Responds to IE Bulletin 88-007, Power Oscillations in Bwrs. Confirms That Shift Technical Advisors Also Received Training
ML17284A557
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/13/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-88-216, IEB-88-007, IEB-88-7, NUDOCS 8810190243
Download: ML17284A557 (2)


Text

gC C<~RATED D/SVKBUTION DKMONSTRXT10N SYSTEM IW REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8810190243 DOC.DATE: 88/10/13 NOTARIZED- NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) R

SUBJECT:

Confirms that ROs & STAs briefed on LaSalle Unit 2 power oscillation event,per IE Bulletin 88-007.

DISTRIBUTION CODE: IE11D COPIES RECEIVED:LTR L ENCL '5 SIZE:

TITLE: Bulletin Response (50 DKT)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A.

PD5 LA PD5 PD SAMWORTH, R D INTERNAL: AEOD/DOA 1 AEOD/DSP 1 AEOD/DS P/TPAB 1 NRR ALEXION,T 1 NRR/DEST/ADE 8H 1 NRR/DEST/ADS 7E 1 NRR/DEST/MEB 9H 1 NRR/DOEA/EAB 11 1 NRR/DOEA/GCB 11 1 NRR/DREP/EPB 10 1 N~/PMA'S/-I B1 2 1 NUDOCS-ABSTRACT EG FI 02 1 RES/DSIR/EIB 1 RGN FILE 01 1 EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" R1KIPIENTS:

PIZASE HELP US TO REDUCE WASTE! CGNTACl'HE DOCUMENT CDÃHKL DESK BDCM Pl-37 (EZZ. 20079) KQ EIZMZNRZZ YOUR NAME FROM DISTEUBUTICjN LISTS &DR DOCGMEMIS YOU DClNPT NEED)

TOTAL NUMBER.OF COPIES REQUIRED: LTTR 21 ENCL pd

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P:O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 October 13, 1988 G02-88-216 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D. C. 20555

Subject:

NUCLEAR PLANT NO. 2 .

OPERATING LICENSE NPF-21 RESPONSE TO IEB 88-07, POWER OSCILLATIONS IN BOILING WATER REACTORS (BWRS)

Reference:

Letter, G02-88-196, GC Sorensen to NRC, same subject, dated September 12, 1988 The subject bulletin requested confirmation that licensed reactor operators and shift technical advisors performing shift duties were briefed on the LaSalle Unit 2 power oscillation event within 15 days and received additional specified training within 60 days.

In our response (G02-88-196) we addressed licensed operators but not STAs. This letter is to confirm that the STAs also received this training.

Very truly yours, G. C. Sorensen, Manager Regulatory 'Programs AGH:lw cc: JB Mar tin - NRC RV NR Reynolds BCP&R RB Samworth NRC DL Williams BPA/399 NRC Site Inspector 901A Y i(p SSi0i90 43 SSi0i3 PDR ADOCK 05000397 0 PDC