MONTHYEARIR 05000397/20240032024-11-12012 November 2024 Integrated Inspection Report 05000397/2024003 ML24298A2092024-11-0606 November 2024 – Alternative Requests 5IST-01 (RP01), 5IST-02 (RP02), and 5IST-03 (RP03) – Fifth Interval Inservice Testing Program ML24234A0292024-11-0505 November 2024 Environmental Assessment and Finding of No Significant Impact Related to License Amendment Request to Revise Emergency Plan (EPID L-2024-LLA-0011) - Letter GO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations GO2-24-100, Response to Request for Additional Information Regarding Request for Fourth Ten-Year Interval Inservice Testing2024-11-0404 November 2024 Response to Request for Additional Information Regarding Request for Fourth Ten-Year Interval Inservice Testing ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information 2024-09-24
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24296B1852024-10-16016 October 2024 NRR E-mail Capture - Final - Request for Additional Information - Columbia - Relief Request for Fourth Ten-Year Interval Inservice Testing - EPID: L-2024-LLR-0039 ML24215A3672024-08-0101 August 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station - License Amendment Request to Revise Emergency Plan - EPID L-2024-LLA-0011 ML24169A0402024-06-14014 June 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station (Columbia) - Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs (L-2024-LLR-007 Through 0013) ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22242A1082022-08-30030 August 2022 Information Request, Information Request, Security IR 2022404 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information IR 05000397/20224012022-06-0606 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000397/2022401 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22041A4572022-02-10010 February 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000397/2022010) and Request for Information ML21277A3572021-10-12012 October 2021 CGS Brq RFI Letter, Columbia Generating Station - Notification of Inspection (NRC Inspection Report 05000397/2021004) and Request for Information ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20112F4572020-04-21021 April 2020 NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 ML20034E6082020-02-0303 February 2020 NRR E-mail Capture - RAI Formal Release Columbia TSTF 563 LAR, 30 Day Response Period Due March 3, 2020 ML20028E1512020-01-27027 January 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000397/2020002) and Request for Information IR 05000397/20200102020-01-14014 January 2020 Information Request to Support Upcoming Temporary Instruction 2515/193 Inspection at Columbia Generating Station (Inspection Report 05000397/2020010) ML19267A1842019-09-24024 September 2019 Request for Information for Upcoming Open Phase Condition Inspection at Columbia Generating Station ML19232A2282019-08-20020 August 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia Exigent Amendment - One Electrical RAI, ML19183A4752019-07-0202 July 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia HVAC LAR L-2019-LLA-0034 ML18088A0152018-03-29029 March 2018 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000397/2018010) and Request for ML17341B0272017-12-0707 December 2017 NRR E-mail Capture - RAI Associated with Columbia Amendment Request Revise Tech Spec 5.5.12 for Permanent Extension of Type a and Type C Containment Testing Frequencies for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR - New RAI Response Da ML17292A0572017-10-18018 October 2017 NRR E-mail Capture - New RWCU RAI Due Date Now November 24, 2017 ML17249A6882017-09-0606 September 2017 NRR E-mail Capture - RAIs for Columbia Relief Request RAI (MF8925), 3ISI-19 ML17205A3152017-07-20020 July 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000397/2017004) and Request for Information ML17193A2192017-07-12012 July 2017 NRR E-mail Capture - Columbia RWCU LAR MF8318, Formal Release of RAIs ML17144A1702017-05-24024 May 2017 NRR E-mail Capture - NRC RAIs for Columbia Relief Request MF8922, 3ISI-16 ML17047A7492017-02-16016 February 2017 Response to Request for Additional Information, Columbia Mur LAR Evib Rais ML17006A0902017-01-0404 January 2017 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML17006A0922017-01-0404 January 2017 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML16356A1382016-12-21021 December 2016 NRR E-mail Capture - Columbia Mur LAR Evib RAIs Non - Proprietary Version - Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate ML16342C4322016-12-0707 December 2016 NRR E-mail Capture - Columbia Measurement Uncertainty Recapture Power Uprate LAR Rais: Human Performance: MF8060, Formal Release for Response on Monday January 9, 2017 ML16327A1842016-11-22022 November 2016 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML16323A1192016-11-16016 November 2016 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML16218A3902016-08-0808 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Request for Measurement Uncertainty Recapture (Mur) Power Uprate (from 3486 Mwt to 3544 Mwt) ML16194A3702016-07-11011 July 2016 Notification of NRC Triennial Heat Sink Performance Inspection 05000397/2016003 and Request for Information ML16069A3592016-03-0909 March 2016 NRR E-mail Capture - Second Round Rais: Columbia MF6042 LAR TSTF-425 ML16061A5542016-03-0101 March 2016 Notification of NRC Design Bases Inspection (05000397/2016007) and Initial Request for Information ML16061A5662016-03-0101 March 2016 Notification of Design Bases Inspection (Programs)(Inspection Report 05000397/2016008) and Initial Request for Information 2024-08-01
[Table view] |
Text
June 6, 2022
SUBJECT:
COLUMBIA GENERATING STATION - INFORMATION REQUEST FOR THE CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000397/2022401
Dear Mr. Robert Schuetz,
On October 3, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0 at your Columbia Generating Station. The inspection will be performed to evaluate and verify your ability to meet the requirements of the NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54, Protection of Digital Computer and Communication Systems and Networks. The onsite portion of the inspection will take place during the week of October 3, 2022.
