B Carbon April 28, 2014

Adsorber Test

Title Date

2013 Annual Radioactive Effluent Release Report April 2014

2014 Annual Radioactive Effluent Release Report April 2015

Cross-Check Program 2013 Summary Report February 2014

Cross-Check Program 2014 Summary Report February 2015

Section 2RS7: Radiological Environmental Monitoring Program

Procedures

Number Title Revision

SWP-CHE-01 Groundwater Protection Program 03

PPM 1.11.1 REMP Implementation Procedure -

REMP 5.11 Use and Maintenance of Automatic Composite 02

Samplers

REMP 9.10 Environmental TLD Calculations 01

REMP 11.01 Milk Sampling 06

A-14

Procedures

Number Title Revision

REMP 11.02 Soil and Sediment Sampling 03

REMP 11.06 Fish Collection and Preparation 01

REMP 11.07 REMP Water Sample Collection 06

REMP 11.09 REMP Air Sample Collection 05

REMP 12.06 Quality Assurance for the Radiological Laboratory 01

REMP 12.07 Radiological Laboratory Measurement Assurance 01

Program

SOP 11.09r05 REMP Air Sample Collection 05

Audits, Self-Assessments, and Surveillances

Number Title Date

AR 291084 Perform a Self-Assessment of SWP-CHE-01, Groundwater January, 2014

Protection Program Against the Requirements of NEI 07-07

15-A-08 Energy Northwest Audit Report 15-A-08 of Mission Support March 9, 2015

Alliance - Radiological Site Services

AU-RP/RW-13 Quality Services Audit Report; Radiation Protection and November 2013

Process Control program

AR-SA:305111 Focused Self-Assessment Report; Radioactive Gaseous June 19, 2015

and Liquid Effluents; Radiological Environmental Monitoring

Program; and Radioactive Solid Waste Processing,

Radioactive Material Handling, Storage, and Transportation

Action Requests (ARs)

00320966 00303414 00335039 00331779 00300634

00317136 00333542 00318632 00320309 00316091

00321365 00325192 00329806 00331590 0033106

00333286 00299745 00334171 00334146 00303414

A-15

Miscellaneous Documents

Title Revision/Date

Plant Meteorological Tower Data Availability Records, 2013, 2015 and 2015 September 2015

(Year to Date)

Plant Specific Logs for Licensee Compliance to Title 10 Part 50.75.g. (Year September 2015

to Date)

2013 Annual Radiological Environmental Operating Report May 2014

2014 Annual Radiological Environmental Operating Report May 2015

Offsite Dose Calculation Manual June 1991

Offsite Dose Calculation Manual 53

Section 2RS8: Radioactive Solid Waste Processing, and Radioactive Material Handling,

Storage, and Transportation

Procedures

Number Title Revision

1.10.1 Notifications and Reportable Events 37

11.2.23.1 Shipping Radioactive Materials and Waste 15

11.2.23.2 Computerized Radioactive Waste and Material 19

Characterization

11.2.23.4 Packaging Radioactive Material and Waste 23

11.2.23.14 Sampling of Radioactive Waste Streams 12

11.2.23.19 Operation of The Pacific Nuclear Resin Drying System 07, 13, 14

11.2.23.29 LSA Contaminated Laundry Shipments 11

11.2.23.37 Use of the 14D-2.0 Type A Transportation Cask 05

RW000103 Waste Characterizing Computer Code 00

RW000115 WNP-2 Radwaste Procedure Training 00

RW000116 NRC Packaging and Shipping Regulations 00

RW000117 DOT Packaging and Shipping Regulations 00

RW000118 Burial Site Disposal Requirements 00

SWP-CHE-02 Chemical Process Management and Control 24

A-16

Procedures

Number Title Revision

SWP-RMP-02 Radioactive Waste Process Control Program 05

Audits, Self-Assessments, and Surveillances

Number Title Date

AU-RP/RW-13 Quality Services Audit Report: Radiation Protection and December 3,

Process Control Program 2013

AU-CH-14 Quality Service Audit Report: Chemistry/REMP/Non-Rad and October 23, 2014

