January 23, 2023

SUBJECT:

COLUMBIA GENERATING STATION - INTEGRATED INSPECTION REPORT 05000397/2022004

Dear Robert Schuetz:

On December 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Columbia Generating Station. On January 12, 2023, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No NRC-identified or self-revealing findings were identified during this inspection.

Licensee-identified violations which were determined to be of very low safety significance are documented in this report. We are treating these violations as non-cited violations (NCVs)

consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Columbia Generating Station.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Patricia J. Vossmar, Chief Projects Branch A Division of Operating Reactor Safety Docket No. 05000397 License No. NPF-21

Enclosure:

As stated

Inspection Report

Docket Number:

05000397

License Number:

NPF-21

Report Number:

05000397/2022004

Enterprise Identifier:

I-2022-004-0004

Licensee:

Energy Northwest

Facility:

Columbia Generating Station

Location:

Richland, WA

Inspection Dates:

October 01, 2022, to December 31, 2022

Inspectors:

P. Niebaum, Senior Resident Inspector

A. Donley, Resident Inspector

N. Hernandez, Operations Engineer

J. Drake, Senior Reactor Inspector

S. Hedger, Senior Emergency Preparedness Inspector

H. Strittmatter, Emergency Preparedness Inspector

J. Walker, Emergency Response Inspector

Approved By:

Patricia J. Vossmar, Chief

Projects Branch A

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Columbia Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Licensee-identified non-cited violations are documented in report sections: 71111.15 and 71152

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Columbia Generating Station began the inspection period at rated thermal power (RTP). On December 10, 2022, the station reduced power to approximately 60 percent RTP for a control rod sequence exchange and surveillance testing. The station returned to 100 percent RTP later that day and remained at or near that power level for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset and during seasonal cold temperatures for the following systems:

diesel generator ventilation on November 8, 2022

standby service water on November 10, 2022

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)residual heat removal system (RHR) A when RHR B was out of service for maintenance on October 17, 2022 (2)high pressure core spray system (HPCS) when the reactor core isolation cooling (RCIC) system was out of service for corrective maintenance on November 29, 2022

(3) RHR B when the RHR A system was out of service for maintenance on December 6, 2022 (4)control room air conditioning system B when aligned to standby service water while emergency control room chiller B was out of service for maintenance on December 16, 2022

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the emergency diesel generator division 2 system on October 10, 2022.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (8 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1)fire areas DG-3, 9, 5; diesel generator 2 (DG-2), DG-2 day tank, and DG-2 diesel fuel oil storage tank access rooms; on October 4, 2022 (2)fire area R-5, RHR pump room 2A, on October 17, 2022 (3)fire area RC-3/1, vertical electrical cable chase, on November 15, 2022 (4)fire area R-4, RHR pump room 2B, on December 6, 2022 (5)fire areas RC-9, 6, 7; remote shutdown and division 2 battery rooms, electrical equipment, and reactor protection system (RPS) rooms; on December 16, 2022 (6)fire areas RC-4, 5; division 1 electrical equipment, RPS, and battery rooms; on December 16, 2022 (7)fire area R-1, reactor building elevation 471-foot general equipment area, on December 27, 2022 (8)fire area DG-10, deluge valve equipment room, on December 27, 2022

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated internal flooding mitigation protections in the reactor building 422-foot elevation, emergency core cooling pump room watertight doors, on December 23, 2022.

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered October 31, 2022, to December 8, 2022.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during a load reduction, control rod sequence exchange, and scram time testing on December 10, 2022.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated an annual simulator exam scenario on November 21, 2021.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1)high energy line break (HELB) structures, enclosures, and panels on October 7, 2022 (2)adjustable speed drive system for the reactor recirculation pumps on December 22, 2022

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Yellow risk for inoperability of the backup transformer due to Bonneville Power Administration maintenance on the 115 kV line on October 28, 2022
(2) Yellow risk for corrective maintenance on the reactor core isolation cooling keep fill pump on November 29 and 30, 2022
(3) Yellow risk and increased on-line fire risk for residual heat removal system A planned maintenance outage on December 6, 2022
(4) Yellow risk for a high-risk evolution due to increased plant transient probability associated with emergent Bonneville Power Administration work on 500kV output line breaker on December 21, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1)condition report (CR) 437368, control room chiller 1B (CCH-CR-1B) lower sight glass low oil level, completed on October 20, 2022

