IR 05000277/2013006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:September 3, 2013
{{#Wiki_filter:UNITED STATES  NUCLEAR REGULATORY COMMISSION    REGION I  2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 3, 2013  


==SUBJECT:==
Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2013006 AND 05000278/2013006)
 
4300 Winfield Rd.
 
Warrenville, IL 60555 SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2013006 AND 05000278/2013006)


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==

Revision as of 02:51, 15 July 2019

ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000277/2013006 and 05000278/2013006
ML13240A170
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/03/2013
From: Mel Gray
Reactor Projects Region 1 Branch 4
To: Pacilio M
Exelon Nuclear, Exelon Generation Co
gray, mel
References
IR-13-006
Download: ML13240A170 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 3, 2013

Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear

4300 Winfield Rd.

Warrenville, IL 60555 SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2013006 AND 05000278/2013006)

Dear Mr. Pacilio:

On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Peach Bottom Atomic Power Station (Peach Bottom) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Peach Bottom Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Peach Bottom Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC's Reacto r Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators

demonstrated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

In addition to baseline inspections, the NRC will perform IP 92702, "Follow-up on Corrective Actions for Violations and Deviations," IP71003, "Post-Approval Site Inspection for License Renewal," IP71004, "Power Uprate," and Temporary Instruction 2515/182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and

Tanks." The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5209 with any questions you have regarding this letter.

Sincerely,

/RA/ Mel Gray, Chief Reactor Projects Branch 4 Division of Reactor Projects

Docket Nos.: 50-277, 50-278 License Nos.: DPR-44, DPR-56

Enclosure: Inspection Plan

cc w/encl: Distribution via ListServ

ML13240A170 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME mmt SHansell/MG for SH SBarber/SB MGray/MG DATE 08 /25 /13 08 / 26 /13 09/03 /13

Page 1 of 2 08/01/2013 15:08:45 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Peach BottomInspection / Activity Plan 07/01/2013-12/31/201471124-HP 1 2, 3 IP Occupational ALARA Planning and Controls71124.02 07/29/2013 08/02/2013 2, 3 IP Occupational Dose Assessment71124.04 07/29/2013 08/02/2013 2, 3 IP Radiation Monitoring Instrumentation71124.05 07/29/2013 08/02/201371124.07-REMP 1 2, 3 IP Radiological Environmental Monitoring Program71124.07 09/02/2013 09/06/20137111108G-U3 INSERVICE INSPECTION 1 3 IP Inservice Inspection Activities - BWR7111108G 09/16/2013 09/20/201371124-HP 1 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/16/2013 09/20/2013 3 IP Occupational ALARA Planning and Controls71124.02 09/16/2013 09/20/201371124.08-RADWASTE 1 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 10/21/2013 10/25/201371124-HP 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 01/06/2014 01/10/2014 2, 3 IP Occupational ALARA Planning and Controls71124.02 01/06/2014 01/10/2014 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 01/06/2014 01/10/2014 2, 3 IP Occupational Dose Assessment71124.04 01/06/2014 01/10/2014 EP-EP ANNUAL REPORT 4 2, 3 IP Drill Evaluation7111406 01/01/2014 12/31/2014 71003-U3 LR COMMITMENTS PHASE 2 2 3 IP Post-Approval Site Inspection for License Renewal 71003 01/21/2014 01/24/2014TI-182-DEGRAD UNDERGROUND PIPING - PHASE 2 1 2, 3 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 02/24/2014 02/28/2014 CDBI-CDBI 7 2, 3 IP Component Design Bases Inspection7111121 03/03/2014 03/07/2014 2, 3 IP Component Design Bases Inspection7111121 03/17/2014 03/21/2014 2, 3 IP Component Design Bases Inspection7111121 03/31/2014 04/04/2014EP EXER-EP EXERCISE INSPECTION 1 2, 3 IP Exercise Evaluation - Hostile Action (HA) Event7111407 04/07/201404/11/201471124-HP 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/19/2014 05/23/2014 2, 3 IP Occupational ALARA Planning and Controls71124.02 05/19/2014 05/23/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/01/2013 15:08:45 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Peach BottomInspection / Activity Plan 07/01/2013-12/31/201471124-HP 1 2, 3 IP Radiation Monitoring Instrumentation71124.05 05/19/2014 05/23/201471124-RETS 1 2, 3 IP Radiation Monitoring Instrumentation71124.05 09/08/2014 09/12/2014 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 09/08/2014 09/12/20147111111B-PB LSRO REQUAL INSP WITH P/F RESULTS 1 2, 3 IP Licensed Operator Requalification Program7111111B 12/08/2014 12/12/201471124-HP 1 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/27/2014 10/31/2014 2 IP Occupational ALARA Planning and Controls71124.02 10/27/2014 10/31/20147111108G-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR7111108G 10/27/2014 10/31/2014 71004-EC/FAC POWER UPRATE 1 2 IP Power Uprate 7100411/03/201411/07/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.