January 20, 2022

SUBJECT:

COLUMBIA GENERATING STATION - INTEGRATED INSPECTION REPORT 05000397/2021004

Dear Mr. Schuetz:

On December 31, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Columbia Generating Station. On January 6, 2022, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jason W. Kozal, Chief Reactor Projects Branch A Division of Reactor Projects Docket No. 05000397 License No. NPF-21

Enclosure:

As stated

Inspection Report

Docket Number:

05000397

License Number:

NPF-21

Report Number:

05000397/2021004

Enterprise Identifier:

I-2021-004-0117

Licensee:

Energy Northwest

Facility:

Columbia Generating Station

Location:

Richland, Washington

Inspection Dates:

October 01, 2021 to December 31, 2021

Inspectors:

P. Niebaum, Senior Resident Inspector

A. Donley, Resident Inspector

R. Alexander, Regional State Liaison Officer

B. Bergeon, Operations Engineer

M. Hayes, Operations Engineer

S. Hedger, Senior Emergency Preparedness Inspector

N. Hernandez, Operations Engineer

N. Okonkwo, Reactor Inspector

Approved By:

Jason W. Kozal, Chief

Reactor Projects Branch A

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Columbia Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Columbia started the report period at 100 percent rated thermal power (RTP). On October 12, 2021, power was reduced to approximately 60 percent RTP as a result of a condensate transient and trip of the 'B' reactor feed pump. The licensee restarted the reactor feed pump and returned to 100 percent RTP on October 13, 2021. On December 5, 2021, the licensee reduced power from 100 percent RTP to approximately 15 percent in preparation for a maintenance outage to make plant repairs. On December 6, 2021 the licensee shut down the plant to Mode 4 and began the maintenance outage which ended when the plant synchronized the main generator with the grid on December 13, 2021. The licensee achieved 100 percent RTP on December 14, 2021, and maintained that power level until the end of the report period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identification and Resolution, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)emergency diesel generator 2 during the annual maintenance window for emergency diesel generator 1 on October 5, 2021 (2)division 2 control room emergency chilled water when the division 1 control room emergency chiller was inoperable on October 20, 2021 (3)standby gas treatment division A when division B was inoperable on October 28, 2021 (4)startup transformer and normal transformers when the backup transformer, E-TR-B, was out of service for maintenance on November 9, 2021

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Areas RC-4 and RC-5; division 1 electrical equipment, reactor protection system, battery, and security equipment rooms; on October 18, 2021
(2) Fire Area M-27, division 2 instrument rack room E-IR-H22/P027 enclosure, on October 21, 2021
(3) Fire Area 1/1, reactor building 548' elevation room 513, on November 2, 2021
(4) Fire Area RC-9/2, remote shutdown room, on November 18, 2021

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated internal flooding mitigation protections in the 471' elevation area of the reactor building with the RHR-P-2C room floor plugs removed on November 9 and 10, 2021.

71111.07A - Heat Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness and performance of emergency diesel generator 1 heat exchangers DCW-HX-1A1 and DCW-HX-1A2 on October 12, 2021.

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Partial)

(1)

(Partial)

The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered November 15-19, 2021. Due to maintenance outage MO-02, two crews will be administered the annual operating test in January 2022. Complete results of the requalification exam will be reviewed following completion of exam administration.

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)

The inspection is complete pending review of the final results of the 2021 annual operating test. Most crews were administered the exam November 15-19, 2021. However, due to the maintenance outage MO-02, two crews will be administered the annual operating test in January 2022.

(1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on November 11, 2021.

Annual Requalification Operating Tests The inspectors evaluated the adequacy of the facility licensees annual requalification operating test.

Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests and evaluating their licensed operators for mastery of training objectives as required by 10 CFR 55.59(a)(2).

Requalification Examination Security The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.

Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.

Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.

Control Room Simulator The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.

Problem Identification and Resolution The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during power ascension following a reactor feed pump trip on October 13, 2021. The inspectors also observed and evaluated licensed operator performance in the control room during a power reduction, main turbine trip, and placing shutdown cooling in service and transitioning the plant to Mode 4 in preparation for maintenance outage MO-02 on December 5-6, 2021.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated a licensed operator requalification evaluated scenario on November 3, 2021.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (4 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1)diesel generator system B voltage regulator potential transformer fuse failure on August 18, 2021

(2) FW-V-65B borescope on December 6, 2021 (3)residual heat removal valve 50A potential internal leakage impact on December 21, 2021 (4)standby liquid control system on December 30, 2021

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1)yellow risk during planned maintenance outage for emergency diesel generator 1, week of October 4, 2021 (2)yellow risk during planned maintenance outage for residual heat removal train B, October 18-20, 2021 (3)yellow risk during corrective maintenance on the standby gas treatment train B on October 28, 2021 (4)yellow risk during planned maintenance on the standby gas treatment train A on November 9, 2021

