MONTHYEARIR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 IR 05000397/20230122023-11-20020 November 2023 Commercial Grade Dedication Inspection Report 05000397/2023012 IR 05000397/20230102023-11-0909 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 IR 05000397/20230932023-11-0101 November 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 ML23299A2072023-10-26026 October 2023 Biennial Requalification Inspection Request for Information IR 05000397/20230032023-10-25025 October 2023 Integrated Inspection Report 05000397/2023003 IR 05000397/20230112023-10-0404 October 2023 License Renewal Phase 2 Report 05000397/2023011 IR 05000397/20234012023-09-11011 September 2023 Security Baseline Inspection Report 05000397/2023401 IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20230022023-08-0101 August 2023 Integrated Inspection Report 05000397/2023002 IR 05000397/20230922023-06-0101 June 2023 NRC Inspection Report 05000397/2023092 and Preliminary White Finding IR 05000397/20230902023-06-0101 June 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023090 IR 05000397/20230012023-05-0505 May 2023 Integrated Inspection Report 05000397/2023001 - April 26, 2023 IR 05000397/20233012023-05-0101 May 2023 NRC Examination Report 05000397/2023301 IR 05000397/20220062023-03-0101 March 2023 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2022006) IR 05000397/20234022023-02-23023 February 2023 NRC Security Baseline Inspection Report 050003972023402 (Full Report) IR 05000397/20220042023-01-23023 January 2023 Integrated Inspection Report 05000397/2022004- 4th Quarter IR 05000397/20224062023-01-18018 January 2023 NRC Security Baseline Inspection Report 05000397/2022406 (Cover Letter) IR 05000397/20224042023-01-17017 January 2023 Amended - Columbia Generating Station - Security Baseline Inspection Report 05000397/2022404 (Public) IR 05000397/20224012022-11-12012 November 2022 Cyber Security Inspection Report 05000397/2022401 (Cover Letter Only) IR 05000397/20220032022-10-31031 October 2022 Integrated Inspection Report 05000397/2022003 IR 05000397/20224052022-09-15015 September 2022 Material Control and Accounting Program Inspection Report 05000397 2022405 Cover Ltr Only IR 05000397/20224032022-09-0101 September 2022 NRC Security Inspection Report 05000397/2022403 (Full Report) IR 05000397/20220022022-07-28028 July 2022 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000397/2022002 and 07200035/2022001 IR 05000397/20220102022-06-30030 June 2022 Design Basis Assurance Inspection (Team) Inspection Report 05000397/2022010 IR 05000397/20224022022-06-23023 June 2022 Security Baseline Inspection Report 05000397/2022402 IR 05000397/20220012022-04-29029 April 2022 Integrated Inspection Report 05000397/2022001 IR 05000397/20210062022-03-0202 March 2022 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2021006) IR 05000397/20210042022-01-20020 January 2022 Integrated Inspection Report 05000397/2021004 IR 05000397/20214012022-01-19019 January 2022 Security Baseline Inspection Report 05000397/2021401 IR 05000397/20210902022-01-13013 January 2022 NRC Inspection Report 05000397/2021090 and Preliminary White Finding IR 05000397/20214202021-11-0404 November 2021 Security Baseline Inspection Report-Cover Letter - 05000397/2021420 IR 05000397/20210122021-11-0303 November 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000397/2021012 IR 05000397/20210032021-11-0202 November 2021 Integrated Inspection Report 05000397/2021003 IR 05000397/20210112021-09-21021 September 2021 Triennial Fire Protection Inspection Report 05000397/2021011 IR 05000397/20214022021-09-0909 September 2021 Security Baseline Inspection Report 05000397/2021402 IR 05000397/20210102021-08-29029 August 2021 Biennial Problem Identification and Resolution Inspection Report 05000397/2021010 IR 05000397/20210022021-08-0202 August 2021 Integrated Inspection Report 05000397/2021002 IR 05000397/20210132021-07-20020 July 2021 NRC Post - Approval Site Inspection for License Renewal (Phase I) Inspection Report 05000397/2021013 ML21141A1752021-05-24024 May 2021 Notification of NRC Design Bases Assurance Inspection (Programs) (05000397/2021012) and Initial Request