(2) CR 438074, alternate power supply for 2A and 2B inverters impacted due to degraded capacitors associated with transformer E-TR-IN/2, completed on October 31, 2022
(3) CR 438395, evaluation of barrier impairment process for tornado missile barrier B-DOOR-G200 associated with the 'B' service water pump house planned for November 1, 2022
(4) CR 436766, service water flow to control room emergency chiller 1B below minimum flow for operability, on November 17, 2022
(5) CR 439030, watertight door R10A found open and door R10 not fully dogged, on December 23, 2022

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:

(1)work order 02167219 for control room division A emergency filtration system following planned system outage on October 12, 2022 (2)work order 02200819, corrective maintenance for replacement of the capacitors in E-TR-IN/2 on October 27, 2022 (3)work order 02164578 for FLEX diesel generator (DG4) following maintenance on November 16, 2022 (4)work order 02201855, replacement of RCIC-P-3, reactor core isolation cooling keep fill pump power frame on November 30, 2022

(5) OSP-RHR/IST-Q702, RHR Loop A Operability Test, following planned maintenance on RHR system A on December 7, 2022

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (3 Samples)

(1) WO 02189057, channel calibration/functional test of RHR system B (low pressure coolant injection mode) pump start time delay relay, RHR-RLY-K70B, on October 20, 2022
(2) SR 3.6.4.1.1 secondary containment drawdown time determination per OSP-INST-H101 on November 9, 2022
(3) WO 02195088, monthly operability test of DG-2, on December 22, 2022

Inservice Testing (IP Section 03.01) (1 Sample)

(1) OSP-SW/IST-Q701, Standby Service Water Loop A Operability, in accordance with WO 02189201 on November 7, 2022

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

(1) The inspectors evaluated the biennial emergency plan exercise conducted on October 25, 2022. The exercise scenario simulated a reactor coolant system leak in the drywell, an anticipated transient without scram, losses of feedwater and condensate pumps; a break in the reactor core isolation cooling system steam line with failed isolation; emergency depressurization with loss of most low-pressure emergency core cooling systems, and a loss of reactor vessel water level below the top of active fuel.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10)===

(1) October 1, 2021, through September 30, 2022

BI02: RCS Leak Rate Sample (IP Section 02.11) (1 Sample)

(1) October 1, 2021, through September 30, 2022

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1) October 1, 2021, through September 30, 2022 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
(1) October 1, 2021, through September 30, 2022 EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
(1) October 1, 2021, through September 30, 2022

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) CR 437979, missed limiting condition for operation 3.0.9 and flood tour, on November 17, 2022
(2) CR 433720, RRC-P-1A (1A reactor recirculation pump) manually tripped following restart on adjustable speed drive channel 1A/2 on June 11, 2022

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) The inspectors reviewed the licensees corrective action program for an identified adverse trend in procedure use and adherence that might be indicative of a more significant safety issue, CR 00433595, gap in procedure use and adherence. One observation was documented in the results section of this report.

INSPECTION RESULTS

Licensee-Identified Non-Cited Violation 71111.15 This violation of very low safety significance was identified by the licensee and has been entered into the licensees corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Violation: Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, criterion V, Instructions, Procedures, and Drawings requires in part, activities affecting qualityshall be accomplished in accordance with these instructions, procedures, or drawings. More specifically, licensee procedure 1.3.57, Barrier Impairment, step 4.11.1 states that flood barriers shall be operable in Modes 1/2/3, and step 4.11.2.1.a.3 provides the required compensatory measures to be taken when the reactor building 422-foot water-resistant doors are propped open for more than 15 minutes. Contrary to this requirement, on November 24, 2022, with two flood barriers inoperable in Mode 1, the licensee failed to implement the required compensatory measures. Specifically, the licensee identified door R10A was left open and door R10 was not fully latched in the closed position, rendering both doors inoperable and no compensatory measures had been implemented. These are the two water-resistant doors leading into the high-pressure core spray pump room from the control rod drive pump room and are both credited flood barriers. Upon discovery, the licensee closed and latched the two doors restoring operability of the flood barriers and documented the issue in a condition report.