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) CR 421875, foreign material found during containment exhaust purge, valve 4A seat inspection on October 5, 2021
(2) CR 426218, diesel generator 1A2 governor oil leak on October 14, 2021
(3) CR 426623, diesel generator 3 voltage regulator field current lower than normal on October 28, 2021
(4) CR 427172, increased vibration on WMA-FN-53A, division 1 electrical switchgear supply fan, on November 26, 2021
(5) CR 425406, increased pressure in residual heat removal system A on December 14, 2021

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) EC 18472, Removable Steel Curb for Standby Liquid Control (SLC) Tank Area Reactor Building 548, Revision 001

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) TSP-DG1-B502, Standby Diesel Generator DG1 Load Testing, on October 13, 2021
(2) OSP-RHR/IST-Q703, RHR Loop B Operability Test, on October 19, 2021
(3) OSP-SGT-M702, Standby Gas Treatment System B Operability, on October 28, 2021 (4)work order 02187303 for service water pressure control valve 15A on October 29, 2021 (5)work order 02184040 on FW-V-65A to repair a packing leak and to replace the valve motor on December 13, 2021

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated maintenance outage MO-02 activities from December 6-13, 2021.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) SOP-ELEC-W101, Offsite Station Power Alignment Check, Revision 032, on October 7, 2021
(2) OSP-SLC/IST-Q701, Standby Liquid Control Pumps Operability Test, Revision 030, on October 21, 2021

RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)

(1) OSP-INST-H101, Shift and Daily Instrument Checks (Modes 1, 2, and 3), Revision 095, on December 17, 2021

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

(1) The inspectors evaluated the biennial emergency plan exercise conducted on October 26, 2021. The exercise scenario simulated a greater than Operating Basis Earthquake seismic event resulting in a low-power anticipated transient without a reactor scram, and reduction to a single source of AC power to the vital busses. Additionally, the seismic event was simulated to result in damage to the spent fuel pool and water leaking from the pool into lower elevations of the reactor building. Ultimately, the spent fuel pool water level reduced to a very low level for an extended period of time, requiring declaration of a General Emergency and issuance of a Protective Action Recommendation to the offsite authorities. The licensee's exercise activities also included demonstration of one of the station's extensive damage mitigation guideline strategies, per the requirements of 10 CFR 50.155(b)(2),in mitigating the loss of the spent fuel pool water inventory.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes.

SWP-EPP-01, Emergency Response Organization & Training, Revision 23 - effective 01/28/2021

PPM 13.8.1, Emergency Dose Assessment, Revision 40 - effective 06/24/2021

PPM 13.14.4, EP Equipment Maintenance & Testing, Revision 55 - effective 06/24/2021

PPM 13.1.1, Classifying the Emergency (Matrix), Revision 49/Minor Revision 2 - effective 06/24/2021

PPM 13.1.1A, Classifying the Emergency (Technical Bases), Revision 34/Minor Revision 2 - effective 06/24/2021 This evaluation does not constitute NRC approval.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10)===

(1) October 1, 2020, through September 30, 2021

BI02: RCS Leak Rate Sample (IP Section 02.11) (1 Sample)

(1) October 1, 2020, through September 30, 2021

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1) October 1, 2020, through September 30, 2021 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
(1) October 1, 2020, through September 30, 2021 EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
(1) October 1, 2020, through September 30, 2021

71152 - Problem Identification and Resolution (PI&R)

Semiannual Trend Review (IP Section 02.02) (1 Sample)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends associated with transient combustible controls that might be indicative of a more significant safety issue. One observation was documented in the results section of this report.

Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) CR 426130, trip of condensate booster pump 2A and reactor feed pump 1B on October 12, 2021
(2) Effectiveness of corrective actions related to the full implementation cyber security inspection findings as discussed in NRC Inspection Report 05000397/2020401 (ML20259A191)

INSPECTION RESULTS

Observation: Increase in Transient Combustible Control Deficiencies 71152 The inspectors reviewed the station's corrective action program for trends associated with fire protection program implementation during a six-month period ending on December 31, 2021. Nine condition reports documented NRC-identified issues associated with fire protection program implementation. Of those nine issues, eight were associated with transient combustible controls within safety-related areas of the plant. The inspectors determined three issues were minor violations of licensee procedure PPM 1.3.10C, "Control of Combustibles". Specifically, CRs 426453, 426919, and 427406 document NRC-identified combustible materials in the reactor building that were found in combustible material exclusion zones. The licensee removed the materials from the exclusion zones and added additional signs/postings in the areas to reinforce the program requirements.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On November 8, 2021, the inspectors presented the Emergency Preparedness Exercise Inspection results to Mr. W.G. Hettel, Chief Nuclear Officer, and other members of the licensee staff.

