SUBJECT:

COLUMBIA GENERATING STATION - BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000397/2021010

Dear Mr. Schuetz:

On July 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your Columbia Generating Station. On August 2, 2021 the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspection team reviewed the stations corrective action program and the stations implementation of the program to evaluate its effectiveness in identifying, prioritizing, evaluating, and correcting problems, and to confirm that the station was complying with NRC regulations and licensee standards for corrective action programs. Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.

The team also evaluated the stations processes for use of industry and NRC operating experience information and the effectiveness of the stations audits and self-assessments.

Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.

Finally, the team reviewed the stations programs to establish and maintain a safety conscious work environment and interviewed station personnel to evaluate the effectiveness of these programs. Based on the teams observations and the results of these interviews, the team found that your organization appeared to have a safety conscious work environment where individuals felt free to raise concerns without fear of retaliation. Most expressed positive experiences after raising issues to their supervisors and documenting issues in condition reports, and all individuals indicated that they would not hesitate to raise safety concerns.

However, the team noted that several individuals brought up continuing morale concerns, consistent with the results of the previous problem identification and resolution inspection (NRC Problem Identification and Resolution Inspection Report 05000397/2019010). The team noted that if not addressed properly, these morale concerns could erode the individuals willingness to bring up safety concerns in the future.

No findings or violations of more than minor significance were identified during this inspection.

August 29, 2021 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ami N. Agrawal, Team Leader Inspection Programs & Assessment Team Division of Reactor Safety Docket No. 05000397 License No. NPF-21

Enclosure:

As stated

Inspection Report

Docket Number:

05000397

License Number:

NPF-21

Report Number:

05000397/2021010

Enterprise Identifier:

I-2021-010-0003

Licensee:

Energy Northwest

Facility:

Columbia Generating Station

Location:

Richland, WA

Inspection Dates:

July 12, 2021 to July 30, 2021

Inspectors:

F. Ramirez Munoz, Senior Reactor Inspector (Team Lead)

H. Freeman, Senior Project Engineer

N. Greene, Senior Health Physicist

P. Niebaum, Senior Resident Inspector

R. Smith, Senior Resident Inspector

Approved By:

Ami N. Agrawal, Team Leader

Inspection Programs & Assessment Team

Division of or Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a biennial problem identification and resolution inspection at Columbia Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin tele-work. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

OTHER ACTIVITIES - BASELINE

71152B - Problem Identification and Resolution Biennial Team Inspection (IP Section 02.04)

(1) The inspectors performed a biennial assessment of the licensees corrective action program, use of operating experience, self-assessments and audits, and safety conscious work environment.

Corrective Action Program Effectiveness: The inspectors assessed the corrective action programs effectiveness in identifying, prioritizing, evaluating, and correcting problems. The inspectors sampled over 220 condition reports and their associated cause evaluations, if applicable. The inspectors also conducted a five-year review of the high pressure core spray system and the emergency chilled water system, which included review of failures, maintenance issues, surveillances, corrective and preventive maintenance, reliability, and maintenance rule performance. In addition, the inspectors reviewed 16 findings and violations issued during the biennial period.

Operating Experience, Self-Assessments and Audits: The inspectors assessed the effectiveness of the stations processes for use of operating experience, audits, and self-assessments. The sample included industry operating experience communications like 10 CFR Part 21 notifications and other vendor correspondence, NRC generic communications, publications from various industry groups, and site evaluations. The sample also included reviews of licensee self-assessments and internal audits.

Safety Conscious Work Environment: The inspectors assessed the effectiveness of the stations programs to establish and maintain a safety conscious work environment. The team interviewed 55 individuals, attended routine meetings, interviewed the Employee Concerns Program Manager, and reviewed employee concerns files.

INSPECTION RESULTS

Assessment 71152B Corrective Action Program Assessment

Based on the samples reviewed, the team determined that the licensees corrective action program complied with regulatory requirements and self-imposed standards. The licensees performance in each of the areas of Problem Identification, Problem Prioritization and Evaluation, and Corrective Actions adequately supported nuclear safety.

Effectiveness of Problem Identification: Based on the samples reviewed, the team determined that the licensee's performance in this area adequately supported nuclear safety. Overall, the team found that the licensee was identifying and documenting problems at an appropriately low threshold that supported nuclear safety.