Significance/Severity: Green. The inspectors determined the finding was very low safety significance, Green, when screened in accordance with NRCs Inspection Manual Chapter (IMC) 0609, Appendix A, The Significance Determination Process For Findings At-Power.

Specifically, using the exhibit 2 mitigating systems screening questions, the finding did not involve the loss of degradation of equipment specifically designed to mitigate a flooding initiating event (e.g., flooding barriers) for greater than 14 days.

Corrective Action References: The issue was captured in the licensees corrective action program under CR 439030.

Licensee-Identified Non-Cited Violation 71152A This violation of very low safety significance was identified by the licensee and has been entered into the licensees corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Violation: 10 CFR 50, Appendix B, criterion V, Instructions, Procedures, and Drawings requires in part Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings. More specifically, licensee procedure 1.3.57, Barrier Impairment, step 4.11.1 states that flood barriers shall be operable in Modes 1/2/3, and step 4.14.1 states in part that HELB barriers in primary and secondary containment are required to be operable in Modes 1/2/3.

Compensatory measures are required for when those barriers are inoperable, depending on the function of the barrier that is impacted (e.g., HELB and flood), as defined in license procedure 1.3.57. Contrary to this requirement, on October 24, 2022, with a flood and HELB barrier inoperable in Mode 1, the licensee failed to implement the required compensatory measures. Specifically, the licensee failed to enact the compensatory measures listed in procedure 1.3.57 while maintenance was performed on reactor building door R211 that rendered the flood and HELB barrier functions of the door inoperable.

Significance/Severity: Green. The inspectors determined the finding was very low safety significance, Green, when screened in accordance with NRCs Inspection Manual Chapter (IMC) 0609, Appendix A, The Significance Determination Process For Findings At-Power.

Specifically, all of the screening questions in exhibit 2 mitigating systems screening questions, section A, mitigating SSCs and PRA functionality (except reactivity control systems) were answered no as the door was fixed and the barrier restored within 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

Corrective Action References: The issue was captured in the licensees corrective action program as CR 437979.

Observation - Adverse Trend in Procedure Use and Adherence 71152S The inspectors reviewed the licensee's corrective action program (CAP) for licensee-identified adverse trends during a six-month period ending November 28, 2022. CR 433595 documented an adverse trend in NRC violations that reflect human performance issues in procedure use and adherence. The gap, drivers, actions, results worksheet and associated corrective actions for this negative trend have been completed. The licensee is continuing to monitor for any additional NRC violations that reflect issues in procedure use and adherence and if performance degrades further, another CR will be written to address the continued negative trend. While the licensee continues to trend performance, the station has begun implementing corrective actions including manager in the field observations and specific pre-job brief templates.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On November 21, 2022, the inspectors presented the emergency preparedness exercise inspection results to Robert Schuetz, Chief Executive Officer, and other members of the licensee staff.

On December 9, 2022, the inspectors presented the annual requalification examination inspection results to Kelly Robertson, Examination Group Supervisor, and other members of the licensee staff.

On January 12, 2023, the inspectors presented the integrated inspection results to Robert Schuetz, Chief Executive Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