On November 11, 2021, the inspectors presented the Biennial Requalification Inspection results to Mr. M. Davis, Training Manager, and other members of the licensee staff.

On November 18, 2021, the inspectors presented the Cyber Security Full Implementation Problem Identification and Resolution Inspection results to Mr. D.M.

Kovacs, Information Services Manager, and other members of the licensee staff.

On January 6, 2022, the inspectors presented the Integrated Inspection results to Mr. R. Schuetz, Chief Executive Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04

Corrective Action

Documents

Action Requests

25767

71111.04

Drawings

M512-3

Flow Diagram Diesel Oil & Miscellaneous Systems Diesel

Generator Building

2

71111.04

Drawings

M512-4

Flow Diagram Diesel Oil & Miscellaneous Systems Diesel

Generator Building

015

71111.04

Drawings

M544

Flow Diagram HVAC-Standby Gas Treatment Reactor

Building

076

71111.04

Drawings

M548-1

Flow Diagram HVAC for Control and Switchgear Rooms

Radwaste Building

103

71111.04

Drawings

M775

Flow Diagram Emergency Chilled Water Piping System

Control Room

030

71111.04

Procedures

SOP-DG2-LU

Emergency Diesel Generator (DIV 2) Valve and Power

Supply Lineup

008

71111.04

Procedures

SOP-HVAC/CR-

LU

Control, Cable, and Critical Switchgear Rooms HVAC Lineup

003

71111.04

Procedures

SOP-HVAC/CR-

STBY

Control, Cable, and Critical Switchgear Rooms HVAC in

Standby Status

2

71111.04

Procedures

SOP-SGT-LU

Standby Gas Treatment System Lineup

000

71111.04

Procedures

SOP-SGT-STBY

Placing Standby Gas Treatment in Standby Status

2

71111.04

Work Orders

29162794

71111.05

Calculations

FP-02-85-03

Combustible Loading Calculation

011

71111.05

Corrective Action

Documents

Action Requests

26330, 426386, 426453

71111.05

Drawings

FM892-2

Fire Barrier and Fire Boundary Plan, Mezzanine Floors, El

467' and 471' and Misc. Floors

010

71111.05

Fire Plans

PFP-RB-522

Reactor 522

006

71111.05

Fire Plans

PFP-RB-548

Reactor 548

004

71111.05

Fire Plans

PFP-RW-467

Radwaste 467

006

71111.05

Miscellaneous

Fire Impairment Permit 21-0334

71111.05

Procedures

1.3.10

Plant Fire Protection Program Implementation

037

71111.05

Procedures

1.3.10C

Control of Combustibles

2

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.05

Procedures

15.2.2

Function and Sensitivity Check of Ionization Detectors

21

71111.06

Calculations

ME-02-02-02

Reactor Building Flooding Analysis

004

71111.06

Corrective Action

Documents

AR 323449323449Root Cause Evaluation Non-Conservative Flood Tour

2

71111.07A

Calculations

ME-2-17-10

Determine Tube Plugging Limits for Division 1 and 2 DCW

Heat Exchangers

000

71111.07A

Calculations

ME-2-92-241

Calculation for DCW Heat Exchanger 1A1 and 1A2

Performance Monitoring Data Evaluation

001

71111.07A

Calculations

ME-2-92-244

Minimum Heat Transfer Rate Required for DCW Heat

Exchangers A & B

000

71111.07A

Corrective Action

Documents

Action Requests

26094, 426042, 426053, 426058, 388652

71111.07A

Miscellaneous

MOT-HX-1-1

Maintenance Optimization Template: Heat Exchangers

000

71111.07A

Procedures

8.4.54

Thermal Performance Monitoring of DCW-HX-1A1 and

DCW-HX-1A2

011

71111.07A

Work Orders

2161467, 02161468, 02106204, 02134497

71111.11A

Miscellaneous

20 Annual Operating Test Results

000

71111.11A

Miscellaneous

21 Annual Operating Test Results

000

71111.11B

Corrective Action

Documents

Action Requests

2616, 414418, 427173, 427069, 398299

71111.11B

Engineering

Changes

Simulator Engineering Changes Summary

10/18/2021

71111.11B

Miscellaneous

Operations Training Advisory Group Meeting Minutes

03/11/2020

71111.11B

Miscellaneous

Operations Training Advisory Group Meeting Minutes

06/17/2020

71111.11B

Miscellaneous

Operations Training Advisory Group Meeting Minutes

09/28/2020

71111.11B

Miscellaneous

Operations Training Advisory Group Meeting Minutes

07/26/2021

71111.11B

Miscellaneous

Simulator Review Board Minutes

11/06/2019

71111.11B

