ML17272A894: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/21/1980
| issue date = 03/21/1980
| title = Forwards Final Deficiency Rept Re Pipe Whip Restraint Problems
| title = Forwards Final Deficiency Rept Re Pipe Whip Restraint Problems
| author name = RENBERGER D L
| author name = Renberger D
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name = ENGELKEN R H
| addressee name = Engelken R
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| docket = 05000397
| docket = 05000397

Revision as of 02:16, 19 June 2019

Forwards Final Deficiency Rept Re Pipe Whip Restraint Problems
ML17272A894
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/21/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17272A895 List:
References
GO2-80-74, NUDOCS 8004020302
Download: ML17272A894 (4)


Text

DISTRIBUTION CODE: 8019S COPIES RECEIVED:LTR g ENCL 9 SIZE: TITLE: Construction Deficiency Report (10CFR50.55E')

Pen-5 8'Q./9-TZ-~NOTES.PN RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LJTR ENCL ID CODE/NAME LTTR ENCL ACTION: 14 PM P7-/pit/Cg 1 1 15 BC 4~~A"f 1 1 20 LA g~g+y'1 21 AD~mg 1 1 INTERNAL: 1 1 1 1 1 1 1 1 1 1 1 1 02 NRC PDR 1 2 2 07 EDO L STAFF 1 1 09 DEPY DIR=OPS 1 1 11 STANDRDS DEV 1 1 1 16 AO FOR ENGR 1 1 1 17 AD REAC SFTY 1 1 1 23 OELD 1 1 AO/S I TE TECH 1.1 1 DIRECTOR DSE 1 1 1 HANAUERgS~1 1 1'MATL ENG BR 1 1 1 POWER SYS BR 1 1 0 08 MPA 10 QAB 13F IELD COOR/IE" 17 AD PLANT SYS 22 DIR OPM AD/RC I/IK AEOD GEOSC IENCES BR IKC SYS BR MECH ENG BR STRUCT ENG BR RKGULATO INFORMATION DISTRIBUTION TEN (RIOS)r 41~ACCESSION NBR:8004020302 DOC~DATE;80/03/21 NOTARIZED:

NO DOCKET FACIL:50-397 HPPSS Nuclear Projects Unit 2i Nashington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION RENBERGER<D.L, washington Public Power Supply System REC I P~NAME RECIPIENT AFFILIATION ENGELKENpR

~li, Region 5~San Francisco~

Office of the Director

SUBJECT:

Forwards final deficiency rept re pipe whip restraint problems.EXTERNAL: 03 LPDR 20 ACRS 1 1 ib 16 04 NSIC Apg~3]pe gb TOTAL NUMBER OF COPIES REQUIRED~LTTR~ENCL r II>

=~Washington Public Power Supply System A JOINT OPERATING AGENCY P.O.BOX 966 3000 GSO, WASHINGTON WAS RICHLAND.WASHINCSON 9935?RHONt (5091 375 5000 March 21, 1980 G02-80-74 Mr.R.H.Engelken, Director Nucl ear Regul atory Commission Region V Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1990 N.Cal.ifornia Boulevard Walnut Creek, California 94596

Subject:

'PPSS NUCLEAR PROJECT NO.2 DOCKET NUMBER 50-397, CPPR-93 CORRECTIVE ACTION PROGRAM FOR RESOLUTION OF PIPE WHIP RESTRAINT PROBLEMS, REPORTABLE DEFICIENCY 10CFR50.55 e

Reference:

1)Letter G02-79-226, DL Renberger to RH Engelken, dated 12/10/79 2)Letter G02-80-28, DL Renberger to RH Engelken, dated 2/1/80 3)NRC Letter, RH Engelken to NO Strand, dated 2/8/80

Dear Mr.Engelken:

Reference 1)responded to NRC concerns associated with the Pipe Whip Restraint Corrective Action Program and was established as an interim 50.55(e)report in a-telephone conversation with D.Haist of Region V.Reference 2)letter provided more detailed information on the Pipe Whip Restraint Corrective Action Program.Reference 3)concurred with our plans for corrective action.This letter constitutes our final report under the provisions of\80040@0~c m RH Engelken Nuclear Regulato~Commission March Page Two, 50.55(e)on the corrective action for the Pipe Whip Restraints, The status is attached.Please contact us if you have any questions.

Very truly yours, DLR/JEL/ln

Attachment:

As stated 0, L..RENBERCiER Assistant Director Technology cc: JM Blas-88R, NY HR Canter-BSR, NY Spike Ford, NUS JR Lewis-BPA, Ri,chland-V Stello-Office of Inspection 8 Enforcement, Washington, D.C.JJ Verderber-B8R, NY