 Issue dateTitleTopic
ML20043J10025 May 1990NPDES Nonccompliance Notification:On 900329,discharge of 30-40 Gallons of Fuel Oil Into Storm Sewer Drain Occurred & Release of 25 Gallons Fuel Oil Into Discharge Canal Occurred on 900510.Spill Prevention Control Plan Encl.W/O Encl
ML20247G91914 September 1989NPDES Noncompliance Notification:On 890907,bypass of Onsite Sewage Plant Resulted in Discharge of Not More than 1,000 Gallons of Untreated Sewage.Caused by Crack in Sewage Line. Domestic Water Secured & Sewage Pipe Repaired
ML20245H4817 August 1989NPDES Noncompliance Notification:On 890626,11 Gallons of Houghto-Safe 620 Hydraulic Fluid Spilled in Subpile Room of Unit During Preparation for CRD Removal Work.Major Portion of Spill Collected in Dry Well Sumps & Floor Flushed
ML20247P88326 May 1989NPDES Noncompliance Notification:Biological Oxygen Demand of Sample from Disharge Point 501 Exceeded Monthly Average Permit Limit.Caused by Increase in Sewage Treatment Plant Loading.Sampling Frequency Increased & Trench Backfilled
ML20246N6892 May 1989NPDES Noncompliance Notification Re Bod of Sample Taken from Discharge Point 501 Exceeding Monthly Average Permit Limit. Caused by Increase in Sewage Treatment Plant Loading Due to Increase in Power Plant Outage Work Force
ML20235V87727 February 1989NPDES Noncompliance Notification:On 890127,sample Taken from Storm Drain 101 Exceeded Oil & Grease Monthly Limit.Oil Absorbent Matl Placed at Discharge of Storm Drain Inside Oil Retaining Boom
ML20206M16422 November 1988NPDES Noncompliance Notification:On 881017,pH Samples from Discharge Point 301 Exceeded Monthly Permit Limit.Caused by Leakage of Sump Discharge Valves.Action Taken to Neutralize Settling Basin W/Addition of Acid
ML20155D10622 September 1988NPDES Noncompliance Notification:On 880829,wet Well in Front of Unit 1 Administration Bldg Overflowed.Caused by Lack of Pumping Wet Well as Scheduled.Restrooms Secured in Temporary Trailers & Parking Access Blocked
ML20196K68422 June 1988NPDES Noncompliance Notification:On 880501,pH of Settling Basin Discharge Point Exceeded Permit Limit.Cause Unknown. Discharge to River Stopped & Soda Ash Added to Neutralize Settling Basin
ML20245D42125 May 1988NPDES Noncompliance Notification:On 880406,total Phosphorus Sample Exceeded Monthly Average.Caused by High Solids Carryover from Clarifers & Lower than Normal Phs.Alum to Sewage Plant Equalization Basin Increased
ML20154P48525 May 1988NPDES Noncompliance Notification:On 880406,BOD of Sample from Discharge Point 501 Exceeded Monthly Average & Instantaneous Max Limits.Caused by High Solids Carryover Through Sewage Plant.Wet Well Pumps Repaired & Cleaned
ML20154P47725 May 1988NPDES Noncompliance Notification:On 880414,pH of Sample from Discharge Point 301 Exceeded Monthly Permit Limit.Caused by Release of Neutralizing Tank a W/O Continuous Ph Indication &/Or Trip Protection.Settling Basin Isolated & NeutralizedGrab sample
ML20154P42725 May 1988NPDES Noncompliance Notification:On 880406,suspended Solids from Discharge Point 501 Exceeded Max Permit Limit.Caused by High Solids Carryover Through Sewage Plant Resulting from Wet Well Pumps Tripping on Thermals.Pumps Repaired/Cleaned
ML20147B64323 February 1988NPDES Noncompliance Notification:On 880106-28 Samples from Discharge Point 501 Sewage Treatment Plant Exceeded Monthly Average & Instantaneous Max Limits.Cause Unknown.Program of Wasting Will Be Implemented to Reduce Solids
ML20147B43023 February 1988NPDES Noncompliance Notification:Total Phosphorus of Samples Taken from Discharge Point 501 Exceeded Monthly Average & Max Permit Limit.Caused by Inability of Sewage Treatment Plant to Continously Reduce Phosporus Level
ML20236J17428 October 1987NPDES Noncompliance Notification:On 870911 & 24,biochemical Oxygen Demand of Two Samples from Discharge Point 501 Exceeded Monthly Average Permit Limit.Caused by Excessive Carryover from Clarifiers.Solids Passed Through Sys Reduced
