Similar Documents at Fermi |
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000341/19990171999-10-21021 October 1999 Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted. Major Areas Inspected:Incident Involving Loaded Firearm in Protected Area Identified on 990922 & Being Considered as Noncited Violation IR 05000341/19990111999-10-0707 October 1999 Insp Rept 50-341/99-11 on 990724-0908.Two NCVs Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19990101999-08-10010 August 1999 Insp Rept 50-341/99-10 on 990619-0723.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19990061999-08-0606 August 1999 Insp Rept 50-341/99-06 on 990712-0716.No Violations Noted. Major Areas Inspected:Review of Various Aspects of Licensee Chemistry & Radiation Protection Programs,Specifically in Listed Areas IR 05000341/19990091999-07-12012 July 1999 Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Operations IR 05000016/19990011999-06-30030 June 1999 Insp Rept 50-016/99-01 on 990614-17.No Violations Noted. Major Areas Inspected:Mgt & Control,Decommissioning Support Activities,Industry Safety & Radiological Safety IR 05000341/19990071999-06-0101 June 1999 Insp Rept 50-341/99-07 on 990402-0515.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support IR 05000341/19990041999-05-26026 May 1999 Insp Rept 50-341/99-04 on 990503-07.No Violations Noted. Major Areas Inspected:Radiological Emergency Response Preparedness Program,Aspect of Plant Support IR 05000341/19990081999-04-29029 April 1999 Partially Withheld (Ref 10CFR73.21) Insp Rept 50-341/99-08 on 990405-09.No Violations Noted.Major Areas Inspected: Physical Protection Program,Aspect of Plant Support IR 05000341/19990031999-04-23023 April 1999 Insp Rept 50-341/99-03 on 990218-0401.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Engineering,Maint & Plant Support ML20205P1751999-04-14014 April 1999 Insp Rept 50-341/99-06 on 990315-19.No Violations Noted. Major Areas Inspected:Licensee Plant Support Performance Re Gaseous & Liquid Effluents,Liquid Waste Processing,Esf Filtration & CR Heating Ventilation & Air Conditioning IR 05000341/19990051999-03-19019 March 1999 Insp Rept 50-341/99-05 on 990308-11.No Violations Noted. Major Areas Inspected:Reviewed Fire Protection Program,An Aspect of Plant Support IR 05000341/19990021999-03-0808 March 1999 Insp Rept 50-341/99-02 on 990111-29.Violations Noted.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000341/19980151999-02-22022 February 1999 Errata to Insp Rept 50-341/98-15.Rept Incorrectly Documented That Loose Internal Sleeving on Turbine Control Valve Caused Power Oscillations Greater than 10% During Plant Operation IR 05000341/19980191999-01-21021 January 1999 Insp Rept 50-341/98-19 on 981110-990104.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20198D5671998-12-0707 December 1998 Insp Rept 50-341/98-15 on 980922-1109.Noncited Violations Were Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000341/19980171998-11-16016 November 1998 Insp Rept 50-341/98-17 on 980909-1021.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage 6 IR 05000341/19980181998-10-30030 October 1998 Insp Rept 50-341/98-18 on 981006-08.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants IR 05000341/19980131998-10-20020 October 1998 Insp Rept 50-341/98-13 on 980730-0921.No Violations Noted. Major Areas Inspected:Aspects Oflicensee Operations, Engineering,Maint & Plant Support IR 05000341/19980161998-10-0606 October 1998 Insp Rept 50-341/98-16 on 981014-18.No Violations Noted. Major Areas Inspected:Alara Planning & Controls for Sixth Refueling Outage,Internal Exposure Monitoring,Radiological Surveys & Posting & Radiation Worker Performance IR 05000016/19980071998-09-30030 September 1998 Insp Rept 50-016/98-07 on 980909-11.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Industrial Safety & Radiological Safety IR 05000341/19980121998-09-0101 September 1998 Insp Rept 50-341/98-12 on 980619-0803.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000341/19980081998-07-14014 July 1998 Insp Rept 50-341/98-08 on 980504-0618.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support IR 05000341/19980101998-06-29029 June 1998 Insp Rept 50-341/98-10 on 980608-12.No Violations Noted. Major Areas Inspected:Plant Support & Evaluation of Licensee Performance During Station Biennial Exercise of Emergency Plan IR 05000341/19980111998-06-25025 June 1998 Insp Rept 50-341/98-11 on 980608-12.No Violations Noted. Major Areas Inspected:Radiological Controls for Spent Fuel Pool Clean Out Project IR 05000341/19980091998-06-0404 June 1998 Insp Rept 50-341/98-09 on 980511-15.No Violations Noted. Major Areas Inspected:Aspects of Licensee Performance Re Physical Security for Facility IR 05000341/19980061998-06-0303 June 1998 Insp Rept 50-341/98-06 on 980317-0427.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19980031998-05-11011 May 1998 Insp Rept 50-341/98-03 on 971221-980316.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20247D4511998-05-0606 May 1998 Insp Rept 50-341/98-07 on 980406-09.Violations Noted.Major Areas Inspected:Plant Support IR 05000016/19980061998-04-21021 April 1998 Insp Rept 50-016/98-06 on 980324-26.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities & Radiological Safety ML20216E7901998-04-10010 April 1998 Insp Rept 50-341/98-05 on 980320-0406.Violations Noted: Failure to Demonstrate Reactor Protection Sys Trip Function Units & Isolation Actuation Trip Units within Response Time Limit of at Least Once Per 18 Months IR 05000341/19980041998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support ML20217K2821998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000341/19970161998-02-0505 February 1998 Insp Rept 50-341/97-16 on 981108-0105.Noncited Violation Identified.Major Areas Inspected:License Operations,Maint, Engineering & Plant Support IR 05000341/19970171998-01-21021 January 1998 Insp Rept 50-341/97-17 on 971201-05.No Violations Noted. Major Areas Inspected:Conduct of Operations,Operator Training & Qualification & Miscellaneous Operations Issues ML20202H8581998-01-0303 January 1998 Insp Rept 50-341/97-14 on 970923-1107.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000341/19970141998-01-0202 January 1998 Insp Rept 50-341/97-14 on 970923-1107.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970151997-11-0404 November 1997 Insp Rept 50-341/97-15 on 971008-10.No Violations Noted. Major Areas Inspected:Plant Support Performance Re mid-cycle Outage Chemistry,Alara Planning & Implementation & Radiation Worker Practices ML20198N3291997-10-29029 October 1997 Insp Rept 50-341/97-11 on 970804-1010.Violations Noted. Major Areas Inspected:Review & Assess Engineering & Technical Support at Plant IR 05000341/19970131997-10-27027 October 1997 Insp Rept 50-341/97-13 on 970811-0922.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000341/19970121997-09-25025 September 1997 Insp Rept 50-341/97-12 on 970804-06.No Violations Noted. Major Areas Inspected:Exam Procedures & Representative Records,Observations of Activities & Interviews W/Staff & Conduct of Security & Safeguards Activities IR 05000341/19970101997-09-25025 September 1997 Insp Rept 50-341/97-10 on 970630-0812.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970071997-08-26026 August 1997 Insp Rept 50-341/97-07 on 970508-0630.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20149K8691997-07-0101 July 1997 Insp Rept 50-341/97-03 on 970320-0509.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Plant Support IR 05000341/19970091997-06-26026 June 1997 RP Insp Rept 50-341/97-09 on 970602-06.No Violations Noted. Major Areas Inspected:Plant Support Performance Re Chemistry,Effluents & Environ Monitoring ML20148N1471997-06-19019 June 1997 Insp Rept 50-341/97-05 on 970512-30.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000341/19970081997-06-13013 June 1997 Insp Rept 50-341/97-08 on 970519-23.No Violations Noted. Major Areas Inspected:Review of Physical Security Program Performance IR 05000341/19970041997-06-13013 June 1997 Insp Rept 50-341/97-04 on 970310-14 & 0512-16.No Violations Noted.Major Areas Inspected:Review of Representative Post Job ALARA Reviews,Radiation Exposure Data & self-assessments from 1996 Refueling Outage ML20140D3521997-06-0202 June 1997 Insp Rept 50-341/97-02 on 970201-0319.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970061997-05-21021 May 1997 Insp Rept 50-341/97-06 on 970428-0502.No Violations Noted. Major Areas Inspected:Insp Included Review of Radiological Emergency Response Preparedness Program 1999-08-06
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000341/19990171999-10-21021 October 1999 Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted. Major Areas Inspected:Incident Involving Loaded Firearm in Protected Area Identified on 990922 & Being Considered as Noncited Violation IR 05000341/19990111999-10-0707 October 1999 Insp Rept 50-341/99-11 on 990724-0908.Two NCVs Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19990101999-08-10010 August 1999 Insp Rept 50-341/99-10 on 990619-0723.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19990061999-08-0606 August 1999 Insp Rept 50-341/99-06 on 990712-0716.No Violations Noted. Major Areas Inspected:Review of Various Aspects of Licensee Chemistry & Radiation Protection Programs,Specifically in Listed Areas IR 05000341/19990091999-07-12012 July 1999 Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Operations IR 05000016/19990011999-06-30030 June 1999 Insp Rept 50-016/99-01 on 990614-17.No Violations Noted. Major Areas Inspected:Mgt & Control,Decommissioning Support Activities,Industry Safety & Radiological Safety IR 05000341/19990071999-06-0101 June 1999 Insp Rept 50-341/99-07 on 990402-0515.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support IR 05000341/19990041999-05-26026 May 1999 Insp Rept 50-341/99-04 on 990503-07.No Violations Noted. Major Areas Inspected:Radiological Emergency Response Preparedness Program,Aspect of Plant Support IR 05000341/19990081999-04-29029 April 1999 Partially Withheld (Ref 10CFR73.21) Insp Rept 50-341/99-08 on 990405-09.No Violations Noted.Major Areas Inspected: Physical Protection Program,Aspect of Plant Support IR 05000341/19990031999-04-23023 April 1999 Insp Rept 50-341/99-03 on 990218-0401.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Engineering,Maint & Plant Support ML20205P1751999-04-14014 April 1999 Insp Rept 50-341/99-06 on 990315-19.No Violations Noted. Major Areas Inspected:Licensee Plant Support Performance Re Gaseous & Liquid Effluents,Liquid Waste Processing,Esf Filtration & CR Heating Ventilation & Air Conditioning IR 05000341/19990051999-03-19019 March 1999 Insp Rept 50-341/99-05 on 990308-11.No Violations Noted. Major Areas Inspected:Reviewed Fire Protection Program,An Aspect of Plant Support IR 05000341/19990021999-03-0808 March 1999 Insp Rept 50-341/99-02 on 990111-29.Violations Noted.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000341/19980151999-02-22022 February 1999 Errata to Insp Rept 50-341/98-15.Rept Incorrectly Documented That Loose Internal Sleeving on Turbine Control Valve Caused Power Oscillations Greater than 10% During Plant Operation IR 05000341/19980191999-01-21021 January 1999 Insp Rept 50-341/98-19 on 981110-990104.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20198D5671998-12-0707 December 1998 Insp Rept 50-341/98-15 on 980922-1109.Noncited Violations Were Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000341/19980171998-11-16016 November 1998 Insp Rept 50-341/98-17 on 980909-1021.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage 6 IR 05000341/19980181998-10-30030 October 1998 Insp Rept 50-341/98-18 on 981006-08.