ML17277B318: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-jREGUlATORY
{{#Wiki_filter:j REGUlATORY      .. ORMATION   DISTRIBUTION SYS               i (RIDS)
..ORMATION DISTRIBUTION SYS i (RIDS)ACCESSION NBR 8403130227 DOC~DATE 8Q/03/09 NOTARI'ZED NO DOCKET FACIL:50 397 NPPSS Nuclear Projecti Unit 2~Hashington.
ACCESSION NBR 8403130227               DOC ~ DATE   8Q/03/09 NOTARI'ZED NO                       DOCKET FACIL:50 BYNAME397  NPPSS   Nuclear Projecti       Unit 2~ Hashington. Public Powe.             05000397 AUTH                   AUTHHOR   AFFILIATION SORENSEN>G,C,         Nashington Public Power Supply System
Public Powe.05000397 AUTH BYNAME AUTHHOR AFFILIATION SORENSEN>G,C, Nashington Public Power Supply System.RFCIP~NAME'ECIPIENT AFFILIATION DENTONiH,Re Office of Nuclear Reactor Regulationi Director SUBJECTS Forwards info re, shift, experienceiper DF Schnell 840301 ltr 8 SER (NURE4 0892).Licensed classroom training 8 exam conductedi DISTRIBUTION CODE M003S'GOf IES RECEIVED!LT'R~ENCL'SIZE~.TITLE!..Operators Requalification Program NOTES+REC IP IENT ID CODE/NAME NRA LB2-'BC INTERNAL;NRR LES QB R WET'.E 00 COPIES LTTR iFNCL j 1 1 1 1 1 RECIPIENT'D COOK/NAME AULUCKgRe NRR/DHFS/OLB 01 RGN5 COPIES LTTR.-ENCL 1"2 2'1 EXTERNAl: ACRS NRC-PDR NTIS 08 10 10 02 1 1 1 1 LPDR NSIC 03 05 1 1 1 1 , TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21  
      .RFCIP ~ NAME'ECIPIENT AFFILIATION DENTONiH,Re           Office of Nuclear Reactor Regulationi                     Director SUBJECTS     Forwards   info   re, shift, experienceiper               DF Schnell 840301 ltr 8 SER (NURE4     0892).Licensed classroom training 8 exam conductedi DISTRIBUTION CODE         M003S     'GOf IES RECEIVED! LT'R           ~   ENCL'SIZE       ~
~Q I N~~ki*
    .TITLE!.. Operators   Requalification       Program NOTES+
March 9, 1984 G02-84-127 Washington Public Power Supply System P.O.Box 968 3000 George Washington Way Richland, Washington 99352 (509)372-5000 8403130227 840309 PDR ADOCK 05000397 V PDR Docket No.50-397 Mr.H.R.Denton, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555
REC IP IENT           COPIES            RECIPIENT'D COPIES ID CODE/NAME           LTTR iFNCL                    COOK/NAME        LTTR .-ENCL NRA LB2-'BC                 j    1      AULUCKgRe                          1 INTERNAL;       NRR   LES     QB             1     1     NRR/DHFS/OLB 01                   "2     2' R  WET'.E        00        1    1      RGN5                                    1 EXTERNAl: ACRS                   08       10     10     LPDR                      03      1     1 NRC- PDR          02        1     1     NSIC                     05       1     1 NTIS                        1     1
, TOTAL NUMBER OF COPIES REQUIRED: LTTR                 21             ENCL   21


==Dear Mr.Denton:==
        ~ Q I N
  ~ ~
ki
* Washington Public Power Supply System P.O. Box 968  3000 George Washington Way Richland, Washington 99352    (509) 372-5000 March  9, 1984                                            8403130227 840309 PDR ADOCK 05000397 G02-84-127                                                V                      PDR Docket No. 50-397 Mr. H. R. Denton,    Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.      20555
 
==Dear Mr. Denton:==


==Subject:==
==Subject:==
NUCLEAR PLANT NO. 2 REQUEST FOR SHIFT EXPERIENCE INFORMATION


==References:==
==References:==
1}, Letter,    G02-83-1043, G. C. Sorensen  (SS) to A. Schwencer (NRC), "Safety Evaluation Report, NUREG-0892, Closure of License Condition 10, BWR Startup or Operating Experience", dated November      ll,  1983
: 2)  Letter,    G02-83-1134, G. C. Sorensen, (SS) to A. Schwencer (NRC), "Facility Staffing Survey", dated December 9, 1983
                        -3}  Letter, D. F. Schnell (Union Electric Co.) to Utility Group, "Request for Shift Experience Information", dated March 1, 1984 As  requested by Reference 3, the attached shift experience information is provided. Reference 3 also. requested information on the use of shift advisors. At present, only one of the six shifts utilize an advisor.
This use has been discussed at length with Messrs. R. Auluck and Mr.
A. Schwencer.
Additional information      on the use of advisors and      facility staff    experience was  provided in References      1 and,2.
Should you have"any questions,          please contact Mr. P. L. Powell, Manager, WNP-2  Licensing.
Very  truly yours, 6'cs'.
C. Sorensen, Ma ager Regulatory Programs PLP/tmh Attachments                                                                    plo~3 Auluck - NRC
                          '
cc:  R WS  Chin - BPA A  Schwencer  -  NRC DF  Schnell - Union Electric        Co.
H  Thompson  -  NRC AD  Toth -  NRC  Site