Rad Effluents/ODCM Program

30511 Focused Self-Assessment Report: Radioactive Gaseous and June 19, 2015

Liquid Effluents; Radiological Environmental Monitoring

Program; Radioactive Solid Waste Processing, Radioactive

Material Handling, Storage, and Transportation

Action Requests (ARs)

00297650 00300182 00308527 00316555 00316676

00316835 00316913 00320373 00323678 00323841

00325137 00332690 00332758 00333434 00333463

00333590

Radioactive Material and Waste Shipments

Number Title Date

13-07 RWCU Resin (Non-DOT) March 26, 2013

13-39 12 Boxes of Dry Active Waste (LSA II) June 11, 2013

13-46 12 Boxes of Dry Active Waste (LSA II) June 27, 2013

13-50 Resin Bead, 1 PDX, 8 Boxes of Dry Active Waste (LSA II) August 27, 2013

14-03 RHR-P-2B (Type A) January 16, 2014

14-10 4 Condensate F/D Resins, 2 Boxes Dry Active Waste May 20, 2014

(LSA II)

14-16 EDDR/FDR F/D Resins (LSA II) June 11, 2014

A-17

Radioactive Material and Waste Shipments

Number Title Date

14-32 Condensate F/D Resins - 5 liners (RETURNED) (LSA II) October 9, 2014

14-38 EDR/FDR Resin Condensate (LSA II) December 15,

2014

15-01 Condensate F/D Resins; 4 Boxes Dry Active Waste (LSA II) January 20, 2015

15-43 One 20 C-Van with Dry Active Waste (LSA II) June 4, 2015

Radiation Work Permits

Number Title Revision

30003514 2015 RW 437 Waste Processing NUPAC Cage - LHRA 00

30003520 2015 RW NUPAC Cage Processing - LHRA High Risk 00

30003498 NRC Tours and Inspections - HRA 00

Radiological Surveys

Number Title Date

4435 ISFSI Building 105 July 27, 2015

4497 Building 167 & C-Vans August 3, 2015

4500 Warehouse 5 (Building 80) August 3, 2015

4710 Building 13 Laundry August 21, 2015

4874 LSA Pad September 8,

2015

5057 Radwaste 437 NUPAC Cage September 23,

2015

A-18

Miscellaneous Documents

Number Title Revision/Date

ODCM LEP Columbia Generating Station Offsite Dose Calculation Manual 53

Columbia Generating Station Final Safety Analysis Report - 57

Chapter 11.4, Solid Waste Management System

2013 Annual Radioactive Effluent Release Report April 30, 2014

DIC 1554.58 Columbia Generating Station Scaling Factor Determination March 24, 2015

Package

2014 Annual Radioactive Effluent Release Report April 30, 2015

10 CFR 61 Scaling Factor Determination September 17,

2015

Section 4OA1: Performance Indicator Verification

Procedures

Number Title Revision

CI-10.17 Iodine 12

CSP-I131-W101 Reactor Coolant Isotopic Analysis for I-131 Dose 9

Equivalent

Miscellaneous

Number Title Revision

MSPI-01-BD-001 MSPI Basis Document 17

286838 286894 332833 333421

Work Orders

02069131

Section 4OA2: Problem Identification and Resolution

Procedures

Number Title Revision

SWP-CAP-06 Condition Report Review 22

A-19

Action Requests (ARs)

329576 333690 334108

Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion

Procedures

Number Title Revision

3.4.1 Minimizing the Potential of Draining the Reactor Vessel 19

Action Requests (ARs)

323625 326336 326573 328051 328312

328726 329328

A-20

The following items are requested for the

Public Radiation Safety Inspection

Columbia

September 21-24, 2015

Integrated Report 2015003

Inspection areas are listed in the attachments below.