ML20236J14428 October 1987NPDES Noncompliance Notification:On 870911 & 24,total Phosphorus of Samples for Discharge Point 501 Exceeded Monthly Average Permit Limit.Caused by Sewage Treatment Plant Inability to Reduce Phosphorus Below Permit LimitGrab sample
ML20237H54831 August 1987NPDES Noncompliance Notification:On 870701 Oil Spill Occurred.Caused by Personnel Error Associated W/Failure to Pump Down Full Dirty Oil Storage Tank.Individuals Involved Counseled & Supervisory Attention IncreasedHigh winds
ML20214S35828 May 1987NPDES Noncompliance Notification:Monthly Average Total Phosphorus of Discharge Point 501 Exceeded Monthly Average Permit Limit.Caused by Sewage Treatment Plant Not Able to Reduce Phosphorus Below Permit Limit.Mods Underway
ML20214S31928 May 1987NPDES Noncompliance Notification:On 870413,suspended Solids of Sample from Discharge Point Exceeded Instantaneous Max Permit Limit.Caused by High Suspended Solids in Aeration Tank.Wasting of Sludge Increased to Reduce Solids Level
ML20214B46930 April 1987NPDES Noncompliance Notification:Thermal Discharge from Discharge Point 001 Cooling Towers Exceeded Permit Requirements.Caused by Erroneous Recorded Measurements & Permit Requirements.Malfunctioning Monitors Repaired
ML20205B95417 March 1987NPDES Noncompliance Notification:During Jan 1987,two Samples from Discharge Point 501 Exceeded Monthly Average & Instantaneous Max Permit Limits.Caused by High Settleable Solids in Aeration Tank.Program of Wasting Solids Begun
ML20205B86717 March 1987NPDES Noncompliance Notification:During Jan 1987,total Phosphorus Samples from Discharge Point 501 Exceeded Limit. Caused by Sewerage Treatment Plant Not Being Able to Reduce Phosphorus Below Limit.Feed Rate of Ultrion Increased
ML20205B84817 March 1987NPDES Noncompliance Notification:During Feb 1987,total Phosphorus Samples from Discharge Point 501 Exceeded Limit. Caused by Sewerage Treatment Plant Not Being Able to Reduce Phosphorus Below Limit.Feed Rate of Ultrion Increased
ML20214T77913 November 1986NPDES Noncompliance Notification:On 861024,pH Sample from Discharge Point 301 Exceeded Permit Limit.Caused by out-of- Svc Neutralizing Tank Ph Meter & Ph Meter for Raw Water Sump Which Drifted Out of Calibr.Raw Water Sump Ph Meter Calibr
ML20215N20524 October 1986NPDES Noncompliance Notification:On 860930,oil & Grease of Sample from Settling Basin Exceeded Monthly Average Permit Limit.Cause Unknown.Analysis Not Received in Time to Allow Resample to Bring Average Value Into Compliance
ML20215N21823 October 1986NPDES Noncompliance Notification:On 860902,pH of Sample from Wastewater Settling Basin Exceeded Permit Limit.Caused by out-of-svc Neutralizing Tank Ph Meter & out-of-calibr Ph Meter for Raw Water Pump
ML20215M88217 October 1986NPDES Noncompliance Notification:Phosphorus Level Exceeded Monthly Average Permit Limit for Sept 1986.Caused by Sewage Treatment Plant.Feed Rate Increased Incrementally While Phosphorus Levels Monitored
ML20210P55929 September 1986NPDES Noncompliance Notification:On 860806,pH of Sample from Discharge Point 301 (Waste Water Settling Basin) Exceeded Limits.Caused by Acid Inadvertently Entering Raw Pump Through Open Drain Valve.Liquid Added to Lower Ph Limit
ML20206K04423 June 1986Noncompliance Notification:On 860507,total Phosphorous Sample from Discharge Point 501 Exceeded Permit Limits for Instantaneous Max.Caused by Sewage Treatment Plant Incapable of Reducing Phosphorous.Flow Element Installed
ML20198N60022 May 1986NPDES Noncompliance Notification:On 860402,biological Oxygen Demand of Samples from Discharge Point 501 Exceeded Permit Limits.Cause Unknown.Waste Sludge Tank Pumped to Prevent Recirculation of Ultrion 8155 During Decant
