October 25, 2023

SUBJECT:

COLUMBIA GENERATING STATION - INTEGRATED INSPECTION REPORT 05000397/2023003

Dear Robert Schuetz:

On September 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Columbia Generating Station. On October 12, 2023, the NRC inspectors discussed the results of this inspection with Dave Brown, Operations Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Vossmar, Patricia on 10/25/23 Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety Docket No. 05000397 License No. NPF-21

Enclosure:

As stated

Inspection Report

Docket Number: 05000397 License Number: NPF-21 Report Number: 05000397/2023003 Enterprise Identifier: I-2023-003-0005 Licensee: Energy Northwest Facility: Columbia Generating Station Location: Richland, WA Inspection Dates: July 01, 2023, to September 30, 2023 Inspectors: A. Donley, Senior Resident Inspector R. Bywater, Senior Project Engineer J. Copeland, Reactor Inspector M. Hayes, Senior Resident Inspector J. Melfi, Project Engineer Approved By: Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Columbia Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Columbia Generating Station (CGS) began the inspection period at rated thermal power (RTP).

On July 2, 2023, the unit reduced power to 85 percent for emergent adjustable speed drive (ASD) maintenance. On July 4, 2023, ASD maintenance was completed, and the plant returned to 100 percent RTP. On July 10, 2023, the unit was again reduced to 85 percent for planned ASD maintenance. Maintenance was completed on July 11, 2023, and the unit returned to 100 percent RTP. On August 3, 2023, the unit was reduced to 65 percent for planned ASD maintenance and returned to 100 percent RTP that same day. On September 20, 2023, the unit emergently decreased power to 92 percent due to issues with the condensate demineralizer system and following maintenance, the unit was returned to 100 percent RTP on September 21, 2023. On September 23, 2023, the unit was lowered to 80 percent for planned surveillance testing and returned to 100 percent RTP that same day. The unit remained at RTP for the rest of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed onsite portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness of the adjustable speed drive A and B standby glycol heat exchanger fans and normal transformer TR-N1 and TR-N2 cooling sprays for extreme weather conditions prior to the onset of seasonal high temperatures on August 17, 2023.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) residual heat removal system C when low pressure core spray was out of service for maintenance on July 10, 2023
(2) high-pressure core spray system when reactor core isolation cooling system was out of service for maintenance on September 12, 2023
(3) standby gas treatment system A while standby gas treatment system B was out of service for maintenance on September 26, 2023

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of diesel generator 3 on September 20, 2023.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) fire area SW-1, standby service water pump house A, on August 10, 2023
(2) fire area RC-10/U, control room, on August 10, 2023
(3) fire area 5010-3, secondary essential fire suppression water supply building 33, on August 22, 2023
(4) fire area R-3, high-pressure core spray pump room, on September 12, 2023

Fire Brigade Drill Performance Sample (IP Section 03.02) (2 Samples)

(1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill on July 13, 2023.
(2) The inspectors evaluated the onsite fire brigade training and performance during an unannounced fire drill on September 26, 2023.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during planned control rod sequence exchange on September 23, 2023.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated the cycle 23-3 evaluated scenario on July 25, 2023.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) 10 CFR 50.65(a)(3) periodic assessment for the period of January 1, 2021, to December 31, 2022, on August 23, 2023
(2) condensate demineralizer inlet valve C repair and replacement, following failure on September 19, 2023

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated the accuracy and completeness of risk assessments for the reactor core isolation cooling system planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed on September 11, 2023.

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) CR 444515, stroke times found out of tolerance during OSP-MS/IST-Q701, main steam isolation valve closure test - shutdown, completed on July 18, 2023
(2) CR 449521, one service water B spray ring header nozzle clogged in the service water A pond, completed on August 21, 2023
(3) CR 448300, reactor water sample line inner isolation valve RRC-V-19 failed to isolate flow during quarterly inservice testing, on August 31, 2023
(4) CR 450082, high-pressure core spray pump 2 discharge valve, SW-V-29, actuator mounting bolts found with less thread engagement than specified in plant procedure 10.2.10, on September 11, 2023
(5) CR 448641, foreign material found in drywell floor drain flow transmitter FDR-FT-38, completed on September 22, 2023
(6) CR 449747, disagreement between procedure requirements and design basis calculation for time critical operator actions for flooding in the low pressure core spray pump room, completed on September 29, 2023

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system

operability and/or functionality: Post-Maintenance Testing (PMT) (IP Section 03.01)

(1) WO 02194701, replacement of SW-V-822A, supply isolation valve to cooling coil 51A-1, on August 8, 2023
(2) WO 02210840, investigation of traversing in-core probe B flux following refueling outage 26, on August 28, 2023
(3) WO 02210870, reactor core isolation cooling out of service, on September 11, 2023