Miscellaneous

Simulator Review Board Minutes

09/03/2020

71111.11B

Miscellaneous

Simulator Review Board Minutes

08/25/2021

71111.11B

Miscellaneous

JPM Overlap Tracking Data

001

71111.11B

Miscellaneous

Simulator Scenario Overlap Tracking Data

001

71111.11B

Miscellaneous

21 Operating Test Sample Plan

001

71111.11B

Miscellaneous

List of Licensed Operators

10/27/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.11B

Miscellaneous

Crew F 2019-2021 Training Records

11/10/2021

71111.11B

Miscellaneous

Crew F 2019-2021 Watchstanding Records

11/10/2021

71111.11B

Miscellaneous

LORQ 2021 Crew F Scenario Evaluation Summary

11/10/2021

71111.11B

Miscellaneous

LORQ 2021 Crew F JPM Evaluation Summary

11/10/2021

71111.11B

Miscellaneous

21 Crew F Annual Operating Test Exam Package

71111.11B

Miscellaneous

Simulator Differences Report

11/08/2021

71111.11B

Miscellaneous

Remedial

Training

LR002480

20 Annual Operating Test - Week 7 JPM Exam (Blue)

2/16/2020

71111.11B

Miscellaneous

Remedial

Training

LR002488

Cycle 20-3 Crew B Remedial Training

07/06/2020

71111.11B

Miscellaneous

Remedial

Training

LR002492

Cycle 20-4 Crew C Remedial Training

07/13/2020

71111.11B

Miscellaneous

Remedial

Training

LR002492

Cycle 20-4 Crew S Remedial Training

08/24/2020

71111.11B

Miscellaneous

Remedial

Training

LR002510

Cycle 21-1 Crew B Remedial Training

2/01/2021

71111.11B

Miscellaneous

Remedial

Training

LR002518

Cycle 21-2 Crew F Remedial Training

04/12/2021

71111.11B

Miscellaneous

Simulator

Discrepancy

Reports

3409, 3381, 3343, 3300

71111.11B

Miscellaneous

Test ID: LE0041

Operating Test Simulator Scenario 41

000

71111.11B

Miscellaneous

Test ID: 3731

LORQ 2021 Biennial Week 2 RO Written Exam (Blue)

11/01/2021

71111.11B

Miscellaneous

Test ID: 3732

LORQ 2021 Biennial Week 2 SRO Written Exam (Blue)

11/01/2021

71111.11B

Miscellaneous

Test ID: 3733

LORQ 2021 Biennial Week 3 RO Written Exam (Gold 2)

11/03/2021

71111.11B

Miscellaneous

Test ID: 3734

LORQ 2021 Biennial Week 3 SRO Written Exam (Gold 2)

11/03/2021

71111.11B

Miscellaneous

Test ID: LE0008

Operating Test Simulator Scenario 8

000

71111.11B

Miscellaneous

Test ID: LE0031

Operating Test Simulator Scenario 31

000

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.11B

Miscellaneous

Test ID: LE0032

Operating Test Simulator Scenario 32

000

71111.11B

Miscellaneous

Test ID: LE0035

Operating Test Simulator Scenario 35

000

71111.11B

Miscellaneous

Test ID: LE0038

Operating Test Simulator Scenario 38

000

71111.11B

Miscellaneous

Test ID: LE0046

Operating Test Simulator Scenario 46

000

71111.11B

Miscellaneous

Test ID: LEA0002

Operating Test Administrative JPM 2

000

71111.11B

Miscellaneous

Test ID: LEA0003

Operating Test Administrative JPM 3

000

71111.11B

Miscellaneous

Test ID: LEA0004

Operating Test Administrative JPM 4

000

71111.11B

Miscellaneous

Test ID: LEA0006

Operating Test Administrative JPM 6

000

71111.11B

Miscellaneous

Test ID: LEA0008

Operating Test Administrative JPM 8

000

71111.11B

Miscellaneous

Test ID: LEA0009

Operating Test Administrative JPM 9

000

71111.11B

Miscellaneous

Test ID: LEP0001

Operating Test Plant JPM 1

000

71111.11B

Miscellaneous

Test ID:

LEP00011

Operating Test Plant JPM 11

000

71111.11B

Miscellaneous

Test ID:

LEP00011

Operating Test Plant JPM 11

000

71111.11B

Miscellaneous

Test ID: LEP0003

Operating Test Plant JPM 3

000

71111.11B

Miscellaneous

Test ID: LEP0004

Operating Test Plant JPM 4

000

71111.11B

Miscellaneous

Test ID: LEP0006

Operating Test Plant JPM 6

000

71111.11B

Miscellaneous

Test ID: LEP0016

Operating Test Plant JPM 16

000

71111.11B

Miscellaneous

Test ID: LES0002

Operating Test Sim/CR JPM 2

000

71111.11B

Miscellaneous

Test ID: LES0003

Operating Test Sim/CR JPM 3

000

71111.11B

Miscellaneous

Test ID: LES0004

Operating Test Sim/CR JPM 4

000

71111.11B

Miscellaneous

Test ID: LES0019

Operating Test SIM/CR JPM 19

000

71111.11B

Miscellaneous

Test ID:

