September 28, 2020

SUBJECT:

COLUMBIA GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000397/2020411

Dear Mr. Sawatzke:

On September 3, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Columbia Generating Station. The NRC inspectors discussed the results of this inspection with Mr. G. Hettel, Chief Nuclear Officer, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Digitally signed by Ray L. Kellar Date: 2020.09.28 14:55:07 -05'00'

Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 05000397 License No. NPF-21

Enclosure:

As stated

Inspection Report

Docket Number:

05000397

License Number:

NPF-21

Report Number:

05000397/2020411

Enterprise Identifier: I-2020-411-0003

Licensee:

Energy Northwest

Facility:

Columbia Generating Station

Location:

Richland, WA

Inspection Dates:

July 19, 2020 to September 3, 2020

Inspectors:

D. Holman, Senior Physical Security Inspector

D. Hostetter, Physical Security Inspector

C. Roettgen, Senior Resident Inspector

L. Merker, Resident Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Columbia Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: [All requirements]
  • Tier II: [All requirements except: 02.09(b)]
  • Tier III: [All requirements]

71130.07 - Security Training

Security Training (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: All Requirements [except 02.07 and 02.08]
  • Tier III: 6 Requirements [specifically 02.10, 02.11a, 02.12a-b, 02.14a-b]

71130.14 - Review of Power Reactor Target Sets

The inspectors evaluated the Security Target Set Program. The following elements were evaluated:

Review of Power Reactor Target Sets

(1)

  • Events and logs: All Requirements
  • Target set identification and development process review: All Requirements
  • Verification of target sets changes: All Requirements
  • Verification of complete and accurate target sets: All Requirements

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 6, 2020, the inspectors presented the security baseline inspection results to Mr. G. Hettel, Chief Nuclear Officer, and other members of the licensee staff.
  • On September 3, 2020, the inspectors presented the target set inspection results to Mr. G. Hettel, Chief Nuclear Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.04

Corrective Action

Documents

Action Requests

(ARs)

23987, 317467, 358926, 373273

Miscellaneous

10.28.28

Security Door Maintenance

Revision 12

07/11/2013

10.28.30

Setup and Test-Balanced Magnetic Switches

Revision 9

10/25/2012

10.28.45

Setup and Test-Microwave Link-Omni Spectra Model 300B

Revision 7

08/11/2015

10.28.46

Setup and Test-Microwave Link-Omni Spectra Model 310B

Revision 6

08/11/2015

10.28.47

Setup and Test-Maintenance of CCTV Cameras

Revision 7

08/15/2019

10.28.49

Setup and Test/Probability of Detection-Garrett Hand Held

Metal Detector Model 1165190 Super Scanner V

Revision 6

11/14/2018

10.28.52

Hand Geometry System Probability Test

Revision 3

07/31/2017

10.28.59

Setup and Test/Operability of Detection-Explosive GE Entry

Scan 4

Revision 6

09/28/2017

10.28.60

Setup and Test/Probability of Detection-Meter 300 Metal

Detectors System

Revision 1

2/03/2015

10.28.62

Inspection & Testing the Perifield-M Detection System

Revision 5

10/25/2017

10.28.65

Setup and Testing-Intrusion Detection IPID-ECSI

International

Revision 0

07/31/2017

10.28.66

IPID Intrusion Probability Testing

Revision 1

06/05/2019

Audit/Assessment

Energy Northwest Snapshot Self-Assessment Report

07/17/2020

Procedures

Physical Security

Plan

Physical Security Plan, Security Training & Qualification,

Safeguards Contingency Plan, and Independent Spent Fuel

Storage Installation

Revision 20

07/29/2019

SPIP-SEC-02

Central and Secondary Alarm Stations

Revision 21

2/12/2017

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SPIP-SEC-08

Issue, Receipt, Storage, Maintenance, Accountability and

Handling of Security Equipment, Firearms, and Ammunition

Revision 16

03/28/2018

SPIP-SEC-09

Intrusion Detection System, Annunciators, Operability Test,

Inspection and Maintenance Records

Revision 29

04/11/2018

SPIP-SEC-10

Special Purpose Detectors, Operability Test, Inspection, and

Maintenance Records

Revision 18

06/22/2016

SPIP-SEC-48

Itemizer 4DX Explosive Detector

Revision 7

01/31/2019

SPIP-SEC-49

Intrusion Detection System Operability Test

Revision 13

10/31/2019

SPIP-SEC-50

Door Operability Test

Revision 8

08/30/2016

SPIP-TQS-01

Security Firearms Maintenance Program

Revision 8

10/02/2019

Work Orders

Work Order 2084509

CHECK ALARMS ON RADIO SYSTEM IN CAS

Work Order 2136168

SECIDSFENCE, CLEAN PERIFIELD IDS FENCE

Work Order 2137030

OSP-ELEC-M702 DIESEL GEN 2 MONTHLY OPERABILITY

TEST

Work Order 2145833

OSP-ELEC-M702 DIESEL GEN 2 MONTHLY OPERABILITY

TEST

71130.07

Corrective Action

Documents

Action Requests

(ARs)

2320, 382333, 409227

Corrective Action

Documents

Resulting from

Inspection

Action Request

(ARs)

409490, 409491, 409492, 409494, 409495, 409498, 409548

Miscellaneous

Appendix 4, DQD

Code: SCPM0002

Protective Mask Performance Test Summary Sheet

Not Marked

Lesson Plan:

SCOC0018

Protective Tactical Mask

Revision 2

Lesson Plan:

SCOC0079

Tactical Qualification Course Performance Test

Administration Manual

1/23/18

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Lesson Plan:

SCOC0089

Initial 40 HR OJT Contingency

6/12/18

Security Manual

NSO-01

Nuclear Security Officer Initial Certification OJT/OJE

Administrator Manual

Revision 005

Procedures

GBP-LEG-04

NRC Investigations: Rights of Energy Northwest Employees

Revisions

001 and 002

OHI-07

Nuclear Security Officer Examination

Revision 001

SPIP-SEC-01

Sergeant and Lieutenant Duties

Revision 25

SPIP-TQS-02

Security Force Training Program

Revision 005

SPIP-TQS-05

Security Training Corrective Action Program

Revision 006

SPIP-TQS-06

Managing Security Qualifications

Revision 005

SPIP-TQS-07

Security Training Range Operating Procedure

Revision 004

SWP-CAP-01

Corrective Action Program

Revision 041

71130.14

Corrective Action

Documents

Action Requests

(ARs)

249690, 376884, 380872, 384981, 394718, 407375

Miscellaneous

Columbia Generation Station Target Sets

01/04/2018,

03/14/2019,

07/14/2020

Procedures

5.5.2

RHR/SW Crosstie Lineup

2

CDA-01

Critical Digital Asset List

019

SWP-SEC-14

Safety/Security Interface Program

007

SWP-SEC-16

Identification, Maintenance and Development of Target Sets

000