NPDES Noncompliance Notification:On 880406,total Phosphorus Sample Exceeded Monthly Average.Caused by High Solids Carryover from Clarifers & Lower than Normal Phs.Alum to Sewage Plant Equalization Basin Increased
ML20245D421
Person / Time
Site: Peach Bottom  
Issue date: 05/25/1988
From: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
HARRISBURG, PA
References
NUDOCS 8806030344
Download: ML20245D421 (2)


Text

y e

PHILADELPHIA ELECTRIC COMPANY

  • PEACH BOTTOM ATOMIC POWER STATION R. D.1, Box 208 Delta, Pennsylvania 17314 PEACM BorruMorpts rotea OF EXCELIIMCI C17)4$67o14 D. M. Smith Vice PrCsident Mr.y 25, 1988 Department of Environmental Resources Bureau of Water Quality Management One Ararat Blvd.

Harrisburg, PA 17110

SUBJECT:

Noncompliance with NPDES Permit Peach Bottom Atomic Power Station Permit No.

PA 0009733 Gentlemen:

DESCRIPTION OF NONCOMPLIA_NCE:

The total phosphorus of a sample taken from discharge point 501 (Sewage Treatment Plant) exceeded the monthly average.

Date Sample Taken:

4/6/88 4/13/88 4/20/88 Date Results Received:

5/12/88 4/26/88 5/8/88 Results of Analysis:

3.7 ppm 2.2 ppm 2.4 ppm Permit Limitation:

2.0 pnm monthly average Monthly Average 2.7 ppm CAUSE OF NONCOMPLIANCE:

The cause of the first noncompliance is high solids carryover from the 1

clarifiers.

The second and third noncompliances were caused by lower than normal pHs which interfered with the alum removal of phosphorus.

OURATIONOFNONCOMPLIANg:

The duration of the noncompliance is estimated to be from April 6, 1988 through April 12, 1988 0006030s 44 880525

[f)

PDR ADOCK 05000277

/

S DCD

/[O h

e

'-' ';p 1

CORRECTIVE ACTION:

The corrective action has been to increase the alum to the sewage plant equalization basin, We have been monitoring the daily effluent for phosphorus, using a short form method, and the results are consistently less than 2.0 ppm.

l Very truly yours, A*

JAV/ala cc:

Environmental Protection Agency Water Permits Branch Pennsylvania Section 3WM52 841 Chestnut Building Philadelphia, Pennsylvania 19107 Director Administrator i

ONRR Region I US NRC Office of Inspection and Enforcement Washington, DC 20555 US Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 l

\\