LR002421

Operating Test Administrative JPM 2421

000

71111.11B

Procedures

1.3.1

Plant Procedures Manual Operating Policies, Programs, and

Practices

131

71111.11B

Procedures

1.8.10

Plant Procedures Manual Administration of Medical

Qualifications

2

71111.11B

Procedures

1.8.11

Plant Procedures Manual Medical Examination Program for

Licensed Operators

2

71111.11B

Procedures

CT01

Simulator Core Performance Testing

06/07/2021

71111.11B

Procedures

SP01

Simulator Steady State Testing

08/25/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.11B

Procedures

TDI-06

Simulator Management

21

71111.11B

Procedures

TDI-08

Licensed Operator Requalification Program

044

71111.11B

Procedures

TDI-23

LORQ Annual Exam Development and Administration

016

71111.11B

Procedures

TDI-24

Exam Security

017

71111.11B

Procedures

TRG-TQS-02

Application for and Maintenance of Reactor Operator and

Senior Reactor Operator License

007

71111.11B

Procedures

TT01

Simulator Manual Scram from Full Power

2/18/2021

71111.11Q

Miscellaneous

LE000036

LORQ Annual Exam Scenario LE000036

10/25/2021

71111.11Q

Procedures

3.2.1

Normal Plant Shutdown

098

71111.11Q

Procedures

OSP-RCS-C102

RPV Non-critical Cooldown Surveillance

013

71111.11Q

Procedures

SOP-FWH-

START

Extraction Steam and Heater Vent/Drains Startup

014

71111.11Q

Procedures

SOP-MT-

SHUTDOWN

Main Turbine Shutdown

017

71111.11Q

Procedures

SOP-RFT-START

Reactor Feedwater Turbine System Start

23

71111.11Q

Procedures

SOP-RPS-

BYPASS

Bypassing RPS Interlocks in Modes 3, 4, and 5

009

71111.11Q

Procedures

SOP-RRC-

FLOW-QC

Reactor Power Change with RRC Flow Controllers - Quick

Card

005

71111.11Q

Procedures

SOP-RRC-

SHUTDOWN

Reactor Recirculation System Shutdown

005

71111.11Q

Procedures

TDI-08

Licensed Operator Requalification Program

018

71111.12

Corrective Action

Documents

Action Requests

24457, 425452, 427855, 427839, 416409, 402185,

408231, 425406, 424725, 398119, 419603, 401196,

2412, 416085, 416689, 423079, 411795, 397980,

388557, 426756, 425721, 423079, 426419, 409044, 405968

71111.12

Drawings

EWD-47E-033

Electrical Wiring Diagram Standby AC Power System Diesel

Generator 2 Excitation System

010

71111.12

Miscellaneous

Technical Assessment Supporting Reportability for

AR#424457

71111.12

Miscellaneous

Reportability Evaluation for AR 00424457

71111.12

Miscellaneous

System Engineering Maintenance Rule Data for FW-V-65B

71111.12

Miscellaneous

Investigation

Template

DG-2 voltage regulator unresponsive

10/05/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.12

Miscellaneous

NUREG-1760

Aging Assessment of Safety-Related Fuses Used in Low-

and Medium-Voltage Applications in Nuclear Power Plants

May 2002

71111.12

Procedures

1.19.3

Component Condition Monitoring Program

005

71111.12

Procedures

1.19.3D

Thermographic Monitoring And Analysis

008

71111.12

Procedures

1.3.47

Fuse Replacement Control

014

71111.12

Procedures

1.5.11

Maintenance Rule Program

016

71111.12

Procedures

1.5.13

Preventive Maintenance Optimization Living Program

044

71111.12

Procedures

OSP-SLC/IST-

Q701

Standby Liquid Control Pumps Operability Test

030

71111.12

Procedures

SPS-9-6

Infrared Thermography

2

71111.12

Procedures

SYS-4-22

Maintenance Rule Program

015

71111.12

Work Orders

2113215, 02113215, 02148140, 01143000, 01170774,

2081140, 02140260, 02044229, 02144962, 02113409,

2148012, 02153416, 02163209

71111.13

Procedures

1.3.83

Protected Equipment Program

034

71111.13

Procedures

1.5.14

Risk Assessment and Management for

Maintenance/Surveillance Activities

043

71111.15

Corrective Action

Documents

Action Requests

419710, 421649, 421804, 421875, 425406, 424725,

408231, 402185, 398119

71111.15

Miscellaneous

Operator Logs from May 7, 2021, to June 17, 2021

71111.15

Miscellaneous

5.19.5

ECCS Relief Valve Setpoints

004

71111.15

Miscellaneous

CVI 1033-00,13,1

Pressure Relief Valve

000