Surveillance Testing (IP Section 03.01) (2 Samples)

(1) TSP-CONT-R801, containment isolation valve and penetration leak test program, on July 25, 2023
(2) 15.3.17, fire door operability inspections, on September 6, 2023

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) OSP-CCH/IST-M701, control room emergency chiller system A operability, on August 14, 2023

Reactor Coolant System Leakage Detection Testing (IP Section 03.01) (1 Sample)

(1) ISP-FDR/EDR-X301, drywell sump flow monitors channel calibration, on July 21, 2023

Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)

(1) OSP-FLEX-Q705, diesel generator 5 quarterly surveillance, following annual maintenance, on July 17, 2023

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the team A emergency preparedness drill on August 29,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05) ===

(1) July 1, 2022, through June 30, 2023

MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)

(1) July 1, 2022, through June 30, 2023

MS08: Heat Removal Systems (IP Section 02.07) (1 Sample)

(1) July 1, 2022, through June 30, 2023

MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)

(1) July 1, 2022, through June 30, 2023

MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)

(1) July 1, 2022, through June 30, 2023

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) CR 00445257, diesel generator 3 autostart during performance of surveillance test ISP-EFC-B108, completed on August 21,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 12, 2023, the inspectors presented the integrated inspection results to Dave Brown, Operations Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.01 Procedures SOP-HOT- Hot Weather Operations 009

WEATHER-OPS

71111.01 Procedures SOP- Warm Weather Operations 020

WARMWEATHER-

OPS

71111.04 Corrective Action Action Requests 441907, 440596

Documents

71111.04 Drawings M512-1 Flow Diagram Diesel Oil and Miscellaneous Systems Diesel 048

Generator Building

71111.04 Drawings M521-3 Flow Diagram Residual Heat Removal Loop C 013

71111.04 Drawings M524-1 Flow Diagram Standby Service Water System Reactor, 140

Radwaste, D.G. Bldg's and Yard

71111.04 Drawings M544 Flow Diagram HVAC-Standby Gas Treatment Reactor 076

Building

71111.04 Procedures SOP-DG3-LU High Pressure Core Spray Diesel Generator Valve and Power 010

Supply Lineup

71111.04 Procedures SOP-DG3-STBY High Pressure Core Spray Diesel Generator Standby Lineup 023

71111.04 Procedures SOP-HPCS-LU HPCS Valve and Breaker Lineup 004

71111.04 Procedures SOP-HPCS-STBY Placing HPCS in Standby Status 005

71111.04 Procedures SOP-RHR-LU RHR System Valve and Breaker Lineup 009

71111.04 Procedures SOP-RHR-STBY Placing RHR in Standby Status 006

71111.04 Procedures SOP-SGT-LU Standby Gas Treatment System Lineup 000

71111.04 Procedures SOP-SGT-STBY Placing Standby Gas Treatment in Standby Status 002

71111.04 Procedures SOP-SW-LU Standby Service Water System Valve and Breaker Lineup 016

71111.04 Work Orders 02178463

71111.05 Corrective Action Action Requests 449750, 449751

Documents

71111.05 Drawings FM892-4 Fire Barrier and Fire Boundary Plan Reactor Building Misc 015

Elevations

71111.05 Fire Plans NPFP-01 Non-Power Block Pre-Fire Plan 008

71111.05 Fire Plans PFP-MN-XFMR- Main Transformer Yard Miscellaneous Buildings 009

YD-MISC

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.05 Fire Plans PFP-RB-422 Reactor 422 009