Please provide the requested information on or before August 31, 2015.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1- A, applicable organization charts in file/folder 1- B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Martin Phalen at (817) 200-1158 or

martin.phalen@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

A-21

1. Radiation Monitoring Instrumentation (71124.05)

Date of Last Inspection: November 8, 2013

A. List of contacts and telephone numbers for the following areas:

1. Effluent monitor calibration

2. Radiation protection instrument calibration

3. Installed instrument calibrations

4. Count room and Laboratory instrument calibrations

B. Applicable organization charts

C. Copies of audits, self-assessments, vendor or NUPIC audits for contractor support and

LERs, written since date of last inspection, related to:

1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey

instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,

or whole body counters

2. Installed radiation monitors

D. Procedure index for:

1. Calibration, use and operation of continuous air monitors, criticality monitors,

portable survey instruments, temporary area radiation monitors, electronic

dosimeters, teledosimetry, personnel contamination monitors, and whole body

counters.

2. Calibration of installed radiation monitors

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Calibration of portable radiation detection instruments (for portable ion chambers)

2. Whole body counter calibration

3. Laboratory instrumentation quality control

F. A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the following programs:

1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey

instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,

whole body counters,

2. Installed radiation monitors,

3. Effluent radiation monitors

4. Count room radiation instruments

NOTE: The lists should indicate the significance level of each issue and the search criteria

used. Please provide in document formats which are searchable so that the inspector can

perform word searches.

G. Offsite dose calculation manual, technical requirements manual, or licensee controlled

specifications which lists the effluent monitors and calibration requirements.

H. Current calibration data for the whole body counters.

I. Primary to secondary source calibration correlation for effluent monitors.

J. A list of the point of discharge effluent monitors with the two most recent calibration

dates and the work order numbers associated with the calibrations.

K. Radiation Monitoring System health report for the previous 12 months

A-22

2. Radioactive Gaseous and Liquid Effluent Treatment (71124.06)

Date of Last Inspection: November 8, 2013

A. List of contacts and telephone numbers for the following areas:

1. Radiological effluent control

2. Engineered safety feature air cleaning systems

B. Applicable organization charts

C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since date of last inspection, related to:

1. Radioactive effluents

2. Engineered Safety Feature Air cleaning systems

D. Procedure indexes for the following areas

1. Radioactive effluents

2. Engineered Safety Feature Air cleaning systems

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Sampling of radioactive effluents

2. Sample analysis

3. Generating radioactive effluent release permits

4. Laboratory instrumentation quality control

5. In-place testing of HEPA filters and charcoal adsorbers

6. New or applicable procedures for effluent programs (e.g., including ground water

monitoring programs)

F. List of corrective action documents (including corporate and sub-tiered systems) written

since date of last inspection, associated with:

1. Radioactive effluents

2. Effluent radiation monitors

3. Engineered Safety Feature Air cleaning systems

NOTE: The lists should indicate the significance level of each issue and the search criteria

used. Please provide in document formats which are searchable so that the inspector can

perform word searches.

G. 2013 and 2014 Annual Radioactive Effluent Release Report or the two most recent

reports

H. Current Copy of the Offsite Dose Calculation Manual

I. Copy of the 2013 and 2014 interlaboratory comparison results for laboratory quality

control performance of effluent sample analysis, or the two most recent results.

J. Effluent sampling schedule for the week of the inspection

K. New entries into 10 CFR 50.75(g) files since date of last inspection

L. Operations department (or other responsible dept.) log records for effluent monitors

removed from service or out of service

M. Listing or log of liquid and gaseous release permits since date of last inspection

A-23

N. A list of the technical specification-required air cleaning systems with the two most

recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal

adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers

associated with the surveillances

O. System Health Report for radiation monitoring instrumentation. Also, please provide a

specific list of all effluent radiation monitors that were considered inoperable for 7 days

or more since November 2011. If applicable, please provide the relative Special Report

and condition report(s) moreover

P. A list of all radiation monitors that are considered §50.65/Maintenance Rule equipment.

Q. A list of all significant changes made to the Gaseous and Liquid Effluent Process

Monitoring System since the last inspection. If applicable, please provide the

corresponding UFSAR section in which this change was documented.

R. A list of any occurrences in which a non-radioactive system was contaminated by a

radioactive system. Please include any relative condition report(s).

