Text
DISTRIBUTION CODE:
8019S COPIES RECEIVED:LTR g ENCL 9 SIZE:
TITLE: Construction Deficiency Report (10CFR50.55E')
Pen -
5 8'Q.
/9-TZ-
~
NOTES. PN RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LJTR ENCL ID CODE/NAME LTTR ENCL ACTION:
14 PM P7 -/pit/Cg 1
1 15 BC 4 ~~ A"f 1
1 20 LA g~g +y' 1
21 AD ~mg 1
1 INTERNAL:
1 1
1 1
1 1
1 1
1 1
1 1
02 NRC PDR 1
2 2
07 EDO L STAFF 1
1 09 DEPY DIR= OPS 1
1 11 STANDRDS DEV 1
1 1
16 AO FOR ENGR 1
1 1
17 AD REAC SFTY 1
1 1
23 OELD 1
1 AO/S I TE TECH 1
.1 1
DIRECTOR DSE 1
1 1
HANAUERgS ~
1 1
1
'MATL ENG BR 1
1 1
POWER SYS BR 1
1 0
08 MPA 10 QAB 13F IELD COOR/IE" 17 AD PLANT SYS 22 DIR OPM AD/RCI/IK AEOD GEOSC IENCES BR IKC SYS BR MECH ENG BR STRUCT ENG BR RKGULATO INFORMATION DISTRIBUTION TEN (RIOS) r 41~
ACCESSION NBR:8004020302 DOC ~ DATE; 80/03/21 NOTARIZED:
NO DOCKET FACIL:50-397 HPPSS Nuclear Projects Unit 2i Nashington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION RENBERGER<D.L, washington Public Power Supply System REC I P ~ NAME RECIPIENT AFFILIATION ENGELKENpR ~ li, Region 5~
San Francisco~
Office of the Director
SUBJECT:
Forwards final deficiency rept re pipe whip restraint problems.
EXTERNAL: 03 LPDR 20 ACRS 1
1 ib 16 04 NSIC Apg
~
3 ]pe gb TOTAL NUMBER OF COPIES REQUIRED ~
LTTR ~
ENCL
r II>
= ~
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 966 3000 GSO, WASHINGTON WAS RICHLAND. WASHINCSON 9935?
RHONt (5091 375 5000 March 21, 1980 G02-80-74 Mr. R.
H. Engelken, Director Nucl ear Regul atory Commission Region V
Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1990 N. Cal.ifornia Boulevard Walnut Creek, California 94596
Subject:
'PPSS NUCLEAR PROJECT NO.
2 DOCKET NUMBER 50-397, CPPR-93 CORRECTIVE ACTION PROGRAM FOR RESOLUTION OF PIPE WHIP RESTRAINT PROBLEMS, REPORTABLE DEFICIENCY 10CFR50.55 e
Reference:
1)
Letter G02-79-226, DL Renberger to RH Engelken, dated 12/10/79 2)
Letter G02-80-28, DL Renberger to RH Engelken, dated 2/1/80 3)
NRC Letter, RH Engelken to NO Strand, dated 2/8/80
Dear Mr. Engelken:
Reference
- 1) responded to NRC concerns associated with the Pipe Whip Restraint Corrective Action Program and was established as an interim 50.55(e) report in a-telephone conversation with D. Haist of Region V.
Reference
- 2) letter provided more detailed information on the Pipe Whip Restraint Corrective Action Program.
Reference
- 3) concurred with our plans for corrective action.
This letter constitutes our final report under the provisions of
\\
80040@0 ~c m
RH Engelken Nuclear Regulato~
Commission March Page
- Two, 50.55(e) on the corrective action for the Pipe Whip Restraints, The status is attached.
Please contact us if you have any questions.
Very truly yours, DLR/JEL/ln
Attachment:
As stated 0, L.. RENBERCiER Assistant Director Technology cc:
JM Blas - 88R, NY HR Canter - BSR, NY Spike Ford, NUS JR Lewis - BPA, Ri,chland V
Stello - Office of Inspection 8 Enforcement, Washington, D.C.
JJ Verderber - B8R, NY