for Information IR 05000397/20210012021-05-0707 May 2021 CGS2021001-IR-NH, Columbia Generating Station - Integrated Inspection Report 05000397/2021001 IR 05000397/20213012021-04-21021 April 2021 NRC Exam Report 05000397/2021301 IR 07200035/20214012021-03-25025 March 2021 Independent Spent Fuel Storage Installation Nrc Security Inspection Report 07200035/2021401 IR 05000397/20200062021-03-0303 March 2021 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2020006) IR 05000397/20200042021-02-0303 February 2021 Integrated Inspection Report 05000397/2020004 IR 05000397/20200032020-12-21021 December 2020 Revised Integrated Inspection Report 05000397/2020003 ML20302A2312020-10-28028 October 2020 Integrated Inspection Report 05000397/2020003 IR 05000397/20204112020-09-28028 September 2020 Security Baseline Inspection Report 05000397/2020411 IR 05000397/20200052020-09-0101 September 2020 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2020005) IR 05000397/20200022020-07-29029 July 2020 Integrated Inspection Report 05000397/2020002 2024-01-29
[Table view] Category:Letter
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000397/20230122023-11-20020 November 2023 Commercial Grade Dedication Inspection Report 05000397/2023012 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000397/20230102023-11-0909 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 IR 05000397/20230932023-11-0101 November 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 ML23299A2072023-10-26026 October 2023 Biennial Requalification Inspection Request for Information IR 05000397/20230032023-10-25025 October 2023 Integrated Inspection Report 05000397/2023003 IR 05000397/20230112023-10-0404 October 2023 License Renewal Phase 2 Report 05000397/2023011 IR 05000397/20234012023-09-11011 September 2023 Security Baseline Inspection Report 05000397/2023401 GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) ML24032A2182023-09-0101 September 2023 Information Request, Security IR 2024401 GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20230022023-08-0101 August 2023 Integrated Inspection Report 05000397/2023002 GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 ML23206A2442023-07-25025 July 2023 Energy Northwest Columbia Generating Station, Response to Apparent Violation in NRC Inspection Report 05000397/2023092; EA-23-054 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance ML23163A2502023-06-12012 June 2023 Summary of Changes and Analysis for Revision 41 of Plant Procedures Manual 13.8.1 Emergency Dose Projection System Operations GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report ML23157A2702023-06-0101 June 2023 4-2022-011 -022 Letter - OI Closure to Licensee IR 05000397/20230922023-06-0101 June 2023 NRC Inspection Report 05000397/2023092 and Preliminary White Finding IR 05000397/20230902023-06-0101 June 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023090 GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report IR 05000397/20230012023-05-0505 May 2023 Integrated Inspection Report 05000397/2023001 - April 26, 2023 GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications IR 05000397/20233012023-05-0101 May 2023 NRC Examination Report 05000397/2023301 GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 2024-01-08
[Table view] |
Text
October 26, 2023 Robert Schuetz Chief Executive Officer Energy Northwest MD 1023 P.O. Box 968 Richland, WA 99352
SUBJECT:
COLUMBIA GENERATING STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000397/2023004) AND REQUEST FOR INFORMATION
Dear Robert Schuetz:
During the week of November 27, 2023, three inspectors from the Nuclear Regulatory Commissions (NRC) Region IV office will perform the baseline biennial requalification inspection at Columbia Generating Station, using NRC Inspection Procedure 71111.11B, Licensed Operator Requalification Program.
Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into three groups:
- The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared.
- The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site.
- The third group (Section C of this enclosure) identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site.
