September 11, 2023

SUBJECT:

COLUMBIA GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000397/2023401

Dear Grover Hettel:

On August 31, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Columbia Generating Station and discussed the results of this inspection with Dave Brown, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000397 License No. NPF-21

Enclosure:

As stated

Inspection Report

Docket Number:

05000397

License Number:

NPF-21

Report Number:

05000397/2023401

Enterprise Identifier:

I-2023-401-0009

Licensee:

Energy Northwest

Facility:

Columbia Generating Station

Location:

Richland, WA

Inspection Dates:

August 28, 2023 to August 31, 2023

Inspectors:

T. Weir, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Columbia Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

elements: Fitness For Duty Program

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: 6 Requirements (02.10, 02.11, 02.12, 02.13a, 02.14a, 02.14c)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On August 31, 2023, the inspectors presented the security baseline inspection results to Dave Brown, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.08

Corrective Action

Documents

27275, 427310,

27311, 428902,

2401, 434203,

436464, 441407,

2386, 444388,

447511, 448156

71130.08

Corrective Action

Documents

Resulting from

Inspection

450035, 450085,

450033, 450017,

450086, 450095,

450096

71130.08

Miscellaneous

Physical Security Plan

Rev. 21

71130.08

Miscellaneous

Alco-Sensor VXL Breath Alcohol Tester Brochure -

Workplace

71130.08

Procedures

GBP-HR-15

Employee Assistance Program (EAP)

Rev. 0

71130.08

Procedures

PSM-4.6

Fitness for Duty Policy

Rev. 6

71130.08

Procedures

SWP-FFD-

Processing and Suitable Inquiry Results

Rev. 0

71130.08

Procedures

SWP-FFD-01

Fitness for Duty Program Requirements

Rev. 23

71130.08

Procedures

SWP-FFD-02

Behavior Observation Program

Rev. 7

71130.08

Procedures

SWP-FFD-03

Fatigue Management

Rev. 5

71130.08

Procedures

SWP-FFD-04

Work Hour Controls

Rev.10

71130.08

Procedures

SWP-FFD-05

Medical Review Officer (MRO) and Substance Abuse Expert

Rev. 1

71130.08

Procedures

SWP-FFD-06

Drug Chemical Testing and Processing

Rev. 0

71130.08

Procedures

SWP-FFD-09

Fitness for Duty Electronic Information Exchange

Rev. 0

71130.08

Procedures

SWP-SEC-07

Nuclear Power Plant Access Authorization Program

Rev. 23

71130.08

Self-Assessments

22-02994

Talen Energy Supplier Audit Report

04/13/2022

71130.08

Self-Assessments

23-0018

Xcel Energy Audit Report/Medtox Laboratory Inc.

05/04/2023

71130.08

Self-Assessments

AR-412829412829Fitness for Duty Snapshot Self-Assessment

08/03/2023

71130.08

Self-Assessments

AU-AA-FFD-

PADS-MRO-SAE-

Audit Report

08/07/2023