| | Start date | Site | Title | Topic |
|---|
| ENS 58226 | 31 March 2026 04:00:00 | University Of Pittsburgh | Medical Event | Reactive Inspection |
| ML26062A818 | 26 March 2026 | Vogtle | Issuance of Amendment Nos. 230 and 212, Regarding Alternative Source Term Using Regulatory Guide 1.183 Revision 1 | Boric Acid Loss of Offsite Power Moisture Carryover Fuel cladding Manual Operator Action Operational leakage Control Room Habitability |
| ENS 58198 | 11 March 2026 05:00:00 | Lee Sumit Medical Center | Medical Event | |
| ML26007A121 | 5 March 2026 | Kansas State University | Examination Report Letter No. 50-188/OL-26-01, Kansas State University | Shutdown Margin High Radiation Area Earthquake |
| ML26044A240 | 3 March 2026 | | March 3 2026 Letter to R Hildebrant Re Vermont Draft Impep Report | Pandemic Underdose |
| ML26057A104 | 26 February 2026 | University of Missouri-Columbia | University of Missouri Research Reactor, 2025 Reactor Operations Annual Report | License Renewal Restart |
| ML26037A091 | 26 February 2026 | Ginna | R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 161 to Adopt TSTF-51, Revision 2 | Unanalyzed Condition Shutdown Margin Surveillance Frequency Control Program Recently irradiated fuel Fire Protection Program |
| ML26056A010 | 25 February 2026 | 99902049 | Final Safety Evaluation for the SMR-300 Design Basis Accident Radiological Consequences Analysis Methodology Licensing Topical Report, HI-2241098, Revision 1 | |
| ML26030A200 | 25 February 2026 | 07109337 | Safkeg-LS Model No. 3979A, CoC No. 9337, Revision 6, CoC | |
| ML26016A620 | 23 February 2026 | Grand Gulf Arkansas Nuclear River Bend Waterford | Issuance of Amendments Related to Adoption of TSTF-596, Revision 2 | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Hydrostatic Probabilistic Risk Assessment Surveillance Frequency Control Program Loss of Offsite Power Safeguards Contingency Plan Operational leakage Metamic Gas accumulation |
| ML26035A141 | 10 February 2026 | Beaver Valley Davis Besse Perry Comanche Peak | Issuance of Amendments | Shutdown Margin Anticipated operational occurrence Surveillance Frequency Control Program Pressure Boundary Leakage Unidentified leakage |
| ENS 58158 | 9 February 2026 20:00:00 | Billings Clinic | Medical Event | |
| IR 05000338/2025004 | 9 February 2026 | North Anna | Integrated Inspection Report 05000338/2025004 and 05000339/2025004 | Mission time Reserve Station Service Transformer Functionality Assessment Aging Management Significance Determination Process Operability Determination License Renewal Fire Protection Program Hardened grease |
| Information Notice 2026-02, Using Generic Process Checklists in Medical Care to Prevent Human Error | 6 February 2026 | | Using Generic Process Checklists in Medical Care to Prevent Human Error | Brachytherapy |
| ML26033A255 | 2 February 2026 | 99902117 05000614 | Enclosure 2: PSAR Subsection 2.4.13 Accidental Releases of Liquid Effluents Into Ground and Surface Waters | |
| ULNRC-06922, Enclosure 8: Evaluation of Changes for AST RE-Analysis for an Increase in Fuel Burnup | 28 January 2026 | Callaway | Enclosure 8: Evaluation of Changes for AST RE-Analysis for an Increase in Fuel Burnup | Loss of Offsite Power Deep Dose Equivalent Accident Tolerant Fuel Pre-submittal Spent fuel rack Leak-Before-Break |
| ML26007A265 | 21 January 2026 | Grand Gulf Arkansas Nuclear River Bend Waterford | Issuance of Amendments Related to Revision of Technical Specifications to Use Online Monitoring Methodology | Safe Shutdown Shutdown Margin Anticipated operational occurrence Post Accident Monitoring Probabilistic Risk Assessment Surveillance Frequency Control Program Safeguards Contingency Plan |
| CNL-25-048, Application to Revise Technical Specification 5.5.3 Radioactive Effluent Controls Program to Support Revision of the Offsite Dose Calculation Manual That Accounts for Radionuclides Generated When Using Potassium Hydroxide | 15 January 2026 | Sequoyah | Application to Revise Technical Specification 5.5.3 Radioactive Effluent Controls Program to Support Revision of the Offsite Dose Calculation Manual That Accounts for Radionuclides Generated When Using Potassium Hydroxide | Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report License Renewal |
| ENS 58117 | 7 January 2026 06:00:00 | Mercyone Des Moines | Dose to an Embryo | Reactive Inspection |