NUCLEAR PLANT NO.2 REQUEST FOR SHIFT EXPERIENCE INFORMATION 1}, Letter, G02-83-1043, G.C.Sorensen (SS)to A.Schwencer (NRC),"Safety Evaluation Report, NUREG-0892, Closure of License Condition 10, BWR Startup or Operating Experience", dated November ll, 1983 2)Letter, G02-83-1134, G.C.Sorensen, (SS)to A.Schwencer (NRC),"Facility Staffing Survey", dated December 9, 1983-3}Letter, D.F.Schnell (Union Electric Co.)to Utility Group,"Request for Shift Experience Information", dated March 1, 1984 As requested by Reference 3, the attached shift experience information is provided.Reference 3 also.requested information on the use of shift advisors.At present, only one of the six shifts utilize an advisor.This use has been discussed at length with Messrs.R.Auluck and Mr.A.Schwencer.
b I
Additional information on the use of advisors and facility staff experience was provided in References 1 and,2.Should you have"any questions, please contact Mr.P.L.Powell, Manager, WNP-2 Licensing.
II r
Very truly yours, 6'cs'.C.Sorensen, Ma ager Regulatory Programs PLP/tmh Attachments cc: R Auluck-NRC'WS Chin-BPA A Schwencer-NRC DF Schnell-Union Electric Co.H Thompson-NRC AD Toth-NRC Site plo~3 b II r I 4'1}}
        '1 4}}

Revision as of 15:37, 29 October 2019

Forwards Info Re Shift Experience,Per DF Schnell 840301 Ltr & SER (NUREG-0892).Licensed Classroom Training & Exam Conducted
ML17277B318
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/09/1984
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0892, RTR-NUREG-892 GO2-84-127, NUDOCS 8403130227
Download: ML17277B318 (4)


Text

j REGUlATORY .. ORMATION DISTRIBUTION SYS i (RIDS)

ACCESSION NBR 8403130227 DOC ~ DATE 8Q/03/09 NOTARI'ZED NO DOCKET FACIL:50 BYNAME397 NPPSS Nuclear Projecti Unit 2~ Hashington. Public Powe. 05000397 AUTH AUTHHOR AFFILIATION SORENSEN>G,C, Nashington Public Power Supply System

.RFCIP ~ NAME'ECIPIENT AFFILIATION DENTONiH,Re Office of Nuclear Reactor Regulationi Director SUBJECTS Forwards info re, shift, experienceiper DF Schnell 840301 ltr 8 SER (NURE4 0892).Licensed classroom training 8 exam conductedi DISTRIBUTION CODE M003S 'GOf IES RECEIVED! LT'R ~ ENCL'SIZE ~

.TITLE!.. Operators Requalification Program NOTES+

REC IP IENT COPIES RECIPIENT'D COPIES ID CODE/NAME LTTR iFNCL COOK/NAME LTTR .-ENCL NRA LB2-'BC j 1 AULUCKgRe 1 INTERNAL; NRR LES QB 1 1 NRR/DHFS/OLB 01 "2 2' R WET'.E 00 1 1 RGN5 1 EXTERNAl: ACRS 08 10 10 LPDR 03 1 1 NRC- PDR 02 1 1 NSIC 05 1 1 NTIS 1 1

, TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21

~ Q I N

~ ~

ki

  • Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 March 9, 1984 8403130227 840309 PDR ADOCK 05000397 G02-84-127 V PDR Docket No. 50-397 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

Subject:

NUCLEAR PLANT NO. 2 REQUEST FOR SHIFT EXPERIENCE INFORMATION

References:

1}, Letter, G02-83-1043, G. C. Sorensen (SS) to A. Schwencer (NRC), "Safety Evaluation Report, NUREG-0892, Closure of License Condition 10, BWR Startup or Operating Experience", dated November ll, 1983

2) Letter, G02-83-1134, G. C. Sorensen, (SS) to A. Schwencer (NRC), "Facility Staffing Survey", dated December 9, 1983

-3} Letter, D. F. Schnell (Union Electric Co.) to Utility Group, "Request for Shift Experience Information", dated March 1, 1984 As requested by Reference 3, the attached shift experience information is provided. Reference 3 also. requested information on the use of shift advisors. At present, only one of the six shifts utilize an advisor.

This use has been discussed at length with Messrs. R. Auluck and Mr.

A. Schwencer.

Additional information on the use of advisors and facility staff experience was provided in References 1 and,2.

Should you have"any questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing.

Very truly yours, 6'cs'.

C. Sorensen, Ma ager Regulatory Programs PLP/tmh Attachments plo~3 Auluck - NRC

'

cc: R WS Chin - BPA A Schwencer - NRC DF Schnell - Union Electric Co.

H Thompson - NRC AD Toth - NRC Site

b I

II r

'1 4