GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report

From kanterella
Jump to navigation Jump to search
Licensing Basis Document Update and Biennial Commitment Change Report
ML23346A213
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/12/2023
From: David Brown
Energy Northwest
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML23346A212 List:
References
GO2-23-105
Download: ML23346A213 (1)


Text

         

 



!  "     



   

David P. Brown ENERGY Columbia Generating Station P.O. Box 968, MD PE23 NORTHWEST Richland, WA 99352-0968 Ph. 509-377-8385 dpbrown@energy-northwest.com

December 12, 2023 10 CFR 50.71(e)

GO2-23-105

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397, LICENSING BASIS DOCUMENT UPDATE AND BIENNIAL COMMITMENT CHANGE REPORT

Dear Sir or Madam:

In accordance with the requirements of 10 CFR 50.71(e), Energy Northwest hereby submits the following updated Columbia Generating Station (Columbia) Licensing Basis Documents:

x Final Safety Analysis Report (FSAR), Amendment 67 x Licensee Controlled Specifications (LCS), Revision 129 x Technical Specification Bases (TSB), Revision 134 x Operational Quality Assurance Program Description (OQAPD), Revision 57.

In addition to other changes, FSAR Amendment 67 removes some redundant information and excessive detail from the FSAR to improve its focus and clarity. In accordance with Nuclear Energy Institute (NEI) NEI 98-03, Revision 1, Guidelines for Updating Final Safety Analysis Reports, as endorsed by Regulatory Guide 1.181, Content of the Updated Final Safety Analysis Report in Accordance with 10 CFR 50.71(e), a brief description of the information removed is provided in Attachment 1.

Attachment 2 contains the Columbia Generating Station 2022-2023 Commitment Change Report. This report is submitted pursuant to NEI 99-04, Guidelines for Managing NRC Commitment Changes.

ATTACHMENT 6 CONTAINS INFORMATION THAT IS WITHHELD FROM PUBLIC RELEASE IN ACCORDANCE WITH 10 CFR 2.390. UPON REMOVAL OF ATTACHMENT 6, THIS LETTER AND OTHER ATTACHMENTS ARE UNCONTROLLED.

         

 



!  "     



   

GO2-23-105 Page 2 of 3

Columbia License Basis Documents are provided in electronic format in Attachments 3 and 4. Additionally, the files in Attachment 4 contain hyperlinks. These hyperlinks are not essential to the FSAR content and are disabled.

Energy Northwest has performed its biennial review of plant changes in accordance with 10 CFR 54.37(b) to determine whether there are any newly identified structures, systems or components (SSC) that require ag ing management or there are any time limited aging analyses that require re-evaluation. There were no SSCs that met the definition of newly identified. There were no new materials or environments identified.

There were also no time limited aging analyses that required re-evaluation.

Consistent with Energy Northwests past FSAR submittals, Energy Northwest is providing a publicly available version of the FSAR (Attachment 4) in which information previously considered to be sensitive unclassified (non-safeguards) information have been removed. A list of pages removed from the public version of the FSAR submittal is contained in Attachment 5. Attachment 6 contains all pages there were removed from the publicly available version and has been labeled as Withhold from Public Release.

There are no commitments being made by this letter.

If you have any questions or desire additional information pertaining to this report, please contact Mr. R.M. Garcia, Licensing Supervisor, at (509) 377-8463.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the ______ day of _____________ 2023. 

Respectfully,

jn DocuSigned by :

LE:i!,J:a~~~

David P. Brown Site Vice President

         

 



!  "     



   

GO2-23-105 Page 3 of 3

Attachments: 1. Redundant Information and Excessive Detail Removed from the FSAR

2. Regulatory Commitment Changes (NEI 99-04 Process)
3. Licensee Controlled Specifications, Revision 129 Technical Specification Bases, Revision 134 Operational Quality Assurance Program Description, Revision 57
4. Columbia Generating Station FSAR, Amendment 67, Publicly Available
5. Information Withheld From Columbia Generating Station Publicly Available FSAR Amendment 67
6. Columbia Generating Station FSAR, Amendment 67, Pages Considered to be Sensitive Unclassified (Non-Safeguards)