Action Requests

26293, 429685, 413893, 423107, 433925

71111.01

Procedures

SOP-

COLDWEATHER-

OPS

Cold Weather Operations

039, 040

Corrective Action

Documents

Action Requests

437345, 434126, 431146, 417435, 416161, 384618, 360196,

437802, 439746

Corrective Action

Documents

Resulting from

Inspection

Action Requests

439747

M512-3

Flow Diagram Diesel Oil & Miscellaneous Systems Diesel

Generator Building

2

M520

Flow Diagram HPCS and LPCS Systems Reactor Building

105

M521-1

Flow Diagram Residual Heat Removal System Loop A

117

M521-2

Flow Diagram Residual Heat Removal Loop B

117

M524-2

Flow Diagram Standby Service Water System Reactor,

Radwaste, D.G. Bldgs and Yard

24

M551

Flow Diagram HVAC Circ water, Make-up water & Service

Water Pump Houses & Diesel Generator Bldg

071

Drawings

M775

Flow Diagram Emergency Chilled Water Piping System

Control Room

030, 031

OSP-HPCS-M102

HPCS Valve Lineup

006

OSP-RHR-M105

Residual Heat Removal System B Valve Position Verification

004

OSP-SW-M102

Standby Service Water Loop B Valve Position Verification

053

SOP-DG2-LU

Emergency Diesel Generator (DIV 2) Valve & Power Supply

Lineup

010

SOP-DG2-STBY

Emergency Diesel Generator (DIV 2) Standby Lineup

25

71111.04

Procedures

SOP-HVAC/CR-

LU

Control, Cable, and Critical Switchgear Rooms HVAC Lineup

003

SOP-HVAC/CR-

OPS

Control, Cable, and Critical Switchgear Rooms HVAC

Operations

030

SOP-HVAC/CR-

STBY

Control, Cable, and Critical Switchgear Rooms HVAC in

Standby Status

2

SOP-RHR-LU

RHR System Valve and Breaker Lineup

009

SOP-RHR-STBY

Placing RHR in Standby Status

006

Procedures

SOP-SW-LU

Standby Service Water System Valve & Breaker Lineup

016

2134916, 02106765, 02175583, 02184395

71111.04

Work Orders

Work Requests

29104562, 29119495, 29166453, 29144635, 29133029

Calculations

FP-02-85-03

Combustible Loading Calculation

011

Corrective Action

Documents

Action Requests

434082

Corrective Action

Documents

Resulting from

Inspection

Action Requests

437869, 438816, 440032, 439936, 439941

PFP-DG-

BUILDING

Diesel Generator Building

004, 005

PFP-RB-471

Reactor 471

007

PFP-RB-

BUILDING

Reactor 422

007

Fire Plans

PFP-RW-467

Radwaste 467 (Fire Area RC-3/1)

006, 007

15.2.14

Function Check, Sensitivity Check and Cleaning of

Photoelectric Detectors

015

15.2.16

Thermal Detector - Channel Function Test

009

15.2.2

Function and Sensitivity Check of Ionization Detectors

21

15.4.6

Essential Fire Rated Penetration Seal and Essential Fire and

Flood Barrier Operability Inspection

014

Procedures

ABN-FIRE

Fire

045

71111.05

Work Orders

2166895

5.44.20

Calculation of Allowable Leakage Past Doors on RB Pump

Rooms Elevation 422

001

71111.06

Calculations

ME-02-02-02

Calculation for Reactor Building Flooding Analysis

001

Calculations

ME-02-93-57 and

calculation

modifications

CMR-98-0167,

CMR-94-0507

Effects of Stairwell Flooding on Adjacent Pump Rooms

(422 ft 3 in Elevation)