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants IR 05000341/19980131998-10-20020 October 1998 Insp Rept 50-341/98-13 on 980730-0921.No Violations Noted. Major Areas Inspected:Aspects Oflicensee Operations, Engineering,Maint & Plant Support IR 05000341/19980161998-10-0606 October 1998 Insp Rept 50-341/98-16 on 981014-18.No Violations Noted. Major Areas Inspected:Alara Planning & Controls for Sixth Refueling Outage,Internal Exposure Monitoring,Radiological Surveys & Posting & Radiation Worker Performance IR 05000016/19980071998-09-30030 September 1998 Insp Rept 50-016/98-07 on 980909-11.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Industrial Safety & Radiological Safety IR 05000341/19980121998-09-0101 September 1998 Insp Rept 50-341/98-12 on 980619-0803.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000341/19980081998-07-14014 July 1998 Insp Rept 50-341/98-08 on 980504-0618.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support IR 05000341/19980101998-06-29029 June 1998 Insp Rept 50-341/98-10 on 980608-12.No Violations Noted. Major Areas Inspected:Plant Support & Evaluation of Licensee Performance During Station Biennial Exercise of Emergency Plan IR 05000341/19980111998-06-25025 June 1998 Insp Rept 50-341/98-11 on 980608-12.No Violations Noted. Major Areas Inspected:Radiological Controls for Spent Fuel Pool Clean Out Project IR 05000341/19980091998-06-0404 June 1998 Insp Rept 50-341/98-09 on 980511-15.No Violations Noted. Major Areas Inspected:Aspects of Licensee Performance Re Physical Security for Facility IR 05000341/19980061998-06-0303 June 1998 Insp Rept 50-341/98-06 on 980317-0427.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19980031998-05-11011 May 1998 Insp Rept 50-341/98-03 on 971221-980316.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20247D4511998-05-0606 May 1998 Insp Rept 50-341/98-07 on 980406-09.Violations Noted.Major Areas Inspected:Plant Support IR 05000016/19980061998-04-21021 April 1998 Insp Rept 50-016/98-06 on 980324-26.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities & Radiological Safety ML20216E7901998-04-10010 April 1998 Insp Rept 50-341/98-05 on 980320-0406.Violations Noted: Failure to Demonstrate Reactor Protection Sys Trip Function Units & Isolation Actuation Trip Units within Response Time Limit of at Least Once Per 18 Months IR 05000341/19980041998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support ML20217K2821998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000341/19970161998-02-0505 February 1998 Insp Rept 50-341/97-16 on 981108-0105.Noncited Violation Identified.Major Areas Inspected:License Operations,Maint, Engineering & Plant Support IR 05000341/19970171998-01-21021 January 1998 Insp Rept 50-341/97-17 on 971201-05.No Violations Noted. Major Areas Inspected:Conduct of Operations,Operator Training & Qualification & Miscellaneous Operations Issues ML20202H8581998-01-0303 January 1998 Insp Rept 50-341/97-14 on 970923-1107.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000341/19970141998-01-0202 January 1998 Insp Rept 50-341/97-14 on 970923-1107.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970151997-11-0404 November 1997 Insp Rept 50-341/97-15 on 971008-10.No Violations Noted. Major Areas Inspected:Plant Support Performance Re mid-cycle Outage Chemistry,Alara Planning & Implementation & Radiation Worker Practices ML20198N3291997-10-29029 October 1997 Insp Rept 50-341/97-11 on 970804-1010.Violations Noted. Major Areas Inspected:Review & Assess Engineering & Technical Support at Plant IR 05000341/19970131997-10-27027 October 1997 Insp Rept 50-341/97-13 on 970811-0922.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000341/19970121997-09-25025 September 1997 Insp Rept 50-341/97-12 on 970804-06.No Violations Noted. Major Areas Inspected:Exam Procedures & Representative Records,Observations of Activities & Interviews W/Staff & Conduct of Security & Safeguards Activities IR 05000341/19970101997-09-25025 September 1997 Insp Rept 50-341/97-10 on 970630-0812.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970071997-08-26026 August 1997 Insp Rept 50-341/97-07 on 970508-0630.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20149K8691997-07-0101 July 1997 Insp Rept 50-341/97-03 on 970320-0509.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Plant Support IR 05000341/19970091997-06-26026 June 1997 RP Insp Rept 50-341/97-09 on 970602-06.No Violations Noted. Major Areas Inspected:Plant Support Performance Re Chemistry,Effluents & Environ Monitoring ML20148N1471997-06-19019 June 1997 Insp Rept 50-341/97-05 on 970512-30.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000341/19970081997-06-13013 June 1997 Insp Rept 50-341/97-08 on 970519-23.No Violations Noted. Major Areas Inspected:Review of Physical Security Program Performance IR 05000341/19970041997-06-13013 June 1997 Insp Rept 50-341/97-04 on 970310-14 & 0512-16.No Violations Noted.Major Areas Inspected:Review of Representative Post Job ALARA Reviews,Radiation Exposure Data & self-assessments from 1996 Refueling Outage ML20140D3521997-06-0202 June 1997 Insp Rept 50-341/97-02 on 970201-0319.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970061997-05-21021 May 1997 Insp Rept 50-341/97-06 on 970428-0502.No Violations Noted. Major Areas Inspected:Insp Included Review of Radiological Emergency Response Preparedness Program 1999-08-06
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000341/19990171999-10-21021 October 1999 Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted. Major Areas Inspected:Incident Involving Loaded Firearm in Protected Area Identified on 990922 & Being Considered as Noncited Violation IR 05000341/19990111999-10-0707 October 1999 Insp Rept 50-341/99-11 on 990724-0908.Two NCVs Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19990101999-08-10010 August 1999 Insp Rept 50-341/99-10 on 990619-0723.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19990061999-08-0606 August 1999 Insp Rept 50-341/99-06 on 990712-0716.No Violations Noted. Major Areas Inspected:Review of Various Aspects of Licensee Chemistry & Radiation Protection Programs,Specifically in Listed Areas IR 05000341/19990091999-07-12012 July 1999 Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Operations IR 05000016/19990011999-06-30030 June 1999 Insp Rept 50-016/99-01 on 990614-17.No Violations Noted. Major Areas Inspected:Mgt & Control,Decommissioning Support Activities,Industry Safety & Radiological Safety IR 05000341/19990071999-06-0101 June 1999 Insp Rept 50-341/99-07 on 990402-0515.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support IR 05000341/19990041999-05-26026 May 1999 Insp Rept 50-341/99-04 on 990503-07.No Violations Noted. Major Areas Inspected:Radiological Emergency Response Preparedness Program,Aspect of Plant Support IR 05000341/19990081999-04-29029 April 1999 Partially Withheld (Ref 10CFR73.21) Insp Rept 50-341/99-08 on 990405-09.No Violations Noted.Major Areas Inspected: Physical Protection Program,Aspect of Plant Support IR 05000341/19990031999-04-23023 April 1999 Insp Rept 50-341/99-03 on 990218-0401.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Engineering,Maint & Plant Support ML20205P1751999-04-14014 April 1999 Insp Rept 50-341/99-06 on 990315-19.No Violations Noted. Major Areas Inspected:Licensee Plant Support Performance Re Gaseous & Liquid Effluents,Liquid Waste Processing,Esf Filtration & CR Heating Ventilation & Air Conditioning IR 05000341/19990051999-03-19019 March 1999 Insp Rept 50-341/99-05 on 990308-11.No Violations Noted. Major Areas Inspected:Reviewed Fire Protection Program,An Aspect of Plant Support IR 05000341/19990021999-03-0808 March 1999 Insp Rept 50-341/99-02 on 990111-29.Violations Noted.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000341/19980151999-02-22022 February 1999 Errata to Insp Rept 50-341/98-15.Rept Incorrectly Documented That Loose Internal Sleeving on Turbine Control Valve Caused Power Oscillations Greater than 10% During Plant Operation IR 05000341/19980191999-01-21021 January 1999 Insp Rept 50-341/98-19 on 981110-990104.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20198D5671998-12-0707 December 1998 Insp Rept 50-341/98-15 on 980922-1109.Noncited Violations Were Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000341/19980171998-11-16016 November 1998 Insp Rept 50-341/98-17 on 980909-1021.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage 6 IR 05000341/19980181998-10-30030 October 1998 Insp Rept 50-341/98-18 on 981006-08.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants IR 05000341/19980131998-10-20020 October 1998 Insp Rept 50-341/98-13 on 980730-0921.No Violations Noted. Major Areas Inspected:Aspects Oflicensee Operations, Engineering,Maint & Plant Support IR 05000341/19980161998-10-0606 October 1998 Insp Rept 50-341/98-16 on 981014-18.No Violations Noted. Major Areas Inspected:Alara Planning & Controls for Sixth Refueling Outage,Internal Exposure Monitoring,Radiological Surveys & Posting & Radiation Worker Performance IR 05000016/19980071998-09-30030 September 1998 Insp Rept 50-016/98-07 on 980909-11.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Industrial Safety & Radiological Safety IR 05000341/19980121998-09-0101 September 1998 Insp Rept 50-341/98-12 on 980619-0803.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000341/19980081998-07-14014 July 1998 Insp Rept 50-341/98-08 on 980504-0618.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support IR 05000341/19980101998-06-29029 June 1998 Insp Rept 50-341/98-10 on 980608-12.No Violations Noted. Major Areas Inspected:Plant Support & Evaluation of Licensee Performance During Station Biennial Exercise of Emergency Plan IR 05000341/19980111998-06-25025 June 1998 Insp Rept 50-341/98-11 on 980608-12.No Violations Noted. Major Areas Inspected:Radiological Controls for Spent Fuel Pool Clean Out Project IR 05000341/19980091998-06-0404 June 1998 Insp Rept 50-341/98-09 on 980511-15.No Violations Noted. Major Areas Inspected:Aspects of Licensee Performance Re Physical Security for Facility IR 05000341/19980061998-06-0303 June 1998 Insp Rept 50-341/98-06 on 980317-0427.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19980031998-05-11011 May 1998 Insp Rept 50-341/98-03 on 971221-980316.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20247D4511998-05-0606 May 1998 Insp Rept 50-341/98-07 on 980406-09.Violations Noted.Major Areas Inspected:Plant Support IR 05000016/19980061998-04-21021 April 1998 Insp Rept 50-016/98-06 on 980324-26.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities & Radiological Safety ML20216E7901998-04-10010 April 1998 Insp Rept 50-341/98-05 on 980320-0406.Violations Noted: Failure to Demonstrate Reactor Protection Sys Trip Function Units & Isolation Actuation Trip Units within Response Time Limit of at Least Once Per 18 Months IR 05000341/19980041998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support ML20217K2821998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000341/19970161998-02-0505 February 1998 Insp Rept 50-341/97-16 on 981108-0105.Noncited Violation Identified.Major Areas Inspected:License Operations,Maint, Engineering & Plant Support IR 05000341/19970171998-01-21021 January 1998 Insp Rept 50-341/97-17 on 971201-05.No Violations Noted. Major Areas Inspected:Conduct of Operations,Operator Training & Qualification & Miscellaneous Operations Issues ML20202H8581998-01-0303 January 1998 Insp Rept 50-341/97-14 on 970923-1107.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000341/19970141998-01-0202 January 1998 Insp Rept 50-341/97-14 on 970923-1107.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970151997-11-0404 November 1997 Insp Rept 50-341/97-15 on 971008-10.No Violations Noted. Major Areas Inspected:Plant Support Performance Re mid-cycle Outage Chemistry,Alara Planning & Implementation & Radiation Worker Practices ML20198N3291997-10-29029 October 1997 Insp Rept 50-341/97-11 on 970804-1010.Violations Noted. Major Areas Inspected:Review & Assess Engineering & Technical Support at Plant IR 05000341/19970131997-10-27027 October 1997 Insp Rept 50-341/97-13 on 970811-0922.