71111.15

Miscellaneous

CVI-OMM 53-00,

68, 1-1

Operation - Maintenance Instructions and Parts Catalog for

4400 KW Generator Set (Diesel Generator)

06/18/2017

71111.15

Procedures

10.1.13

Foreign Materials Controls for Systems and Components

29

71111.15

Procedures

IST-4

Inservice Testing Program Plan Fourth Ten-Year Inspection

Interval

005

71111.15

Procedures

SOP-CN-CONT-

VENT

Containment Vent, Deinert, Purge, and Ventilating

27

71111.15

Procedures

SOP-DG-GOV-

OIL

Diesel Generator Governor Oil Level Control

004

71111.15

Procedures

TSP-CEP/X67-

R802

LLRT of CEP-V-3A, CEP-V-3B, CEP-V-4A, CEP-V-4B

2

71111.15

Work Orders

2180846, 02144962, 02113409

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.18

Procedures

IP-ENG-001

Standard Design Process

2

71111.19

Corrective Action

Documents

Action Requests

20502, 426064, 426065, 416137, 416484, 426066,

26083, 426152, 426155, 427879, 427882, 178865, 428098

71111.19

Engineering

Changes

18926

001

71111.19

Procedures

1.19.3A

Vibration Monitoring

003

71111.19

Procedures

10.24.241

Flow Makeup and Pressure Decay Leak Rate Testing

003

71111.19

Procedures

10.25.132

Thrust Adjustment and Diagnostic Analysis of Motor

Operated Valves

035

71111.19

Procedures

10.25.216

Inspection of Limitorque Magnesium Rotor Actuator Motors

000

71111.19

Procedures

ESP-SW/IST-

Q703

SW-PCV-15A Operability

001

71111.19

Procedures

OSP-SW-M101

Standby Service Water Loop A Valve Position Verification

047

71111.19

Procedures

TSP-RFW/X17A-

R802

LLRT of RFW-V-65A, RFW-V-65B, RWCU-V-40

008

71111.19

Work Orders

2139565, 02185110, 02146053, 02169916, 02176358,

2176355, 02085978, 02186616

71111.20

Miscellaneous

Reactivity Control Plan

December

21

71111.20

Procedures

MO-02 Maintenance Outage Shutdown Safety Plan

000

71111.20

Procedures

3.1.2

Reactor Plant Startup

2

71111.20

Procedures

3.2.1

Normal Plant Shutdown

098

71111.20

Procedures

ABN-ROD

Control Rod Faults

033

71111.20

Procedures

OSP-RCS-C101

RPV Heatup Surveillance

015

71111.20

Procedures

SOP-ENTRY-DW

Personnel Entry into Drywell

28

71111.20

Work Orders

2106252

71111.22

Corrective Action

Documents

Action Requests

26419, 426490, 426698, 426983, 426943

71111.22

Miscellaneous

Operator Logs from October 3 through October 7, 2021

71111.22

Miscellaneous

Operator Rounds from 12/17/2021

71111.22

Miscellaneous

Night Order 678

Night Order Information for DG1 Extended Maintenance

Window

71111.22

Procedures

IST-4

Inservice Testing Program Plan Fourth Ten-Year Inspection

005

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Interval

71111.22

Work Orders

2151937, 02163213, 02119596, 02163211, 02163209,

2184382, 02175359

71114.01

Corrective Action

Documents

Action Requests

347241, 347050, 347129, 396909, 396911, 397283,

400747, 400778, 401064, 402143, 404484, 412568,

414139, 414993, 415789, 416265, 416842, 416863,

417219, 417323, 417713 420879, 420927, 423847, 424705,

25035

71114.01

Corrective Action

Documents

Resulting from

Inspection

Action Request

26806

71114.01

Miscellaneous

Columbia Generating Station ERO Exercise Manual Team

"D"

10/26/2021

71114.01

Miscellaneous

October 2021 Columbia Generating Station & Off-site

Response Agency Evaluated Exercise: Leadership Team

Debrief

11/03/2021

71114.01

Miscellaneous

Exercise Participant Records from the Simulator, TSC/OSC,

EOF, and JIC

10/26/2021

71114.01

Procedures

ABN-

EARTHQUAKE

Earthquake

016

71114.01

Procedures

ABN-EDMG

Extensive Damage Mitigation Guidelines

2

71114.01

Procedures

ABN-FPC-LOSS

Loss of Fuel Pool Cooling

016

71114.01

Procedures

ABN-FSG-002

Water Makeup Strategies for RPV, SFP, DW, WW During an

Extended Loss of AC Power or other Beyond Design Basis

Event

011

71114.01

Procedures

ABN-TSG-001

Spent Fuel Pool Makeup from Stairwell Fire Header

006

71114.01

Procedures

ABN-TSG-002

Spent Fuel Pool Make-Up from External Building Sources

007 (Minor

01)