000

Corrective Action

Documents

Action Requests

435749, 435704, 437438, 408253

Corrective Action

Documents

Resulting from

Inspection

Action Requests

439802

2-0472

Barrier Impairment Permit

A553

Door Schedule Sheet 1

045

CVI 210A-08,6

Spec Section 8H Watertight Doors R4 through R13

010

SPC 08H

Design Specification for Division 8 Section 8H Interior Water-

Resistant Doors and Frames

003

Miscellaneous

STL-S748

Structural Reactor Building Interior Walls

25

Procedures

15.3.17

Fire Door Operability Inspections

011

71111.06

Work Orders

2168010, 02141746

71111.11A

Miscellaneous

22 Annual Licensed Operator Requalification Examination

Results

Reactivity Control Plan, Sequence Exchange and Surveillance

Testing

December

22

Miscellaneous

LE000047

LORQ Annual Exam Scenario

000

3.3.1

Reactor Scram

069

OSP-CRD-W101

Control Rod Scram Accumulator Verification

009

OSP-RPS-S402

MSIV Closure Scram Functional

000

SOP-DEH-OPS

Main Turbine DEH Operations

23

SWP-TQS-01

Training, Qualifications and Simulators

21

TDI-23

LORQ Annual Exam Development and Administration

018

71111.11Q

Procedures

TSP-CRD-C101

CRD Scram Timing with Auto Scram Timer System

030

71111.12

Corrective Action

Documents

Action Requests

23489, 390934, 390844, 3908733, 389937, 400637, 401022,

416184, 411721, 431110, 431123, 431209, 424522, 430304,

431015, 432146, 418481, 424626, 390934, 435704, 410248,

408826, 433588, 424399, 433720, 273087

Corrective Action

Documents

Resulting from

Inspection

Action Requests

435131, 434361, 434359, 438062

M545-1

Flow Diagram Heating Ventilation and Air conditioning Reactor

Building

073

M545-2

Flow Diagram Heating Ventilation and Air conditioning Reactor

Building

014

Drawings

M545-3

Flow Diagram Heating Ventilation and Air conditioning Reactor

Building

26

Engineering

Changes

EC 13763

Evaluation of Open Enclosures

004

Life Cycle Management Plan Adjustable Speed Drives

004, 005

2B35-20,13,16

GE FANUC Automation Series 90 30 PLC Installation &

Hardware Manual

WO 02112343, 02112340,

AR 433720433720 AR 273087273087 AR 433720433720001

TM-2004

Evaluation of Safety-Significant Equipment for Moisture

Intrusion Potential

001

Miscellaneous

TM-2019

Summary of Equipment Qualification Environmental Profiles

013

1.3.56

Conduct of Maintenance

015

1.3.57

Barrier Impairment

043

1.5.11

Maintenance Rule Program

016

10.25.60

Reactor Recirc Inverter Maintenance

000

ABN-ASD-INV

RRC ASD UPS

Failure

RRC ASD UPS Failure

2

SOP-ELEC-ASD-

OPS

Adjustable Speed Drive UPS System Operation

004

SOP-ELEC-ASD-

START

Adjustable Speed Drive UPS System Startup

003

SOP-HVAC-ASD

Shutdown ASD Building Ventilation System Shutdown

000

71111.12

Procedures

SOP-RRC-FLOW-

QC

Reactor Power Change With RRC Flow Controllers - Quick

Card

005

SOP-RRC-

SHUTDOWN

Reactor Recirculation System Shutdown

005

SYS-4-22

Maintenance Rule Program

015

Procedures

SYS-4-23

Maintenance Rule Structural Baseline Inspections

001

2198308, 0217913, 02117345

2112343, 02112340

71111.12

Work Orders

Work Requests

29162338, 29147552, 29167052, 29147084, 29165557,

29152335, 29162244

Corrective Action

Documents

Action Requests

439372, 439864, 439875

Fire Prevention Evaluation Permits: 22-0062, 22-0063,

2-0064, 22-0065, 22-0066, 22-0067, 22-0068, 22-0069,

