{{#Wiki_filter:ACCELERATED
{{#Wiki_filter:ACCELERATED OSI'IGHUTION DEMON%RATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)CCESSION NBR:8805120229 DOC.DATE: 88/05/06 NOTARIZED:
OSI'IGHUTION
NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION'ORENSEN,G.C.
DEMON%RATION
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SYSTEM REGULATORY
 
INFORMATION
==SUBJECT:==
DISTRIBUTION
Responds to NRC 870128 ltr re violations noted in Insp Rept 50-397/86-25.
SYSTEM (RIDS)CCESSION NBR:8805120229
DISTRIBUTION CODE: IEOID COPIES RECEIVED'LTR I ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation R sponse NOTES: RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS DEDRO NRR/DLPQ/PEB ll NRR/DOEA DIR 11 NRR/DREP/RPB 10 NRR/PMAS/ILRB12 OE LIEBERMAN,J RggEXtH RGN5 FILE 01 TERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME SAMWORTH,R AEOD NRR MORISSEAUgD NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC 15-B-18 RES/DRPS DEPY NRC PDR COPIES LTTR ENCL 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1/ATOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25 Washington Public Power Supply System 3000George Washington Way P.O.Box968 Richland, Washington99352-0968 (509)372-5000 May 6, 1988 G02-88-111 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.CD 20555 Gentlemen:
DOC.DATE: 88/05/06 NOTARIZED:
 
NO DOCKET FACIL:50-397
==Subject:==
WPPSS Nuclear Project, Unit 2, Washington
NUCLEAR PLANT NO.2 LICENSE NO.'PF-21 NRC INSPECTION REPORT 86-25  
Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION'ORENSEN,G.C.
 
Washington
==Reference:==
Public Power Supply System RECIP.NAME
 
RECIPIENT AFFILIATION
Letter, G.C.Sorensen (SS)to J.B.Martin (NRC-RV), dated 1/28/87 In the referenced letter, the Supply System committed to revise Plant Procedure (PPM)1.3.10,"Fire Protection Program," in response to NRC Inspection Report Notice of Violation 86-25-15.The procedure was revised to strengthen the pr ocesses and better define the responsibilities associated with fire protection staff reviews of 1)design change packages, 2)welding and cutting activities, and 3)actual fires that occurred.As a result of further review, the procedure is currently in the process of being revised to incorporate additional changes made to the Fire Protection Program since the time the referenced letter was sent to the NRC.Specific changes made to the original response to the Notice of Violation are as follows: a)Review of Welding and Cutting Activities
Document Control Branch (Document Control Desk)SUBJECT: Responds to NRC 870128 ltr re violations
~The Industrial Safety and Fire Protection Group will be responsible for auditing Maintenance Work Requests (MWRs)in the field, on a random basis, to determine if adequate preplanning for impairments, hazardous work, etc., has been included.~The Plant Fire Marshal will be responsible for taking followup action to assure closeout of Transient Combustible Permits and Cutting-Welding-Grinding Permits which have exceeded the specified time limit.SS05i20229 S80506 PDR ADQCK 05000397 9 DCD Page Two NUCLEAR PLANT NO.2 LICENSE NO.NPF-21 NRC INSPECTION REPORT 86-25 b)Investigation of Actual Fires~The Shift Support Supervisor will be res ons'he Plant Fire Marshal of fires e plosions or related incidents, unp anne fire protection impairments.
noted in Insp Rept 50-397/86-25.
~The Plant Fire Marshal will be re i e responsible for informing the explosions or related incidents.
DISTRIBUTION
a e y and Fire Protection Grou of a p any fires, It is antici ated th p at PPM 1.3.10 will be revised by May 13, 1988.Should you have any questions regardin this M P Po ll M-2 L'ery truly yours, Ac.G.C.Sorensen, Manager Regulatory Programs lw cc: JB Mar tin, HRC RV NS Reynolds-BCP8R RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A}}
CODE: IEOID COPIES RECEIVED'LTR
I ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
of Violation R sponse NOTES: RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS DEDRO NRR/DLPQ/PEB
ll NRR/DOEA DIR 11 NRR/DREP/RPB
10 NRR/PMAS/ILRB12
OE LIEBERMAN,J
RggEXtH RGN5 FILE 01 TERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME SAMWORTH,R
AEOD NRR MORISSEAUgD
NRR/DLPQ/QAB
10 NRR/DREP/EPB
10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT
OGC 15-B-18 RES/DRPS DEPY NRC PDR COPIES LTTR ENCL 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1/ATOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25  
Washington
Public Power Supply System 3000George
Washington
Way P.O.Box968 Richland, Washington99352-0968
(509)372-5000
May 6, 1988 G02-88-111
Docket No.50-397 U.S.Nuclear Regulatory
Commission
Attn: Document Control Desk Washington, D.CD 20555 Gentlemen:
Subject: NUCLEAR PLANT NO.2 LICENSE NO.'PF-21 NRC INSPECTION
REPORT 86-25 Reference:
Letter, G.C.Sorensen (SS)to J.B.Martin (NRC-RV), dated 1/28/87 In the referenced
letter, the Supply System committed to revise Plant Procedure (PPM)1.3.10,"Fire Protection
Program," in response to NRC Inspection
Report Notice of Violation 86-25-15.The procedure was revised to strengthen
the pr ocesses and better define the responsibilities
associated
with fire protection
staff reviews of 1)design change packages, 2)welding and cutting activities, and 3)actual fires that occurred.As a result of further review, the procedure is currently in the process of being revised to incorporate
additional
changes made to the Fire Protection
Program since the time the referenced
letter was sent to the NRC.Specific changes made to the original response to the Notice of Violation are as follows: a)Review of Welding and Cutting Activities
~The Industrial
Safety and Fire Protection
Group will be responsible
for auditing Maintenance
Work Requests (MWRs)in the field, on a random basis, to determine if adequate preplanning
for impairments, hazardous work, etc., has been included.~The Plant Fire Marshal will be responsible
for taking followup action to assure closeout of Transient Combustible
Permits and Cutting-Welding-Grinding
Permits which have exceeded the specified time limit.SS05i20229
S80506 PDR ADQCK 05000397 9 DCD  
Page Two NUCLEAR PLANT NO.2 LICENSE NO.NPF-21 NRC INSPECTION
REPORT 86-25 b)Investigation
of Actual Fires~The Shift Support Supervisor
will be res ons'he Plant Fire Marshal of fires e plosions or related incidents, unp anne fire protection
impairments.
~The Plant Fire Marshal will be re i e responsible
for informing the explosions
or related incidents.
a e y and Fire Protection
Grou of a p any fires, It is antici ated th p at PPM 1.3.10 will be revised by May 13, 1988.Should you have any questions regardin this M P Po ll M-2 L'ery truly yours, Ac.G.C.Sorensen, Manager Regulatory
Programs lw cc: JB Mar tin, HRC RV NS Reynolds-BCP8R RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A
}}