| ML25351A015 | 30 December 2025 | Vogtle | Issuance of Amendment to Increase Flexibility in Mode Restraints | Grab sample Post Accident Monitoring Probabilistic Risk Assessment Significance Determination Process Power change |
| L-2025-190, Corrected Amendment 33 to the Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | 29 December 2025 | Saint Lucie | Corrected Amendment 33 to the Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | Boric Acid Loop seal High Radiation Area Grab sample Anticipated operational occurrence Coatings Fuel cladding Power Uprate Overexposure Spent fuel rack Spill |
| NL-25-0336, License Amendment Request Revise Technical Specification 3.4.10, Reactor Coolant System (RCS) Specific Activity | 22 December 2025 | Vogtle | License Amendment Request Revise Technical Specification 3.4.10, Reactor Coolant System (RCS) Specific Activity | Power change |
| ML25345A481 | 21 December 2025 | 99902049 | ML25345A481-SMR (Holtec) Draft Safety Evaluation of Licensing Topical Report HI-2241098, SMR Design Basis Radiological Consequences Analysis Methodology, Revision 1 | |
| ML25339A083 | 8 December 2025 | Vogtle | December 4, 2025, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Revise Technical Specification 3.4.10 for Vogtle Electric Generating Plant, | Pre-submittal |
| ML25330A089 | 4 December 2025 | 05000026 05000025 | SNC Slides - Vogtle 3 and 4 - TSTF-490 LAR - Pre-Submittal Meeting - December 4 2025 (EPID L-202-LRM-0142) | Pre-submittal |
| ML25338A079 | 4 December 2025 | Vogtle | SNC Slides - Vogtle 3 and 4 - TSYF-490 LAR - Pre-Submittal Meeting December 4, 2025 | Pre-submittal |
| ML25336A066 | 2 December 2025 | Vogtle | SNC Slides - Vogtle 3 and 4 - TSYF-490 LAR - Pre-Submittal Meeting December 4, 2025 | Pre-submittal |
| ML25324A041 | 20 November 2025 | Salem Hope Creek | Enclosure 3 - Salem Generating Station, Unit 1, Technical Specification Bases | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Anticipated operational occurrence Hydrostatic Nondestructive Examination Aging Management Missed surveillance Surveillance Frequency Control Program Loss of Offsite Power Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Core Exit Thermocouple Coast down Unidentified leakage Operational leakage Control Room Habitability |
| LR-N25-0078, Enclosure 4 - Salem Generating Station, Unit 2, Technical Specification Bases | 20 November 2025 | Salem Hope Creek | Enclosure 4 - Salem Generating Station, Unit 2, Technical Specification Bases | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Anticipated operational occurrence Hydrostatic Nondestructive Examination Aging Management Missed surveillance Surveillance Frequency Control Program Loss of Offsite Power Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Core Exit Thermocouple Coast down Unidentified leakage Operational leakage Control Room Habitability |
| ML25321A748 | 17 November 2025 | University of Missouri-Columbia | University of Missouri, License Amendment Request to Revise the Technical Specifications for the Addition of Ancillary Exhaust Systems | License Renewal |
| L-2025-178, Submittal of Environmental Report in Support of Restart | 10 November 2025 | Duane Arnold | Submittal of Environmental Report in Support of Restart | Safe Shutdown Offsite Dose Calculation Manual Cyber Security Sewage Treatment Plant Annual Radiological Environmental Operating Report License Renewal Exemption Request Subsequent License Renewal Fire Protection Program Accident Tolerant Fuel Spill Restart |
| ML25304A101 | 31 October 2025 | Crane | Crane Clean Energy Center - Emergency Action Levels | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Operating Basis Earthquake Operator Manual Action Loss of Offsite Power Safeguards Contingency Plan Earthquake Fuel cladding Pressure Boundary Leakage Core Exit Thermocouple Unidentified leakage Spill |
| ML25304A104 | 31 October 2025 | Crane | Crane Clean Energy Center - Emergency Action Levels | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Operating Basis Earthquake Operator Manual Action Loss of Offsite Power Safeguards Contingency Plan Earthquake Fuel cladding Pressure Boundary Leakage Core Exit Thermocouple Unidentified leakage Spill |
| ML25303A293 | 31 October 2025 | Crane | Submittal of Christopher M. Crane Clean Energy Center Environmental Report | Offsite Dose Calculation Manual Coatings Arc flash FLEX Annual Radioactive Effluent Release Report Notice of Violation Sewage Treatment Plant Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report License Renewal Exemption Request Subsequent License Renewal Biofouling Spill Restart |
