PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101
{
215 8414000 December 27, 1985 Department of Environmental Resources Bureau of Water Quality Management One Ararat Blvd.
Harrisburg, PA 17110
SUBJECT:
Noncompliance with NPDES Permit Peach Bottom Atomic Power Station Permit No. PA 0009733 Gentlemen:
DESCRIPTION OF NONCOMPLIANCE:
The pH of a sample from discharge point 301 (Wastewater Settling Basin) exceeded the permit limit.
Date Sample Taken 11/7/85 Date Results Received:
11/7/85 Results of Analysis:
9.1 Permit Limitation:
6.0 to 9.0 CAUSE.OF NONCOMPLIANCE:
The cause of the noncompliance is unknown.
A separate sample taken on the same day by another individual was 9.0.
.The two samples are within the accuracy of the analysis.
gRO10sO33s 851227 ADOCK 05000277 g
PDK fo L
h
o, 2-c DURATION OF NONCOMPLIANCE:
The duration of noncompliance was less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
The pH of discharge point 301 on November 8, 1985, was 8.6.
CORRECTIVE ACTION Corrective action was not required.
Very truly yours,
/Yb
?
1 W. T. Ullrich Superintendent Nuclear Generation Division JAV/WTU:ala Environmental Protection Agency cc:
Water Permits Branch Pennsylvania Section 3WM52 841 Chestnut Building Philadelphia, Pennsylvania 19107 Director Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 Administrator Region I Office of Inspection and Enforcement