Effectiveness of Prioritization and Evaluation of Issues: Overall, the team found that the licensee was appropriately prioritizing and evaluating issues to support nuclear safety. Of the samples reviewed, the team found that the licensee correctly characterized each condition report as to whether it represented a condition adverse to quality, and then prioritized the evaluation and corrective actions in accordance with program guidance.

In January 2021, the licensee began using the IBM Watson artificial intelligence system to pre-screen all condition reports instead of the departmental performance improvement specialists that had previously performed this task. The artificial intelligence system pre-screens the condition report to determine the priority (whether it represents a condition adverse to quality or not), category (A, B, C, D, etc.), and responsible department based upon program inputs. The inspectors noted that following the artificial intelligence pre-screen, 12 percent of condition reports needed to be corrected for priority and 14 percent of condition reports needed to be corrected for severity. However, the final determination review is still performed by the management review team and changes are incorporated back into the artificial intelligence algorithm. As such, the team did not identify any concerns with the licensees implementation of this pre-screening process.

Effectiveness of Corrective Actions: Overall, the team concluded that the licensee's corrective actions supported nuclear safety. Specifically, the Columbia Generating Station developed effective corrective actions for the problems evaluated in the corrective action program and generally implemented these corrective actions in a timely manner commensurate with their safety significance. As part of this inspection, the team selected the plants high pressure core spray and emergency chilled water systems for a focused review within the corrective action program. For these systems, the team performed sample selections of condition reports, looking at the adequacy of the licensee's evaluation process for determining which items are placed in the corrective action process, and the corrective actions taken. The team did not identify any concerns with these systems that were not already being addressed by the station's monitoring and corrective action programs.

Assessment 71152B Use of Self-Assessment & Audits The team reviewed a sample of Columbia Generating Station's departmental self-assessments and audits to assess whether performance trends were regularly identified and effectively addressed. The team also reviewed audit reports to assess the effectiveness of assessments in specific areas. Overall, the team concluded that the licensee had an adequate departmental self-assessment and audit process.

Assessment 71152B Operating Experience The team reviewed a variety of sources of operating experience including NRC generic communications, and publications from various industry groups, such as the Nuclear Energy Institute (NEI) and Electric Power Research Institute (EPRI). The team determined that the Columbia Generating Station is adequately screening and addressing issues identified through operational experience that apply to the station and that this information is evaluated in a timely manner once it is received.

Assessment 71152B Safety Conscious Work Environment (SCWE)

The team conducted safety conscious work environment interviews with 55 employees from five different disciplines that included electrical maintenance, instrumentation and controls, mechanical maintenance, operations, and security. The purpose of these interviews was (1)to evaluate the willingness of the licensee staff to raise nuclear safety issues, either by initiating a condition report or by another method,

(2) to evaluate the perceived effectiveness of the corrective action program at resolving identified problems, and
(3) to evaluate the licensee's safety conscious work environment (SCWE). The team also observed interactions between employees during routine daily production meetings, operational focus meetings and management condition report review meetings. The team interviewed the Employee Concerns Program Manager and reviewed the results of the latest safety culture surveys and a sample of case files that may relate to safety conscious work environment.

The team found that the licensee had a safety conscious work environment where individuals felt free to raise concerns without fear of retaliation. Most expressed positive experiences after raising issues to their supervisors and after documenting issues in condition reports, and all individuals indicated that they would not hesitate to raise safety concerns, through at least one of the several means available at the station. Based on feedback from these interviews regarding anonymous condition reports, the station should consider enhancing communications with plant personnel so that it is better understood how anonymous condition reports are treated. Additionally, the team noted that several individuals brought up continuing morale concerns, particularly mechanical maintenance, electrical maintenance and instrument and controls. These morale concerns appear to be caused by union contract negotiations and arbitration and its impact on the relationship between the staff and senior management. The team noted that the morale concerns are consistent with the results of the previous problem identification and resolution inspection (NRC Problem Identification and Resolution Inspection Report 05000397/2019010) and if not addressed properly could erode the individuals willingness to bring up safety concerns in the future.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On August 2, 2021, the inspectors presented the biennial problem identification and resolution inspection results to Robert Schuetz and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152B