71111.05 Fire Plans PFP-RW-501-507 Radwaste 501-507 008

71111.05 Miscellaneous Fire Protection Evaluation 066

71111.05 Procedures 1.3.10c Control of Combustibles 025

71111.11Q Miscellaneous Columbia Generating Station Power Profile 08/02/2023 -

08/05/2023

71111.11Q Miscellaneous A1C27S20.SEQ Control Rod Sequence Plan 08/29/2023

71111.11Q Procedures 3.3.1 Reactor Scram 071

71111.11Q Procedures 4.601.A3 601.A3 Annunciator Panel Alarms 031

71111.11Q Procedures 5.5.1 RPV Control 023

71111.11Q Procedures 5.5.5 Overriding RCIC Isolation and Trip Signals 009

71111.11Q Procedures SOP-CR- Control Rod Movement 006

MOVEMENT

71111.11Q Procedures TSP-RWM-C101 RWM Control Rod Sequence Verification 009

71111.12 Corrective Action Action Requests 276051, 430719, 448898

Documents

71111.12 Miscellaneous Maintenance Rule Program Documentation of Periodic 03/16/2023

Assessment

71111.12 Procedures SYS-4-22 Maintenance Rule Program 016

71111.12 Work Orders 29173642, 2202213064

71111.13 Procedures 1.3.83 Protected Equipment Program 038

71111.15 Calculations 216-92-041 Weak Link Analysis for Valve No. SW-V-029, BIF 8" 150# 000

Carbon Steel Butterfly Valve

71111.15 Calculations EC 1874 Calc 216-92-041 Rev 0 - Evaluate the impact of PER 202- 10/15/2004

2399

71111.15 Calculations ME-02-02-02 Reactor Building Flooding 004

71111.15 Corrective Action Action Requests 449521, 448256, 449911, 450082, 448610, 448512, 416752,

Documents 444381

71111.15 Corrective Action Action Requests 449793, 448688, 448411

Documents

Resulting from

Inspection

71111.15 Drawings 215-09 General Arrangement 8" Flanged Butterfly Valve with Electric 023

Operator

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.15 Engineering EC13729 Engineering evaluation of the impact of one or several 04/01/2015

Evaluations clogged spray nozzles in the service water spray pond

71111.15 Engineering PER 202-2399 Maximum shear stress of valve stem was not evaluated by 08/19/2002

Evaluations vendor software in weak link analysis of MOVs

71111.15 Miscellaneous Operator logs July 11-18, 2023

71111.15 Miscellaneous LR001725 simulator training scenario LR001725 09/28/2023

71111.15 Miscellaneous night order NO 932 09/26/2023

71111.15 Procedures 10.2.10 Fastener Torque and Tensioning 030

71111.15 Procedures 4.601.A3 601.A3 Annunciator Panel Alarms 031

71111.15 Procedures 5.3.1 Secondary Containment Control 023

71111.15 Procedures ABN-FLOODING Flooding 022

71111.15 Procedures OI-69 Time Critical Operator Actions 017

71111.15 Work Orders 02181057, 02152609, 02182019, 02179297, 02189635,

2187403, 02182735, 02117707-01, 29173619, 02185723,

2119136

71111.24 Corrective Action Action Requests 448380, 448512, 447124, 446629, 445920, 445652, 445588,

Documents 445563, 445551, 445513, 445500, 445499, 444946, 444802,

444644, 444591, 440273, 448752, 434299, 447627, 449729,

2364, 434098, 449554, 449555, 449557, 449602

71111.24 Corrective Action Action Requests 448776, 448831, 450261

Documents

Resulting from

Inspection

71111.24 Drawings 2629-3 RCIC-V-23

71111.24 Procedures IST-04 Inservice Testing Program Plan Fourth Ten-Year Interval 007

71111.24 Procedures OSP-CCH/IST- Control Room Emergency Chiller System A Operability 065

M701

71111.24 Procedures OSP-INST-H101 Shift and Daily Instrument Checks Modes 1, 2, 3 098

71111.24 Procedures RCIC- RCIC Shutdown 011

SHUTDOWN

71111.24 Work Orders 02202560, 02179492, 02177452, 02189714, 02163742,

2188195, 02179313, 02180579, 02203335, 02202780,

202320, 02205329, 02185176

71111.24 Work Orders Work Requests 29172932, 29173012, 29173004, 29172537, 29173422,

29173424, 29173423

71114.06 Corrective Action Action Requests 449992, 450001

Documents

71114.06 Miscellaneous Classification Notification Form Nos. 1-24

71114.06 Miscellaneous CGS ERO Team "A" ERO Drill August 29, 2023, After Action 09/18/2023

Report/Drill Report

71151 Miscellaneous MSPI High Pressure Injection System Derivation Reports 07/26/2023

71151 Miscellaneous MSPI Heat Removal Systems Derivation Reports 07/26/2023

71151 Miscellaneous System Health Reports: RCIC, HPCS, RHR, SW, EAC

71151 Miscellaneous Control Room Operator Logs 07/01/2022 -

06/30/2023

71151 Miscellaneous MSPI Residual Heat Removal Systems Derivation Reports 07/26/2023

71151 Miscellaneous MSPI Emergency AC Power Systems Derivation Reports 07/26/2023

71151 Miscellaneous MSPI Cooling Water Systems Derivation Reports 07/26/2023

71152A Corrective Action Action Requests 445329, 135717, 385756, 419040, 391962, 444491

Documents

71152A Miscellaneous 56625 Event Notification Report 07/17/2023

71152A Procedures ISP-EFC-B108 Excess Flow Check Valve Test of Containment Atmosphere 016

and Suppression Pool Level Instrument Sensing Lines

71152A Work Orders 02183338, 020006193