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000341/19970121997-09-25025 September 1997 Insp Rept 50-341/97-12 on 970804-06.No Violations Noted. Major Areas Inspected:Exam Procedures & Representative Records,Observations of Activities & Interviews W/Staff & Conduct of Security & Safeguards Activities IR 05000341/19970101997-09-25025 September 1997 Insp Rept 50-341/97-10 on 970630-0812.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970071997-08-26026 August 1997 Insp Rept 50-341/97-07 on 970508-0630.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20149K8691997-07-0101 July 1997 Insp Rept 50-341/97-03 on 970320-0509.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Plant Support IR 05000341/19970091997-06-26026 June 1997 RP Insp Rept 50-341/97-09 on 970602-06.No Violations Noted. Major Areas Inspected:Plant Support Performance Re Chemistry,Effluents & Environ Monitoring ML20148N1471997-06-19019 June 1997 Insp Rept 50-341/97-05 on 970512-30.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000341/19970081997-06-13013 June 1997 Insp Rept 50-341/97-08 on 970519-23.No Violations Noted. Major Areas Inspected:Review of Physical Security Program Performance IR 05000341/19970041997-06-13013 June 1997 Insp Rept 50-341/97-04 on 970310-14 & 0512-16.No Violations Noted.Major Areas Inspected:Review of Representative Post Job ALARA Reviews,Radiation Exposure Data & self-assessments from 1996 Refueling Outage ML20140D3521997-06-0202 June 1997 Insp Rept 50-341/97-02 on 970201-0319.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970061997-05-21021 May 1997 Insp Rept 50-341/97-06 on 970428-0502.No Violations Noted. Major Areas Inspected:Insp Included Review of Radiological Emergency Response Preparedness Program 1999-08-06
[Table view] Category:UTILITY
MONTHYEARIR 05000341/19900151990-10-26026 October 1990 Insp Rept 50-341/90-15 on 901009-12.No Violations or Addl Open Items Noted.Major Areas Inspected:Pumps & Valves IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000341/19900121990-09-13013 September 1990 Partially Withheld Physical Security Insp Rept 50-341/90-12 on 900827-31 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Alarm Stations & Communications,Power Supply & Security Training & Qualification IR 05000341/19900111990-09-0707 September 1990 Insp Rept 50-341/90-11 on 900625-0824,No Violations Noted. Major Areas Inspected:Action on Previous Insp Findings, Operational Safety,Maint,Surveillance,Followup of Events, LER Followup,Medical Drill Observation & Regional Requests IR 05000341/19900091990-07-25025 July 1990 Insp Rept 50-341/90-09 on 900514-0706.Violations Noted,But Not Cited.Major Areas Inspected:Action on Previous Insp Findings,Operational Safety,Maint,Surveillance,Followup of Events,Ler Followup,Bulletin & Info Notice Followup IR 05000341/19900071990-06-27027 June 1990 Insp Rept 50-341/90-07 on 900331-0525.Violations Noted.Major Areas Inspected:Action on Previous Insp Findings,Operational Safety,Maint,Surveillance,Followup of Events,Ler & Review of Maint on East Mainstream Bypass Valve & Reactor Scram IR 05000341/19892001989-09-28028 September 1989 SSOMI Rept 50-341/89-200 on 890717-21 & 0731-0804.Weaknesses Identified.Major Areas Inspected:Detailed Design & Engineering Work Products Required to Support Mods Planned for First Refueling Outage IR 05000341/19890211989-09-27027 September 1989 Insp Rept 50-341/89-21 on 890717-0905.No Violations Noted. Major Areas Inspected:Operational Safety,Maint, Surveillances,Followup of Events,Ler Followup,Assembly/ Accountability,& Management Meetings IR 05000341/19890231989-09-25025 September 1989 Insp Rept 50-341/89-23 on 890818-22 & 0901-06.No Violations Noted.Major Areas Inspected:Radwaste Transportation & Chemistry Programs,Including Organization & Mgt Controls, Gaseous & Solid Radwaste,Shipping & QC Programs IR 05000341/19890201989-08-23023 August 1989 Insp Rept 50-341/89-20 on 890626-30 & 0720.Deviation Noted. Major Areas inspected:post-fire Safe Shutdown Capability Configuration Mgt Program & Fire Protection Program IR 05000341/19890181989-08-14014 August 1989 Insp Rept 50-341/89-18 on 890606-0724.No Violations Noted. Major Areas Inspected:Followup of Events,Operational Safety, Maint,Surveillance,Ler Followup,Allegation Followup,Det Review,Preparations for Refueling & Mgt Meetings IR 05000341/19890161989-07-19019 July 1989 Insp Rept 50-341/89-16 on 890531-0602 & 26-31.No Violations Noted.Major Areas inspected:self-initiated SSFI of HPCI Sys. Present Design Control Measures Showed Significant Improvement IR 05000341/19890121989-07-12012 July 1989 Insp Rept 50-341/89-12 on 890225-0623.No Violations Noted. Major Areas Inspected:Allegations Pertaining to Security Operations at Facility IR 05000341/19890111989-07-0707 July 1989 Insp Rept 50-341/89-11 on 890411-0605.Violations Noted. Major Areas Inspected:Action on Previous Insp Findings, Operational Safety,Maint,Surveillance,Followup of Events, LER Followup & NUREG-0737 Action Items IR 05000016/19890011989-06-27027 June 1989 Insp Repts 50-016/89-01 & 50-341/89-14 on 890522-26.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program at Unit 2 During Operation, Including Training & Qualifications IR 05000341/19890191989-06-23023 June 1989 Insp Rept 50-341/89-19 on 890613-15.No Violations,Deviations or Deficiencies Noted.Exercise Weakness Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000341/19890131989-06-0909 June 1989 Insp Rept 50-341/89-13 on 890508-12.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions to Correct Deficiencies Identified by NRC Diagnostic Evaluation Team Re Training & Qualification Effectiveness IR 05000341/19890151989-05-31031 May 1989 Insp Rept 50-341/89-15 on 890515-19.Violation Noted.Major Areas Inspected:Allegation Re Operation of Facility ML20247A6941989-05-15015 May 1989 Safety Insp Rept 50-341/89-06 on 890203-0412.Violations Noted Re Failure to Properly Design Railcar Door Seals for Flood Protection & Containment Integrity.Major Areas Inspected:Reactor Bldg Railcar Door Designs IR 05000341/19890101989-05-10010 May 1989 Partially Withheld Insp Rept 50-341/89-10 on 890417-21 & 24- 27 (Ref 10CFR73.21 & 2.790).Violations Noted.Major Areas Inspected:Mgt Support,Alarm Stations & Communications, Testing & Maint & Training & Qualification IR 05000341/19890071989-04-28028 April 1989 Page 7 to Special Safety Insp Rept 50-341/89-07 ML20245H7491989-04-17017 April 1989 Insp Rept 50-341/89-07 on 890118-0323.Violations Noted. Major Areas Inspected:Followup of 890118 Event Where HPCI Div II Steam Line Flow Differential Pressure Transmitter Was Found Calibr to Value Greater than Tech Spec Limit IR 05000341/19880331989-04-0404 April 1989 Insp Rept 50-341/88-33 on 881212-890323.Violations Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings & Review of Allegations Re Plant Operation IR 05000341/19890091989-03-27027 March 1989 Insp Rept 50-341/89-09 on 890306-10.No Violations Noted. Major Areas Inspected:Plant Chemistry & Radiation Protection Organization,Mgt Controls,Qa,Confirmatory Measurements for in-plant Radiochemical Analysis,Audits & Environ Monitoring IR 05000341/19890021989-03-0303 March 1989 Insp Rept 50-341/89-02 on 890101-0217.Violations Noted.Major Areas Inspected:Action on Previous Insp Findings,Operational Safety,Maint,Surveillance,Followup of Events,Ler Followup & Regional Request IR 05000341/19890051989-02-16016 February 1989 Enforcement Conference Rept 50-341/89-05 on 890208.Major Areas discussed:10CFR50,App B Violations Re Failure to Implement Corrective Action for Info Notice 87-12 & Failure to Lubricate Train B Breaker Per Applicable Procedures IR 05000341/19880341988-12-0505 December 1988 Enforcement Conference Rept 50-341/88-34 on 881118.Major Areas Discussed:Apparent Violations to 10CFR50,App B Identified & Info Pertinent to Cause,Extent,Treatment & Corrective Action to Prevent Recurrence of Problems IR 05000341/19880291988-12-0505 December 1988 Insp Rept 50-341/88-29 on 881018-20,1031-1103 & 09.No Violations or Deviations Identified.Major Areas Inspected: Licensee Compliance W/Atws rule,10CFR50.62 ML20206L5651988-11-23023 November 1988 Insp Rept 50-341/88-08 on 880308-0920.Violations Noted.Major Areas Inspected:Circumstances Re Licensee Actions in Response to Matl Control Allegations Reported to NRC in Jan & Feb 1988 IR 05000341/19880251988-11-0808 November 1988 Insp Rept 50-341/88-25 on 880906-1006.Apparent Violations Noted.Major Areas Inspected:Failure of Recirculation Pump B Discharge Valve to Close on 880820 & 28 & Issuance of Confirmatory Action Ltr CAL-RIII-88-24 IR 05000341/19880281988-11-0808 November 1988 Partially Withheld Safeguards Insp Rept 50-341/88-28 on 881003-14 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Mgt Support,Security Program,Plans,Audits, Protected & Vital Area Barriers,Packages & Vehicles ML20204K1171988-10-12012 October 1988 Insp Rept 50-341/88-21 on 880716-0831.Violations Noted. Major Areas Inspected:Action on Previous Insp Findings, Operational Safety,Maint,Surveillance,Followup of Events, LER Followup,Personnel Qualifications & Regional Requests IR 05000341/19880201988-08-26026 August 1988 Insp Rept 50-341/88-20 on 880705-14.No Violations Noted. Major Areas Inspected:Licensee Emergency Operating Procedures,Operator Training & Plant Sys to Accomplish Listed Objectives for NRC Temporary Instruction 2515/92 IR 05000341/19880191988-08-15015 August 1988 Insp Rept 50-341/88-19 on 880531-0715.No Violations Noted. Major Areas Inspected:Followup of Events,Operational Safety, Maint,Surveillance,Ler Followup,Startup Test Observation, Generic Ltr Review,Rept Review & Mgt Meetings IR 05000341/19880121988-07-19019 July 1988 Insp Rept 50-341/88-12 on 880401-0527.Violations Noted.Major Areas Inspected:Action on Previous Insp Findings,Operational Safety,Maint,Surveillance,Ler Followup,Mgt Meetings,Tmi Action Item Followup & Operation Safety Team Insp Followup IR 05000341/19880181988-06-24024 June 1988 Safety Insp Rept 50-341/88-18 on 880516-20 & 0606-10. Violations Noted.Major Areas Inspected:Msiv Open/Close Manual Relay Logic,Surveillance Program Review,App R - High Impedence Fault & Deviation Rept Review IR 05000341/19880161988-06-0606 June 1988 Insp Rept 50-341/88-16 on 880517-20.No Violations or Deviations Noted.Major Areas Inspected:Annual Util Emergency Preparedness Exercise Involving Observations by Three NRC Representatives of Functions & Locations During Exercise IR 05000341/19880061988-05-26026 May 1988 Insp Rept 50-341/88-06 on 880206-0331.Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Ler Followup,Safety evaluation,NUREG-0737 Actions,Followup of Events & Startup Test Preparation IR 05000341/19880151988-05-24024 May 1988 Insp Rept 50-341/88-15 on 880427-29.No Violations or Deviations Noted.Major Areas Inspected:Maint Activities Conducted at End of Planned Local Leak Rate Test Outage IR 05000341/19880141988-05-12012 May 1988 Insp Rept 50-341/88-14 on 880117-0428.Violation Noted.Major Areas Inspected:Circumstances & Licensee Actions Surrounding Failure of Noninterruptible Control Air Compressor on 880114 IR 05000341/19880071988-05-11011 May 1988 Revised Page 7 to Insp Rept 50-341/88-07,correcting Errors & to Assure Clearer Understanding of NRC Concerns ML20154E6481988-05-0505 May 1988 Insp Rept 50-341/87-48 on 871018-880331.Violations Noted. Major Areas Inspected:Events Surrounding Failure of Licensed Operators to Comply W/Tech Spec Action Requirements Associated W/Reactor Protection Sys Instrument Channel ML20151X8461988-04-21021 April 1988 Insp Rept 50-341/88-07 on 880307-25.Violation & Deviation Noted.Major Areas Inspected:Maint Activities & Licensee Action on Previous Inspector Identified Problems IR 05000341/19880131988-04-20020 April 1988 Enforcement Conference Rept 50-341/88-13 on 880413.Major Areas Discussed:Review & Discussion of Enforcement Options Re Four Potential Violations of Licensee Security Plan IR 05000341/19880111988-04-15015 April 1988 Insp Rept 50-341/88-11 on 880328-30.No Violations or Deviations Noted.Major Areas Inspected:Activities Re Main Steam Isolation Valve Spring Failures & IE Bulletin 85-003 Concerning motor-operated Valve Switch Settings IR 05000341/19880101988-04-12012 April 1988 Partially Withheld Insp Rept 50-341/88-10 on 880310-24 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected: Security Program Audits,Records & Repts,Testing & Maint, Locks,Keys & Combinations & Vital Area Barriers IR 05000341/19880021988-03-30030 March 1988 Partially Withheld Allegation Review & Physical Security Insp Rept 50-341/88-02 (Ref 10CFR73.21(c)(2)).No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Records & Repts IR 05000341/19880051988-02-23023 February 1988 Insp Rept 50-341/88-05 on 880202-05.No Violations Noted. Major Areas Inspected:Onsite Followup of Events at Operating Reactors,Onsite Followup of Written Repts & non-license Training IR 05000341/19870411988-01-12012 January 1988 Insp Rept 50-341/87-41 on 870824-1228.No Violations Noted. Major Areas Inspected:Inadequate Controls for Drug Test Urine Samples,Excessive Alcohol Use & Drug Use at Offsite Locations & Personnel Under Influence of Drugs or Alcohol IR 05000341/19870501988-01-0606 January 1988 Insp Rept 50-341/87-50 on 871207-11.Violation Noted.Major Areas Inspected:Radiation Protection Activities,Including Organization & Mgt Control,Training & Qualification,Exposure Control,Control of Radioactive Matls & Contamination 1990-09-07
