SUBJECT:
COLUMBIA GENERATING STATION - BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000397/2021010
Dear Mr. Schuetz:
On July 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your Columbia Generating Station. On August 2, 2021 the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspection team reviewed the stations corrective action program and the stations implementation of the program to evaluate its effectiveness in identifying, prioritizing, evaluating, and correcting problems, and to confirm that the station was complying with NRC regulations and licensee standards for corrective action programs. Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.
The team also evaluated the stations processes for use of industry and NRC operating experience information and the effectiveness of the stations audits and self-assessments.
Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.
Finally, the team reviewed the stations programs to establish and maintain a safety conscious work environment and interviewed station personnel to evaluate the effectiveness of these programs. Based on the teams observations and the results of these interviews, the team found that your organization appeared to have a safety conscious work environment where individuals felt free to raise concerns without fear of retaliation. Most expressed positive experiences after raising issues to their supervisors and documenting issues in condition reports, and all individuals indicated that they would not hesitate to raise safety concerns.
However, the team noted that several individuals brought up continuing morale concerns, consistent with the results of the previous problem identification and resolution inspection (NRC Problem Identification and Resolution Inspection Report 05000397/2019010). The team noted that if not addressed properly, these morale concerns could erode the individuals willingness to bring up safety concerns in the future.
No findings or violations of more than minor significance were identified during this inspection.
August 29, 2021 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Ami N. Agrawal, Team Leader Inspection Programs & Assessment Team Division of Reactor Safety Docket No. 05000397 License No. NPF-21
Enclosure:
As stated
Inspection Report
Docket Number:
05000397
License Number:
Report Number:
Enterprise Identifier:
I-2021-010-0003
Licensee:
Energy Northwest
Facility:
Columbia Generating Station
Location:
Richland, WA
Inspection Dates:
July 12, 2021 to July 30, 2021
Inspectors:
F. Ramirez Munoz, Senior Reactor Inspector (Team Lead)
H. Freeman, Senior Project Engineer
N. Greene, Senior Health Physicist
P. Niebaum, Senior Resident Inspector
R. Smith, Senior Resident Inspector
Approved By:
Ami N. Agrawal, Team Leader
Inspection Programs & Assessment Team
Division of or Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a biennial problem identification and resolution inspection at Columbia Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin tele-work. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
OTHER ACTIVITIES - BASELINE
71152B - Problem Identification and Resolution Biennial Team Inspection (IP Section 02.04)
- (1) The inspectors performed a biennial assessment of the licensees corrective action program, use of operating experience, self-assessments and audits, and safety conscious work environment.
Corrective Action Program Effectiveness: The inspectors assessed the corrective action programs effectiveness in identifying, prioritizing, evaluating, and correcting problems. The inspectors sampled over 220 condition reports and their associated cause evaluations, if applicable. The inspectors also conducted a five-year review of the high pressure core spray system and the emergency chilled water system, which included review of failures, maintenance issues, surveillances, corrective and preventive maintenance, reliability, and maintenance rule performance. In addition, the inspectors reviewed 16 findings and violations issued during the biennial period.
Operating Experience, Self-Assessments and Audits: The inspectors assessed the effectiveness of the stations processes for use of operating experience, audits, and self-assessments. The sample included industry operating experience communications like 10 CFR Part 21 notifications and other vendor correspondence, NRC generic communications, publications from various industry groups, and site evaluations. The sample also included reviews of licensee self-assessments and internal audits.
Safety Conscious Work Environment: The inspectors assessed the effectiveness of the stations programs to establish and maintain a safety conscious work environment. The team interviewed 55 individuals, attended routine meetings, interviewed the Employee Concerns Program Manager, and reviewed employee concerns files.
INSPECTION RESULTS
Assessment 71152B Corrective Action Program Assessment
Based on the samples reviewed, the team determined that the licensees corrective action program complied with regulatory requirements and self-imposed standards. The licensees performance in each of the areas of Problem Identification, Problem Prioritization and Evaluation, and Corrective Actions adequately supported nuclear safety.
