NPDES Noncompliance Notification:On 890127,sample Taken from Storm Drain 101 Exceeded Oil & Grease Monthly Limit.Oil Absorbent Matl Placed at Discharge of Storm Drain Inside Oil Retaining Boom
ML20235V877
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/27/1989
From: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
PENNSYLVANIA, COMMONWEALTH OF
References
NUDOCS 8903100382
Download: ML20235V877 (2)


Text

CCN-89-14032

. ,, . ~.

~

PIIILADELPAIIA ELECTRIC COMPANY tw PEAClf IK7FIUM AIUMIC POWER STATION

\ R. D.1,11ox 208

'Wgn di Delta, l'ennsyh ania 17384

. u a i.unini- nie row ut oe nuts u.u (717) 156-7014 u sanah s i. now ni February 27, 1989 Department of Environmental Resources Bureau of Water Quality Management One Ararat Blvd.

Harrisburg, PA 17110

SUBJECT:

Noncompliance with NPDES Permit l

Peach Bottom Atomic Power Station Permit No. PA 0009733 Gentlemen:

DESCRIPTION OF NONCOMPLIANCE:

A sample taken from storm drain #101 exceeded the oil and grease ,

monthly limit.

Date Sample Taken: 1/27/89 Date Results Received: 2/3/89 Results of Analysis: 113.9 ppm Permit Limitation: 15 ppm average, 30 ppm maximum CAUSE OF NONCOMPLIANCE:

The cause of the noncompliance was most probably residual oil from a previous event. This drain normally has no flow. When a small flow was observed on January 27, 1989, a slight oil sheen was noticed and a sample was taken. In order to get a sample, it was necessary to dip the sample out of less than two inches of standing water.

DURATION OF NONCOMPLIANCE:

The duration of the noncompliance is estimated to be less than one day.

~

DO$$$$$$f PNu \

lk

m -

.: - . ~

( To: Department of. Environmental Resources Page 2 o CORRECTIVE ACTION:

p The corrective actions included:

1) Placing an oil absorbent material at the discharge of the

~

storm drain inside the oil retaining boom on January 27, 1989. l

2) A sample was also taken at the end of the discharge canal.

The results of this sample taken on January 28, 1989.was 1.2 i ppm.

3) The residual oil absorbent materials from inside the boom area was cleaned on January 30, 1989, since then no additional evidence of oil was noted. ]

PREVENTION OF FURTHER OCCURRENCES:

The zurn oil separator from the diesel building, which discharges to  !

sample point 101, was disassembled and inspected on February 7, 1989. It was found to be clean and working properly.

The collector basin at sample point 101 has collected rock and gravel from the storm drain that interferes with sampling. This material will be removed from the basin. The estimated completion date is February 28, 1989.

l Sincerely, p ,

y'w, m f. '/f ?p. . df v

f f) phU DMS/JFF/DPL/DLO/JAV:ala cc: Environmental Protection Agency Water Permits Branch Pennsylvania Section 3WMS2 841 Chestnut Building Philadelphia, Pennsylvania 19107 Director Administrator 0NRR Region I US NRC Office of Inspection and Enforcement Washington, DC 20555 US Huclear Regulatury Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 bcc: J. W. Gallaher W. B. W111sey E. J. Bradley J. M. Ford T. E. Shannon D. L. Oltmans NRMS Correspondence Control Desk