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000341/19990171999-10-21021 October 1999 Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted. Major Areas Inspected:Incident Involving Loaded Firearm in Protected Area Identified on 990922 & Being Considered as Noncited Violation IR 05000341/19990111999-10-0707 October 1999 Insp Rept 50-341/99-11 on 990724-0908.Two NCVs Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19990101999-08-10010 August 1999 Insp Rept 50-341/99-10 on 990619-0723.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20210Q4191999-08-10010 August 1999 Notice of Violation from Insp on 990619-0723.Violation Noted:Within 2 Hours of Removing Div 1 Diesel Generator 11 from Svc Licensee Failed to Verify That Components Depending on Div 2 Diesel Were Operable IR 05000341/19990061999-08-0606 August 1999 Insp Rept 50-341/99-06 on 990712-0716.No Violations Noted. Major Areas Inspected:Review of Various Aspects of Licensee Chemistry & Radiation Protection Programs,Specifically in Listed Areas ML20210J2201999-07-23023 July 1999 Notice of Violation from Insp on 990524.Violation Noted: on 980920 Kf Enoch Engaged in Deliberate Misconduct That Caused Licensee to Be in Violation of Condition of License IR 05000341/19990091999-07-12012 July 1999 Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Operations IR 05000016/19990011999-06-30030 June 1999 Insp Rept 50-016/99-01 on 990614-17.No Violations Noted. Major Areas Inspected:Mgt & Control,Decommissioning Support Activities,Industry Safety & Radiological Safety IR 05000341/19990071999-06-0101 June 1999 Insp Rept 50-341/99-07 on 990402-0515.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support IR 05000341/19990041999-05-26026 May 1999 Insp Rept 50-341/99-04 on 990503-07.No Violations Noted. Major Areas Inspected:Radiological Emergency Response Preparedness Program,Aspect of Plant Support IR 05000341/19990081999-04-29029 April 1999 Partially Withheld (Ref 10CFR73.21) Insp Rept 50-341/99-08 on 990405-09.No Violations Noted.Major Areas Inspected: Physical Protection Program,Aspect of Plant Support IR 05000341/19990031999-04-23023 April 1999 Insp Rept 50-341/99-03 on 990218-0401.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Engineering,Maint & Plant Support ML20205P1751999-04-14014 April 1999 Insp Rept 50-341/99-06 on 990315-19.No Violations Noted. Major Areas Inspected:Licensee Plant Support Performance Re Gaseous & Liquid Effluents,Liquid Waste Processing,Esf Filtration & CR Heating Ventilation & Air Conditioning IR 05000341/19990051999-03-19019 March 1999 Insp Rept 50-341/99-05 on 990308-11.No Violations Noted. Major Areas Inspected:Reviewed Fire Protection Program,An Aspect of Plant Support IR 05000341/19990021999-03-0808 March 1999 Insp Rept 50-341/99-02 on 990111-29.Violations Noted.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions ML20207J1531999-03-0808 March 1999 Notice of Violation from Insp on 990111-29.Violation Noted: as of Jan 1999,calculation DC-0367, Design Calculations for RHR Sys, Rev 6,incorrectly Concluded That Stated Item Would Occur IR 05000341/19980151999-02-22022 February 1999 Errata to Insp Rept 50-341/98-15.Rept Incorrectly Documented That Loose Internal Sleeving on Turbine Control Valve Caused Power Oscillations Greater than 10% During Plant Operation IR 05000341/19980191999-01-21021 January 1999 Insp Rept 50-341/98-19 on 981110-990104.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20198D5671998-12-0707 December 1998 Insp Rept 50-341/98-15 on 980922-1109.Noncited Violations Were Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000341/19980171998-11-16016 November 1998 Insp Rept 50-341/98-17 on 980909-1021.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage 6 PNO-III-98-055, on 981113,licensee Shut Unit Down to Repair Steam Leak from Reactor Feedwater Check Valve.Valve Is SR & Would Provide Containment Isolation Function Under Accident Conditions1998-11-13013 November 1998 PNO-III-98-055:on 981113,licensee Shut Unit Down to Repair Steam Leak from Reactor Feedwater Check Valve.Valve Is SR & Would Provide Containment Isolation Function Under Accident Conditions IR 05000341/19980181998-10-30030 October 1998 Insp Rept 50-341/98-18 on 981006-08.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants PNO-III-98-048, on 981008,Detroit Edison Declared Alert Based on Operator Rept of Smoke & Fire Alarm Coming from EDG 12 Control Panel in Switchgear Room.Operator Tripped EDG 12, Opened Output Breaker & Left Switchgear Room1998-10-21021 October 1998 PNO-III-98-048:on 981008,Detroit Edison Declared Alert Based on Operator Rept of Smoke & Fire Alarm Coming from EDG 12 Control Panel in Switchgear Room.Operator Tripped EDG 12, Opened Output Breaker & Left Switchgear Room IR 05000341/19980131998-10-20020 October 1998 Insp Rept 50-341/98-13 on 980730-0921.No Violations Noted. Major Areas Inspected:Aspects Oflicensee Operations, Engineering,Maint & Plant Support IR 05000341/19980161998-10-0606 October 1998 Insp Rept 50-341/98-16 on 981014-18.No Violations Noted. Major Areas Inspected:Alara Planning & Controls for Sixth Refueling Outage,Internal Exposure Monitoring,Radiological Surveys & Posting & Radiation Worker Performance IR 05000016/19980071998-09-30030 September 1998 Insp Rept 50-016/98-07 on 980909-11.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Industrial Safety & Radiological Safety ML20154D1361998-09-30030 September 1998 Notice of Violation from Insp on 980304-0702.Violation Noted:On 980213,individual Failed to Contact Radiation Protection Dept for Appropriate Radiological Briefing IR 05000341/19980121998-09-0101 September 1998 Insp Rept 50-341/98-12 on 980619-0803.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20236R1251998-07-15015 July 1998 Notice of Violation from Insp Completed on 970922.Violation Noted:Licensee Made Revs to Procedures as Described in Safety Analysis Rept W/O Receiving Prior Commission Approval IR 05000341/19980081998-07-14014 July 1998 Insp Rept 50-341/98-08 on 980504-0618.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support ML20236Q9241998-07-14014 July 1998 Notice of Violation from Insp on 980504-0618.Violation Noted:Operators Were Making Changes to Facility by Defeating Various Control Room Annunciators W/O Performing Written Safety Analysis Rept IR 05000341/19980101998-06-29029 June 1998 Insp Rept 50-341/98-10 on 980608-12.No Violations Noted. Major Areas Inspected:Plant Support & Evaluation of Licensee Performance During Station Biennial Exercise of Emergency Plan IR 05000341/19983011998-06-29029 June 1998 NRC Operator Licensing Exam Rept 50-341/98-301OL(including Completed & Graded Tests) for Tests Administered on 980406- 0520.Six Applicants Were Administered Exam,Two Failed Written Exam,Two Failed Operating Exam & One Failed Both IR 05000341/19980111998-06-25025 June 1998 Insp Rept 50-341/98-11 on 980608-12.No Violations Noted. Major Areas Inspected:Radiological Controls for Spent Fuel Pool Clean Out Project IR 05000341/19980091998-06-0404 June 1998 Insp Rept 50-341/98-09 on 980511-15.No Violations Noted. Major Areas Inspected:Aspects of Licensee Performance Re Physical Security for Facility IR 05000341/19980061998-06-0303 June 1998 Insp Rept 50-341/98-06 on 980317-0427.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19980031998-05-11011 May 1998 Insp Rept 50-341/98-03 on 971221-980316.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20247D4371998-05-0606 May 1998 Notice of Violation from Insp on 980406-09.Violation Noted: on 980120,two Mechanical Maint Staff Entered North Reactor Water Cleanup Room,Locked High Radiation Area,W/O Stay Time Tracking & Deviation Not Authorized by Radiation Protection ML20247D4511998-05-0606 May 1998 Insp Rept 50-341/98-07 on 980406-09.Violations Noted.Major Areas Inspected:Plant Support IR 05000016/19980061998-04-21021 April 1998 Insp Rept 50-016/98-06 on 980324-26.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities & Radiological Safety ML20216E7901998-04-10010 April 1998 Insp Rept 50-341/98-05 on 980320-0406.Violations Noted: Failure to Demonstrate Reactor Protection Sys Trip Function Units & Isolation Actuation Trip Units within Response Time Limit of at Least Once Per 18 Months ML20217K2821998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support ML20217K2681998-03-31031 March 1998 Notice of Deviation from Insp on 971113-980226.Deviation Noted:Licensee Stored Irradiated Fuel in West Fuel Preparation Machine in Sf Pool Oversight on 971114-15 & 971115-17,resulting in Only 20.5 Feet Water Above Top of Sf ML20217K2531998-03-31031 March 1998 Notice of Violation from Insp on 971113-980226.Violation Noted:Inspector Identified That on 971115,licensee Removed Multiple Fuel Rods from Irradiated Fuel Bundle YJ7119,up to Four at One Time,During Failed Fuel Insp Activities IR 05000341/19980041998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support ML20216B5451998-03-0404 March 1998 Notice of Violation from Insp on 970804-1010.Violation Noted:Analysis Did Not Consider All Scenarios in Providing Bases for Determination That USQ Did Not Exist IR 05000341/19970161998-02-0505 February 1998 Insp Rept 50-341/97-16 on 981108-0105.Noncited Violation Identified.Major Areas Inspected:License Operations,Maint, Engineering & Plant Support PNO-III-98-015, on 980201,reactor Scrammed from 96% Power Following Trip of Main Turbine.Main Turbine Trip Resulted from Main Generator Load Rejection Protective Signal. Investigation Continuing1998-02-0404 February 1998 PNO-III-98-015:on 980201,reactor Scrammed from 96% Power Following Trip of Main Turbine.Main Turbine Trip Resulted from Main Generator Load Rejection Protective Signal. Investigation Continuing IR 05000341/19970171998-01-21021 January 1998 Insp Rept 50-341/97-17 on 971201-05.No Violations Noted. Major Areas Inspected:Conduct of Operations,Operator Training & Qualification & Miscellaneous Operations Issues ML20202H8531998-01-0303 January 1998 Notice of Violation from Insp on 970923-1107.Violation Noted:On 971027 W/Edg 14 Inoperable,Licensee Identified That Operators Failed to Perform Verification Checks in SR 4.8.1.1.1 at Least Once Per Eight Hours 1999-08-06
[Table view] |
Inspection Report - Fermi - 1986031 |
---|
|
|
Text
'
.