Effectiveness of Problem Identification: Based on the samples reviewed, the team determined that the licensee's performance in this area adequately supported nuclear safety. Overall, the team found that the licensee was identifying and documenting problems at an appropriately low threshold that supported nuclear safety.
Effectiveness of Prioritization and Evaluation of Issues: Overall, the team found that the licensee was appropriately prioritizing and evaluating issues to support nuclear safety. Of the samples reviewed, the team found that the licensee correctly characterized each condition report as to whether it represented a condition adverse to quality, and then prioritized the evaluation and corrective actions in accordance with program guidance.
In January 2021, the licensee began using the IBM Watson artificial intelligence system to pre-screen all condition reports instead of the departmental performance improvement specialists that had previously performed this task. The artificial intelligence system pre-screens the condition report to determine the priority (whether it represents a condition adverse to quality or not), category (A, B, C, D, etc.), and responsible department based upon program inputs. The inspectors noted that following the artificial intelligence pre-screen, 12 percent of condition reports needed to be corrected for priority and 14 percent of condition reports needed to be corrected for severity. However, the final determination review is still performed by the management review team and changes are incorporated back into the artificial intelligence algorithm. As such, the team did not identify any concerns with the licensees implementation of this pre-screening process.
Effectiveness of Corrective Actions: Overall, the team concluded that the licensee's corrective actions supported nuclear safety. Specifically, the Columbia Generating Station developed effective corrective actions for the problems evaluated in the corrective action program and generally implemented these corrective actions in a timely manner commensurate with their safety significance. As part of this inspection, the team selected the plants high pressure core spray and emergency chilled water systems for a focused review within the corrective action program. For these systems, the team performed sample selections of condition reports, looking at the adequacy of the licensee's evaluation process for determining which items are placed in the corrective action process, and the corrective actions taken. The team did not identify any concerns with these systems that were not already being addressed by the station's monitoring and corrective action programs.
Assessment 71152B Use of Self-Assessment & Audits The team reviewed a sample of Columbia Generating Station's departmental self-assessments and audits to assess whether performance trends were regularly identified and effectively addressed. The team also reviewed audit reports to assess the effectiveness of assessments in specific areas. Overall, the team concluded that the licensee had an adequate departmental self-assessment and audit process.
Assessment 71152B Operating Experience The team reviewed a variety of sources of operating experience including NRC generic communications, and publications from various industry groups, such as the Nuclear Energy Institute (NEI) and Electric Power Research Institute (EPRI). The team determined that the Columbia Generating Station is adequately screening and addressing issues identified through operational experience that apply to the station and that this information is evaluated in a timely manner once it is received.
Assessment 71152B Safety Conscious Work Environment (SCWE)
The team conducted safety conscious work environment interviews with 55 employees from five different disciplines that included electrical maintenance, instrumentation and controls, mechanical maintenance, operations, and security. The purpose of these interviews was (1)to evaluate the willingness of the licensee staff to raise nuclear safety issues, either by initiating a condition report or by another method,
- (2) to evaluate the perceived effectiveness of the corrective action program at resolving identified problems, and
- (3) to evaluate the licensee's safety conscious work environment (SCWE). The team also observed interactions between employees during routine daily production meetings, operational focus meetings and management condition report review meetings. The team interviewed the Employee Concerns Program Manager and reviewed the results of the latest safety culture surveys and a sample of case files that may relate to safety conscious work environment.
