.t g;
1
'PHIL ELPHIA ELF.C1'RIC COMPANY -
PEACH BOT 10M ATO.I.(IC POWER STATION R. D 1, Acx 208 Deka, Pennsylvania 173!4
,s mc Mw.mafo.se o, axcausix (71?) 4 $6 7014 D. M. Smith
/
Vice President May 25, 1988 I
Department of Environmental Resources Bureau of Water Quality Management One Ararat Blvd.
Harrisburg, PA 17110
SUBJECT:
Noncompliance with NPDES Permit Peach Bottom Atomic Power Station Permit No.
PA 0009733 Gentlemen:
DESCRIPT_ ION OF NONCOMPLIANCE:
The B00 of a sample from discharge point 501 (Sewage Trettnent Plant) exceeded the monthly aver 6ge and instantaneous. maximum limits.
Date Sample Taken:
4/6/88 4/13/88 4/20/88 Date Results Received:
5/12/88 4/26/88 5/8/88 Results of Analysis 150 mg/l 7 mg/l 22 mg/l Monthly Avg.
59.7 Permit Limitation:
30 mg/l Monthly Average 60 mg/l Instantaneous Maximum CAUSE Or NONCOMPLIANCE:
The cause of the noncompliance was high solids carryover through the sewage plant.
This was caused by the #1 and #2 wet we'll pumps returning to service on April 6, 1988 after tripping on thermals due to clogging with debris.
DURATION OF NONCOMPLIANCE _:
The estimated duration of the noncompliance was twelve hours, i
i JgpSB8Bi2ggggm
.s nc.n N
j';
. t..
G,,
,p, a
CORRECTIVE ACTION:
The il and #2 wet well pumps were repaired / cleaned on' April 6, 1988.
)
)
\\
Ver$trulyyours, JAV/ala g