,
!
.U,. S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-341/86031(DRSS)
Docket No. 50-341 License No. NPF-43 Licensee: The Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166 Facility Name: Enrico Fermi Atomic Power Plant, Unit 2 Inspection At: Fermi 2 site, Monrce, MI Inspection Conducted: October 21-23, 1986 Inspectors: . Fos Team Leader
//
Da"A~/
!d
'
lf
. Williamsen m
! # 8 (,.
Dat( '
Approved By: W ne ief o/a/2c, Emergency Preparedness Date'
Section Inspection Sumary Inspection on October 21-23, 1986 (Repert No. 50-341/86031(DRSS))
Areas Inspected: Routine, announced inspection of the annual Fermi Unit 2 Emergency Exercise, involving observations by five NRC representatives of key functions and locations during the exercise. The inspection involved three NRC inspectors and two consultant Results: No violations, deficiencies, or deviations were identified. No exercise weaknesses were identified, t
8611230436 861113 PDR ADOCK 05000341 G PDR
_ _ . _
c
.
DETAILS
.
1. Persons Contacted NRC Observers and Areas Observed J. Foster, Control Room, TSC, OSC, E0F N. Williamsen, Emergency Operations Facility (EOF)
W. Rogers,_0SC, PASS Sample F. McManus,~ Control Room T. Lonergan, E0F Detroit Edison Company
- R. Sylvia, Group *R. Lenhart, Plant Manager
- T. Randazzo, Emergency Officer, EOF
"M. Hoffman, Emergency Coordinator
- E. Madsen, Exercise Coordinator
- G. Overbeck, Director, Nuclear Training
- G. Preston, Operations Engineer C. Hall, Communicator J. Tibgi, Shift Technical Advisor D. Hoskins, Reactor Engineer R. Johnson, Reactor Operator R. Bovinet, Senior Control Room Operator L. Barker, Reactor Operator
- R. Speek, Assistant Shift Supervisor
- A. Inks, Control Room Communicator G. Pierce, Shift Supervisor D. Johnson, Simulator Operator C. Lin, Simulator Operator J. Conen, E0F Controller
- R. Anderson, Radiological Protection Coordinator L. Bomgart, RET Field Teams M. Hubney, Dose Assessor
- M. Lico, Dose Assessor B. Cummings, Asst. Radiological Protection Coordinator M. Radenberg, Meteorologist M. Stewart, Health Physics
- B. Lewis, Nuclear Training
- B. Heffner, Public Information
- R. Kelm, Nuclear Security
- E, Cochrane, Computer Service
- J. Wynn, Information Systems
- R. Eberhardt, Rad. Che *J. Bobba, Rad. Che * Trahey, Director, NQA
- L. Simpkin, Nuclear Safety Ad * Diroff, Information Systems
. .- -. -
-- . .-. . . . - - . . - . -- *
.
- DePriest, Information Systems
- Kluska-Vierk, Nuclear Prod. - Serv. Ad *E. Dragon, HPASS
- P. Poole, Information Systems
- S. Washburn, Information Systems
- C. Sexauer, Comp. Serv./ Info. Systems
- H. Ebner, Information Systems-
- J. Nolloth, Comp.. Ser * Kalisek, Nuclear Security
- J. Korte, Nuclear Security
- L. Barker, Nuclear OPS R. Szkotnicki, Controller
- Denotes all personnel who attended the exit interview on October 23, 198 . Licensee Action on Previously-identified Items (Closed) Open Item No. 50-341/86018-01: Lack of guidance on consideration of a two mile precautionary evacuation in case of
" loss of physical control of the facility." The applicable Procedure, No. EP-545 " Protective Action Guidelines and Recommendations", Revision 4, was reviewed and found to contain appropriate guidance in Table 5.1. This item is close (Closed) Open Item No. 50-341/86018-02: Lack of delineation of drills for emergency call-out procedures (shift augmentation).
Procedure No. EPA-4, Revision 3, " Drills and Exercises" now contains this information in Section 5. This item is close (Closed) Open Item No. 50-341/85041-01: Failure to incorporate current and forecast meteorology into protective action decisionmaking. During the current exercise, dose assessment personnel made excellent use of current and projected meteorological information, and the information was well utilized in protective action decisionmakin This item is close (Closed) Open Item No. 50-341/85041-02: Failure to follow ALARA considerations for off-site teams. During the current exercise, concern for the radiological exposure of the off-site teams was adequately demonstrated through dose projection, authorization for doses beyond regulatory limits if required, and discussion of the need for teams to be administered potassium iodide tablets. This item is close (0 pen) Open Item No. 50-341/85041-04: Revision of dose assessment computer code to support Anticipated Transient Without Scram (ATWS)
conditions. Licensee personnel indicated that revisions to the computer code have been made to accommodate ATWS condition The modified program was not reviewed during this inspection, and this item will remain open pending review of the progra , _ _ __ .._ __ _ ._ ,
. General An unannounced, off-hours exercise of the Fermi 2 Emergency Plan was conducted at the Enrico Fermi Atomic Power Plant, Unit 2, on October 22, 1986. The exercise. tested,the licensee's and offsite emergency suppor organizations' capabilities to respond to a simulated accident scenario resulting in.a major release of radioactive effluen The exercise was integrated with a test of response capabilities of the State of Michigan and counties of Wayne and Monroe, whose extent of participation.is delineated in Attachment.1. This was'a partial participation exercise for the State of Michiga Attachment 1' describes the: Scope and Objectives of.tbe exercise and Attachment 2 describes the exercise scenari . General Observations Procedures This exercise was conducted in accordance with 10 CFR Part 50, Appendix E requirements using the Enrico Fermi Unit 2 Power Station Radiological Emergency Plan and Emergency Plan Implementing Procedure Coordination The licensee's response was coordinated, orderly and timely. If the events had been real, the actions taken by the licensee's would have been sufficient to permit the State and local authorities to-
'take appropriate actions to protect the public's health and safet Observers
.The licensee's observers monitored and critiqued this exercise along with five NRC observers and a number of Federal Emergency Management Agency (FEMA) observers, ,
FEMA observations or, the response of State and local governments will be provided in a separate repor Exercise Critioues A critique was held with the licensee and NRC representatives on October 23, 1986. The NRC discussed the observed strengths and
' weaknesses during the exit interview. In addition, a public critique was held by FEMA on October 24, 1986, to present the
!
preliminary offsite findings of the FEMA exercise observers.
I
,
!
i
. _ _ . . _ . _ . . , . . , _ _ _ _ _ _ . , . , . . . . . _ _ _ , _ _ . . . _ . _ . _ . , . . _ _ , , , _ _ ~ . . . _ , . . . _ _ _ . . . _ - . . . , , _ , , _ . _
.
_
'
.
5. Specific Observations Control Room Team work and overall conduct of personnel in the Simulator Control Roon was excellen The shift supervisor displayed detailed plant knowledge and maintained positive control of activities in the Control Roo Reports to State, local agencies and the NRC were timely, within the fifteen minute requirement for State and local agencies and the one hour requirement for the NR Operations and communications, both via telephone and face to face, were conducted in a formal and efficient manner throughout the exercise. However, all forms and checklists were not completely filled i Examples of this included the " plant response" section '
of the Notification of Unusual Event (NUE) request for an ambulance, and the assembly / accountability section of the Shift Supervisor's alert checklist. At some time after the NUE notification information form was approved and transmitted to the State and local agencies, e the block for ambulance was checke The licensee did not fully implement Procedure No. RERP-EP-290,
" Emergency Notifications". The Control Room communicator continued to make NRC notifications via the ENS telephone throughout the exercise. Procedure No. EP-290 requires the ENS notifications to be the responsibility of the TSC once the TSC is activate Licensee personnel indicated that there was a conscious decision to have the responsibility for communication with the NRC remain in the Control Room, based on the assumption that the NRC would request this in an actual inciden The governing procedure should be revised to describe the actions expected. During review of Procedure No. RERP-EP-290, it was also noted that the Control Room is the only location authorized to use the notification form used for communication with the NR Based on the above findings, this portion of the licensee's program is adequate. However, the following item should be considered for improvement:
- Procedure No. RERP-EP-290 should be revised to describe who will communicate with the NRC in a drill or actual inciden It should also reflect that the notification form for NRC communications be utilized at whatever location has NRC communication responsibilit Technical Support Center (TSC)
On activation of the TSC, personnel arrived promptly, in an orderly, professional manne Radiological monitoring equipment (air sample station, survey meter) were placed into operation, and offsite dose projection computer programs were initiated. Noise levels were lo _ _ _ . . _ _ . _ _ _ _ . _ _ . _ _ _ _ _ - - . _ . -
_ ,
_- . .. .. _.__ -. - . _ _
'
.