Experience has shown that baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., sample set) to be inspected by the cyber-security inspection procedure. This information should be made available via electronic means (e.g., compact disc or other electronic means) and delivered to the regional office no later than July 11, 2022. The inspection team will review this information and, by August 8, 2022, will request the specific items that should be provided for review.
The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of your cyber security program selected for the cyber-security inspection. This information will be requested for review in the regional office prior to the inspection by September 5, 2022. The third group of requested documents consists of those items that the inspection team will review, or need access to, during the inspection. Please have this information available by the first day of the onsite inspection, October 3, 2022.
The fourth group of information is necessary to aid the inspection team in tracking issues identified during the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that these documents are up to date and complete to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Greg Pick. We understand that our regulatory contact for this inspection is Dan Cook of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at 817-504-2105 or via e-mail at greg.pick@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Greg Pick, Senior Reactor Inspector Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 50-397 License Nos. NPF-21 Enclosure:
Columbia Generating Station Cyber-Security Inspection Document Request Distribution via Listserv Signed by Pick, Gregory on 06/06/22
Enclosure Inspection Report:
05000397/2022401 Inspection Dates:
October 3 - 8, 2022 Inspection Procedure:
IP 71130.10, Cyber-Security, Revision 0 Reference:
ML21330A088, Guidance Document for Development of the Request for Information (RFI) and Notification Letter for Full-Implementation of the Cyber-Security Inspection, Revision 1 NRC Inspectors:
Greg Pick, (Lead)
Marcus Chisolm 817-504-2105 817-200-1426 greg.pick@nrc.gov marcus.chisolm@nrc.gov Nnaerika Okonkwo 817-200-1114 nnaerika.okonkwo@nrc.gov NRC Contractors:
Balla Barro Alan Konkal balla.barro@nrc.gov alan.konkal@nrc.gov I.
Information Requested for In-Office Preparation The initial request for information (Table RFI#1) provides the team with the general information necessary to select appropriate components and cyber security program elements to develop a site-specific inspection plan. The initial request for information is used to identify the list of critical systems and critical digital assets plus operational and management security control portions of the cyber security program to be chosen as the sample set to be inspected. Please provide the information listed in Table RFI#1 to the regional office by July 11, 2022, or sooner, to facilitate the selection of the specific items that will be reviewed.
The team will examine the returned documentation from the initial request for information and select specific critical systems and critical digital assets to provide for a more deliberate, focused second request for information. The team will submit the second request by August 8, 2022, which will identify the critical systems and critical digital assets that will be utilized to evaluate the defensive architecture and the areas of your cyber security program selected for the inspection. We request that the information for the second request be made available for review by September 5, 2022.
All requests for information shall follow the referenced guidance document ADAMS Accession No. ML21330A088. The preferred file format for all lists is a searchable Excel spreadsheet file. The information should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
Table RFI#1 Section 3, Paragraph Number/Title:
IP Ref
A list of all Identified Critical Systems and Critical Digital Assets,-
highlight/note any. additions, deletions, reclassifications due to new guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last cyber security inspection.
Overall
A list of EP and Security onsite and offsite digital communication systems Overall
Network Topology Diagrams to include information and data flow for critical systems in levels 2, 3 and 4 (If available)
Overall
Ongoing Monitoring and Assessment program documentation 03.01(a)
The most recent effectiveness analysis of the Cyber Security Program 03.01(b)
Vulnerability screening/assessment and scan program documentation 03.01(c)
Cyber Security Incident response documentation, including incident detection, response, and recovery documentation as well as contingency plan development, implementation and including any program documentation that requires testing of security boundary device functionality 03.02(a)
and 03.04(b)
Device Access and Key Control documentation 03.02(c)
Password/Authenticator documentation 03.02(c)
0 User Account/Credential documentation 03.02(d)
1 Portable Media and Mobile Device control documentation, including kiosk security control assessment/documentation 03.02(e)
2 Design change/ modification program documentation and a List of all design changes completed since the last cyber security inspection, including either a summary of the design change or the 50.59 documentation for the change.