Information Withhold from Public Release in Accordance with 10 CFR 2.390

cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident Inspector CD Sonoda-BPA

         

 



!  "     



   

GO2-23-105 Attachment 1 Page 1 of 1

Redundant Information and Excessive Detail Removed from the FSAR

CHAPTER 3 Section Description of Change Type Drawings 3.6-Remove drawings that were duplicated Redundant 6 and 3.6-7 information 3.9.6 Remove unnecessary text with specific references to 10 Obsolete CFR 50.55a and ASME code information

CHAPTER 6 Section Description of Change Type 6.3 Delete during a 40-year lifetime from the end of the sentence Excessive detail

CHAPTER 8 Section Description of Change Type 8.3.1.2.2 Remove verbiage no less than once every 30 months Excessive detail Tables 8.3-1, Change information in tables to historical status Obsolete 8.3-2, 8.3-3, information 8.3-10 8.3 Delete during a 40-year lifetime from the end of the sentence Excessive detail

CHAPTER 9 Section Description of Change Type 9.1 Delete during a 40-year lifetime from the end of the sentence Excessive detail

9.1.4.2.5.7 Remove text that is not necessary for the requirement of Redundant tool per RG 1.70 information 9.5.5.4 Remove verbiage no less than once every 30 months Excessive detail 9.5.6.4 Remove verbiage no less than once every 30 months Excessive detail 9.5.7.4 Remove verbiage no less than once every 30 months Excessive detail 9.5.8.4 Remove verbiage no less than once every 30 months Excessive detail

CHAPTER 10 Section Description of Change Type Figure 10.1-1 Remove F, F1, G, and G1 values Excessive detail

APPPENDIX A Section Description of Change Type A.4 Change information in table to historical status Obsolete Information

         

 



!  "     



   

GO2-23-105 Attachment 2 Page 1 of 1

Regulatory Commitment Changes (NEI 99-04 Process)

This section reports changes to regulatory commitments consistent with the information pertaining to Regulatory Commitment Changes and is included pursuant to the NEI 99-04 criteria for reporting.

The following license renewal commitments were deleted due to incorporation into the FSAR and thus have a higher level of control. Reference, FSAR, Appendix A, Table A-1 and NEI 99-04, Step 1.

EN Commitment FSAR Table EN Commitment FSAR Table Tracking Number A-1 Item Tracking Number A-1 Item Number Number 12856 2 12858 5 12860 28 12862 4 12864 23 12866 6 12868 8 12870 15 12872 7 12874 9 12876 10 12878 11 12880 13 12882 25 12884 26 12886 20 12888 31 12890 22 12892 19 12894 32 12896 24 12898 29 12900 46 12902 52 12904 33 12906 35 12908 34 12910 36 12914 38 12918 53 12920 39 12922 40 12924 44 12926 42 12928 45 12930 54 12936 58 12938 60 13053 48 13055 41 13057 17 13059 27 13061 18 13064 14 21011 1 21012 49 21013 43 21014 61 21015 62 21016 63 21352 12 21355 16 21369 51 21374 59 21379 64 21383 66 21389 69 21391 70

         

 



!  "     



   