2-0070, 22-0071, 22-0072, 22-0073

Operator Log Entry

2/21/2022

P-500kV-003

eSOMS protection scheme

P-E-TR-B-02

eSOMS protection scheme

P-RHR-SYS-A-

001

eSOMS protection scheme

T22-E-TR-B-006

eSOMS tracker

Miscellaneous

T22-RHR-SYS-A-

001

eSOMS tracker

1.3.83

Protected Equipment Program

037

1.3.85

On-line Fire Risk Management

006

1.5.14

Risk Assessment and Management for

Maintenance/Surveillance Activities

044

Annunciator

Response

Procedure

4.800.C4

800.C4 Annunciator Panel Alarms

71111.13

Procedures

OI-41

Operations Work Control Expectations

073

5.44.20

Calculation of Allowable Leakage Past Doors on RB Pump

Rooms Elevation 422

001

Calculations

ME-02-02-02

Calculation for Reactor Building Flooding Analysis

001

71111.15

Corrective Action

Documents

Action Requests

27687, 438205, 436881, 323811, 422237, 409203

Corrective Action

Documents

Resulting from

Inspection

Action Requests

437600, 437632, 438708

Drawings

E504-1

Vital One Line Diagram

007

EC 16619

Engineering

Changes

EC 17325

Service Water Pump House Door B-DOOR-G200 with gear

box internal shear pins broken

000

BIP 19-0146

Barrier Impairment Permit for B-DOOR-G200

10/31/2022

BIP 21-0269

Barrier Impairment Process for B-DOOR-G200

06/06/2021

CVI 339-00,1,5

York Centrifugal Turbopak R-11, Installation, Operation and

Maintenance Instructions

001

Miscellaneous

TM-2150

Mission Time of Emergency Safety Features

2

8.4.81

SW System Performance with FPC HX Valved In

008

ABN-FLOODING

Flooding

2

ISP-FDR-X301

ECCS Pump Room Flood Level - Calibration

003

OSP-ELEC-W102

Electrical Distribution Subsystem Breaker Alignment and

Power Availability Verification

037

OSP-SW-M102

Standby Service Water Loop B Valve Position Verification

046, 051

Procedures

SPS-9-5

Fuji Ultrasonic Flowmeter Operation

001

20167155, 02187303, 02188838, 02085979, 02145627,

2085979, 02177755

71111.15

Work Orders

Work Requests

29167528

Corrective Action

Documents

Action Requests

437433, 437322, 437340, 439058

Drawings

M521-1

Flow Diagram - Residual Heat Removal System Loop A

119

10.2.10

Fastener Torque and Tensioning

030

MSP-WMA-B101

Control Room Div A Emergency Filtration System HEPA Filter

Test

010

MSP-WMA-B103

Control Room Div A Filtration System - Carbon Adsorber Test

014

OSP-FLEX-Q704

Diesel Generator 4 Quarterly Surveillance

2

Procedures

OSP-RCIC-M101

RCIC Fill, Flow Controllers, and Valve Lineup Verification

019

71111.19

Work Orders

2167220, 02178890

Corrective Action

Documents

Action Requests

307452, 321177, 035374, 438611, 438649, 439867, 439868

EWD-9E-004B

Electrical Wiring Diagram RHR System, Pump RHR-P-2B

Breaker RHR-CB-P2B

003

Drawings

EWD-9E-097

Electrical Wiring Diagram Residual Heat Removal System

Miscellaneous Relay Circuits (Div 2)

013

Engineering

Evaluations

TE 12862

Technical Evaluation of Secondary Containment Loss of

Safety Function

03/06/2014

E/I-02-91-1076

Setting Range Determination For RHR-RLY-K70A(B)

003

ESP-RHR-Q902

RHR Pump B Time Delay (LPCI Mode) - CFT/CC

014

IST-4

Inservice Testing Program Plan, Fourth Ten-Year Inspection

Interval

6.0

Procedures

OSP-ELEC-M702

Diesel Generator 2 - Monthly Operability Test

71111.22

Work Orders

Work Request 29168454

Corrective Action

Documents

Action Requests

(ARs)