There was an excellent use of meteorological data, both as input to ,
current dose assessment calculations, and as information for 1 consideration for future Protective Action Recommendation Forecast meteorology was obtained and properly utilize ' Status boards were well utilized.- Early in the exercise, the Emergency Officer decided to concentrate on status board parameters of central interest. Much later in the exercise, when the press of activity lessened, parameters of minor interest were also poste It was noted that the TSC status boards lack provision for trending selected plant parameters of major interest (the capability for
' trending two parameters had previously been added to the E0F).
Assembly / accountability was conducted during the time the TSC was activating. Initial assembly / accountability took approximately 35 minutes (with a goal of thirty minutes), with only two personnel'
(both NRC observers) unaccounted for. Full accountability was achieved approximately two minutes late The (simulated) second shift of TSC personnel was advised of routes to take to the plant which would minimize their exposure to the release plum A frisker station / step-off pad was established at the door to the TSC'once the scenario included a radiological release. Security guards located on the opposite side of the entrance door questioned all entrants.as to whether they had frisked themselves for contamination. A similar frisking station / step-off pad arrangement was established at the entrance to the EOF. In both cases, however, the guards could not actually observe the frisking performed by entrant Based on the above findings, this portion of the licensee's program is acceptable. -However, the following items should be considered for improvement:
- Frisker stations should be located where individuals frisking themselves can,be observed, to better insure that adequate contamination control is achieve * A status board for trending selected plant parameters of major
. interest should be available in the TS Operational Support Center (OSC)
During the period of observation in the OSC, personnel were reacting to the exercise scenario in a professional manner. -The OSC noise urpose of each level was in plant teamlow, wasand the location, know Radiationcomposition dose trackingand p/ projection for OSC team members was adequately demonstrate Based on the above findings, this portion of the licensee's program is acceptabl [ .
.
.
d. Post-accident Sample In general, the team selected to perform the PASS sample performed adequately. However, two problems were noted during the taking of a drywell gas sample. The first dealt with the lack of valve and instrument labeling associated with the demineralized water storage tank and the flowmeter used to determine the flush time. The second dealt with personnel not being directed to wear Self Contained Breathing Apparatus (SCBA) face masks while taking and transporting the sampl Based on the above findings, this portion of the licensee's program is adequate. However, the following item should be considered for improvement:
- Valves and instruments on the PASS system panel should be clearly labele * The procedure for taking a PASS sample should be revised to require the use of full SCBA (including facemasks) at all times while taking and transporting a PASS sampl e. Emergency Operations Facility (E0F)
Personnel began arriving in the E0F approximately thirty minutes after the Alert was declared. The key personnel in the E0F were responding to the signal on their beepers, while other personnel responded to phone calls from the Detroit Dispatch. As the players arrived, the E0F was quickly and efficiently set up with access control, ventilation system on " Emergency", a frisking station outside of the double doors, EPIPs on desks, etc. Thus, when a Site Area Emergency was declared at 0431 hours0.00499 days <br />0.12 hours <br />7.126323e-4 weeks <br />1.639955e-4 months <br />, most of the players in the EOF had already arrived. Transfer of command and control to the EOF was done very efficiently about fifteen minutes after the Site Area Emergency was declared. This was also about five minutes after the TSC declared a General Emergenc Transfer of command and control was correctly delayed for several minutes while the TSC was in the final stages of declaring the General Emergency and TSC staff were completing the associated offsite notifications.
!
When command and control was transferred to the E0F, the status l
boards were already current and they were updated very quickly when i new information was available. Periodic briefings were used to j inform E0F personnel of current plant status and current action Communications between the EOF and Canada and between the E0F and the State of Michigan were handled in an expeditious and professional manner. Extensive telephone discussions with State of Michigan personnel always preceeded the issuing-of a Protective
Action Recommendation (PAR). The verbal communications were so good that one minor communication failure initially slipped by unnoticed:
i the telefaxed Message No. 6 incorrectly showed the PAR " keyhole" as
!
l 7 l
. . ~ . . . _ _ .~ _ _ . . _ _ _ _ ___ _ . _ _
.
-
,
,
- - evacuate'0-2 miles in all sectors and then 2-10 miles downwind,
' - whereas all the parties knew that the intended recommendation-(that n the State'had accepted and was implementing) was to evacuate .
L 0-5 miles'in all s.ectors, and 5-10 miles downwind of the plan This error was accurately reflected in the EOF ~ status boards, and was later observed to be corrected by the players by the issuance of
- -
,
Message No. NRC personnel contacted both the State of Michigan and Canada following the exercise, and were advised that communication during the exercise had been satisfactor Good communications.with the TSC was maintained using a dedicated .
ring-down speakerphone. Communications to the corporate headquarters was through an electronic data link by the Emergency Officer's log-keeper. The TSC could have asked for copies of the
, messages via their own data link,-but did not do so during the ,
- . exercis Meteorological proje'ctions were continually updated and the State
,
was always informed when a dose calculation based on updated
- weather conditions was being computed. Data frori the field teams was posted and assessed and integrated into the dose calculation The dispatch control from the E0F to the offsite field teams was
,
s
. goo The RET coordinator communicated by radio to the teams; the radio room was an adjacent low-noise room in a corner of the EOF; the teams responded promptly to instructions from the E0F. Status i I
boards, both in the radio roem and in the main E0F showed the '
+
locations of the teams and the results of their survey s Personnel who were assigned dose assessment responsibilities in the E0F arrived, setup their work areas and equipment', and initiated
, assigned activities in a timely manner and in accord with the i- -
pertinent Emergency Planning Implementing Procedures (EPIPs). Dose 4 assessment personnel aggressively pursued their procedurally 1 assigned responsibilities throughout the exercise. Information regarding radiation dose conditions and projections were continuously
'
developed and were frequently and effectively communicated to the E0F's Emergency Officer as well as dose assessment counterparts in
- the TSC and State office Dose assessment equipment (computers, printers communications equipment (telephones, radios,' a,and accessories),
nd directories) necessary for the acquisition, calculation, display, documentation and dissemination of pertinent meteorological and plant conditions
'
were'available. For the most part, all such equipment performed g adequately throughout the exercise. Dose assessment and meteorological personnel demonstrated an awareness of backup or alternate systems and the procedures for their use.
[
i
!.
w e. - 9 .U%,,ay..ggm., re,p.-_M,.,, ,%m.,,_m,-y,,v.-,.,mr,,,- --.__m ,,~4+m%~e7 ,-,,,,.m,y.m.,.,- .,,.m,,%-,,my,-w,__r_,,.m,_._%,.m,,-,m,...-
.
, -. .. - - - - - - . . . . - -- -
- .
,
.
,
The physical arrangement of the dose assessment area, equipment, i decisional . aids, status boards, etc. provided for easy' access, display and coordination of information collected by the functional
- groups involved in dose assessment-tasks. Status boards, decisional C aids.and displays were well maintained and provided pertinent
- information in a concise, legible manner. Trending of conditions
'
- were displayed where possibl Many of the Public Address (PA) announcements received in the EOF from the Simulator Control Room during the exercise were at times 1 accompanied by interfering noise, i.e. squeals or other feedback-like noise. This was subsequently identified as a circuit problem not related to the exercis EOF dose assessment personnel (dose assessors and meteorologists)
, experienced a temporary loss of displays on their ERIS computer terminals during this exercise. Exercise controller personnel were
'
'
observed to actively participate in hands-on manipulation of the
< terminals to bring them back on-line. This was due in part to an
- . " exercise artifact", in that the ERIS system utilizes file information rather than real data during exercise The controller noted above-was knowledgeable of the ERIS system, and was present to i assist with the system in case of failur EOF players were frequently reminded to check their Direct Reading .
Dosimeters (DRDs). A random check of a small sampling of the <
1- players in the E0F indicated a variation in their understanding of j readings obtained and the actions required of them based on the l readings obtained.
i i'
Based on the above findings, this portion of the licensee's program
-
is acceptable. However, the-following item should be considered for improvement:
i * Training for personnel involved in the Emergency Preparedness program, especially those personnel who do not utilize L dosimetry on a routine basis, should include information as to
- how to read a DRD, and what actions should be taken in response i to DRD readings.
6. Exercise Scenario and Control
. The licensee's exercise scenario was challenging, including: a '
l contaminated / injured man, meteorological changes, and
'
assembly / accountability. The degree of challenge in an exercise scenario is considered when assessing observed exercise weaknesses, f Exercise control was considered adequate in all area !
,
A General Emergency, based on a loss of two, with the potential loss of the f i third Fission Product Barrier (FPB) was properly declared at 0443 hours0.00513 days <br />0.123 hours <br />7.324735e-4 weeks <br />1.685615e-4 months <br />.
. However, the scenario did not expect the General Emergency declaration
'
until approximately 0510 hours0.0059 days <br />0.142 hours <br />8.43254e-4 weeks <br />1.94055e-4 months <br />, based on Projected Whole Body dose at the
l 9
-.-.m
-
-
, _ , . , _ , . _,,_,.,,.,_,__,,__._,,,_,_,._.-_.._,___,_...___.._.,_._., , . , . .
.
.
site boundary or loss of three FPBs. The concept that a serious challenge to a FPB should be considered the same as a breach of that barrier should be considered by exercise scenario author The simulator failed at 0634 hours0.00734 days <br />0.176 hours <br />0.00105 weeks <br />2.41237e-4 months <br />, shortly after the operators manipulated controls to flood the drywell with water from the spent fuel
. pool, an action for which the simulator is not programmed. The scenario timeline was subsequently maintained by the combined efforts of the operators (players) and controllers extrapolating data from the time of failure. The operators should not be expected to provide input for the scenario. If the simulator had failed earlier, at the time of, or just before the reactor scram, the plant parameter cata to maintain the
~
. scenario would not have been available. It is recommended that a backup system for providing plant parameter data to the operators be available for future exercise . Licensee Critiques The licensee held three levels of exercise critiques, one at each individual facility immediately following the exercise, a critique for controllers / observers following the facility critiques, and a presentation at the Exit Interview. NRC personnel attended critiques at their respective facilities, and both subsequent critiques, and determined that exercise deficiencies of significance had been identified by licensee personne . Exit Interview The inspectors held an exit interview the day after the exercis3 on October 23, 1986, with the representatives denoted in Section 1. The NRC Team Leader discussed the scope and findings of the inspection. The applicant was also asked if any of the information discussed during the exit was proprietary. The applicant responded that none of the information was proprietar Attachments: Exercise Scope and Objectives Exercite Scenario Outline l
!
_ _ _ ,_. , - _ _ _ - _ _ . - - _ . - _ _- - -----,-__ _, . .
- -__
- . . - _ . - - - - .
.
. .
,
Ex;rciss Manual FERMEX '86 ,
Page 3-2 l SECTION 3 - SCOPE, OBJECTIVES, AND SIMULATIONS FOR FERMEX 86
l i DETROIT EDISON
,
3. SCOPE FERMEX 86 will be a small scale exercise that will simulate an emergency at Fermi 2 4 that will result in offsite radiological releases that will require response from the Fermi 2. Counties of Monroe and Wayne, and State cf Michigan Emergency Response ,
Organizations. The counties will be fully operational with the State of Michigan operational from the State EOC in Lansing only. The EXERCISE is designed to test Edison's response to various plant emergencies; to establish the communications.and coordination between Edison and offsite governmental Emergency Response Organizations and Facilities; and address the specific responsibilities, capabilities, and interfaces of each organized element of the Fermi 2 RERP Plan and implementing Procedures.