Corrective Action

Documents

AR-xxxxxx

24656, 231738, 276051, 300881, 303254, 322254, 333679,

334459, 353023, 355482, 358871, 359059, 359206, 360595,

2801, 366178, 366179, 366189, 367730, 368369, 368573,

369273, 369740, 369803, 371289, 372512, 372892, 373494,

376273, 376387, 378159, 378162, 378527, 378892, 382784,

386750, 387435, 388173, 388855, 389079, 389652, 389753,

389808, 389856, 389987, 390029, 390041, 390048, 390379,

390486, 390800, 390812, 391337, 391579, 391893, 392031,

393112, 393215, 393268, 393270, 393438, 393618, 393990,

393998, 394506, 394579, 394892, 395031, 395167, 395246,

395843, 396051, 396543, 396587, 397224, 397451, 397558,

398065, 398820, 398943, 399263, 399463, 399548, 399557,

400046, 400052, 400330, 400349, 400405, 401003, 401129,

401200, 401246, 401325, 401663, 401906, 401907, 402059,

2121, 402186, 402296, 402303, 402483, 402556, 402648,

403029, 403084, 403835, 404225, 404472, 404507, 405209,

405309, 405974, 406348, 406957, 407057, 407314, 407648,

407939, 407977,407984, 408057, 408149, 408181, 408505,

408562, 408563, 408604, 408708, 409123, 409203, 409238,

409249, 409261, 409650, 409842, 410087, 410266, 410403,

410451, 410638, 410709, 411103, 411140, 411263, 411560,

411598, 411840, 412247, 412778, 412795, 412801, 412816,

413001, 413040, 413545, 414236, 414277, 415034, 415122,

415187, 415317, 415351, 415479, 415798, 415885, 416095,

416249, 416254, 416546, 417140, 417217, 417274, 417343,

417361, 417374, 417546, 417952, 418191, 418344, 418442,

418510, 418593, 418722, 418872, 418921, 418950, 419140,

419420, 419458, 419485, 419609, 419652, 419654, 419702,

419840, 419866, 420293, 420343, 420564, 420679, 420829,

20881, 421315, 422275, 422381

71152B

Corrective Action

Documents

AR-xxxxxx

23579, 423658, 423667, 423713, 423714, 423727, 423728

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Resulting from

Inspection

71152B

Drawings

M520

Flow Diagram HPCS and LPCS Systems, Reactor Building

105

71152B

Engineering

Changes

EC11288

Replace the Stack Monitors

01/15/2019

71152B

Engineering

Changes

EC14954

CCH Bypass Line AR 22465622465609/11/2017

71152B

Engineering

Changes

EC16619

Credit CCH For MCR Equipment Operability

71152B

Engineering

Changes

EC17951

500 KV Loss Of Bus Protection

71152B

Engineering

Evaluations

AR276051276051(a)(1) Performance Improvement Plan and Goals - 42

devices

015

71152B

Engineering

Evaluations

Design Base

Document

Division 300

Section 351

Radwaste Building Mixed Air System

71152B

Miscellaneous

Reportability Evaluation for AR: 417140 (417217)

71152B

Miscellaneous

Simulator Inspection Report

06/02/2021

71152B

Miscellaneous

Training for Performance Improvement w/ Post-training

Evaluations

06/21/2021

71152B

Miscellaneous

Daily Production Meeting (0615)

07/13/2021

71152B

Miscellaneous

Columbia Generating Station Daily Report

07/13/2021

71152B

Miscellaneous

Daily Management CR Review CRs to Review 7/12/2021 To

7/13/2021

07/13/2021

71152B

Miscellaneous

Operations Aggregate Index (Online/Outage)

07/08/2021

71152B

Miscellaneous

Daily 15 for Thursday August 1, 2019

08/01/2019

71152B

Miscellaneous

Condition Monitoring for CCH-SYS-A and CCH-SYS-B

71152B

Miscellaneous

Violation Report - Operations (FFD)