The team found that the licensee had a safety conscious work environment where individuals felt free to raise concerns without fear of retaliation. Most expressed positive experiences after raising issues to their supervisors and after documenting issues in condition reports, and all individuals indicated that they would not hesitate to raise safety concerns, through at least one of the several means available at the station. Based on feedback from these interviews regarding anonymous condition reports, the station should consider enhancing communications with plant personnel so that it is better understood how anonymous condition reports are treated. Additionally, the team noted that several individuals brought up continuing morale concerns, particularly mechanical maintenance, electrical maintenance and instrument and controls. These morale concerns appear to be caused by union contract negotiations and arbitration and its impact on the relationship between the staff and senior management. The team noted that the morale concerns are consistent with the results of the previous problem identification and resolution inspection (NRC Problem Identification and Resolution Inspection Report 05000397/2019010) and if not addressed properly could erode the individuals willingness to bring up safety concerns in the future.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On August 2, 2021, the inspectors presented the biennial problem identification and resolution inspection results to Robert Schuetz and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
AR-xxxxxx
24656, 231738, 276051, 300881, 303254, 322254, 333679,
334459, 353023, 355482, 358871, 359059, 359206, 360595,
2801, 366178, 366179, 366189, 367730, 368369, 368573,
369273, 369740, 369803, 371289, 372512, 372892, 373494,
376273, 376387, 378159, 378162, 378527, 378892, 382784,
386750, 387435, 388173, 388855, 389079, 389652, 389753,
389808, 389856, 389987, 390029, 390041, 390048, 390379,
390486, 390800, 390812, 391337, 391579, 391893, 392031,
393112, 393215, 393268, 393270, 393438, 393618, 393990,
393998, 394506, 394579, 394892, 395031, 395167, 395246,
395843, 396051, 396543, 396587, 397224, 397451, 397558,
398065, 398820, 398943, 399263, 399463, 399548, 399557,
400046, 400052, 400330, 400349, 400405, 401003, 401129,
401200, 401246, 401325, 401663, 401906, 401907, 402059,
2121, 402186, 402296, 402303, 402483, 402556, 402648,
403029, 403084, 403835, 404225, 404472, 404507, 405209,
405309, 405974, 406348, 406957, 407057, 407314, 407648,
407939, 407977,407984, 408057, 408149, 408181, 408505,
408562, 408563, 408604, 408708, 409123, 409203, 409238,
409249, 409261, 409650, 409842, 410087, 410266, 410403,
410451, 410638, 410709, 411103, 411140, 411263, 411560,
411598, 411840, 412247, 412778, 412795, 412801, 412816,
413001, 413040, 413545, 414236, 414277, 415034, 415122,
415187, 415317, 415351, 415479, 415798, 415885, 416095,
416249, 416254, 416546, 417140, 417217, 417274, 417343,
417361, 417374, 417546, 417952, 418191, 418344, 418442,
418510, 418593, 418722, 418872, 418921, 418950, 419140,
419420, 419458, 419485, 419609, 419652, 419654, 419702,
419840, 419866, 420293, 420343, 420564, 420679, 420829,
20881, 421315, 422275, 422381
Corrective Action
Documents
AR-xxxxxx
23579, 423658, 423667, 423713, 423714, 423727, 423728
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Resulting from
Inspection
Drawings
M520
Flow Diagram HPCS and LPCS Systems, Reactor Building
105
Engineering
Changes
Replace the Stack Monitors
01/15/2019
Engineering
Changes
