{{#Wiki_filter:ACCELERATED
{{#Wiki_filter:ACCELERATED         OSI'IGHUTION                               DEMON%RATION           SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
OSI'IGHUTION
CCESSION NBR:8805120229                             DOC.DATE: 88/05/06   NOTARIZED: NO         DOCKET FACIL:50-397   WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME         AUTHOR Washington Public Power Supply System AFFILIATION'ORENSEN,G.C.
DEMON%RATION
RECIP.NAME         RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SYSTEM REGULATORY
 
INFORMATION
==SUBJECT:==
DISTRIBUTION
Responds to NRC 870128 50-397/86-25.
SYSTEM (RIDS)CCESSION NBR:8805120229
ltr re violations noted in Insp Rept DISTRIBUTION CODE: IEOID                 COPIES RECEIVED'LTR             I ENCL     SIZE:
DOC.DATE: 88/05/06 NOTARIZED:
TITLE: General (50 Dkt)-Insp Rept/Notice of                           Violation R sponse NOTES:
NO DOCKET FACIL:50-397
RECIPIENT                               COPIES          RECIPIENT        COPIES ID CODE/NAME                             LTTR ENCL    ID  CODE/NAME      LTTR ENCL PD5 PD INTERNAL: ACRS 1    1    SAMWORTH,R            2    2          /
WPPSS Nuclear Project, Unit 2, Washington
2    2    AEOD                  1    1          A DEDRO NRR/DLPQ/PEB NRR/DOEA DIR 11 ll                            1 1
Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION'ORENSEN,G.C.
1 1
Washington
1 1
Public Power Supply System RECIP.NAME
NRR MORISSEAUgD NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 1
RECIPIENT AFFILIATION
1 1
Document Control Branch (Document Control Desk)SUBJECT: Responds to NRC 870128 ltr re violations
1 1
noted in Insp Rept 50-397/86-25.
1 NRR/DREP/RPB 10                             2    2    NRR/DRIS DIR 9A       1    1 NRR/PMAS/ILRB12                              1    1    NUDOCS-ABSTRACT       1    1 OE  LIEBERMAN,J                              1    1    OGC 15-B-18         1    1 RggEXtH                                      1    1    RES/DRPS   DEPY       1   1 RGN5    FILE  01                            1     1 TERNAL: LPDR                                          1     1   NRC PDR NSIC                                        1     1 TOTAL NUMBER OF COPIES REQUIRED: LTTR                             25   ENCL   25
DISTRIBUTION
 
CODE: IEOID COPIES RECEIVED'LTR
Washington Public Power Supply System 3000George Washington Way P.O. Box968 Richland, Washington99352-0968 (509)372-5000 May 6, 1988 G02-88-111 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn:   Document Control Desk Washington, D.CD 20555 Gentlemen:
I ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
 
of Violation R sponse NOTES: RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS DEDRO NRR/DLPQ/PEB
==Subject:==
ll NRR/DOEA DIR 11 NRR/DREP/RPB
NUCLEAR PLANT NO. 2 LICENSE NO.'PF-21 NRC INSPECTION REPORT 86-25
10 NRR/PMAS/ILRB12
 
OE LIEBERMAN,J
==Reference:==
RggEXtH RGN5 FILE 01 TERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME SAMWORTH,R
Letter, G. C. Sorensen (SS) to J. B. Martin (NRC-RV),
AEOD NRR MORISSEAUgD
dated 1/28/87 In the referenced     letter, the Supply System committed to revise Plant Procedure   (PPM)   1.3. 10, "Fire Protection Program," in response to NRC Inspection Report Notice of Violation 86-25-15. The procedure was revised to strengthen the pr ocesses and better define the responsibilities associated with fire protection staff reviews of 1) design change packages,
NRR/DLPQ/QAB
: 2) welding and cutting activities, and 3) actual fires that occurred.
10 NRR/DREP/EPB
As a result of further review, the procedure is currently in the process of being revised to incorporate additional changes made to the Fire Protection Program since the time the referenced letter was sent to the NRC. Specific changes made to the original response to the Notice of Violation are as follows:
10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT
a) Review   of Welding and Cutting Activities
OGC 15-B-18 RES/DRPS DEPY NRC PDR COPIES LTTR ENCL 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1/ATOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25  
              ~ The   Industrial Safety and Fire Protection Group will be responsible for auditing Maintenance Work Requests (MWRs) in the field, on a random basis, to determine         if adequate preplanning for impairments, hazardous work, etc., has been included.
Washington
              ~ The   Plant Fire Marshal will be responsible for taking followup action to assure closeout of Transient Combustible Permits and Cutting-Welding-Grinding Permits         which     have   exceeded       the specified time limit.
Public Power Supply System 3000George
SS05i20229 S80506 PDR   ADQCK 05000397 9                   DCD
Washington
 
