l' PHILADELPHIA ELECTRIC COMPANY '
PEACH BOTTOM ATOMIC POWER STATION k D.1 Box 208 Delta, Pennsyhula 17314
- re.cs wrm-rna rov sa or tuttttscs (717) 4$6 7014 D. M. Smith Vice PreWderit May 25, 1988 i
Department of Environmental Resources Bureau of Water Quality Management One Ararat Blvd.
Harrisburg, PA 17110
SUBJECT:
Noncompliance with NPUES Permit Peach Bottom Atomic Power Station Permit No.
PA 0009733 Gentlemen:
DESCRIPTIONOFNONCOMPLIANC[:
Tht saspended solids of d sample from discharge point 501 (Sewage Treatment Plant) exceeded the instantaneous maximum permit limit.
Date Sample Taken 4/6/88 Date Results Received:
4/7/88 Results of Analysis:
69.2 mg/l Permit Limitation:
30 mg/l Avg.
CAUSE OF__ NONCOMPLIANCE:
j The cause of the noncompliance was high solids carryover through the sewage plant. This was caused by #1 and #2 wet well pumps tripping on thermals due to clogging with debris. When the pumps were cleared, the high flows caused high carryover, and hydraulically overloading the clarifiers.
00RA110N OF NONCOMPLIANCE:
The estimated duration of the noncompliance was twelve hours.
l l
l W
- s I
l 8806030334 880525
\\
PDR ADOCK 05000277 iO S
- w -..
-m g
CORRECTIVE ACTION:
The wet well pumps were repaired / cleaned on April 6, 1988.
Very truly yours, JAV:ala cc: Environmental Protection Agency Water Permits Branch Pennsylvania Section 3WM52 841 Chestnut Building Philadelphia, Pennsylvania 19107
-Director Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 Administrator Region i Office of Inspection and Enforcement US Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 I