07/12/2021

71152B

Miscellaneous

Daily Management CR Review - CRs to Review 7/25/2021 to

7/26/2021

71152B

Miscellaneous

Columbia Generating Station Daily Report

07/26/2021

71152B

Miscellaneous

List of the Main Control Room Deficiencies Including Back

Panels

07/28/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152B

Miscellaneous

IBM Watson Statistics - January thru June 2021

06/17/2021

71152B

Miscellaneous

Reportability Evaluation for AR 00409238: CMS-RIS-27E

and F Do Not Meet Required Seismic Configuration

71152B

Miscellaneous

Supervisor Shipping Paperwork Review

71152B

Miscellaneous

1Q2021

High Pressure Core Spray System Health Report

03/31/2021

71152B

Miscellaneous

25999 R8

Effectiveness Review for AR-CR 386750

03/28/2019

71152B

Miscellaneous

2366

Operating Experience Request

71152B

Miscellaneous

401659

Operating Experience Request

71152B

Miscellaneous

404198

Operating Experience Request

71152B

Miscellaneous

406289

PM Change Request for Inspect Cooling Water Fans

04/27/2020

71152B

Miscellaneous

408591

Operating Experience Request

71152B

Miscellaneous

411134

Operating Experience Request

71152B

Miscellaneous

413989

Operating Experience Request

71152B

Miscellaneous

415824

Operating Experience Request

71152B

Miscellaneous

417418

PM Change Request for Inspect Cooling Water Fans

03/18/2021

71152B

Miscellaneous

CAP KPI/LTCA-

JUNE

PERFORMANCE ASSESSMENT REVIEW BOARD (PARB)

Meeting Minutes

07/13/2021

71152B

Miscellaneous

Division 300,

Section 308

High Pressure Core Spray Design Basis Document

016

71152B

Miscellaneous

MT000723

Gap, Drive, Action, Results (GDAR) Presentation

03/31/2020

71152B

Miscellaneous

Root Cause

Evaluation

386750

Parameters for PRM-SR-1 Were Incorrect

2/28/2018

71152B

Miscellaneous

Root Cause

Evaluation

399463

HPCS Diesel Starting Air Depressurization Event

01/22/2020

71152B

Miscellaneous

TREQ 19-0099

Recovery Actions ABN-FWH-HILEVEL/TRIP

07/19/2019

71152B

Miscellaneous

TREQ 19-0173

Suppression Pool cooling Prioritization

11/20/2019

71152B

Operability

Evaluations

Technical Assessment Supporting Reportability for AR-

417140

71152B

Operability

Evaluations

334459

Control Room Chilled (CCH), Radwaste Mixed Air (WMA)

71152B

Procedures

1.3.66

Operability Determination

037

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152B

Procedures

1.3.76

Integrated Risk Management

056

71152B

Procedures

1.4.7

Control of Supplemental Personnel

019/009

71152B

Procedures

10.25.13 A

4.16KV Vacuum Breaker Maintenance with Stored Energy

Mechanism

21

71152B

Procedures

10.25.13 A

4.16kV Vacuum Breaker Maintenance with Stored Energy

Mechanisms

21

71152B

Procedures

CDM-01

Cause Determination Manual

017

71152B

Procedures

DIC 234.1

Standard Procurement And Use Policy

71152B

Procedures

ISP-APRM/RRC-

B301

APRM-CHS-1 Recirculation Flow Transmitters Calibration

003

71152B

Procedures

OI-14

Columbia Generating Station Operational Challenges and

Risk Program

017

71152B

Procedures

OI-9

Operations Standards and Expectations

079

71152B

Procedures

OSP-CCH/IST-

M701

Control Room Emergency Chiller System A Operability

055

71152B

Procedures

OSP-CCH/IST-

M701

Control Room Emergency Chiller System A Operability

054

71152B

Procedures

OSP-CCH/IST-

M702

Control Room Emergency Chiller System B Operability

049

71152B

Procedures

OSP-HPCS-A701

High Press Core Spray Keep Fill Integrity Test

010

71152B

Procedures

OSP-SW/IST-

Q703

HPCS Service Water Operability

030

71152B

Procedures

PPM 1.5.13

Preventive Maintenance Optimization Living Program

2, 44

71152B

Procedures

PPM 10.19.1

Cooling Tower Fan Maintenance

71152B

Procedures

PPM 10.25.13B

DHP-VR-350 3000 Amp Circuit Breaker Maintenance

005

71152B

Procedures

PPM 11.2.23.1

Shipping Radioactive Materials and Waste

71152B

Procedures

PPM 11.2.23.44

Operation of the Self Engaging Rapid Dewatering System

(SERDS)