Way P.O.Box968 Richland, Washington99352-0968
Page Two NUCLEAR PLANT NO. 2 LICENSE NO. NPF-21 NRC INSPECTION REPORT 86-25 b) Investigation of Actual Fires
(509)372-5000
        ~ The   Shift Support Supervisor will             be res Plant Fire Marshal of fires e plosions or related incidents, ons'he unp anne   fire protection impairments.
May 6, 1988 G02-88-111
        ~ The   Plant Fire Marshal           will i          re bee responsible       for informing the a e y   and         Fire Protection Grou p of any      a   fires, explosions or related incidents.
Docket No.50-397 U.S.Nuclear Regulatory
It is antici p ated th at PPM 1.3. 10       will be   revised by   May 13,   1988.
Commission
Should   you   have   any questions         regardin     this M   P       Po   ll M             -2 L'ery truly yours, Ac.
Attn: Document Control Desk Washington, D.CD 20555 Gentlemen:
G. C. Sorensen, Manager Regulatory Programs lw cc: JB Mar tin,   HRC RV NS Reynolds   - BCP8R RB Samworth   - NRC DL Williams   - BPA/399 NRC Site   Inspector 901A}}
Subject: NUCLEAR PLANT NO.2 LICENSE NO.'PF-21 NRC INSPECTION
REPORT 86-25 Reference:
Letter, G.C.Sorensen (SS)to J.B.Martin (NRC-RV), dated 1/28/87 In the referenced
letter, the Supply System committed to revise Plant Procedure (PPM)1.3.10,"Fire Protection
Program," in response to NRC Inspection
Report Notice of Violation 86-25-15.The procedure was revised to strengthen
the pr ocesses and better define the responsibilities
associated
with fire protection
staff reviews of 1)design change packages, 2)welding and cutting activities, and 3)actual fires that occurred.As a result of further review, the procedure is currently in the process of being revised to incorporate
additional
changes made to the Fire Protection
Program since the time the referenced
letter was sent to the NRC.Specific changes made to the original response to the Notice of Violation are as follows: a)Review of Welding and Cutting Activities
~The Industrial
Safety and Fire Protection
Group will be responsible
for auditing Maintenance
Work Requests (MWRs)in the field, on a random basis, to determine if adequate preplanning
for impairments, hazardous work, etc., has been included.~The Plant Fire Marshal will be responsible
for taking followup action to assure closeout of Transient Combustible
Permits and Cutting-Welding-Grinding
Permits which have exceeded the specified time limit.SS05i20229
S80506 PDR ADQCK 05000397 9 DCD  
Page Two NUCLEAR PLANT NO.2 LICENSE NO.NPF-21 NRC INSPECTION
REPORT 86-25 b)Investigation
of Actual Fires~The Shift Support Supervisor
will be res ons'he Plant Fire Marshal of fires e plosions or related incidents, unp anne fire protection
impairments.
~The Plant Fire Marshal will be re i e responsible
for informing the explosions
or related incidents.
a e y and Fire Protection
Grou of a p any fires, It is antici ated th p at PPM 1.3.10 will be revised by May 13, 1988.Should you have any questions regardin this M P Po ll M-2 L'ery truly yours, Ac.G.C.Sorensen, Manager Regulatory
Programs lw cc: JB Mar tin, HRC RV NS Reynolds-BCP8R RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A
}}