71114.01

Procedures

ABN-TSG-003

Spent Fuel Pool Spray from External Building Sources

011

71114.01

Procedures

ABN-TSG-010

Spent Fuel Pool Makeup Through the Residual Heat

Removal System Via Fire Water or Condensate Transfer

006 (Minor

2)

71114.01

Procedures

EP-01

Emergency Plan

067

71114.01

Procedures

PPM 11.2.24.2

Surveillance and Response for Changing Plant Conditions

014

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.01

Procedures

PPM 13.1.1

Classifying the Emergency (Matrix)

049 (Minor

2)

71114.01

Procedures

PPM 13.1.1a

Classifying the Emergency (Bases)

034 (Minor

2)

71114.01

Procedures

PPM 13.10.2

TSC Manager Duties

035 (Minor

04)

71114.01

Procedures

PPM 13.10.4

Radiation Protection Manager Duties

033 (Minor

03)

71114.01

Procedures

PPM 13.11.1

EOF Manager Duties

044 (Minor

05)

71114.01

Procedures

PPM 13.11.10

Security Manager Duties

2 (Minor

2)

71114.01

Procedures

PPM 13.12.9

JIC Management

25

71114.01

Procedures

PPM 13.14.11

EP Equipment

015 (Minor

01)

71114.01

Procedures

PPM 13.14.8

Drill and Exercise Program

018 (Minor

2)

71114.01

Procedures

PPM 13.2.1

Emergency Exposure Levels / Protective Action Guides

2 (Minor

2)

71114.01

Procedures

PPM 13.2.2

Determining Protective Action Recommendations

20 (Minor

2)

71114.01

Procedures

PPM 13.4.1

Emergency Notifications

044 (Minor

01)

71114.01

Procedures

PPM 13.5.1

Local, Protected Area or Site Evacuation

031 (Minor

01)

71114.01

Procedures

PPM 13.8.1

Emergency Dose Projection System Operations

040

71114.01

Procedures

PPM 13.9.1

Environmental Field Monitoring Operations

045 (Minor

03)

71114.01

Procedures

PPM 5.3.1

Secondary Containment Control (EOP)

21

71114.04

Corrective Action

Documents

Resulting from

Inspection

Action Request

(AR)

26618

71114.04

Miscellaneous

50.54(q) Log

50.54(q) Effectiveness Evaluation - Revision 40 to PPM

06/07/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

21-01

(Evaluation)

13.8.1

71114.04

Miscellaneous

50.54(q) Log

21-01

(Screening)

50.54(q) Screening - PPM 13.8.1 Emergency Dose

Projection System Operations, Major Revision 40

06/03/2021

71114.04

Miscellaneous

50.54(q) Log

21-02

(Screening)

50.54(q) Screening - SWP-EPP-01, Emergency Response

Organization and Training, Revision 23

01/25/2021

71114.04

Miscellaneous

50.54(q) Log

21-06

(Screening)

50.54(q) Screening - PPM 13.1.1, Classifying the

Emergency, Rev 49, Minor Rev 002

06/08/2021

71114.04

Miscellaneous

50.54(q) Log

21-07

(Screening)

50.54(q) Screening - PPM 13.1.1A, Classifying the

Emergency - Technical Bases, Rev 34, Minor Rev 002

06/08/2021

71114.04

Miscellaneous

50.54(q) Log

21-13

(Evaluation)

50.54(q) Effectiveness Evaluation - PPM 13.14.4 Rev 55

06/10/2021

71114.04

Miscellaneous

50.54(q) Log

21-13

(Screening)

50.54(q) Screening - PPM 13.14.4 Major Rev 55,

Emergency Equipment Maintenance and Testing

06/10/2021

71114.04

Procedures

EPI-16

§50.54(Q) Change Evaluation

016

71151

Corrective Action

Documents

Action Requests

411978, 412134, 414414, 415437, 415617, 417833,

418096, 421896, 423346

71151

Miscellaneous

Columbia Generating Station Alert and Notification System

(ANS) Design Report

2

71151

Miscellaneous

Select DEP Performance Indicator Data Packages (2020-20,

20-23, 2020-25, 2020-28, 2021-04, 2021-07, 2021-09,

21-11, 2021-14, 2021-17, & 2021-19)

