{{#Wiki_filter:Washington Public Power Supply System P.Q.Box 968 3000 George Washington Way Richland, Washington 99352 (509)372-5000 Docket No.50-397 October 22, 1982 G02-82-865 Mr.R.H.Engelken U.S.Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596  
{{#Wiki_filter:Washington Public Power Supply System P.Q. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 Docket No. 50-397 October 22, 1982 G02-82-865 Mr. R. H. Engelken U. S. Nuclear Regulatory Commission Region   V 1450 Maria Lane,   Suite 210 Walnut Creek,   California   94596


==Dear Mr.Engelken:==
==Dear Mr. Engelken:==


==Subject:==
==Subject:==
WNP-2 PLANT VERIFICATION REPORT Enclosed are two copies of the current WNP-2 Plant Verification Report for your information.
WNP-2 PLANT VERIFICATION REPORT Enclosed are two copies of the current WNP-2 Plant Verification Report for your information. This report will form the basis for our presenta-tion to NRC on November 10. The report has not substantially changed, si nce the draft we provided during our June 15, 1982, meeting in Walnut Creek.
This report will form the basis for our presenta-tion to NRC on November 10.The report has not substantially changed, si nce the draft we provided during our June 15, 1982, meeting in Walnut Creek.The revisions reflect comments by the independent outside technical audi tor, Technical Audit Associates, and clarifications which resulted from our working with the document over the past few months.Very truly yours, (8A R.B.Glasscock, Director Licensing and Assurance  
The revisions reflect comments by the independent outside technical audi tor, Technical Audit Associates, and clarifications which resulted from our working with the document over the past few months.
Very truly yours, (8A R. B. Glasscock, Director Licensing and Assurance


==Attachment:==
==Attachment:==


WNP-2 Plant Verification Report (2 cys)cc: HR Oenton 8210270016 821022 PDR ADOCK 05000397 ji A PDR  
WNP-2 Plant Verification Report (2 cys) cc:   HR Oenton 8210270016 821022 PDR ADOCK 05000397               ji A                 PDR
'4~1 t~lj P 1'r,j.}}
 
  '4 t ~
          ~1 lj P
1
'
r,j.}}

Revision as of 16:08, 29 October 2019

Forwards Revision 1 to Plant Verification Rept, Dtd Oct 1982
ML17276B698
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/22/1982
From: Glasscock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17276B697 List:
References
GO2-82-865, NUDOCS 8210270016
Download: ML17276B698 (2)


Text

Washington Public Power Supply System P.Q. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 Docket No. 50-397 October 22, 1982 G02-82-865 Mr. R. H. Engelken U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596

Dear Mr. Engelken:

Subject:

WNP-2 PLANT VERIFICATION REPORT Enclosed are two copies of the current WNP-2 Plant Verification Report for your information. This report will form the basis for our presenta-tion to NRC on November 10. The report has not substantially changed, si nce the draft we provided during our June 15, 1982, meeting in Walnut Creek.

The revisions reflect comments by the independent outside technical audi tor, Technical Audit Associates, and clarifications which resulted from our working with the document over the past few months.

Very truly yours, (8A R. B. Glasscock, Director Licensing and Assurance

Attachment:

WNP-2 Plant Verification Report (2 cys) cc: HR Oenton 8210270016 821022 PDR ADOCK 05000397 ji A PDR