Text

RKGULATO INFORMATION DISTRIBUTION TEN (RIOS) r 41~

ACCESSION NBR:8004020302 DOC ~ DATE; 80/03/21 NOTARIZED: NO DOCKET FACIL:50-397 BYNAME HPPSS Nuclear Projects Unit 2i Nashington Public Powe 05000397 AUTH AUTHOR AFFILIATION RENBERGER<D.L, washington Public Power Supply System REC I P ~ NAME RECIPIENT AFFILIATION ENGELKENpR ~ li, Region 5~ San Francisco~ Office of the Director

SUBJECT:

Forwards final deficiency rept re pipe whip restraint problems.

DISTRIBUTION CODE: 8019S COPIES RECEIVED:LTR g ENCL 9 SIZE:

TITLE: Construction Deficiency Report (10CFR50.55E')

NOTES. Pen -

PN 5 8'Q. /9-TZ- ~

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LJTR ENCL ID CODE/NAME LTTR ENCL ACTION: 14 PM P7 -/pit/Cg 1 1 15 BC 4 ~~ A"f 1 1 20 LA g~g +y' 1 21 AD ~mg 1 1 INTERNAL: 1 1 02 NRC PDR 1 1 0 2 2 07 EDO L STAFF 08 MPA 1 1 09 DEPY DIR= OPS 1 10 QAB 1 1 11 STANDRDS DEV 1 1 13F IELD COOR/IE" 1 1 16 AO FOR ENGR 1 1 17 AD PLANT SYS 1 1 17 AD REAC SFTY 1 22 DIR OPM 1 1 23 OELD 1 AD/RC I/IK 1 1 AO/S I TE TECH 1 1 AEOD .1 1 DIRECTOR DSE 1 1 GEOSC IENCES BR 1 1 HANAUERgS ~ 1 1 IKC SYS BR 1 1 'MATL ENG BR 1 1 MECH ENG BR 1 1 POWER SYS BR 1 STRUCT ENG BR 1 1 EXTERNAL: 03 LPDR 1 1 04 NSIC 20 ACRS ib 16 Apg 3

~

]pe TOTAL NUMBER OF COPIES REQUIRED ~ LTTR ~ ENCL gb

r II>

= ~

Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 966 3000 GSO, WASHINGTON WAS RICHLAND. WASHINCSON 9935? RHONt (5091 375 5000 March 21, 1980 G02-80-74 Mr. R. H. Engelken, Director Nucl ear Regul atory Commission Region V Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1990 N. Cal.ifornia Boulevard Walnut Creek, California 94596

Subject:

'PPSS NUCLEAR PROJECT NO. 2 DOCKET NUMBER 50-397, CPPR-93 CORRECTIVE ACTION PROGRAM FOR RESOLUTION OF PIPE WHIP RESTRAINT PROBLEMS, REPORTABLE DEFICIENCY 10CFR50.55 e

Reference:

1) Letter G02-79-226, DL Renberger to RH Engelken, dated 12/10/79
2) Letter G02-80-28, DL Renberger to RH Engelken, dated 2/1/80
3) NRC Letter, RH Engelken to NO Strand, dated 2/8/80

Dear Mr. Engelken:

Reference 1) responded to NRC concerns associated with the Pipe Whip Restraint Corrective Action Program and was established as an interim 50.55(e) report in a- telephone conversation with D. Haist of Region V.

Reference 2) letter provided more detailed information on the Pipe Whip Restraint Corrective Action Program. Reference 3) concurred with our plans for corrective action.

This letter constitutes our final report under the provisions of

\

80040@0 ~c m

RH Engelken Nuclear Regulato~ Commission March Page Two, 50.55(e) on the corrective action for the Pipe Whip Restraints, The status is attached.

Please contact us if you have any questions.

Very truly yours, 0, L.. RENBERCiER Assistant Director Technology DLR/JEL/ln

Attachment:

As stated cc: JM Blas - 88R, NY HR Canter - BSR, NY Spike Ford, NUS JR Lewis - BPA, Ri,chland V Stello - Office of Inspection 8 Enforcement, Washington, D.C.

JJ Verderber - B8R, NY