71152B

Procedures

PPM 11.2.23.46

Shipment of Category 1 and 2 Material

71152B

Procedures

PPM 11.2.23.47

DOT Non-Radioactive Material Shipments

71152B

Procedures

PPM 11.2.23.48

Packaging and Shipment of Type A Packages

71152B

Procedures

PPM 11.2.23.49

Radioactive Material LSA and SCO Requirements and

Checklist

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152B

Procedures

PPM 11.2.23.50

Type B Package and Requirements Checklist

71152B

Procedures

PPM 11.2.23.51

Shipment of Excepted Packages

71152B

Procedures

PPM 3.1.10

OPS-4 Logs

014

71152B

Procedures

PPM 6.2.1

New Fuel Handling, Delivery Truck to Railroad Bay

28/001

71152B

Procedures

SOP-CCH-

START-QC

Emergency Chill Water Chiller Start Quick Card (CCH-CR-

1A(B))

000/002

71152B

Procedures

SOP-DG-DSA

Diesel Starting Air Operations

13, 15, 18

71152B

Procedures

SOP-HVAC/CR-

LU

Control, Cable, and Critical Switchgear Rooms HVAC Lineup

2

71152B

Procedures

SOP-HVAC/CR-

OPS

Control, Cable, and Critical Switchgear Rooms HVAC

Operation

28

71152B

Procedures

SWP-CAP-01

Corrective Action Program

044

71152B

Procedures

SWP-CAP-06

Condition Reports

28

71152B

Procedures

SWP-CHE-02

Chemical Process Management and Control

030

71152B

Procedures

SWP-CSW-31

Cyber Security Audit and Accountability

001

71152B

Procedures

SWP-FFD-04

Work Hour Control

009/003

71152B

Procedures

TDI-04

Processing of Training Request

71152B

Procedures

TDI-06

Simulator Management

71152B

Procedures

TDI-24

Exam Security

017

71152B

Procedures

TSP-CCH/ISI-

G801

ASME CCH System Leakage Test (Loop A)

2

71152B

Procedures

TSP-HPCS-B801

HPCS Leakage Surveillance

006

71152B

Self-Assessments

Columbia Nuclear Station Plant Nuclear Safety Culture

Assessment

04/20/2020

71152B

Self-Assessments 01-2020 Quality

Functional Area Scorecard (FAS 3.0)

01/2021

71152B

Self-Assessments 01-2020 Reactor

Fuels (NF.1)

Functional Area Scorecard (FAS 3.0)

01/2020

71152B

Self-Assessments 01-2021

Maintenance

Functional Area Scorecard (FAS 3.0)

01/2021

71152B

Self-Assessments 01-2021

Operations

Functional Area Scorecard (FAS 3.0)

01/2021

71152B

Self-Assessments 01-2021

Radiation

Functional Area Scorecard (FAS 3.0)

01/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Protection

71152B

Self-Assessments 01-2021 Training

Functional Area Scorecard (FAS 3.0)

01/2021

71152B

Self-Assessments 02-2020

Operations

Functional Area Scorecard (FAS 3.0)

2/2020

71152B

Self-Assessments 02-2020

Radiation

Protection

Functional Area Scorecard (FAS 3.0)

2/2020

71152B

Self-Assessments 02-2021

Emergency

Preparedness

Functional Area Scorecard (FAS 3.0)

2/2021

71152B

Self-Assessments 02-2021

Radiation

Protection

Functional Area Scorecard (FAS 3.0)

2/2021

71152B

Self-Assessments 02-2021 Reactor

Fuels

Functional Area Scorecard (FAS 3.0)

2/2021

71152B

Self-Assessments 03-2020

Maintenance

Functional Area Scorecard (FAS 3.0)

03/2020

71152B

Self-Assessments 03-2021

Radiation

Protection

Functional Area Scorecard (FAS 3.0)

03/2021

71152B

Self-Assessments 05-2020

Radiation

Protection

Functional Area Scorecard (FAS 3.0)

05/2020

71152B

Self-Assessments 12-2020

Radiation

Protection

Functional Area Scorecard (3.0)

2/2020

71152B

Self-Assessments 2-2021

Engineering

Functional Area Scorecard (FAS 3.0)