4Q/2020 -

3Q/2021

71151

Miscellaneous

Selection of Records - Surveillance Tests: ESSN Perform

Siren System Test

4Q/2020 -

3Q/2021

71151

Miscellaneous

Control Room Operator Logs for October 1, 2020, to

September 30, 2021

71151

Miscellaneous

ERO Participation Performance Indicator (PDQ) Records

4Q/2020 -

3Q/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71151

Procedures

CI-10.17

Iodine

2

71151

Procedures

CSP-I131-W101

Reactor Coolant Isotopic Analysis for I-131 Dose Equivalent

009

71151

Procedures

EPI-18

Emergency Preparedness Performance Indicators

27

71151

Procedures

OSP-INST-H101

Shift and Daily Instrument Checks Modes 1, 2, 3

094

71151

Procedures

TSI-6.2.22

EP Annual Emergency Response Siren System Activation

Test

004

71151

Procedures

TSI-6.2.32

EP Siren Polling Test

003

71151

Work Orders

2182246, 02182234, 02172201, 02169755, 02164080

71152

Corrective Action

Documents

Action Requests

28204, 421766, 420414, 423611, 423693, 424224,

2006, 425456, 424472, 423355, 424250, 425494,

26453, 426919, 426920, 426921, 426922, 426923,

27406, 407875, 408043, 408518, 408174, 408048,

408079, 408173, 408045, 408605, 408496, 408562,

408178, 408563, 362689, 376101, 400239, 407065

71152

Drawings

E538-41A

Connection Wiring Diagram, Digital Fault Recorders E-DFR-

1A and E-DFR-18 Auto Fault Recording System

NI

71152

Drawings

E538-41E

Elementary Wiring Diagram, Digital Fault Recorder E-DFR-

1A and E-DFR-18 Alarm Configurations

NI

71152

Drawings

EWD-103E-001

Electrical Wiring Diagram, Plant Computer System

Functional Configuration and LAN interface Sheet 1

23

71152

Engineering

Changes

EC 16625

Oscillograph Fault Recorder Replacement Project

2

71152

Engineering

Changes

EC 17643

Field Change request for EC 17643-Level 3 TO Level 2

Data Diode Replacement

A

71152

Engineering

Changes

EC 17643

Level 3 to Level 2 Data Diode Replacement

000

71152

Engineering

Changes

EC 17946

NET4 Lifecycle

000

71152

Engineering

Changes

EC 18075

Modification for Replacement of DMA Air Damper Motor

DMA-M-AD32/2

001

71152

Miscellaneous

Trend Codes Manual - All Codes

08/05/2021

71152

Miscellaneous

AR 400239-09

AR 400239-09, Review whitelisting justification report

N/A

71152

Miscellaneous

AR 408562-01

HUIT

AR 4085624085622020 Cyber Inspection Human Performance

Investigation Template (HUIT)

001

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152

Miscellaneous

AR 408563408563and

408178 HUIT

AR 408563408563and 408178 2020 Cyber Inspection Human

Performance Investigation Template (HUIT)

001

71152

Miscellaneous

AR SA 362689

Focused Self-Assessment Report Cyber Security Milestone

Readiness Review

11/27/2017

71152

Miscellaneous

EOC Report

CR 00408563 2020 Cyber Inspection - Perform EOC

10/12/2020

71152

Miscellaneous

PARB Meeting

Minutes

Performance Assessment Review Board (PARB) meeting

minutes for R/CR: 408563 & 408562

09/08/2020

71152

Miscellaneous

RBG-48128

Reply to a Notice of Violation; EA-21-017, 030 and 050

10/29/2021

71152

Miscellaneous

SA 3761010

2018 Cyber Security Self-Assessment Objective 3

N/A

71152

Procedures

1.3.66

Operability Determination

037

71152

Procedures

2.19

Qualification Directory - Section No. 2.19

008

71152

Procedures

20005-APRM-

DRE

Cyber Detection Response Elimination-APRM

7/20/2021

71152

Procedures

ALTCTL-01

Cyber Security Alternate Controls

005

71152

Procedures

DES-6-1

Design of Digital Plant Systems and Components

20

71152

Procedures

FCEI-4.1.4

Facility Modifications and Configuration Control

004

71152

Procedures

GBP-AM-11

Long Range Planning and Current Year Funding

2

71152

Procedures

GBP-CAP-03

Trending Program

2

71152

Procedures

GBP-IS-28

Information Technology System Lifecycle

001

71152

Procedures

ISDI-CYBER-06

Cyber Security Assessment Process

004

71152

Procedures

SWP-CAP-01

Corrective Action Program

044

71152

Procedures

SWP-CAP-06

Condition Report Review

28

71152

Procedures

SWP-CSW-12

Cyber Security Defensive Strategy

004

71152

Procedures

SWP-CSW-14

Tamper Device Control and Use

2

71152

Procedures

SWP-CSW-18

Cyber Security Assessments

007

71152

Procedures

SWP-CSW-31

Cyber Security Audit and Accountability

001

71152

Procedures

SWP-CSW-32

Cyber Security Related Software Maintenance

000

71152

Procedures

TM-01

Trending Manual

004

71152

Work Orders

2177187, 02167195

JK

PN

AS

HG

HF

JE

MH

AD

VG

FR

DATE

COLUMBIA GENERATING STATION - INTEGRATED INSPECTION REPORT 05000397/2021004

January 20, 2022