GO2-23-105 Attachment 5 Page 1 of 3

Information Withheld From Columbia Generating Station Publicly Available FSAR Amendment 67 Figure Figure/Table Figure Figure Figure 1.2-1 Figure 3.2-5 Figure 3.5-36 Figure 3.6-35.1 Figure 1.2-2.1 Figure 3.2-6 Figure 3.5-37 Figure 3.6-35.2 Figure 1.2-2.2 Figure 3.2-7 Figure 3.5-38 Figure 3.6-36.1 Figure 1.2-3.1 Table 3.5-5 Figure 3.5-39 Figure 3.6-36.2 Figure 1.2-3.2 Figure 3.5-1 Figure 3.5-41 Figure 3.6-37.1 Figure 1.2-4.1 Figure 3.5-2 Figure 3.5-42 Figure 3.6-37.2 Figure 1.2-4.2 Figure 3.5-3 Figure 3.5-43 Figure 3.6-38.1 Figure 1.2-5 Figure 3.5-4 Figure 3.5-44 Figure 3.6-38.2 Figure 1.2-6 Figure 3.5-5 Figure 3.5-45 Figure 3.6-38.3 Figure 1.2-7 Figure 3.5-6 Figure 3.5-46 Figure 3.6-39.1 Figure 1.2-8 Figure 3.5-7 Figure 3.5-47 Figure 3.6-39.2 Figure 1.2-9 Figure 3.5-8 Figure 3.5-49 Figure 3.6-39.3 Figure 1.2-10 Figure 3.5-9 Figure 3.5-50 Figure 3.6-40.1 Figure 1.2-11 Figure 3.5-10 Figure 3.6-1 Figure 3.6-40.2 Figure 1.2-12 Figure 3.5-11 Figure 3.6-2 Figure 3.6-41.1 Figure 1.2-13 Figure 3.5-12 Figure 3.6-3 Figure 3.6-41.2 Figure 1.2-14 Figure 3.5-13 Figure 3.6-4 Figure 3.6-42.1 Figure 1.2-15 Figure 3.5-14 Figure 3.6-5 Figure 3.6-42.2 Figure 1.2-16 Figure 3.5-15 Figure 3.6-6 Figure 3.6-43.1 Figure 1.2-17.1 Figure 3.5-16 Figure 3.6-7 Figure 3.6-43.2 Figure 1.2-17.2 Figure 3.5-17 Figure 3.6-8 Figure 3.6-44.1 Figure 1.2-18 Figure 3.5-18 Figure 3.6-9 Figure 3.6-44.2 Figure 1.2-19 Figure 3.5-19 Figure 3.6-10 Figure 3.6-45.1 Figure 1.2-20 Figure 3.5-20 Figure 3.6-11 Figure 3.6-45.2 Figure 1.2-21 Figure 3.5-21 Figure 3.6-12 Figure 3.6-46.1 Figure 1.2-22 Figure 3.5-22 Figure 3.6-13 Figure 3.6-46.2 Figure 1.2-23 Figure 3.5-23 Figure 3.6-14 Figure 3.6-47.1 Figure 1.2-24 Figure 3.5-24 Figure 3.6-15 Figure 3.6-47.2 Figure 2.1-3 Figure 3.5-25 Figure 3.6-16 Figure 3.6-48.1 Figure 2.4-6.1 Figure 3.5-26 Figure 3.6-17 Figure 3.6-48.2 Figure 2.4-6.2 Figure 3.5-27 Figure 3.6-18 Figure 3.6-49.1 Figure 2.4-6.3 Figure 3.5-28 Figure 3.6-19 Figure 3.6-49.2 Figure 2.4-6.4 Figure 3.5-29 Figure 3.6-20 Figure 3.6-50.1 Figure 2.4-6.5 Figure 3.5-30 Figure 3.6-32.1 Figure 3.6-50.2 Figure 2.4-16 Figure 3.5-31 Figure 3.6-32.2 Figure 3.6-50.3 Figure 2.4-28 Figure 3.5-32 Figure 3.6-33.1 Figure 3.6-51.1 Figure 3.2-2 Figure 3.5-33 Figure 3.6-33.2 Figure 3.6-51.2 Figure 3.2-3 Figure 3.5-34 Figure 3.6-34.1 Figure 3.6-51.3 Figure 3.2-4 Figure 3.5-35 Figure 3.6-34.2 Figure 3.6-52.1

         

 



!  "     



   

