ML17284A557: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 10/13/1988
| issue date = 10/13/1988
| title = Responds to IE Bulletin 88-007, Power Oscillations in Bwrs. Confirms That Shift Technical Advisors Also Received Training
| title = Responds to IE Bulletin 88-007, Power Oscillations in Bwrs. Confirms That Shift Technical Advisors Also Received Training
| author name = SORENSEN G C
| author name = Sorensen G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:gC C<~RATED D/SVKBUTION DKMONSTRXT10N SYSTEM IW REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8810190243 DOC.DATE: 88/10/13 NOTARIZED-NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
{{#Wiki_filter:gC C<~RATED             D/SVKBUTION             DKMONSTRXT10N             SYSTEM IW REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)R  
ACCESSION NBR:8810190243           DOC.DATE: 88/10/13     NOTARIZED- NO         DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME           AUTHOR AFFILIATION SORENSEN,G.C.       Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)               R


==SUBJECT:==
==SUBJECT:==
Confirms that ROs&STAs briefed on LaSalle Unit 2 power oscillation event,per IE Bulletin 88-007.DISTRIBUTION CODE: IE11D COPIES RECEIVED:LTR L ENCL'5 SIZE: TITLE: Bulletin Response (50 DKT)NOTES: RECIPIENT ID CODE/NAME PD5 LA SAMWORTH, R I NTERNAL: AEOD/DOA AEOD/DS P/TPAB NRR/DEST/ADE 8H NRR/DEST/MEB 9H NRR/DOEA/GCB 11 N~/PMA'S/-I B1 2 EG FI 02 RGN FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DSP NRR ALEXION, T NRR/DEST/ADS 7E NRR/DOEA/EAB 11 NRR/DREP/EPB 10 NUDOCS-ABSTRACT RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 A.D NOTE TO ALL"RIDS" R1KIPIENTS:
Confirms that ROs & STAs briefed on LaSalle Unit 2 power oscillation event,per IE Bulletin 88-007.
PIZASE HELP US TO REDUCE WASTE!CGNTACl'HE DOCUMENT CD&#xc3;HKL DESK BDCM Pl-37 (EZZ.20079)KQ EIZMZNRZZ YOUR NAME FROM DISTEUBUTICjN LISTS&DR DOCGMEMIS YOU DClNPT NEED)TOTAL NUMBER.OF COPIES REQUIRED: LTTR 21 ENCL pd WASHINGTON PUBLIC POWER SUPPLY SYSTEM P:O.Box 968~3000 George Washington Way~Richland, Washington 99352 October 13, 1988 G02-88-216 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.20555  
DISTRIBUTION CODE: IE11D         COPIES RECEIVED:LTR     L ENCL   '5 SIZE:
TITLE: Bulletin   Response   (50 DKT)
NOTES:
RECIPIENT           COPIES            RECIPIENT          COPIES ID  CODE/NAME        LTTR ENCL        ID CODE/NAME       LTTR ENCL        A.
PD5 LA                                 PD5 PD SAMWORTH, R                                                                   D INTERNAL: AEOD/DOA                 1            AEOD/DSP              1 AEOD/DS P/TPAB           1            NRR  ALEXION,T        1 NRR/DEST/ADE 8H           1            NRR/DEST/ADS 7E        1 NRR/DEST/MEB 9H           1            NRR/DOEA/EAB 11        1 NRR/DOEA/GCB 11           1            NRR/DREP/EPB 10        1 N~/PMA'S/-I     B1 2     1            NUDOCS-ABSTRACT EG   FI         02       1            RES/DSIR/EIB          1 RGN       FILE   01      1 EXTERNAL: LPDR                                     NRC PDR NSIC NOTE TO   ALL "RIDS" R1KIPIENTS:
PIZASE HELP US TO REDUCE WASTE! CGNTACl'HE DOCUMENT CD&#xc3;HKL DESK BDCM Pl-37 (EZZ. 20079) KQ EIZMZNRZZ YOUR NAME FROM DISTEUBUTICjN LISTS &DR DOCGMEMIS YOU DClNPT NEED)
TOTAL NUMBER.OF COPIES REQUIRED: LTTR             21   ENCL pd
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P:O. Box 968 ~ 3000 George Washington Way   ~ Richland, Washington 99352 October 13, 1988 G02-88-216 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn:     Document Control Desk Mail Station Pl-137 Washington, D. C. 20555


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2.OPERATING LICENSE NPF-21 RESPONSE TO IEB 88-07, POWER OSCILLATIONS IN BOILING WATER REACTORS (BWRS)
NUCLEAR PLANT NO. 2   .
OPERATING LICENSE NPF-21 RESPONSE   TO IEB 88-07, POWER OSCILLATIONS IN BOILING   WATER REACTORS (BWRS)