CCH Bypass Line AR 22465622465609/11/2017
Engineering
Changes
Credit CCH For MCR Equipment Operability
Engineering
Changes
500 KV Loss Of Bus Protection
Engineering
Evaluations
AR276051276051(a)(1) Performance Improvement Plan and Goals - 42
devices
015
Engineering
Evaluations
Design Base
Document
Division 300
Section 351
Radwaste Building Mixed Air System
Miscellaneous
Reportability Evaluation for AR: 417140 (417217)
Miscellaneous
Simulator Inspection Report
06/02/2021
Miscellaneous
Training for Performance Improvement w/ Post-training
Evaluations
06/21/2021
Miscellaneous
Daily Production Meeting (0615)
07/13/2021
Miscellaneous
Columbia Generating Station Daily Report
07/13/2021
Miscellaneous
Daily Management CR Review CRs to Review 7/12/2021 To
7/13/2021
07/13/2021
Miscellaneous
Operations Aggregate Index (Online/Outage)
07/08/2021
Miscellaneous
Daily 15 for Thursday August 1, 2019
08/01/2019
Miscellaneous
Condition Monitoring for CCH-SYS-A and CCH-SYS-B
Miscellaneous
Violation Report - Operations (FFD)
07/12/2021
Miscellaneous
Daily Management CR Review - CRs to Review 7/25/2021 to
7/26/2021
Miscellaneous
Columbia Generating Station Daily Report
07/26/2021
Miscellaneous
List of the Main Control Room Deficiencies Including Back
Panels
07/28/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
IBM Watson Statistics - January thru June 2021
06/17/2021
Miscellaneous
Reportability Evaluation for AR 00409238: CMS-RIS-27E
and F Do Not Meet Required Seismic Configuration
Miscellaneous
Supervisor Shipping Paperwork Review
Miscellaneous
1Q2021
High Pressure Core Spray System Health Report
03/31/2021
Miscellaneous
25999 R8
Effectiveness Review for AR-CR 386750
03/28/2019
Miscellaneous
2366
Operating Experience Request
Miscellaneous
401659
Operating Experience Request
Miscellaneous
404198
Operating Experience Request
Miscellaneous
406289
PM Change Request for Inspect Cooling Water Fans
04/27/2020
Miscellaneous
408591
Operating Experience Request
Miscellaneous
411134
Operating Experience Request
Miscellaneous
413989
Operating Experience Request
Miscellaneous
415824
Operating Experience Request
Miscellaneous
417418
PM Change Request for Inspect Cooling Water Fans
03/18/2021
Miscellaneous
CAP KPI/LTCA-
JUNE
PERFORMANCE ASSESSMENT REVIEW BOARD (PARB)
Meeting Minutes
07/13/2021
Miscellaneous
Division 300,
Section 308
High Pressure Core Spray Design Basis Document
016
Miscellaneous
MT000723
Gap, Drive, Action, Results (GDAR) Presentation
03/31/2020
Miscellaneous
Root Cause
Evaluation
386750
Parameters for PRM-SR-1 Were Incorrect
2/28/2018
Miscellaneous
Root Cause
Evaluation
399463
HPCS Diesel Starting Air Depressurization Event
01/22/2020
Miscellaneous
TREQ 19-0099
Recovery Actions ABN-FWH-HILEVEL/TRIP
07/19/2019
Miscellaneous
TREQ 19-0173
Suppression Pool cooling Prioritization
11/20/2019
Operability
Evaluations
Technical Assessment Supporting Reportability for AR-
417140
Operability
Evaluations
334459
Control Room Chilled (CCH), Radwaste Mixed Air (WMA)
Procedures
1.3.66
037
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
1.3.76
Integrated Risk Management
056
Procedures
1.4.7
Control of Supplemental Personnel
019/009
Procedures
10.25.13 A
4.16KV Vacuum Breaker Maintenance with Stored Energy
Mechanism
21
Procedures
10.25.13 A
4.16kV Vacuum Breaker Maintenance with Stored Energy
Mechanisms
21
Procedures
CDM-01
Cause Determination Manual
017
Procedures
DIC 234.1
Standard Procurement And Use Policy
Procedures
ISP-APRM/RRC-
B301
APRM-CHS-1 Recirculation Flow Transmitters Calibration
003
Procedures
OI-14
