ML17277B318

From kanterella
Jump to navigation Jump to search

Forwards Info Re Shift Experience,Per DF Schnell 840301 Ltr & SER (NUREG-0892).Licensed Classroom Training & Exam Conducted
ML17277B318
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/09/1984
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0892, RTR-NUREG-892 GO2-84-127, NUDOCS 8403130227
Download: ML17277B318 (4)


Text

j REGUlATORY .. ORMATION DISTRIBUTION SYS i (RIDS)

ACCESSION NBR 8403130227 DOC ~ DATE 8Q/03/09 NOTARI'ZED NO DOCKET FACIL:50 BYNAME397 NPPSS Nuclear Projecti Unit 2~ Hashington. Public Powe. 05000397 AUTH AUTHHOR AFFILIATION SORENSEN>G,C, Nashington Public Power Supply System

.RFCIP ~ NAME'ECIPIENT AFFILIATION DENTONiH,Re Office of Nuclear Reactor Regulationi Director SUBJECTS Forwards info re, shift, experienceiper DF Schnell 840301 ltr 8 SER (NURE4 0892).Licensed classroom training 8 exam conductedi DISTRIBUTION CODE M003S 'GOf IES RECEIVED! LT'R ~ ENCL'SIZE ~

.TITLE!.. Operators Requalification Program NOTES+

REC IP IENT COPIES RECIPIENT'D COPIES ID CODE/NAME LTTR iFNCL COOK/NAME LTTR .-ENCL NRA LB2-'BC j 1 AULUCKgRe 1 INTERNAL; NRR LES QB 1 1 NRR/DHFS/OLB 01 "2 2' R WET'.E 00 1 1 RGN5 1 EXTERNAl: ACRS 08 10 10 LPDR 03 1 1 NRC- PDR 02 1 1 NSIC 05 1 1 NTIS 1 1

, TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21

~ Q I N

~ ~

ki

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 March 9, 1984 8403130227 840309 PDR ADOCK 05000397 G02-84-127 V PDR Docket No. 50-397 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

Subject:

NUCLEAR PLANT NO. 2 REQUEST FOR SHIFT EXPERIENCE INFORMATION

References:

1}, Letter, G02-83-1043, G. C. Sorensen (SS) to A. Schwencer (NRC), "Safety Evaluation Report, NUREG-0892, Closure of License Condition 10, BWR Startup or Operating Experience", dated November ll, 1983

2) Letter, G02-83-1134, G. C. Sorensen, (SS) to A. Schwencer (NRC), "Facility Staffing Survey", dated December 9, 1983

-3} Letter, D. F. Schnell (Union Electric Co.) to Utility Group, "Request for Shift Experience Information", dated March 1, 1984 As requested by Reference 3, the attached shift experience information is provided. Reference 3 also. requested information on the use of shift advisors. At present, only one of the six shifts utilize an advisor.

This use has been discussed at length with Messrs. R. Auluck and Mr.

A. Schwencer.

Additional information on the use of advisors and facility staff experience was provided in References 1 and,2.

Should you have"any questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing.

Very truly yours, 6'cs'.

C. Sorensen, Ma ager Regulatory Programs PLP/tmh Attachments plo~3 Auluck - NRC cc: R WS Chin - BPA A Schwencer - NRC DF Schnell - Union Electric Co.

H Thompson - NRC AD Toth - NRC Site

b I

II r

'1 4