A simulated abnormal radiological incident at Fermi 2 will escalate from an UNUSUAL EVENT to a GENERAL EMERGENCY. The emergency will then doescalate to the Reentry
and Recovery Phase where it will terminat As the capabilities of Edison and the various offsite governmental response
'
organizations are brought into play, the effectiveness and efficiency of the organizations'
response will be independently evaluated by the NRC and FEM . OBJECTIVES i
- The specific objectives of FERMEX 86 will demonstrate
- The adequacy of the RERP Plan and its implementing Procedures and test the
- proficiency of the Emergency Response Organization to select and use the
- appropriate p'rocedures for response to the emergency.
i-j\
' The capability of the Control Room operators to respond to a radiological incident
'
at Fermi 2, by manipulating the simulator controls, with a minimum of exercise messages and exercise Controller interface and to use the Simulator Control Room communications to conduct an exercise. (The Simulator is not being evaluated).
(
, The integrated capability of the Emergency Response Organization to respond to a j simulated emergency event. - The effectiveness of the interfaces between the Control Room and the ' permanent Emergency Response facilities, including the Operational Support Center, Technical Support Center, and Emergency Operations Facility.
I 1O l
l l
!
,
- .ww=- , .--- rmv--e,---,e-w+r-em --e--w+= vm-W- *----=-r- *-w- -
.
Ex:rcis] Manu 1 FERMEX '86 Page 3-3
- The adequacy and effectiveness of the permanent emergency communications network between Fermi 2, the State of Michigan, Monroe County, Canada and the !
NRC's Emergency Notification Syste . Proficiency in recognizing, understanding, and applying the Emergency Action Levels in classifying emergency event . The capability of the Control Room to properly use the procedures and forms provided for notification of the State and local governmental agencies within 15 minutes of classification of the emergency event (Canada when required) and l provide followup reports on a periodic basi . The capability of the Control Room to notify the NRC within I hour of declaration of the emergency even . The capability of the Control Room to recognize when a release limit from an effluent stack is exceede . The capability of the TSC and EOF (when activated) to properly notify State and local governmental agencies within 15 minutes of classification of the event, to notify and maintain contact with the NRC within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and provide followup reports on a periodic basi . The capability to perform timely and effective offsite dose assessment based on the use of computer softwar ) 1 The capability to recommend to the responsible State officials protective actions for the general public in the 10-mile EPZ based on plant conditions, potential and/or actual radiological releases and meteorological data on a timely basis (within 15 minutes of declaring a GENERAL EMERGENCY).
1 The capability to recommend to the responsible State officials protective actions for the general public in the 10-mile EPZ based on meteorological forecasts.
,,
1 The capability of the Offsite RETs to locate the plume, to obtain air samples and s
collect environmental samples and deliver them to the EOF Laborator .
1 The use of personnel dosimetry by the Emergency Response Organization in the Control Room, OSC, TSC and EO . The capability of Health Physics personnel to establish control points at the TSC and EOF and perform routine radiological surveys in the facilitle' . The capability of Health Physics personnel to perform inplant surveys with the l proper procedures and instrumentatio *
l O
-
_. _ -
'
-
' Ex:rcisa Manual FERMEX '86 Page 3-4 1 The capability to authorize exceeding 10 CFR 20 exposure limits within the plan . The capability to use inplant lodine monitorin . The capability to obtain lodine grab samples, analyze, and properly use the results in offsite dose assessmen . The capability to obtain and analyze PASS samples as may be requeste . The capability to evacuate an injured / contaminated worker from the site to a hospital offsite for decontamination and treatmen . The capability of the Offsite RETs to observe ALARA monitoring practices while
\ perforaing offsite monitorin . To perform Assembly and Accountability within 30 minute . To promptly, concisely, and accurately notify local news media of an Unusual Event or Alert at Fermi .
2 To update the media at the JPIC at the Site Area or General Emergency classification or when a significant change in Emergency Classification, Meteorological Conditions, Radiation Release, and Protective Action Recommendations occur '
2 To provide the news media with up-to-date coordinated, comprehensive media O briefings at least hourly once the Joint Public Information Team (JPIT) is availabl .
'
3 To respond as fully as possible to all relevant media inquiries no later than the next scheduled media briefin . SIMULATED CONDITIONS
,
h
- Simulator
'
Fermi 2 is a licensed operational facility. For purposes of FERMEX 86, the simulated power level history and other aspects such as nonoperational equipment are defined in the scenerlo summary by the initial Simulator conditions.
i There are conditions the Simulator is not programmed to provide as described i below: The area radiation monitor (ARM) channels will respond and indicate
- offscale. The ARM readings are simulated within the plant according to the location of tha release and the area of concern.
)
i
~
l O
_ _ _.._ _.. .___ _.. _ . .. .__ _ . . _ _ . _ _ _ _ _ _ _ . . _ _. . _ _ ___ ._ _...,_, ___. . -_._.._ _ _ _ ._,.__,,_ _ _ ---.. _ _ _
_ -. . ..
' '
Ex:rcisa M:nu;l
FERMEX '86 Pag 3 3-5 Stack effluent radiation monitors for SGTS, Turbine, Radwaste, and Reactor O' Building stacks are not available from the Simulator. Releases to the environment are simulated according to accident condition . Other The capability to take chemistry samples for analysis will be demonstrate The analytical results are simulated according to accident condition )
!
.
l OFFSITE RESPONSE ORGANIZATIONS l
3. STATE OBJECTIVES Demonstrate ability to mobilize staff and activate facilities promptl . Demonstrate ability to fully staff facilities and maintain staffing around the cloc . Demonstrate ability to make decisions and to coordinate emergency activitie . Demonstrate adequa.cy of facilities and displays to support emergency operation . Demonstrate ability to communicate with all appropriate locations, organizations, and field personne . Demonstrate ability to project doses to the public via plume exposure based on plant and field data, and to determine appropriate protective measures based on PAG's, available shelter, evacuation time estimates, and all other appropriate O factor . Demonstrate ability to alert the public within the 10 mile EPZ, and disseminate an initial instructional message within 15 minute . Demonstrate ability to formulate and distribute appropriate instructions to the public in a timely fashio Demonstrate the organizational ability necessary to manage an orderly evacuation is of all or part of the plume EP . Demonstrate the organizational ability necessary to deal with impediments to i evacuation, such as inclement weather or traffic obstructions.
1 Demonstrate the organizational ability and resources necessary to control access to an evacuated are x l
O
. _ _ _ _ _ _
.
.
.
.
' Ex;rcisa Manual FERMEX '86 Page 3-6 1 Demonstrate ability to continuously monitor and control emergency worker exposur . Demonstrate the ability to make the decision, based on predetermined criteria, to issue Kl to emergency workers and/or the general populatio . Demonstrate ability to brief the media in a clear, accurate and timely manner at the JPI ~
1 Demonstrate ability to provide advance coordination of information released at the
.
JPIC.
?
1 Demonstrate ability to estimate total population exposur . Demonstrate ability to determine and implement appropriate measures for controlled recovery and reentr .
1 Demonstrate ability to identify need for, request, and obtain Federal assistance.
3. WAYNE COUNTY OBJECTIVES Demonstrate ability to mobilize staff and activate facilities promptl . Demonstrate ability to fully staff facilities and maintain staffing around the cloc , Demonstrate ability to make decisions and to coordinate emergency activitie . Demonstrate adequacy of facilities and displays to support emergency operation . Demonstrate ability to communicate with all appropriate locations, organizations, and field personne , Demonstrate ability to alert the public within the 10-mile EPZ and disseminate an
,
initial instructional message within 15 minutes.
it Demonstrate ability to formulate and distribute appropriate instructions to the
- public in a timely fashiori.
- Demonstrate the organizational ability necessary to manage an orderly evacuation of all or part of the plume EPZ.
4 Demonstrate the organizational ability necessary to deal with impediments to .
} evacuation, such as inclement weather or traffic obstruction '
1 Demonstrate the organizational ability and resources necessary to control access to an evacuated area.
$
.
!
!
.
--..---_.,e---y-y.--.. _ ._y,~.ye_.~.--, .. c, -w ym,-_ , - . , , , , - - , ,,,-,,,e_ . , - _ , - . . - - . . _ _ - . , __._m---_- -, _.__ _ . _ _ _ _ _ _ . _
- . . -. . _ - . . . . - -- - . -. - _ _
. . .
,. .
Ex:rciss M:nual FERMEX '86 Page 3-7 l Q~
, b 1 Demonstrate the organizational ability necessary to effect an orderly evacuation of
,
mobility-impaired individuals within the plume EP . Demonstrate ability to continuously monitor and control emergency worker exposur . Demonstrate ability to brief the media in a clear accurate and timely manner at the JPIC.
1 Demonstrate ability to provide advance coordination of information released at the JPI s
.
1 Demonstrate adequacy of procedures for registration and radiological monitoring i of evacuee ,
1 Demonstrate adequacy of facilities for mass care of evacuee . Demonstrate adequate equipment and procedures for decontamination of emergency workers,' equipment, and vehicle "
2 1 Demonstrate ability to determine and implement appropriate measures for controlled recovery and reentry.
.,
3. BROWNSTOWN TOWNSHli8 OBJECTIVES
\ Demonstrate ability to mobilize staff and activate facilities promptl . Demonstrate ability to fully staff facilities and maintain staffing around the cloc . Demonstrate ability to make decisions and to coordinate emergency activitie . Demonstrate adequacy of facilities and displays to support emergency operation '
< Demonstrate ability to communicate with all appropriate locations, organizations,
,4 and field personne . Demonstrate ability to alert the public within the 10-mile EPZ and disseminate an initial instructional message within 15 minute i Demonstrate ability to formulate and distribute appropriate instructions to the
- public'in a timely fashion.
- Demonstrate the organizational ability necessary to manage an orderly evacuation
, of all or part of the plume EPZ.
!
.
O o
,- _.-.-_.-._m-_ __.__.._ - ,,._. - _ .._ _.._ ,---, -...._ _ ,...__,- -_ _ _ _ . _ _ _ , < _ _ _ _ - - . _ _ . - _ . . . _ _ _ _ - - - -
. . _ _
-
,
.
. Ex:rcis? M:nu'.I FERMEX '86 Page 3-8 O Demonstrate the organizational ability necessary to deal with impediments to evacuation, such as inclement weather or traffic obstruction . Demonstrate the organizational ability and resources necessary to control access to an evacuated are . Demonstrate the organizational ability necessary to effect an orderly evacuation of mobility-impaired individuals within the plume EP . Demonstrate ability to continuously monitor and control emergency worker exposur ~
1 Demonstrate ability to brief the media in a clear, accurate, and timely manner at the JPI . Demonstrate ability to provide advance coordination of information released at the JPI . Demonstrate adequacy of procedures for registration and ra'diological monitoring of evacuee . Demonstrate adequacy of facilities for mass care of evacuee . Demonstrate adequate equipment and procedures for decontamination of emergency workers, equipment, and vehicle . Demonstrate ability to determine and implement appropriate measures for controlled recovery and reentr . MONROE COUNTY OBJECTIVES Demonstrate ability to mobilize staff and activate facilities promptl + Demonstrate ability to fully staff facilities and maintain staffing around the cloc '
. Demonstrate ability to make decisions and to coordinate emergency activitie . Demonstrate adequacy of facilities and displays to support emergency operation . Demonstrate ability to communicate with all appropriate locations, organizations, and field personnel.