| ML25307A032 | 30 October 2025 | Cook | Updated Final Safety Analysis Report (Ufsar), Revision 33, Chapter 14, Section 14.2, Tables 14.2.1-2 to 14.2.7-1 (Unit 1) | |
| ML25307A050 | 30 October 2025 | Cook | Updated Final Safety Analysis Report (Ufsar), Revision 33, Chapter 9, Tables | Boric Acid Hydrostatic |
| ML25307A049 | 30 October 2025 | Cook | Updated Final Safety Analysis Report (Ufsar), Revision 33, Chapter 14, Section 14.1, Tables 14.1-1 to 14.1.13-1 (Unit 1) | Loss of Offsite Power Turbine Missile Power Uprate |
| ML25307A011 | 30 October 2025 | Cook | Updated Final Safety Analysis Report (Ufsar), Revision 33, Chapter 14, Section 14.3, Tables 14.3.1-1 to 14.3.9-23, 14.A.1-1 to 14.G-3 (Unit 1) | Boric Acid Loop seal Fire Barrier Coatings Spill |
| ML25307A053 | 30 October 2025 | Cook | Updated Final Safety Analysis Report (Ufsar), Revision 33, Chapter 11, Tables | Boric Acid |
| ML25307A024 | 30 October 2025 | Cook | Updated Final Safety Analysis Report (Ufsar), Revision 33, Chapter 14, Section 14.2, Standby Safeguards Analysis (Unit 1) | Boric Acid Shutdown Margin Loss of Offsite Power Earthquake Fuel cladding Power Uprate Control Room Habitability Spent fuel rack |
| ML25307A078 | 30 October 2025 | Cook | Updated Final Safety Analysis Report (Ufsar), Revision 33, Chapter 14, Section 14.A-G, Radiation Sources (Appendix 14A) (Unit 1) | Safe Shutdown Design basis earthquake Earthquake Fuel cladding |
| RS-25-145, Radiological Emergency Plan Addendum Revision. Includes EP-AA-1003, Addendum 3, Revision 9, Emergency Action Levels for Clinton Station | 23 October 2025 | Clinton | Radiological Emergency Plan Addendum Revision. Includes EP-AA-1003, Addendum 3, Revision 9, Emergency Action Levels for Clinton Station | Safe Shutdown High winds Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Operator Manual Action Nuclear Accident Reporting System Loss of Offsite Power Safeguards Contingency Plan Earthquake Fuel cladding Pressure Boundary Leakage Power change Unidentified leakage GNF3 Spill |
| ML25288A018 | 15 October 2025 | Crystal River | Enclosure 11 - ADP CR3, LLC, History of Settling Pond Activity Levels and Work Activity, May 20, 2025 | Sewage Treatment Plant |
| ML25290A087 | 13 October 2025 | Susquehanna | Updated Final Safety Analysis Report, Rev. 72, Chapter 12, Section 12.2, Radiation Sources | Feedwater Heater Process Control Program Power Uprate |
| ML25290A119 | 13 October 2025 | Susquehanna | Updated Final Safety Analysis Report, Rev. 72, Chapter 18, Section 18.1, Response to Requirements in NUREG-0737 | Reactor Vessel Water Level Grab sample Anticipated operational occurrence Scram Discharge Volume Shift Technical Advisor Loss of Offsite Power Excess Flow Check Valve Earthquake Fuel cladding Thermal fatigue Potassium iodide Control Room Habitability Restart |
| ML25290A079 | 13 October 2025 | Susquehanna | Updated Final Safety Analysis Report, Rev. 72, Chapter 11, Section 11.5, Process and Effluent Radiolgocial Monitoring and Sampling Systems | Grab sample Anticipated operational occurrence Control Room Habitability |
| ML25290A102 | 13 October 2025 | Susquehanna | Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.1, Decrease in Reactor Coolant Temperature | Stroke time Anticipated operational occurrence Feedwater Heater Feedwater Controller Failure Power Uprate Restart |
| ML25290A105 | 13 October 2025 | Susquehanna | Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.4, Reactivity and Power Distributions Anomalies | Shutdown Margin Main Steam Line Radiation Monitor Rod Drop Event Power Uprate Restart |
| ML25290A044 | 13 October 2025 | Susquehanna | Updated Final Safety Analysis Report, Rev. 72, Chapter 5, Section 5.2, Integrity of Reactor Coolant Pressure Boundary | Reactor Vessel Water Level Grab sample Stroke time Weld Overlay Hydrostatic Nondestructive Examination Incorporated by reference High Energy Line Break Abnormal operational transient Feedwater Heater Stress corrosion cracking Power-Operated Valves Pressure Boundary Leakage Unidentified leakage Unidentified leak Power Uprate Subsequent actuation |
| ML25290A083 | 13 October 2025 | Susquehanna | Updated Final Safety Analysis Report, Rev. 72, Chapter 11, Section 11.2, Liquid Waste Management Systems | Grab sample Anticipated operational occurrence Spill |