03.03(a)
3 Supply Chain Management documentation including any security impact analysis for new acquisitions 03.03(a),
(b) and (c)
4 Configuration Management documentation including any security impact analysis performed due to configuration changes since the last inspection 03.03(a)
and (b)
5 Cyber Security Plan and any 50.54(p) analysis to support changes to the plan since the last inspection 03.04(a)
Table RFI#1 Section 3, Paragraph Number/Title:
IP Ref
6 Cyber Security Metrics tracked (if applicable)
03.06 (b)
7 Provide documentation describing any cyber security changes to the access authorization program since the last cyber security inspection.
Overall
8 Provide a list of all procedures and policies provided to the NRC with their descriptive name and associated number (if available)
Overall
9 Performance testing report (if applicable)
03.06 (a)
In addition to the above information please provide the following:
(1) Electronic copy of the UFSAR and technical specifications (2) Name(s) and phone numbers for the regulatory and technical contacts (3) Current management and engineering organizational charts II.
Additional Information Requested to be Available Prior to Inspection As stated in Section I above, the team will examine the documentation requested from Table RFI#1 and submit the list of critical systems and critical digital assets to your staff by August 8, 2022 (i.e., RFI#2). The additional information requested for the specific systems and equipment is identified in Table RFI#2. Please provide the Table RFI#2 information to the lead inspector by September 5, 2022. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
Table RFI#2 Section 3, Paragraph Number/Title:
Items For the system(s) chosen for inspection provide:
Ongoing Monitoring and Assessment activity performed on the system(s)
03.01(a)
All Security Control Assessments for the selected system(s)
03.01(a)
All vulnerability screenings/assessments associated with, or scans performed on the selected system(s) since the last cyber security inspection 03.01(c)
Documentation (including configuration files and rules sets) for Network-based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based Intrusion Detection Systems (HIDS), and Security Information and Event Management (SIEM) systems for system(s) chosen for inspection)
03.02(b)
Table RFI#2 Section 3, Paragraph Number/Title:
Items
Documentation (including configuration files and rule sets) for intra-security level firewalls and boundary devices used to protect the selected system(s)
03.02(c)
Copies of all periodic reviews of the access authorization list for the selected systems since the last inspection 03.02(d)
Baseline configuration data sheets for the selected CDAs 03.03(a)
Documentation on any changes, including Security Impact Analyses, performed on the selected system(s) since the last inspection 03.03(b)
Copies of the purchase order documentation for any new equipment purchased for the selected systems since the last inspection 03.03(c)
0 Copies of any reports/assessment for cyber security drills performed since the last inspection.
03.02(a)
03.04(b)
1 Copy of the individual recovery plan(s) for the selected system(s) including documentation of the results the last time the backups were executed.
03.02(a)
03.04(b)
2 Corrective actions taken as a result of cyber security incidents/issues to include previous NRC violations and Licensee Identified Violations since the last cyber security inspection 03.04(d)
III.
Information Requested to be Available on First Day of Inspection For the critical systems and critical digital assets identified in Section II, provide the following request for information (i.e., Table 1ST Week Onsite) to the team by October 3, 2022, the first day of the inspection.
Table 1ST Week Onsite Section 3, Paragraph Number/Title:
Items
Any cyber security event reports submitted in accordance with 10 CFR 73.77 since the last cyber security inspection 03.04(a)
Updated Copies of corrective actions taken as a result of cyber security incidents/issues, to include previous NRC violations and Licensee Identified Violations since the last cyber security inspection, as well as vulnerability-related corrective actions 03.04(d)
In addition to the above information please provide the following:
(1) Copies of the following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.
a.
Updated Final Safety Analysis Report (if not previously provided)
b.
Original FSAR Volumes c.
Original SER and Supplements d.
FSAR Question and Answers e.
Quality Assurance Plan f.
Technical Specifications (if not previously provided)
g.
Latest IPE/PRA Report (2) Vendor Manuals, Assessment and Corrective Actions:
a.
The most recent Cyber-Security Quality Assurance (QA) audit and/or self-assessment b.
Corrective action documents (e.g., condition reports, including status of corrective actions) generate because of the most recent Cyber-Security Quality Assurance (QA) audit and/or self-assessment IV.
Information Requested To Be Provided Throughout the Inspection (1) Copies of any corrective action documents generated because of the inspection teams questions or queries during the inspection (2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member)
If you have any questions regarding the information requested, please contact the inspection team leader.