3. Radiological Environmental Monitoring Program (71124.07)

Date of Last Inspection: November 8, 2013

A. List of contacts and telephone numbers for the following areas:

1. Radiological environmental monitoring

2. Meteorological monitoring

B. Applicable organization charts

C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since date of last inspection, related to:

1. Radiological environmental monitoring program (including contractor environmental

laboratory audits, if used to perform environmental program functions)

2. Environmental TLD processing facility

3. Meteorological monitoring program

D. Procedure index for the following areas:

1. Radiological environmental monitoring program

2. Meteorological monitoring program

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Environmental Program Description

2. Sampling, collection and preparation of environmental samples

3. Sample analysis (if applicable)

4. Laboratory instrumentation quality control

5. Procedures associated with the Offsite Dose Calculation Manual

6. Appropriate QA Audit and program procedures, and/or sections of the stations QA

manual (which pertain to the REMP)

F. A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the following programs:

1. Radiological environmental monitoring

A-24

2. Meteorological monitoring

NOTE: The lists should indicate the significance level of each issue and the search criteria

used. Please provide in document formats which are searchable so that the inspector can

perform word searches.

G. Wind Rose data and evaluations used for establishing environmental sampling locations

H. Copies of the 2 most recent calibration packages for the meteorological tower

instruments

I. Copy of the 2013 and 2014 Annual Radiological Environmental Operating Report and

Land Use Census, and current revision of the Offsite Dose Calculation Manual, or the

two most recent reports.

J. Copy of the environmental laboratorys interlaboratory comparison program results for

2013 and 2014, or the two most recent results, if not included in the annual radiological

environmental operating report

K. Data from the environmental laboratory documenting the analytical detection sensitivities

for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)

L. Quality Assurance audits (e.g., NUPIC) for contracted services

M. Current NEI Groundwater Initiative Plan and status

N. Technical requirements manual or licensee controlled specifications which lists the

meteorological instruments calibration requirements

O. A list of Regulatory Guides and/or NUREGs that you are currently committed to relative

to the Radiological Environmental Monitoring Program. Please include the revision

and/or date for the committed item and where this can be located in your current

licensing basis/UFSAR.

P. If applicable, per NEI 07-07, provide any reports that document any spills/leaks to

groundwater since the last inspection

4. Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,

and Transportation (71124.08)

Date of Last Inspection: November 8, 2013

A. List of contacts and telephone numbers for the following areas:

1. Solid Radioactive waste processing

2. Transportation of radioactive material/waste

B. Applicable organization charts (and list of personnel involved in solid radwaste

processing, transferring, and transportation of radioactive waste/materials)

C. Copies of audits, department self-assessments, and LERs written since date of last

inspection related to:

1. Solid radioactive waste management

2. Radioactive material/waste transportation program

D. Procedure index for the following areas:

1. Solid radioactive waste management

2. Radioactive material/waste transportation

A-25

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Process control program

2. Solid and liquid radioactive waste processing

3. Radioactive material/waste shipping

4. Methodology used for waste concentration averaging, if applicable

5. Waste stream sampling and analysis

F. A summary list of corrective action documents (including corporate and subtiered

systems) written since date of last inspection related to:

1. Solid radioactive waste

2. Transportation of radioactive material/waste

NOTE: The lists should indicate the significance level of each issue and the search criteria

used. Please provide in document formats which are searchable so that the inspector can

perform word searches.

G. Copies of training lesson plans for 49CFR172 subpart H, for radwaste processing,

packaging, and shipping

H. A summary of radioactive material and radioactive waste shipments made from date of

last inspection to present

I. Waste stream sample analyses results and resulting scaling factors for 2013, 2014,

and 2915, or the two most recent results

J. Waste classification reports if performed by vendors (such as for irradiated hardware)

K. A listing of all onsite radwaste storage facilities. Please include a summary or listing of

the items stored in each facility, including the total amount of radioactivity and the

highest general area dose rate

Although it is not necessary to compile the following information, the inspector will also review:

L. Training, and qualifications records of personnel responsible for the conduct of

radioactive waste processing, package preparation, and shipping