ML20210E55315 March 1986NPDES Noncompliance Notification:On 860205 & 26,samples of Discharge Point 501 Exceeded Monthly Average Biological Oxygen Demand.Caused by Degradation of Biological Activity Associated W/Nalco & Ultrion 8155 Addition Sys
ML20210E13615 March 1986NPDES Noncompliance Notification:On 860205,sample from Discharge Point 501 Exceeded Permit Limit for Instantaneous Max.Caused by Sewage Treatment Plant Unable to Reduce Phosphorous to Below Permit Level
ML20210E56314 March 1986NPDES Noncompliance Notification:On 860225 & 0304,pH Limit of Samples from Discharge Point 401 (Auxiliary Boiler Blowdown) Exceeded Permit Limit.Caused by High Blowdown Rate of Auxiliary Boilers.Blowdown Rates Will Be Reduced
ML20210E26914 March 1986NPDES Noncompliance Notification:On 860210,pH of Sample from Discharge Point 301 Exceeded Limit.Caused by Placing Raw Water Sump Ph Meter in Standby Allowing High Ph Water Into Setting Basin.Mod to Ph Monitor Planned
ML20154J50810 February 1986NPDES Noncompliance Notification:On 860108,phosphorus from Discharge Point 501 (Sewage Treatment Plant) Exceeded Permit Limit.Caused by Inability of Plant to Reduce Phosphorus Level.Aluminum Chloride Coagulant Treatment Sys Installed
ML20210E25710 February 1986NPDES Noncompliance Notification:On 860203,pH Sample from Discharge Point 301 (Wastewater Settling Basin) Exceeded Permit Limit.Caused by Effluent Ph Monitors Out of Calibr. Neutralization Tank & Raw Water Ph Meters Recalibr
ML20136G38330 December 1985NPDES Noncompliance Notification:On 851117,pH of Discharge Point Sample Exceeded Permit Limit.Caused by non-neutral Overflow from Neutralizing Tank.Acid Added to Settling Basin & Personnel Training Planned
ML20136G54130 December 1985NPDES Noncompliance Notification:On 851127,pH of Sample Taken from Discharge Point 301 in Wastewater Setting Basin Exceeded Permit Level.Cause Unknown.No Unusual Entries Noted in Operator Log
ML20136G56327 December 1985NPDES Noncompliance Notification:On 851107,pH of Sample from Wastewater Settling Basin,Discharge Point 301 Found Above Limit.Cause Unknown.On 851108,pH Measured 8.6. Corrective Action Unnecessary
ML20136G64927 December 1985NPDES Noncompliance Notification:On 851104,06,11,20 & 26, Total Phosphorous of Samples Taken from Sewage Treatment Plant Discharge Point 501 Exceeded Permit Limit.Corrective Actions:Use of Phosphorous Cleaning Products MinimizedGrab sample
ML20137X86626 November 1985NPDES Noncompliance Notification:On 851002,03,07,09,12,13, 14,15,16,17,19 & 26,pH of Samples from Discharge Point 301 Exceeded Permit Limit.Caused by Failure to Inform Operators of New Requirement.Operators Informed of New Requirement
ML20137X91726 November 1985NPDES Noncompliance Notification:On 851006,09,16 & 22,total Phosphorus of Samples from Discharge Point 501 Exceeded 4.0 mg/1 Limit.Cause Unknown.Investigation Into Cleaning Substances & Other Possible Sources Initiated on 851113
ML20127E40121 May 1985NPDES Noncompliance Notification:On 850510,biological Oxygen Demand of Sample from Discharge Point 108 Exceeded Permit Limit.Cause Under Investigation.Operational Controls & Monitoring IncreasedGrab sample
ML20127M6573 May 1985NPDES Noncompliance Rept:On 850418,biological Oxygen Demand of Sample from Discharge Point 108 in Sewage Treatment Plant Exceeded Permit Limit.Caused by Pin Floc Carryover from Clarifier.Pressure Filters Utilized
ML20116H69022 April 1985NPDES Noncompliance Notification:On 850410,total Suspended Solids of Sample from Discharge Point 108 Exceeded Permit Limit.Caused by Clogging of Sludge Return Pump A.Lines Blown Back & Valves Lined UpPacking leak
ML20112F7282 January 1985NPDES Noncompliance Notification:Biological Oxygen Demand of 841204 Sample Taken from Discharge Point 108 Exceeded Instantaneous Max Permit Limit.Caused by Low Flow Condition Due to Malfunction of Filter Feedpumps.Pump Repaired