It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Kelly Robertson of your training organization. Our inspection dates are subject to change based on your updated schedule of examination activities.
R. Schuetz 2 If there are any questions about this inspection or the material requested, please contact the lead inspector Nicholas Hernandez, at (817) 200-1118 (nicholas.hernandez@nrc.gov).
PAPERWORK REDUCTION ACT STATEMENT This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0011). Send comments regarding this information collection to the Information Services Branch, Office of the Chief Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and Budget, Washington, DC 20503.
Public Protection Notification The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Signed by Hernandez, Nicholas on 10/26/23 Nicholas A. Hernandez, Operations Engineer Operations Branch Division of Reactor Safety Docket No. 50-397 License No. NPF-21
Enclosure:
Biennial Requalification Inspection Request for Information
ML23299A207 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: XXX Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DORS/OB OE:DORS/OB NAME HGepford NHernandez SIGNATURE /RA/ /RA/
DATE 10/26/23 10/26/23 Initial Request for Information Biennial Requalification Inspection Columbia Generating Station Inspection Report: 05000397/2023004 Inspection Dates: November 27, 2023 - December 1, 2023 Inspection Procedure: IP 71111.11B, Licensed Operator Requalification Program Lead Inspector: Nicholas Hernandez, Operations Engineer A. The following information is requested in order to support inspection preparation activities. These items are listed by section as they appear in the inspection module (i.e. 03.04a, 03.04b, etc.). Requested materials should be sent in an electronic format on CD/DVD in order to arrive at the Region IV office no later than November 16, 2023 OR uploaded to the NRCs secure Box application.
- CD/DVD to: US Nuclear Regulatory Commission, Region IV ATTN: Nicholas Hernandez 1600 E. Lamar Blvd Arlington, TX 76011 General Requests:
- List of licensed operators (SRO & RO) by crew (operating & staff)
- Training and Operations Department organization charts (with qualified LOR evaluators identified)
- Procedures that identify process for revising and maintaining LO continuing training program up to date
- List of outstanding LOR program changes
- List of plant events and industry operating experience incorporated into LOR program since last BRQ
- Audits and/or self-assessment reports addressing the licensed operator requalification training program
- Last 2 years of simulator review committee (or equivalent) meeting minutes
- Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes
- A summary report of all condition reports related to operator actions/errors in the control room Enclosure
- Any revised requalification training that was based on licensed operator performance issues 03.04a: Biennial Requalification Written Examinations
- The current and approved biennial written examination schedule
- The current requalification cycle written examination results for both SRO & RO that have already been administered up to the week prior to the inspection team arrival onsite.
- All written examinations that have been approved for administration up to and including the week before the inspection team is onsite. This will need to have adequate password protection or double envelope protection if mailed via regular mail per NUREG-1021.
- The current requalification cycle examination methodology (sample plan) 03.04b: Annual Requalification Operating Tests
- The schedule for the operating tests (JPMs & scenarios) to be given the week of November 27, 2023
- The operating tests (JPMs & scenarios) (password protected and provide separately via telephone at later date) to be given the week of November 27, 2023
- Current requalification cycle operating tests (SRO & RO) and results up to the week prior to the inspection team arrival onsite
- All 2022 NRC required annual operating tests
- Current requalification cycle operating test methodology (sample plan) 03.04c: Administration of an Annual Requalification Operating Test
- All procedures used to administer the annual operating test
- All procedures used to assess operator performance
- All procedures that describe conduct of simulator training
- All procedures used to test, operate, and maintain the simulator 03.04d: Requalification Examination Security
- Submit any tracking tools that you use as a means to prevent excessive overlap on the written examinations and also meet the intent of sampling all required topics on a periodic basis.
2
- Submit any tracking tools that you use as a means to prevent excessive overlap on the operating tests and also meet the intent of sampling all required malfunctions (including major events, instrument/component malfunctions, TS calls, etc.) on a periodic basis.
