PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8'699 PHILADELPHIA. PA.19101 (215)841-4000 September 29, 1986 Department of Environmental Resources Bureau of Water Quality Management One Ararat Blvd.
Harrisburg, PA 17110
SUBJECT:
Noncompliance with NPDES Permit Peach Bottom Atomic Power Station Permit No.
PA 0009733 Gentlemen:
DESCRIPTION OF NONCOMPLIANCE:
The pH of a sample from discharge point 301 (Waste Water Settling Basin) exceeded the permit limit.
l Date Samples Taken 8/6/86 Date Results Received:
8/6/86 Results of Analysis:
5.0 Permit Limitation:
6.0 to 9.0 CAUSE OF NONCOMPLIANCE:
When the acid day tank for the water plant demineralizers was drained in preparation for maintenance, the acid inadvertently entered the raw water pump through an open drain valve on a neutralizing tank.
When the sump was being recirculated to neutralize *it, some of the acid went to the settling basin.
DURATION OF NONCOMPLIANCE:
The duration of noncompliance was approximately two hours.
8610060797 860729 PDR ADOCK ODOOO:T/7
< /$5 S
PDR P
O
h
- CORRECTIVE ACTION:
Liquid sodium hydroxide was added to the settling basin to bring the pH into the acceptable range.
~
PREVENTION OF FUTURE OCCURRENCES :
A letter was written to shift supervision suggesting neutralization of the raw water sunp should be accomplished by processing the water back through the neutralization tank.
A copy of the letter was also forwarded to the training section.
,Very ruly yours, G. M Leitch Superintendent Nuclear Generation Division JAV/GML:ala Environmental Protection Agency.
cc:
Water Permits Branch Pennsylvania Section 3WM52 841 Chestnut Building Philadelphia, Pennsylvania 19107 Director Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 Adninistrator Region 1 Office of Inspection and Enforcement US Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 L
-