Revision as of 13:23, 17 August 2019

Informs That Rev to Plant Procedure 1.3.10, Fire Protection Program, Committed to in 870128 Response to Insp Rept 50-397/86-25,currently in Process to Incorporate Listed Addl Changes.Procedure Will Be Revised by 880513
ML17279B026
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/06/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-88-111, TAC-63528, NUDOCS 8805120229
Download: ML17279B026 (3)


Text

ACCELERATED OSI'IGHUTION DEMON%RATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)CCESSION NBR:8805120229 DOC.DATE: 88/05/06 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION'ORENSEN,G.C.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 870128 ltr re violations noted in Insp Rept 50-397/86-25.

DISTRIBUTION CODE: IEOID COPIES RECEIVED'LTR I ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation R sponse NOTES: RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS DEDRO NRR/DLPQ/PEB ll NRR/DOEA DIR 11 NRR/DREP/RPB 10 NRR/PMAS/ILRB12 OE LIEBERMAN,J RggEXtH RGN5 FILE 01 TERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME SAMWORTH,R AEOD NRR MORISSEAUgD NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC 15-B-18 RES/DRPS DEPY NRC PDR COPIES LTTR ENCL 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1/ATOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25 Washington Public Power Supply System 3000George Washington Way P.O.Box968 Richland, Washington99352-0968 (509)372-5000 May 6, 1988 G02-88-111 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.CD 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO.2 LICENSE NO.'PF-21 NRC INSPECTION REPORT 86-25

Reference:

Letter, G.C.Sorensen (SS)to J.B.Martin (NRC-RV), dated 1/28/87 In the referenced letter, the Supply System committed to revise Plant Procedure (PPM)1.3.10,"Fire Protection Program," in response to NRC Inspection Report Notice of Violation 86-25-15.The procedure was revised to strengthen the pr ocesses and better define the responsibilities associated with fire protection staff reviews of 1)design change packages, 2)welding and cutting activities, and 3)actual fires that occurred.As a result of further review, the procedure is currently in the process of being revised to incorporate additional changes made to the Fire Protection Program since the time the referenced letter was sent to the NRC.Specific changes made to the original response to the Notice of Violation are as follows: a)Review of Welding and Cutting Activities

~The Industrial Safety and Fire Protection Group will be responsible for auditing Maintenance Work Requests (MWRs)in the field, on a random basis, to determine if adequate preplanning for impairments, hazardous work, etc., has been included.~The Plant Fire Marshal will be responsible for taking followup action to assure closeout of Transient Combustible Permits and Cutting-Welding-Grinding Permits which have exceeded the specified time limit.SS05i20229 S80506 PDR ADQCK 05000397 9 DCD Page Two NUCLEAR PLANT NO.2 LICENSE NO.NPF-21 NRC INSPECTION REPORT 86-25 b)Investigation of Actual Fires~The Shift Support Supervisor will be res ons'he Plant Fire Marshal of fires e plosions or related incidents, unp anne fire protection impairments.

~The Plant Fire Marshal will be re i e responsible for informing the explosions or related incidents.

a e y and Fire Protection Grou of a p any fires, It is antici ated th p at PPM 1.3.10 will be revised by May 13, 1988.Should you have any questions regardin this M P Po ll M-2 L'ery truly yours, Ac.G.C.Sorensen, Manager Regulatory Programs lw cc: JB Mar tin, HRC RV NS Reynolds-BCP8R RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A