ML17284A574: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:AG'CELEMTZD
{{#Wiki_filter:AG'CELEMTZD         =
=D RIBUTION DEMONS'1 RATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8810270432 DOC.DATE: 88/10/19 NOTARIZED:
D     RIBUTION         DEMONS'1 RATION           SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
ACCESSION NBR:8810270432           DOC.DATE: 88/10/19       NOTARIZED: NO             DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME           AUTHOR AFFILIATION SORENSEN,G.C.       Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Responds to Generic Ltr 88-11,"Radiation Embrittlement of Reactor Vessel Matls," Reg Guide 1.99,Rev 2.DISTRIBUTION CODE: A008D COPIES RECEIVED:LTR j ENCLO SIZE: TITLE: OR/Licensing Submittal:
Responds to Generic Ltr 88-11, "Radiation Embrittlement of Reactor Vessel Matls," Reg Guide 1.99,Rev 2.
Reactor Vessel Material Surveillance NOTES: DOCKET 05000397 R Report D RECI,P,IENT ID" CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/PMAS/I LRB12 OGC/HDS2 RES/DS IR/E I B EXTERNAL'PDR NSIC (COPI~ES~LTTR I'ENCL 6.1 1 1 1 1 1 1 1 1RECIPIENT.,"~,COPIES>'1,>)-,;,~'-'ID CODE/NAME'LTTR'ENCL'PD5 PD ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB 11-ABSTRACT 01 RES/MEB NRC PDR ORNL KAM,F A 9 8 NaTE IO ALL"RIDS" R1XXPIENTS:
DISTRIBUTION CODE: A008D COPIES RECEIVED:LTR             j   ENCLO   SIZE:
PIZASE HELP US 10 REMJCE HASTE!<X''ACE'IHE DOCUME&#xc3;Z CX&#xc3;IROL DESK RCCM P1-37 (EXT.20079)TO EIZIMINATF YOUR NME FROM DISTRIKlTIQN LISTS H)R DOCUMENTS YOU DGNiT NEED)/A TOTAL NUMBER OF COPIES REQUIRED: LTTR 30 ENCL  
TITLE: OR/Licensing Submittal: Reactor Vessel Material Surveillance Report NOTES:
R D
RECI,P,IENT         ( COPI~ES         RECIPIENT.,"' ~, COPIES>'1, > )-,;, ~
ID " CODE/NAME      ~ LTTR I'ENCL    '-'ID CODE/NAME     LTTR 'ENCL' PD5 LA                                PD5 PD SAMWORTH,R
: 6.                                                          A INTERNAL: ACRS                                    ARM/DAF/LFMB NRR/DEST/ADS 7E          1            NRR/DEST/CEB 8H NRR/DEST/ESB 8D          1            NRR/DEST/MTB 9H NRR/DEST/RSB 8E          1            NRR/DOEA/TSB 11 NRR/PMAS/I LRB12          1                      -ABSTRACT                             9 OGC/HDS2                  1                            01 RES/DS  IR/E IB          1            RES/MEB                                         8 EXTERNAL'PDR                        1      1    NRC PDR NSIC                      1            ORNL KAM,F
                                                                                                /
A NaTE IO ALL "RIDS" R1XXPIENTS:
PIZASE HELP US 10 REMJCE HASTE! <X''ACE 'IHE DOCUME&#xc3;Z CX&#xc3;IROL DESK RCCM P1-37 (EXT. 20079) TO EIZIMINATF YOUR NME FROM DISTRIKlTIQN LISTS H)R DOCUMENTS YOU DGNiT NEED)
TOTAL NUMBER OF COPIES REQUIRED: LTTR           30     ENCL


WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 G02-88-217 October 19, 1988 SSi0270432 SS1019 PDR ADOCK 05000397 P PDC Docket 50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.20555  
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 SSi0270432 SS1019 PDR    ADOCK 05000397 P                  PDC G02-88-217 October 19, 1988 Docket 50-397 U. S. Nuclear Regulatory Commission Attn:   Document Control Desk Mail Station Pl-137 Washington, D. C.       20555