GO2-23-105 Attachment 5 Page 2 of 3

Information Withheld From Columbia Generating Station Publicly Available FSAR Amendment 67 Figure/Section Figure Figure Figure Figure 3.6-52.2 Figure 3.8-11 Figure 3A.2.1-1 Figure 3A.5.1-14b Figure 3.6-53.1 Figure 3.8-12 Figure 3A.2.1-2 Figure 3A.5.1-15a Figure 3.6-53.2 Figure 3.8-13 Figure 3A.2.1-3 Figure 3A.5.1-15b Figure 3.6-54.1 Figure 3.8-17 Figure 3A.2.1-4 Figure 3A.5.1-16a Figure 3.6-54.2 Figure 3.8-18 Figure 3A.2.1-5 Figure 3A.5.1-16b Figure 3.6-55.1 Figure 3.8-20 Figure 3A.2.1-6 Figure 3A.5.1-17a Figure 3.6-55.2 Figure 3.8-21 Figure 3A.2.1-7 Figure 3A.5.1-17b Figure 3.6-56.1 Figure 3.8-22 Figure 3A.2.1-8 Figure 3A.5.1-18a Figure 3.6-56.2 Figure 3.8-23 Figure 3A.2.1-9 Figure 3A.5.1-18b Figure 3.6-57.1 Figure 3.8-24 Figure 3A.4.1-5 Figure 3A.5.1-19a Figure 3.6-57.2 Figure 3.8-25 Figure 3A.4.1-6 Figure 3A.5.1-19b Figure 3.6-57.3 Figure 3.8-26 Figure 3A.4.1-7 Figure 3A.5.1-20a Figure 3.6-58 Figure 3.8-27 Figure 3A.4.2-1 Figure 3A.5.1-20b Figure 3.6-59 Figure 3.8-28 Figure 3A.4.2-3 Figure 3A.5.1-21a Figure 3.6-60.1 Figure 3.8-29 Figure 3A.5.1-1b Figure 3A.5.1-21b Figure 3.6-60.2 Figure 3.8-30 Figure 3A.5.1-2 Figure 3A.5.1-22a Figure 3.6-65 Figure 3.8-31 Figure 3A.5.1-3a Figure 3A.5.1-22b Figure 3.6-66 Figure 3.8-32 Figure 3A.5.1-3b Figure 3A.5.1-23a Figure 3.6-85 Figure 3.8-33 Figure 3A.5.1-4a Figure 3A.5.1-23b Figure 3.6-86 Figure 3.8-34 Figure 3A.5.1-4b Figure 3A.5.1-24a Figure 3.6-87 Figure 3.8-35 Figure 3A.5.1-5a Figure 3A.5.1-24b Figure 3.6-88 Figure 3.8-36 Figure 3A.5.1-5b Figure 3A.5.1-25a Figure 3.6-92.1 Figure 3.8-37 Figure 3A.5.1-6a Figure 3A.5.1-25b Figure 3.6-92.2 Figure 3.8-38 Figure 3A.5.1-6b Figure 3A.5.1-26a Figure 3.6-92.3 Figure 3.8-39 Figure 3A.5.1-7a Figure 3A.5.1-26b Figure 3.6-93 Figure 3.8-40 Figure 3A.5.1-7b Figure 3A.5.2-1 Figure 3.6-94.1 Figure 3.8-41 Figure 3A.5.1-8a Figure 3A.5.2-2 Figure 3.6-94.2 Figure 3.8-42 Figure 3A.5.1-8b Figure 3A.5.2-3 Figure 3.6-95 Figure 3.8-43 Figure 3A.5.1-9a Figure 3A.5.2-4 Section 3.8.4 Figure 3.8-44 Figure 3A.5.1-9b Figure 3A.5.2-5 Figure 3.8-1 Figure 3.8-45 Figure 3A.5.1-10a Figure 3A.5.2-6 Figure 3.8-2 Figure 3.8-46 Figure 3A.5.1-10b Figure 3A.5.2-7 Figure 3.8-3 Figure 3.8-47 Figure 3A.5.1-11a Figure 3A.5.2-8 Figure 3.8-4.1 Figure 3.8-48 Figure 3A.5.1-11b Figure 3A.5.2-9 Figure 3.8-4.2 Figure 3.8-49 Figure 3A.5.1-12a Figure 3A.5.2-10 Figure 3.8-6 Figure 3.8-50 Figure 3A.5.1-12b Figure 3A.D-11 Figure 3.8-7 Figure 3.8-51 Figure 3A.5.1-13a Figure 3A.I-1 Figure 3.8-8 Figure 3.8-52 Figure 3A.5.1-13b Figure 4.6-4 Figure 3.8-10 Figure 3.8-53 Figure 3A.5.1-14a Figure 5.4-15.3