Columbia Generating Station Operational Challenges and
Risk Program
017
Procedures
OI-9
Operations Standards and Expectations
079
Procedures
OSP-CCH/IST-
M701
Control Room Emergency Chiller System A Operability
055
Procedures
OSP-CCH/IST-
M701
Control Room Emergency Chiller System A Operability
054
Procedures
OSP-CCH/IST-
M702
Control Room Emergency Chiller System B Operability
049
Procedures
High Press Core Spray Keep Fill Integrity Test
010
Procedures
OSP-SW/IST-
Q703
HPCS Service Water Operability
030
Procedures
PPM 1.5.13
Preventive Maintenance Optimization Living Program
2, 44
Procedures
PPM 10.19.1
Cooling Tower Fan Maintenance
Procedures
PPM 10.25.13B
DHP-VR-350 3000 Amp Circuit Breaker Maintenance
005
Procedures
PPM 11.2.23.1
Shipping Radioactive Materials and Waste
Procedures
PPM 11.2.23.44
Operation of the Self Engaging Rapid Dewatering System
(SERDS)
Procedures
PPM 11.2.23.46
Shipment of Category 1 and 2 Material
Procedures
PPM 11.2.23.47
DOT Non-Radioactive Material Shipments
Procedures
PPM 11.2.23.48
Packaging and Shipment of Type A Packages
Procedures
PPM 11.2.23.49
Radioactive Material LSA and SCO Requirements and
Checklist
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
PPM 11.2.23.50
Type B Package and Requirements Checklist
Procedures
PPM 11.2.23.51
Shipment of Excepted Packages
Procedures
PPM 3.1.10
OPS-4 Logs
014
Procedures
PPM 6.2.1
New Fuel Handling, Delivery Truck to Railroad Bay
28/001
Procedures
SOP-CCH-
START-QC
Emergency Chill Water Chiller Start Quick Card (CCH-CR-
1A(B))
000/002
Procedures
SOP-DG-DSA
Diesel Starting Air Operations
13, 15, 18
Procedures
SOP-HVAC/CR-
LU
Control, Cable, and Critical Switchgear Rooms HVAC Lineup
2
Procedures
SOP-HVAC/CR-
Control, Cable, and Critical Switchgear Rooms HVAC
Operation
28
Procedures
SWP-CAP-01
Corrective Action Program
044
Procedures
SWP-CAP-06
Condition Reports
28
Procedures
SWP-CHE-02
Chemical Process Management and Control
030
Procedures
SWP-CSW-31
Cyber Security Audit and Accountability
001
Procedures
SWP-FFD-04
Work Hour Control
009/003
Procedures
TDI-04
Processing of Training Request
Procedures
TDI-06
Simulator Management
Procedures
TDI-24
Exam Security
017
Procedures
TSP-CCH/ISI-
G801
ASME CCH System Leakage Test (Loop A)
2
Procedures
TSP-HPCS-B801
HPCS Leakage Surveillance
006
Self-Assessments
Columbia Nuclear Station Plant Nuclear Safety Culture
Assessment
04/20/2020
Self-Assessments 01-2020 Quality
Functional Area Scorecard (FAS 3.0)
01/2021
Self-Assessments 01-2020 Reactor
Fuels (NF.1)
Functional Area Scorecard (FAS 3.0)
01/2020
Self-Assessments 01-2021
Maintenance
Functional Area Scorecard (FAS 3.0)
01/2021
Self-Assessments 01-2021
Operations
Functional Area Scorecard (FAS 3.0)
01/2021
Self-Assessments 01-2021
Radiation
Functional Area Scorecard (FAS 3.0)
01/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Protection
Self-Assessments 01-2021 Training
Functional Area Scorecard (FAS 3.0)
01/2021
Self-Assessments 02-2020
Operations
Functional Area Scorecard (FAS 3.0)
2/2020
Self-Assessments 02-2020
Radiation
Protection
Functional Area Scorecard (FAS 3.0)
2/2020
Self-Assessments 02-2021
Emergency
Preparedness
Functional Area Scorecard (FAS 3.0)
2/2021
Self-Assessments 02-2021
Radiation
Protection
Functional Area Scorecard (FAS 3.0)
2/2021
Self-Assessments 02-2021 Reactor
Fuels
Functional Area Scorecard (FAS 3.0)
2/2021
Self-Assessments 03-2020
Maintenance
Functional Area Scorecard (FAS 3.0)
03/2020
Self-Assessments 03-2021
Radiation
Protection
Functional Area Scorecard (FAS 3.0)
03/2021
Self-Assessments 05-2020
