| issue date = 12/17/1987
| issue date = 12/17/1987
| title = Requests Extension to Required Response Time to 880205 for Responding to Violations Noted in Insp Rept 50-397/87-19,per 871216 Telcon
| title = Requests Extension to Required Response Time to 880205 for Responding to Violations Noted in Insp Rept 50-397/87-19,per 871216 Telcon
| author name = SORENSEN G C
| author name = Sorensen G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::IR 05000397/1987019]]
See also: [[see also::IR 05000397/1987019]]


=Text=
=Text=

Revision as of 00:56, 19 June 2019

Requests Extension to Required Response Time to 880205 for Responding to Violations Noted in Insp Rept 50-397/87-19,per 871216 Telcon
ML17279A744
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/17/1987
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-87-288, NUDOCS 8712300003
Download: ML17279A744 (5)


See also: IR 05000397/1987019

Text

REGULATORY

INFORNATION

DISTRIBUTION

SYSTEN (RIDS)ACCESSION NBR: 8712300003

DOC.DATE: 87/12/17 NOTARIZED:

NO FACIL: 50-397 WPPSS Nuclear Pro Ject>Unit 2>Washington

Public Powe AUTH.NANE, AUTHOR AFFILIATION

SORENSEN>G.C.Washington

Public Power Supply System RECIP.MANE RECIPIENT AFFILIATION

Document Control Branch (Document Control Desk)DOCKET 05000397 SUBJECT: Requests extension to required response time to 880205 foT responding

to violations

noted in Insp rept 50-397/87-19>

per 871216 telcon.DISTRIBUTION

CODE: IEOID COPIES RECEIVED: LTR j ENCL J SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice

of Violation Response NOTES: REC IP IENT ID CODE/NANE PDS PD COP IES LTTR.ENCL 1 1 RECIPIENT ID CODE/NANE SANWORTH>R COPIES LTTR ENCL 2 2 INTERNAL: ACRS DEDRO NRR/DLPG/PEB

NRR/DREP/EPB

NRR/DRIS DIR RNAN>J RGN5 FILE 01 TERNAL: LPDR NSIC 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1'1 AEOD NRR NORISSEAU>

D NRR/DOEA DIR NRR/DREP/RPB

NRR/PNAS/ILRB

OGC/HDS2 RES DEPY GI NRC PDR 1 1 1 1 1 2 2 1-1 1 1 1 1 go.gg fog TOTAL NUNBER OF COPIES REGUlRED: LTTR 23 ENCL 23

Washington

Public Power Supply System 3000 George Washington

Way.P.O.Box 968 Richland, Washington

99352-0968

(509)372-5000

December 17, 1987 G02-87-288

'ocket'No.

50-397 U.S.Nuclear Regulatory

Commission

Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Subject: Reference:

NUCLEAR PLANT NO.2, LICENSE NPF-21 NRC INSPECTION

REPORT 87-19, REQUEST FOR EXTENSION OF RESPONSE TIME Letter, JB Martin (NRC RV)to GC Sorensen (SS)"NRC Inspection

at WNP-2", dated 12/8/87 The reference forwarded the results of the NRC special team Safety System Functional

Inspection (SSFI)conducted August 3-28, 1987 at WNP-2 and included a request that the Supply System provide a response to the enclosed violation within 30 days (January 7, 1988).It should be noted that the Supply System has continued to work to resolve those issues identified

in the SSFI exit interview.

However the Supply System has reviewed the Notice of Violation and considers that in order to provide a quality response an extension to the 30 days is needed;This request for extension is based on the following considerations:

The number of violations, although level 4 and 5, will require a much larger effort to assemble, review, and approve than any Notice of Violation previously

responded to.Key personnel necessary to ensure an accurate, quality response will be on Holiday throughout

the next few weeks, and the plant has just completed a short but intense outage.This combined with the Holiday Season, results in requested and granted vacation time for personnel to both recover from the outage and enjoy the season.87gpf 7 8 R P,gOCH PDR~Zgpppp3 5ppp397 can.rid<I Wo.g pep ICE'/<3~pl I

Page Two NRC INSPECTION

REPORT 87-19, RE(}VEST FOR EXTENSION OF RESPONSE TIME Accordingly, the Supply System hereby requests an extension to the required response time to February 5, 1988.This request was informally

discussed in a telephone conversation, December 16,'987, between Messrs R.-'J.Pate of your staff and P.L.Powell-of the.Supply System.Should you have further questions, please contact Mr.P.L.Powell, Manager, WNP-2 Licensing.

Very truly yours, G.C.Sorensen,,Manager

Regulatory

Programs PLP/bk cc: JB Martin-NRC RV RB Samworth-NRC NS Reynolds-BCPER DL Williams-BPA-399 NRC Site Inspector-901A