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2 RESPONSE TO GENERIC LETTER 88-11, RADIATION EMBRITTLEMENT OF REACTOR VESSEL MATERIALS, REGULATORY GUIDE 1.99, REVISION 2 As directed by the subject generic letter, the Supply System is in the process of evaluating the WNP-2 reactor vessel materials per Regulatory Guide 1.99, Rev.2 and will be revising the WNP-2 pressure/temperature curves.When completed this evaluation will be used to support a technical specification change scheduled for submittal October 1989.With WNP-2 being relatively"young" the impact of radiation embrittlement is minimal and a submittal on the above schedule remains conservative.
NUCLEAR PLANT NO. 2 RESPONSE TO GENERIC LETTER 88-11, RADIATION EMBRITTLEMENT OF REACTOR VESSEL MATERIALS, REGULATORY GUIDE 1.99, REVISION 2 As directed by the subject generic letter, the Supply System is in the process of evaluating the WNP-2 reactor vessel materials per Regulatory Guide 1.99, Rev. 2 and will be revising the WNP-2 pressure/temperature                 curves. When completed this evaluation will be used to support a technical specification change scheduled for submittal October 1989.               With WNP-2 being relatively "young" the impact of radiation embrittlement is minimal and a submittal on the above schedule remains conservative.           This response satisfies the 180 day submittal requested by the generic       letter.
This response satisfies the 180 day submittal requested by the generic letter.Very truly yours,~~B~+J G.C.Sorensen, Manager Regulatory Programs PLP:lw cc: JB Hartin-NRC RV NR Reynolds-BCPER RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A V j++e I}}
Very truly yours,
~~ B~+ J G. C. Sorensen, Manager Regulatory Programs PLP:lw cc:   JB Hartin -   NRC RV NR Reynolds   - BCPER RB Samworth   - NRC DL Williams BPA/399 NRC Site Inspector - 901A
 
V j+ + e I}}

Latest revision as of 14:54, 29 October 2019

Responds to Generic Ltr 88-11, Radiation Embrittlement of Reactor Vessel Matls. Evaluation of Reactor Vessel Matls, Per Reg Guide 1.99,Rev 2 Underway.Pressure/Temp Curves Will Be Revised
ML17284A574
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/19/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-REGGD-01.099, RTR-REGGD-1.099 GL-88-11, GO2-88-217, NUDOCS 8810270432
Download: ML17284A574 (4)


Text

AG'CELEMTZD =

D RIBUTION DEMONS'1 RATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8810270432 DOC.DATE: 88/10/19 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to Generic Ltr 88-11, "Radiation Embrittlement of Reactor Vessel Matls," Reg Guide 1.99,Rev 2.

DISTRIBUTION CODE: A008D COPIES RECEIVED:LTR j ENCLO SIZE:

TITLE: OR/Licensing Submittal: Reactor Vessel Material Surveillance Report NOTES:

R D

RECI,P,IENT ( COPI~ES RECIPIENT.,"' ~, COPIES>'1, > )-,;, ~

ID " CODE/NAME ~ LTTR I'ENCL '-'ID CODE/NAME LTTR 'ENCL' PD5 LA PD5 PD SAMWORTH,R

6. A INTERNAL: ACRS ARM/DAF/LFMB NRR/DEST/ADS 7E 1 NRR/DEST/CEB 8H NRR/DEST/ESB 8D 1 NRR/DEST/MTB 9H NRR/DEST/RSB 8E 1 NRR/DOEA/TSB 11 NRR/PMAS/I LRB12 1 -ABSTRACT 9 OGC/HDS2 1 01 RES/DS IR/E IB 1 RES/MEB 8 EXTERNAL'PDR 1 1 NRC PDR NSIC 1 ORNL KAM,F

/

A NaTE IO ALL "RIDS" R1XXPIENTS:

PIZASE HELP US 10 REMJCE HASTE! <XACE 'IHE DOCUMEÃZ CXÃIROL DESK RCCM P1-37 (EXT. 20079) TO EIZIMINATF YOUR NME FROM DISTRIKlTIQN LISTS H)R DOCUMENTS YOU DGNiT NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 30 ENCL

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 SSi0270432 SS1019 PDR ADOCK 05000397 P PDC G02-88-217 October 19, 1988 Docket 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D. C. 20555

Subject:

NUCLEAR PLANT NO. 2 RESPONSE TO GENERIC LETTER 88-11, RADIATION EMBRITTLEMENT OF REACTOR VESSEL MATERIALS, REGULATORY GUIDE 1.99, REVISION 2 As directed by the subject generic letter, the Supply System is in the process of evaluating the WNP-2 reactor vessel materials per Regulatory Guide 1.99, Rev. 2 and will be revising the WNP-2 pressure/temperature curves. When completed this evaluation will be used to support a technical specification change scheduled for submittal October 1989. With WNP-2 being relatively "young" the impact of radiation embrittlement is minimal and a submittal on the above schedule remains conservative. This response satisfies the 180 day submittal requested by the generic letter.

Very truly yours,

~~ B~+ J G. C. Sorensen, Manager Regulatory Programs PLP:lw cc: JB Hartin - NRC RV NR Reynolds - BCPER RB Samworth - NRC DL Williams BPA/399 NRC Site Inspector - 901A