2865, 415391, 416842, 416863, 420927, 424824, 432417,

434636, 434926, 434964, 435001, 435004, 435460, 435759,

435785, 435858, 436644, 426115, 427035, 427770, 427887,

430259, 432157, 433111, 433278, 434040, 412056, 420879,

23847, 424448, 424705, 425035, 438082, 438358, 438359

Corrective Action

Documents

Resulting from

Inspection

Action Requests

438193

Columbia Generating Station, ERO Team A ERO Drill, Dress

Rehearsal, September 13, 2022, After Action

Report/Improvement Plan

000

Columbia Generating Station ERO Team A Drill Report,

October 27, 2020 - After Action Report/Improvement Plan

000

Columbia Generating Station ERO Team D Dress Rehearsal

Drill Report, February 25, 2020 - After Action

Report/Improvement Plan

03/19/2020

71114.01

Miscellaneous

Columbia Generating Station ERO Team B Drill Report, April

6, 2021 - After Action Report/Improvement Plan

04/29/2021

Columbia Generating Station ERO Team D Dress Rehearsal

Drill Report, August 31, 2021 - After Action

Report/Improvement Plan

10/7/2021

Columbia Generating Station ERO Team D Exercise Report,

October 26, 2021 - After Action Report/Improvement Plan

2/6/2021

Columbia Generating Station ERO EDMG Demonstration

Exercise Report, November 30, 2021 - After Action

Report/Improvement Plan

000

Columbia Generating Station ERO Team A Drill Report,

February 22, 2022 - After Action Report/Improvement Plan

000

Columbia Generating Station ERO Team C Drill Report,

June 21, 2022 - After Action Report/Improvement Plan

000

Columbia Generating Station ERO Team A Dress Rehearsal

Drill Report, September 13, 2022 - After Action

Report/Improvement Plan

000

Form 26522

Operations Support Center (OSC) Manager Checklist

005

Form 26523

OSC Repair Team Coordinator Checklist

004

Form 26525

OSC Health Physics Lead Checklist

008

Form 26526

OSC HP Technician Checklist

005

Form 26527

OSC Chemistry Technician Checklist

001

Miscellaneous

Form 26528

OSC Craft Lead Checklist

004

13.1.1A

Classifying the Emergency - Technical Bases

034 (Minor

2)

13.10.9

Operations Support Center Manager and Staff Duties

050

13.11.7

Radiological Emergency Manager Duties

037 (Minor

004)

13.14.11

EP Equipment

014 (Minor

001)

13.14.8

Drill and Exercise Program

018 (Minor

2)

13.2.2

Determining Protective Action Recommendations

20 (Minor

2)

13.4.1

Emergency Notifications

044 (Minor

001)

13.8.1

Emergency Dose Projection System Operations

040

71114.01

Procedures

EPI-21

Drill and Exercise Development and Implementation

019

71151

Corrective Action

Documents

Resulting from

Inspection

Action Requests

438201

Consolidated Data Entry (CDE) Desktop Guide

ANS Test Report Data 2021Q4 - 2022Q3

Key ERO Member Drill Participation Data 2021Q4 - 2022Q3

DEP PI Data 2021Q4 - 2022Q3

CGS ANS Design

Report

Alert and Notification System (ANS) Design Report

2

Miscellaneous

NEI 99-02

Regulatory Assessment Performance Indicator Guideline

007

13.14.4

Emergency Equipment Maintenance and Testing

054 (Minor

005)

CI-10.17

Iodine

014

CSP-I131-W101

Reactor Coolant Isotopic Analysis for I-131 Dose Equivalent

009

EPI-18

Emergency Preparedness Performance Indicators

27 (Minor

N/A)

TSI-6.2.22

EP Annual Emergency Response Siren System Activation

Test

004 (Minor

2)

71151

Procedures

TSI-6.2.32

EP Siren Polling Test

003 (Minor

2)

Action Requests

2145

Corrective Action

Documents

Action Requests

(ARs)

430745, 435013, 424814, 435320, 435050, 420746, 433451,

433450, 433448, 419954

Operations Logs

10/24/2022

BI 22-0192

Barrier Impairment Permit

Miscellaneous

Root Cause

Evaluation

RRC-P-1A Manually Tripped Following Restart on ASD 1A/2

Channel

08/16/2022

SOP-HVAC-ASD

Startup ASD Building Ventilation System Startup

000

1.3.57

Barrier Impairment

046

1.3.83

Protected Equipment Program

037

71152A

Procedures

10.25.103

ASD Cooling System Cartridge Filter Replacement

003, 004,

005

10.25.66

Reactor Recirc Inverter, RRC-IN-ASD/1A (1B), Battery

Replacement

000

10.25.68

RRC Induction Motor Drive Software Settings and Self-Test

001

71152A

Procedures

SOP-ELEC-ASD-

SHUTDOWN

Adjustable Speed Drive UPS System Shutdown

003

SOP-RRC-ASD

Reactor Recirculation ASD Operation

018, 019

Procedures

SOP-RRC-

START

Reactor Recirculation System Start

21

2194321

71152A

Work Orders

Work Requests

29165556

GBP-CAP-03

Trending Program

2

71152S

Procedures

TM-01

Trending Manual

004