2/2021

71152B

Self-Assessments AR-SA 356852

Fluid Leak Management

71152B

Self-Assessments AR-SA 374692

Risk Management

04/08/2021

71152B

Self-Assessments AR-SA 376387

71124.06 Radioactive Gaseous and Liquid Effluent

Treatment

09/05/2019

71152B

Self-Assessments AR-SA 378159

71124.08 Radioactive Solid Waste Processing and

Radioactive Material Handling, Storage and Transportation

01/21/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152B

Self-Assessments AR-SA 378162

RESPIRATORY PROTECTION PROGRAM

03/12/2020

71152B

Self-Assessments AR-SA 390029

21 Pre-PI&R

2/29/2021

71152B

Self-Assessments AR-SA 397558

Plant Status Control

09/05/2019

71152B

Self-Assessments AR-SA 400251

Health of the 10 CFR 50.59 Program

01/16/2020

71152B

Self-Assessments AR-SA 404481

Nuclear Projects

10/15/2020

71152B

Self-Assessments AR-SA 411359

Fire Protection

01/13/2021

71152B

Self-Assessments AU-CA-20

Quality Services Audit Report - Corrective Action Program

08/05/2020

71152B

Self-Assessments AU-CH-20

Chemistry and Environmental Monitoring Program

10/01/2020

71152B

Self-Assessments AU-CL-19

Calibration Laboratory Program

03/14/2019

71152B

Self-Assessments AU-DC-20

Quality Services Audit Report (QSAR) - Independent Spent

Fuel Storage Installation

04/16/2020

71152B

Self-Assessments AU-EN-20

QSAR - Engineering Program

03/26/2020

71152B

Self-Assessments AU-EP-21

QSAR - Emergency Preparedness

03/02/2021

71152B

Self-Assessments AU-MM-20

Materials Management Program

11/12/2020

71152B

Self-Assessments AU-MM-20

Quality Services Audit Report Material Management Program

2/03/2020

71152B

Self-Assessments AU-MN-21

QSAR - Maintenance Program

01/28/2021

71152B

Self-Assessments AU-OP/TS-19

Quality services Audit Report for Operations, Technical

Specifications and Applicable License

Conditions Programs

07/31/2019

71152B

Self-Assessments AU-RP/RW-19

Radiation Protection and Process Control Programs

2/05/2019

71152B

Self-Assessments AU-RP/RW-20

Radiation Protection and Process Control Programs

2/16/2020

71152B

Self-Assessments AU-SE-PADS-

MRO/SAE-20

Quality Services Audit Report for Security, Personnel Access

Data System (PADS), Medical Review

Officer (MRO), and Substance Abuse Expert (SAE)

Programs

09/20/2020

71152B

Self-Assessments AU-TQ-20

Quality Services Audit Report for Training Qualification and

Performance of Unit Staff Program and

Processes

06/25/2020

71152B

Shipping Records

21-27

Paperwork Package for Shipment 21-27

04/21/2021

71152B

Work Orders

00GL92 - 05

RECRANK PMT (DG-ENG-1C)

71152B

Work Orders

01045033-01

CW-CT-2 A Structural Inspection

06/10/2003

71152B

Work Orders

2046448-01

01/22/2014

71152B

Work Orders

2050016 - 07

RECRANK PMT (DG-ENG-1C)

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152B

Work Orders

2072674-01

Inspect Cooling Tower Fan CW-FN-1

03/04/2017

71152B

Work Orders

2080487-01

06/29/2016

71152B

Work Orders

2087667-01

05/21/2021

71152B

Work Orders

2087671-01

05/20/2021

71152B

Work Orders

2089994-06

RECRANK PMT (DG-ENG-1C)

71152B

Work Orders

2109310

71152B

Work Orders

2110808-01

Clean Cooling Tower for CW-CT-2C

05/07/2019

71152B

Work Orders

2126103-01

2/24/2019

71152B

Work Orders

2140306-01/02

Inspect/Clean/Repair Seal for CW-CT-2B

06/09/2021

71152B

Work Orders

2165498-01

10/03/2020

71152B

Work Orders

2165835-01

01/02/2021

71152B

Work Orders

2167179-01

CMS-RIS-27F Does Not Meet Required Seismic

Configuration (In-Containment Hi Range Area Radiation

Readout)

07/30/2020

71152B

Work Orders

2167180-01

CMS-RIS-27E Does Not Meet Required Seismic

Configuration (In-Containment Hi Range Area Radiation

Readout)

07/30/2020

71152B

Work Orders

WO214516 and

WO214517

71152B

Work Orders

WO2176936

71152B

Work Orders

WR29158405