iet m.
FE0.:I 'E8 OR:S? - 10:
PHILADELPHI A ELECTRIC COMPANY PC ACH 6801704 ATOMIC. POWER ST ATION w u. t.wox tos 3
okt,T A. P(NNEY LV ANI A 87384 February 23, 1988 s
Department of Environmental Heuources Bureau or Watur Quality Management One Ararat Blvd.
Harrisburg, PA 17110
SUBJECT:
Noncompliance with NPDES Permit Peach Bottom Atomic Power Station Permit No.
PA 0009733 i
Gentlement DESCRIPTION OP NONCOMPLTANCE:
The total phosphorus of samples taken from discharge point 503 (Sewage Treatment Plant) exceeded the monthly average and maximum permit limit.
Date Sample Takung 1/6/88 1/28/88 Date Results Received:
1/19/88 2/8/88 Results of Analysis 6.9 ppm 4.1 ppa Nonthly Average Analysis 5.5 ppa Permit Limitation:
2.0 ppa monthly average 4.0 ppm instantaneous maximum CAUSE OF NONCOMPLIANCE:
The cause of the noncompliance is an inability of the Sewage Treatatant Plant to continuously reduce the phosphorus level below the permit limits.
DURATION OF NONCOMPLIANCE:
The duration of the noncompliance has been intermittent since the receipt of the new permit in October, 1985.
I CORRECTIVE ACTION:
i The corrective action is to use a solution of ferrio chloride instead of Ultrion to precipitate the the phosphorus out of the waste water.
This is a recommendation from DCM consultants.
The ultrion was used for several months, but was not successful in maintaining phosphorus levels below 2 ppa.
Ferric chloride injection started on January 20, 1988.
[
L h
d 8803020093 880223 PDR ADOCK 05000171 S
PDR t
(0
FEb-:i 'm re:w it TEL fO:
uno m
.. PREVENTION OP rudTHER OCCURRENCES:
Although fearle chloride injection was started on January 20, 1988, leako in the system have prevented controlled injection of the. solution.
Parts have been ordered to repair the system.
The repair in expected to be complete by mid February.
3 Very truly yours, d-D. M. Smith Vice President Peach bottom Atomic Power Station JAV/ala cc:
Environmental Protection Agency Water Permits Branch Pennsylvania Section 3WMb2 841 Chestnut Building Philadelphia, Pennsylvania 19107 Director Ada:inist ra t or ONRR Region I US NRC Office of Inspection and Enforcement Washington, DC 20555 tlS Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406