Radiation
Protection
Functional Area Scorecard (FAS 3.0)
05/2020
Self-Assessments 12-2020
Radiation
Protection
Functional Area Scorecard (3.0)
2/2020
Self-Assessments 2-2021
Engineering
Functional Area Scorecard (FAS 3.0)
2/2021
Self-Assessments AR-SA 356852
Fluid Leak Management
Self-Assessments AR-SA 374692
Risk Management
04/08/2021
Self-Assessments AR-SA 376387
71124.06 Radioactive Gaseous and Liquid Effluent
Treatment
09/05/2019
Self-Assessments AR-SA 378159
71124.08 Radioactive Solid Waste Processing and
Radioactive Material Handling, Storage and Transportation
01/21/2019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Self-Assessments AR-SA 378162
RESPIRATORY PROTECTION PROGRAM
03/12/2020
Self-Assessments AR-SA 390029
21 Pre-PI&R
2/29/2021
Self-Assessments AR-SA 397558
Plant Status Control
09/05/2019
Self-Assessments AR-SA 400251
Health of the 10 CFR 50.59 Program
01/16/2020
Self-Assessments AR-SA 404481
Nuclear Projects
10/15/2020
Self-Assessments AR-SA 411359
Fire Protection
01/13/2021
Self-Assessments AU-CA-20
Quality Services Audit Report - Corrective Action Program
08/05/2020
Self-Assessments AU-CH-20
Chemistry and Environmental Monitoring Program
10/01/2020
Self-Assessments AU-CL-19
Calibration Laboratory Program
03/14/2019
Self-Assessments AU-DC-20
Quality Services Audit Report (QSAR) - Independent Spent
Fuel Storage Installation
04/16/2020
Self-Assessments AU-EN-20
QSAR - Engineering Program
03/26/2020
Self-Assessments AU-EP-21
QSAR - Emergency Preparedness
03/02/2021
Self-Assessments AU-MM-20
Materials Management Program
11/12/2020
Self-Assessments AU-MM-20
Quality Services Audit Report Material Management Program
2/03/2020
Self-Assessments AU-MN-21
QSAR - Maintenance Program
01/28/2021
Self-Assessments AU-OP/TS-19
Quality services Audit Report for Operations, Technical
Specifications and Applicable License
Conditions Programs
07/31/2019
Self-Assessments AU-RP/RW-19
Radiation Protection and Process Control Programs
2/05/2019
Self-Assessments AU-RP/RW-20
Radiation Protection and Process Control Programs
2/16/2020
Self-Assessments AU-SE-PADS-
MRO/SAE-20
Quality Services Audit Report for Security, Personnel Access
Data System (PADS), Medical Review
Officer (MRO), and Substance Abuse Expert (SAE)
Programs
09/20/2020
Self-Assessments AU-TQ-20
Quality Services Audit Report for Training Qualification and
Performance of Unit Staff Program and
Processes
06/25/2020
Shipping Records
21-27
Paperwork Package for Shipment 21-27
04/21/2021
Work Orders
00GL92 - 05
RECRANK PMT (DG-ENG-1C)
Work Orders
01045033-01
CW-CT-2 A Structural Inspection
06/10/2003
Work Orders
2046448-01
01/22/2014
Work Orders
2050016 - 07
RECRANK PMT (DG-ENG-1C)
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Work Orders
2072674-01
Inspect Cooling Tower Fan CW-FN-1
03/04/2017
Work Orders
2080487-01
06/29/2016
Work Orders
2087667-01
05/21/2021
Work Orders
2087671-01
05/20/2021
Work Orders
2089994-06
RECRANK PMT (DG-ENG-1C)
Work Orders
2109310
Work Orders
2110808-01
Clean Cooling Tower for CW-CT-2C
05/07/2019
Work Orders
2126103-01
2/24/2019
Work Orders
2140306-01/02
Inspect/Clean/Repair Seal for CW-CT-2B
06/09/2021
Work Orders
2165498-01
10/03/2020
Work Orders
2165835-01
01/02/2021
Work Orders
2167179-01
CMS-RIS-27F Does Not Meet Required Seismic
Configuration (In-Containment Hi Range Area Radiation
Readout)
07/30/2020
Work Orders
2167180-01
CMS-RIS-27E Does Not Meet Required Seismic
Configuration (In-Containment Hi Range Area Radiation
Readout)
07/30/2020
Work Orders
WO214516 and
Work Orders
Work Orders