- All procedures that describe examination security, including procedures used to develop the examinations that include guidelines on overlap between examinations in current exam cycle tests and prior year examinations
- List of all condition reports since the last biennial requalification inspection related to examination security and overlap 03.04e: Remedial Training and Re-Examinations
- List of remedial training conducted or planned since last requalification exam (includes training provided to operators to enable passing requalification exam and training provided to correct generic or individual weaknesses observed during previous requalification exam cycle)
- Remediation plans (lesson plans, reference materials, and attendance documentation) 03.04f: Operator License Conditions
- All procedures and program documentation for maintaining active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators
- All procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since the last biennial inspection 03.04g: Control Room Simulator
- All simulator management and configuration procedures if not already provided
- Simulator discrepancy report summary list for all open discrepancy reports and summary list for those items closed between December 2, 2021
- Primary parameters tested in order to verify core physics parameters (such as moderator temperature coefficient, integral rod worth)). The applicable reference graphs from the plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and the acceptance criteria with results.
- All simulator modification packages that are on hold, delayed, or not completed in the last 2 years
- A list of simulator modification packages completed in the last two year window 3
B. The following information is requested in order to support the onsite inspection activities. Requested materials should be available to the inspection team, either electronically or hardcopy, upon site arrival on November 27, 2023.
03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written Exam and Annual Requalification Operating Tests Quality
- All operating tests (JPMs & scenarios) to be given in all subsequent weeks after onsite week, if available
- All results up to the day the team leaves the site 03.04f: Conformance with Operator License Conditions
- Access to licensed operators records (operating and staff crews)
- Access to licensed operators training attendance records
- Access to licensed operators medical records 03.04g: Control Room Simulator Performance
- Simulator discrepancies from November 29, 2021 - November 27, 2023. This should include all open and closed simulator discrepancy reports, including the documentation/justification for closure.
- Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available)
- Documentation that validates current models, including the thermal-hydraulics and neutronics models, to the actual plant
- All current model deficiencies, including FSAR vs Design differences in the simulator (any documentation on this)
- Summary list of modifications from November 29, 2021 - November 27, 2023
- Plant modifications (both hardware and software) completed on the simulator by due date from November 29, 2021 - November 27, 2023
- Simulator differences Lesson plan used in training (current to November 27, 2023)
- The complete book of all simulator annual performance test packages (usually in a single book but may be electronic or in single test packages), complete with all transient tests, steady state tests, and malfunction tests. This should also include the test procedures for each test, the acceptance criteria, and results. For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the ANSI standard requirements.
4
- All test packages used to verify core physics parameters (such as moderator temperature coefficient and integral rod worth). The applicable reference graphs from the plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and the acceptance criteria with results.
- All simulator tests, configuration management, and related documents available in the room for inspectors to review. This includes training needs analysis packages, simulator review committee meeting minutes, etc.
- Current copy of ANSI 3.5 standard you are committed to for simulator testing C. Columbia Generating Station is required to send the final results summary (see Table 1 below) and any remaining exams and operating tests that have not been reviewed to the regional office lead inspector for this inspection for final review and comparison against the Significance Determination Tools in order to communicate the exit results for the inspection.
TABLE 1: EXAMINATION RESULTS
- 1. Total number of licensed operators.
- 2. Number of licensed operators administered a requalification examination required by 10 CFR 55.59(a).
- 3. Number of individual licensed operators who failed any portion of a requalification examination (written, JPM, or individual simulator scenario failures).
- 4. Divide line 3 by line 2 to obtain the individual requalification examination failure rate. Line 3/Line 2. %
- 5. Number of crews administered simulator scenarios as part of a requalification examination required by 10 CFR 55.59(a).
- 6. Number of crews who performed unsatisfactorily on the simulator scenarios.
- 7. Divide line 6 by line 5 to obtain the crew simulator scenario failure rate. Line 6/Line 5. %
5