GO2-82-865, Forwards Revision 1 to Plant Verification Rept, Dtd Oct 1982
| ML17276B698 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/22/1982 |
| From: | Glasscock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML17276B697 | List: |
| References | |
| GO2-82-865, NUDOCS 8210270016 | |
| Download: ML17276B698 (2) | |
Text
Washington Public Power Supply System P.Q. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 Docket No. 50-397 October 22, 1982 G02-82-865 Mr. R.
H. Engelken U. S. Nuclear Regulatory Commission Region V
1450 Maria Lane, Suite 210 Walnut Creek, California 94596
Dear Mr. Engelken:
Subject:
WNP-2 PLANT VERIFICATION REPORT Enclosed are two copies of the current WNP-2 Plant Verification Report for your information.
This report will form the basis for our presenta-tion to NRC on November 10.
The report has not substantially
- changed, si nce the draft we provided during our June 15, 1982, meeting in Walnut Creek.
The revisions reflect comments by the independent outside technical audi tor, Technical Audit Associates, and clarifications which resulted from our working with the document over the past few months.
Very truly yours, (8A R. B. Glasscock, Director Licensing and Assurance
Attachment:
WNP-2 Plant Verification Report (2 cys) cc:
HR Oenton 8210270016 821022 PDR ADOCK 05000397 ji A
'4
~1 t ~
lj P
1 r,j.