==Reference:==
==Reference:==
 
Letter, G02-88-196,   GC Sorensen   to NRC, same subject, dated September 12, 1988 The   subject bulletin requested confirmation that licensed reactor operators and shift technical       advisors performing shift duties were briefed on the LaSalle Unit 2 power oscillation event within 15 days and received additional specified training within     60 days.
In our response (G02-88-196) we addressed licensed operators but not STAs.This letter is to confirm that the STAs also received this training.Very truly yours, Letter, G02-88-196, GC Sorensen to NRC, same subject, dated September 12, 1988 The subject bulletin requested confirmation that licensed reactor operators and shift technical advisors performing shift duties were briefed on the LaSalle Unit 2 power oscillation event within 15 days and received additional specified training within 60 days.G.C.Sorensen, Manager Regulatory
In our response      (G02-88-196)  we addressed    licensed    operators but not STAs. This letter is to confirm that      the  STAs also received    this training.
'Programs AGH:lw cc: JB Mar tin-NRC RV NR Reynolds-BCP&R RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A SSi0i90 43 SSi0i3 PDR ADOCK 05000397 0 PDC Y i(p}}
Very truly yours, G. C. Sorensen,   Manager Regulatory 'Programs AGH:lw cc:   JB Mar tin - NRC RV NR Reynolds   BCP&R RB Samworth   NRC DL Williams   BPA/399 NRC Site Inspector     901A Y i(p SSi0i90 43 SSi0i3 PDR   ADOCK   05000397 0                   PDC}}

Latest revision as of 14:54, 29 October 2019

Responds to IE Bulletin 88-007, Power Oscillations in Bwrs. Confirms That Shift Technical Advisors Also Received Training
ML17284A557
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/13/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-88-216, IEB-88-007, IEB-88-7, NUDOCS 8810190243
Download: ML17284A557 (2)


Text

gC C<~RATED D/SVKBUTION DKMONSTRXT10N SYSTEM IW REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8810190243 DOC.DATE: 88/10/13 NOTARIZED- NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) R

SUBJECT:

Confirms that ROs & STAs briefed on LaSalle Unit 2 power oscillation event,per IE Bulletin 88-007.

DISTRIBUTION CODE: IE11D COPIES RECEIVED:LTR L ENCL '5 SIZE:

TITLE: Bulletin Response (50 DKT)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A.

PD5 LA PD5 PD SAMWORTH, R D INTERNAL: AEOD/DOA 1 AEOD/DSP 1 AEOD/DS P/TPAB 1 NRR ALEXION,T 1 NRR/DEST/ADE 8H 1 NRR/DEST/ADS 7E 1 NRR/DEST/MEB 9H 1 NRR/DOEA/EAB 11 1 NRR/DOEA/GCB 11 1 NRR/DREP/EPB 10 1 N~/PMA'S/-I B1 2 1 NUDOCS-ABSTRACT EG FI 02 1 RES/DSIR/EIB 1 RGN FILE 01 1 EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" R1KIPIENTS:

PIZASE HELP US TO REDUCE WASTE! CGNTACl'HE DOCUMENT CDÃHKL DESK BDCM Pl-37 (EZZ. 20079) KQ EIZMZNRZZ YOUR NAME FROM DISTEUBUTICjN LISTS &DR DOCGMEMIS YOU DClNPT NEED)

TOTAL NUMBER.OF COPIES REQUIRED: LTTR 21 ENCL pd

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P:O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 October 13, 1988 G02-88-216 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D. C. 20555

Subject:

NUCLEAR PLANT NO. 2 .

OPERATING LICENSE NPF-21 RESPONSE TO IEB 88-07, POWER OSCILLATIONS IN BOILING WATER REACTORS (BWRS)

Reference:

Letter, G02-88-196, GC Sorensen to NRC, same subject, dated September 12, 1988 The subject bulletin requested confirmation that licensed reactor operators and shift technical advisors performing shift duties were briefed on the LaSalle Unit 2 power oscillation event within 15 days and received additional specified training within 60 days.

In our response (G02-88-196) we addressed licensed operators but not STAs. This letter is to confirm that the STAs also received this training.

Very truly yours, G. C. Sorensen, Manager Regulatory 'Programs AGH:lw cc: JB Mar tin - NRC RV NR Reynolds BCP&R RB Samworth NRC DL Williams BPA/399 NRC Site Inspector 901A Y i(p SSi0i90 43 SSi0i3 PDR ADOCK 05000397 0 PDC