SUBJECT:

UPDATED INSPECTION PLAN FOR COLUMBIA GENERATING STATION (REPORT 05000397/2023005)

Dear Robert Schuetz:

The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for Columbia Generating Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In our previous communication dated June 1, 2023, which included NRC Follow-Up Assessment Letter and NRC Inspection Report 05000397/2023090 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23111A237), we informed you of our plan to conduct a supplemental inspection in response to the White finding documented in that report.

This supplemental inspection will be conducted using Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs, when your staff has notified us of your readiness for this inspection. This inspection procedure is conducted to provide assurance that the root cause and contributing causes of risk significant performance issues are understood, the extent of condition and the extent of cause are identified, and the corrective actions are sufficient to prevent recurrence.

With respect to the Preliminary White finding described to you in NRC Inspection Report 05000397/2023092, dated June 1, 2023, (ADAMS Accession No. ML23139A121), the NRC has not reached a final regulatory decision on this matter, and you will be informed separately on any NRC plans for a supplemental inspection.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system ADAMS. The ADAMS system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

August 22, 2023 Please contact me at (817) 200-1144 with any questions you have regarding this letter.

Sincerely, Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety Dockets Nos: 05000397 and 07200035 License No: NPF-21 Enclosure:

Inspection Plan cc w/ encl: Distribution via LISTSERV Signed by Vossmar, Patricia on 08/22/23

ML23233A170 SUNSI Review ADAMS:

Non-Publicly Available Non-SensitiveKeyword:

By: RLB Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS/A BC:DORS/A NAME RBywater PVossmar DATE 8/22/23 8/22/23

Site Inspection Activity Plan 07200035 - Columbia Generating Station (ISFSI)

07/01/2023 - 06/30/2025 Unit Start End Activity CAC Title Staff Count Columbia ISFSI Aging Management Inspection (if IP 60859 gets issued)(1 week, during baseline inspection activities)

9/1/2023 11/30/2023 IP 60859 INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) LICENSE RENEWAL INSPECTION ISFSI Security Inspection (IP 81311)

7/15/2024 7/19/2024 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 8/18/2023 10:15:50 AM 1 of 3

Site Inspection Activity Plan Columbia Generating Station 07/01/2023 - 06/30/2025 Unit Start End Activity CAC Title Staff Count License Renewal Inspection 71003 (Phase 2) - CGS

2 8/6/2023 8/12/2023 IP 71003 000687 Post-Approval Site Inspection for License Renewal

8/20/2023 8/26/2023 IP 71003 000687 Post-Approval Site Inspection for License Renewal Security FFD.08

2 8/28/2023 9/1/2023 IP 71130.08 000740 Fitness For Duty Program Biennial PI&R - CGS

2 9/11/2023 9/15/2023 IP 71152B 000747 Problem Identification and Resolution

9/25/2023 9/29/2023 IP 71152B 000747 Problem Identification and Resolution Commercial Grade Dedication Inspection - 21N - Columbia Generating Station

2 10/16/2023 10/20/2023 IP 71111.21N.03 001808 Commercial Grade Dedication

10/30/2023 11/3/2023 IP 71111.21N.03 001808 Commercial Grade Dedication RP 5,8 -

2 11/13/2023 11/17/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation

11/13/2023 11/17/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation CGS 2023 BRQ

2 11/26/2023 12/2/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security Equipment (.04), Security Training (.07)

2 3/11/2024 3/15/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

3/11/2024 3/15/2024 IP 71130.07 000739 Security Training EP Exercise & PI Inspection (2024) - CGS

2 3/25/2024 3/29/2024 IP 71114.01 000716 Exercise Evaluation

3/25/2024 3/29/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

3/25/2024 3/29/2024 IP 71151 001397 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - CGS

2 4/8/2024 4/12/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

4/29/2024 5/3/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RP 1,4,PI

2 5/6/2024 5/10/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

5/6/2024 5/10/2024 IP 71124.04 000728 Occupational Dose Assessment

5/6/2024 5/10/2024 IP 71151 000746 Performance Indicator Verification RP 6,7

2 6/10/2024 6/14/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Prepared on 8/18/2023 10:15:50 AM 2 of 3

Site Inspection Activity Plan

6/10/2024 6/14/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program Cyber Security - CGS

2 6/24/2024 6/28/2024 IP 71130.10 000741 Cybersecurity Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151)

2 7/15/2024 7/19/2024 IP 71130.02 000734 Access Control

7/15/2024 7/19/2024 IP 71130.09 001656 Security Plan Changes

7/15/2024 7/19/2024 IP 71151 001338 Performance Indicator Verification Fire Protection Inspection - CGS

2 8/12/2024 8/16/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

8/26/2024 8/30/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

CGS 2025 INITIAL EXAM

2 12/8/2024 12/14/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1/12/2025 1/18/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

EP 2025 Program Inspection - CGS

2 2/3/2025 2/7/2025 IP 71114.02 000717 Alert and Notification System Testing

2/3/2025 2/7/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

2/3/2025 2/7/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

2/3/2025 2/7/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness

2/3/2025 2/7/2025 IP 71151 001397 Performance Indicator Verification Security Access Control (71130.02), Security Plan Changes (71130.09), PIV (71151)

2 3/3/2025 3/7/2025 IP 71130.02 000734 Access Control

3/3/2025 3/7/2025 IP 71130.09 001656 Security Plan Changes

3/3/2025 3/7/2025 IP 71151 001338 Performance Indicator Verification Inservice inspection - CGS

2 5/19/2025 5/23/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP 1,3,PI - CGS

2 5/19/2025 5/23/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

5/19/2025 5/23/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

5/19/2025 5/23/2025 IP 71151 000746 Performance Indicator Verification Prepared on 8/18/2023 10:15:50 AM 3 of 3