         

 



!  "     



   

GO2-23-105 Attachment 5 Page 3 of 3

Information Withheld From Columbia Generating Station Publicly Available FSAR Amendment 67 Figure/Section Figure/Table Figure/Section Figure Figure 6.2-23 Figure 8.3-2 Figure 12.3-1 Figure F.6-21 Figure 6.2-32 Figure 8.3-4.1 Figure 12.3-2 Figure J.6-1.1 Figure 6.2-33 Figure 8.3-4.2 Figure 12.3-3 Figure J.6-1.2 Figure 8.1-1 Figure 8.3-4.3 Figure 12.3-4 Figure J.6-2.1 Figure 8.1-2.1 Figure 8.3-4.4 Figure 12.3-5 Figure J.6-2.2 Figure 8.1-2.2 Figure 8.3-4.5 Figure 12.3-6 Figure J.6-3.1 Figure 8.1-2.3 Figure 8.3-4.6 Figure 12.3-7 Figure J.6-3.2 Figure 8.1-2.4 Figure 8.3-5.1 Figure 12.3-8 Figure J.6-4 Figure 8.1-3 Figure 8.3-5.2 Figure 12.3-9 Figure J.6-5 Figure 8.1-4 Figure 8.3-6 Figure 12.3-10 Figure J.6-6 Figure 8.1-5 Figure 8.3-7 Figure 12.3-11 Figure J.6-7 Figure 8.1-6.1 Figure 8.3-8 Figure 12.3-12 Figure J.6-8 Figure 8.1-6.2 Figure 8.3-9 Figure 12.3-13 Figure J.6-9 Section 8.2.2 Figure 8.3-10 Figure 12.3-14 Figure J.6-10 Figure 8.2-1.1 Figure 8.3-23 Figure 12.3-15 Figure J.6-11 Figure 8.2-1.2 Figure 8.3-24 Figure 12.3-16 Figure J.6-12 Figure 8.2-2.1 Figure 8.3-25 Figure 12.3-17 Figure J.6-13 Figure 8.2-2.2 Figure 8.3-26 Figure 12.3-18 Figure J.6-14 Figure 8.2-3.1 Figure 8.3-27 Figure 12.3-22 Figure J.6-15 Figure 8.2-3.2 Figure 8.3-28 Section F.4.4.4 Figure J.6-16 Figure 8.2-3.3 Figure 8.3-29 Figure F.6-1 Figure J.6-17 Figure 8.2-3.4 Figure 8.3-30 Figure F.6-2 Figure J.6-18 Figure 8.2-4.1 Figure 8.3-32 Figure F.6-3 Figure 8.2-4.2 Figure 8.3-33 Figure F.6-4 Figure 8.2-4.3 Figure 8.3-34 Figure F.6-5 Figure 8.2-4.4 Figure 8.3-35 Figure F.6-6 Figure 8.2-5.1 Figure 8.3-36 Figure F.6-7 Figure 8.2-5.2 Figure 8.3-37 Figure F.6-8 Figure 8.2-5.3 Figure 8.3-38 Figure F.6-9 Figure 8.2-5.4 Figure 8.3-52.1 Figure F.6-10 Figure 8.2-6.1 Figure 8.3-52.2 Figure F.6-11 Figure 8.2-6.2 Figure 8.3-53 Figure F.6-12 Figure 8.2-6.3 Figure 9.1-4 Figure F.6-13 Figure 8.2-6.4 Figure 9.1-5 Figure F.6-14 Figure 8.2-7.1 Figure 9.1-13 Figure F.6-15 Figure 8.2-7.2 Figure 9.2-7 Figure F.6-16 Figure 8.2-7.3 Figure 9.2-13 Figure F.6-17 Figure 8.2-7.4 Figure 9.2-14 Figure F.6-18 Figure 8.3-1 Table 9.5-1 Figure F.6-19 Figure 9.5-2 Figure F.6-20