Latest revision as of 15:02, 29 October 2019

Informs That Rev to Plant Procedure 1.3.10, Fire Protection Program, Committed to in 870128 Response to Insp Rept 50-397/86-25,currently in Process to Incorporate Listed Addl Changes.Procedure Will Be Revised by 880513
ML17279B026
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/06/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-88-111, TAC-63528, NUDOCS 8805120229
Download: ML17279B026 (3)


Text

ACCELERATED OSI'IGHUTION DEMON%RATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:8805120229 DOC.DATE: 88/05/06 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR Washington Public Power Supply System AFFILIATION'ORENSEN,G.C.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 870128 50-397/86-25.

ltr re violations noted in Insp Rept DISTRIBUTION CODE: IEOID COPIES RECEIVED'LTR I ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation R sponse NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD INTERNAL: ACRS 1 1 SAMWORTH,R 2 2 /

2 2 AEOD 1 1 A DEDRO NRR/DLPQ/PEB NRR/DOEA DIR 11 ll 1 1

1 1

1 1

NRR MORISSEAUgD NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 1

1 1

1 1

1 NRR/DREP/RPB 10 2 2 NRR/DRIS DIR 9A 1 1 NRR/PMAS/ILRB12 1 1 NUDOCS-ABSTRACT 1 1 OE LIEBERMAN,J 1 1 OGC 15-B-18 1 1 RggEXtH 1 1 RES/DRPS DEPY 1 1 RGN5 FILE 01 1 1 TERNAL: LPDR 1 1 NRC PDR NSIC 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25

Washington Public Power Supply System 3000George Washington Way P.O. Box968 Richland, Washington99352-0968 (509)372-5000 May 6, 1988 G02-88-111 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.CD 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 LICENSE NO.'PF-21 NRC INSPECTION REPORT 86-25

Reference:

Letter, G. C. Sorensen (SS) to J. B. Martin (NRC-RV),

dated 1/28/87 In the referenced letter, the Supply System committed to revise Plant Procedure (PPM) 1.3. 10, "Fire Protection Program," in response to NRC Inspection Report Notice of Violation 86-25-15. The procedure was revised to strengthen the pr ocesses and better define the responsibilities associated with fire protection staff reviews of 1) design change packages,

2) welding and cutting activities, and 3) actual fires that occurred.

As a result of further review, the procedure is currently in the process of being revised to incorporate additional changes made to the Fire Protection Program since the time the referenced letter was sent to the NRC. Specific changes made to the original response to the Notice of Violation are as follows:

a) Review of Welding and Cutting Activities

~ The Industrial Safety and Fire Protection Group will be responsible for auditing Maintenance Work Requests (MWRs) in the field, on a random basis, to determine if adequate preplanning for impairments, hazardous work, etc., has been included.

~ The Plant Fire Marshal will be responsible for taking followup action to assure closeout of Transient Combustible Permits and Cutting-Welding-Grinding Permits which have exceeded the specified time limit.

SS05i20229 S80506 PDR ADQCK 05000397 9 DCD

Page Two NUCLEAR PLANT NO. 2 LICENSE NO. NPF-21 NRC INSPECTION REPORT 86-25 b) Investigation of Actual Fires

~ The Shift Support Supervisor will be res Plant Fire Marshal of fires e plosions or related incidents, ons'he unp anne fire protection impairments.

~ The Plant Fire Marshal will i re bee responsible for informing the a e y and Fire Protection Grou p of any a fires, explosions or related incidents.

It is antici p ated th at PPM 1.3. 10 will be revised by May 13, 1988.

Should you have any questions regardin this M P Po ll M -2 L'ery truly yours, Ac.

G. C. Sorensen, Manager Regulatory Programs lw cc: JB Mar tin, HRC RV NS Reynolds - BCP8R RB Samworth - NRC DL Williams - BPA/399 NRC Site Inspector 901A