, Demonstrate ability to alert the public within the 10-mile EPZ and disseminate an j l initial instructional message within 15 minutes.
i .
b *
l
! --- --- - _ _ . _ _ _ _ . _ - -
_ - _ . -
-
'
\
'
'
Excrcisa M:nu:1 FERMEX '86 Page 3-9 O Demonstrate ability to formulate and distribute appropriate instructions to the public in a timely fashio . Demonstrate the organizational ability necessary to manage an orderly evacuation of all or part of the plume EP . Demonstrate the organizational ability necessary to deal with impediments to evacuation, such as inclement weather or traffic obstruction . Demonstrate the organizational ability and resources necessary to control access to an evacuated are . Demonstrate the organizational ability necessary to effect an orderly evacuation of mobility-impaired irdividuals within the plume EP . Demonstrate ability to coatinuously monitor and control emergency worker exposur . Demonstrate ability to brief the media in a clear, accurate, and timely manner at the JPI . Demonstrate ability to provide advance coordination of information released at the JPI . Demonstrate ability to establish and operate rumor control in a coordinated fashion at the JPI . Demonstrate adequacy of procedures for registration and radiological monitoring of evacuee . Demonstrate adequacy of facilities for mass care of evacuee '
1 Demonstrate adequate equipment and procedures for decontamination of emergency workers, equipment and vehicle .. 1 Demonstrate adequacy of ambulance facilities and procedures for handling
- contaminated individual . Demonstrate ability to determine and irr.plement appropriate measures for controlled recovery and reentry.
i t
O f
L
_ ._..._ _ _ __-- _ - _ . _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ . - _ _ _ . _ - _ _ . . _ . _ _ _ _ _ . - . _ . _ _ _ _ . . _ . . _
. ,
,
,\ '
Page 1 (U)
,
EVE!!P - FEIIfEX 86
'.
SCE!aRIO SCE!aRIO SIfEMOR 24 IlOUR TIIC !aLFUICPION GDCT TIIE IIR: fIIII TIfE IIR: f1IN KEY EVENTS
.
0200 0000 IC-17 Division 2 core spray inoperable - D pump renoved to replace 100% Reactor inpeller alignment key. Engineering Design Package (EDP) 725 Power (=:'3292 IUt) Repacking valve in Radwaste building. Repairs being nude to notor controller for T4803-F602. Division II 112 and O2 recorder inoperable.
0230 0030 Control Room notified of injured nun in the Radwaste building. The individual has head injuries and a perforation of the chest wal Control Room notifies ambulance and hospital according to EP-29 Personnel are disp 1tched to renove injured person to ambulance.
0235 0035 Control Room notified injured man is contaminate thclear Shift Supervisor (NSS) declares an Unusual Event in accorchnce with EP-101, Tab 12, Contaminated Injured Individual Requiring Offsite Ibdical Treatmen NSS assumes position of Emergency Director (ED). Ibtifications are made according to EP-290 0255 0055 tialf B31-076-01 Recirc Loop "A" leak - 55 GP!1 0 1%
0257 0057 Alarm Annunciator DIMiELL FIDOR SUTIP LFNEL DATE OF OIAIGE IIIGI NAIU D75 0300 0100 Ambulance arrives on scen ._
s:
~'
'N .
(/ Page2cf(V '
EVErr StttmIN - PEIDEX 86 *
.
SCEtnRIO SIfiUIMOR SC22RRIO imLETRKTION 24 IDUR TIfE KEY EVENTS (7DCK TIIE I_IR MIri TIfE IFh MIN 0105 Cbntrol Ibom annunciator DRYUELL FIDOR Sl!IP LLVE 0305 alarm Torus water managenent systen punp(s) trip if running and isolation valves clos Ambulance departs for Seaway Hospita The Emergency Director declares an ALERP in accordance with E 0315 0115 Tab 9, Unidentified Leakage Greater than 50 GPl!.
Notifications are made in accordance with EP-29 Emergency Director sounds siren and announces assembly and accountabilit The TSC and OSC personnel assemble in their respective Energency Non-essential personnel assable in their Response Pacilitie respective assembly area When the Dnergency Director announces " assembly conplete",
non-essential personnel will report to their work location (!!issing personnel will be located prior to declaring assembly couplete.) The OSC is activate Onergency Director may direct Control Roan with Technical Specification Action Statment 3.4. TSC is functional and assumes control from the Cbntrol Roo 0400 0200 0220 tulf B31-076-01 Control Room annunciator PRI!nRY CDIFAIt!!EIE PR 0420 0 3%
alarm IOV Control Ibom annunciator Reactor scramsPRIlmRY CO!FAIf!IEIR llIG on high drywell 0421 2 TRIP (3D85) alarnr Set O 0 35% pressur Set II' 010%
3 of 6 ,
SCE!aRIO SCE2RRIO SIf0IRIOR i 24 IlOUR TIFE FELFUlKTIO!1 crnCK TIfE HR: IIIN TIFE, HR: IIIH KEY EVEIES
,
B31-076-01 0 100% Reactor scram causes a transient resulting in a r.njor recirculation suction line brea o Reactor water level decreases rapidl O Primary containment tenperature increases, o Primary and secondary containment isolate with the exception of valve T4803-F602 due to open phase in X-105A penetration box.
,
o SGl'S auto starts, j o Iow Pressure Coolant Injection (LPCI) loop select logic selects
,
recirculation Icop B for injection.
i
'
o All ECCS systens receive initiation signal o LPCI punpa auto start.
.
11alf E21-062-03 o Div. I core spray pumps auto start. Pump C breaker fails to latch shut and breaker re-open (Breaker will rennin closed when operator attempts closing from 01C switch)
i i
"
Drymll pressure and temperature increases.
l Ell-068-02 0 0% I2CI Icop B injection valve, Ell-F0lSB, main line contactor coil l
electrically opens upon energizing. Valve renins shut.
j Bll-081-01 0 20% Core uncovered; fuel clad failur required to drive ARM's past alarm Alarm Annunciator Div. I/II Containment Area Radiation
Monitor Trouble 3D43 (3D43) alarms - CIRRM reading 1.84 x 10 P/Hr.
<
- _
,
,-
.
/
f
-%
4 of 6 WUF SUfMARY - FEINEX 86
.
SCDMIO SCD ARIO SIfRERDR 24 IOUR TIIE !aLRRCPION CEOCK TIfE HR: fiIII TIf"E, flR: fIIf! KEY EVEIRS Core level restored by core spray to 2/3 core coverage. Drywell teraperature and precs.ure decreas '
,
0430 0230 e Annunciator EffICE!TP PIOCESS IMDIATIOII IDf7EiOR TIOUI1LE (3D44)
alarms. Operator verifies on CP-2B v/nich channel has exceeded the '
alarm setpoin Channel reads 3.4 x 10-2 uc/c "
Annunciators 16D2,16D3,16DS and 16D6 alarm. All AITIS in the Ibactor building (all floors) are upscale high, 0445 0245 Emergency Director declares EITB ARPA HIEIUCEY in accordance with EP-lDl, Tab 9, Reactor Coolant Leakage P. ate Greater Timn 5000 GPIl (or Loss of %m Fissions Produc'c Earriers if Fuel Dar. age -
Suspected).! . .
,
Ilotifications are made according to EP-29 t 0450 0250
~~
'
NSS directs OSC Coordinator to dispatch Danch Control teans to:
f
' ' Team 1 - 480V Bus 72CP to investigate and repaiN!afve motor controller for Ell-F015 Team 2 ~- 4COV Bus 72D-3A to investigate and repair valve notoc controD er far T4803-F602.' - ~
Team 3 - Reactdr Building first floor to open Ell-F015B valve manuall Valve T46-F411 seat begins leaking releiming radioactivity from the
,
Drywell to the_ suctica of the m? '
Anntegiator EFFLUEITP bitrFLS PADIATION PDIFtOR tin 1DLE (3D44)
alarrar. - operator verifies en' the Cr-2B vinich cinnnel 07-0S (08-07)
and/or 07-07 (08-07) (depending upon which division of SGPS is
'
running) has exceeded ita alarm setpoin ,
f S r
,. o ('^') (j ge 5 of 6
EVEtTP SUffWW - FERlE: 86
- ,
'
SCE!WIIO SCI 2N<IO SITUIMOR 24 L*JUR TIIE IIALEUtKTION CIDCK TIfE HR: !IIN TIfiE, HR: MIN KEY EVENTS Channel reads 5200 uc/cc and the AXM has been activate Chemistry is requested to obtain an AXM grab sampl Health Physics technicians report radiation levels high in Reactor building on the second floor. Gama reading of 4.7 Wifr and Beta reading of 35 WIIr. TSC is requested to evaltnte stay times in Reactor buildin IUrE: At this point several decisions will have to be made by the combined CR/PSC/OSC regarding repaica. The scenario r.ny diverge from this summar Emergency Director declares a GErERE EfElmCY in accordance uith EP-lDl, Tab 1, Projected Whole Body Dose at Site Boundary Greater than 1 Re W Hr Winle Body, or EP-101, Tab 9, Loss of Three Fission Product Barrier Ibtifications are mde according to EP-290 The Emergency Officer (if the EOF is functional) or Emergency Director makes Protective Action Reconcendations to the State of Michigan.
0520 0320 Team 1 reports open in r.uin contactor coil for Ell-F015B valv The coil is suollen and the operating mechanism will not r.ove.
0525 0325 Team 2 reports open in T2 of notor control cable.
0545 0345 Team I reports controller repaired or jumpers installed for Ell-F0lSB valve. Valve is opened by (bntrol Room or by energizing the circuit locall IUTE: The coabined decision of the CP/fSC/OSC may be to mantally open Ell-F015B valve verses mking electrical repairs. However, the valve will be opened to estab.iah shutdown cooling using RII EDF is functional (if not already functional) and assumes offsite
.
,
responsibility from TSC. Offsite field teams dicIntche ~%
' *
EVaIP
.
SCRRRIO SCF2RRIO SI!KHMOR 24 IKXJR TIIE fBIRRKTION CILCK TIfE HR: f1TN TIfE, IIR: MIN KEY EVE?TPS
0600 0400 Drywell pressure and tenperature decreasing. CIRIY1's reading decreasing due to decay of radioactive isotope Repair team 2 reports open phase for T4803-F602 found in terminal box for X-105D penetration. . Lead is separatcd from connecto Estimte short period of time to replace connector, approxinntely 15 minute Repairs tc T4803-F602 terminal are completed and valve T4803-I'602 closeswgndisconnectswitchisshut. CP-2B readings decrease to 1.4 x 10 uc/cc on SGrS channel R7tE: At scenario time 0630, after a method of core cooling and RPV water level control have been established, and the plume has moved away from the site, the scenario will time shift to two weeks late The Control Roan Sinulator will announce the new plant conditions'
over the HiCom and messages will be passed out to all facilities by controllers giving the new plant status, s Twenty minutes will be allowed for the personnel in all plant facilities to orientate themselves to the new condition Detroit Edison and the State of !!ichigan discuss de-escalation of the Emergency Classificatio The event is de-escalated from GI2CRAL FlEIGDCY to an N1Rf classification based on plant condition The State of Michigan will commence Re-entry and Recovery. Only key Edison personnel required to maintain contact with State and local authorities will renain in the facilitieu. The individual in charge of each of the facilities will select the percormel he requires 1000 0800 The exercise will terminate at 10:00 .
W - -'
E
_ ]