Similar Documents at Fermi |
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000341/19990171999-10-21021 October 1999 Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted. Major Areas Inspected:Incident Involving Loaded Firearm in Protected Area Identified on 990922 & Being Considered as Noncited Violation IR 05000341/19990111999-10-0707 October 1999 Insp Rept 50-341/99-11 on 990724-0908.Two NCVs Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19990101999-08-10010 August 1999 Insp Rept 50-341/99-10 on 990619-0723.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19990061999-08-0606 August 1999 Insp Rept 50-341/99-06 on 990712-0716.No Violations Noted. Major Areas Inspected:Review of Various Aspects of Licensee Chemistry & Radiation Protection Programs,Specifically in Listed Areas IR 05000341/19990091999-07-12012 July 1999 Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Operations IR 05000016/19990011999-06-30030 June 1999 Insp Rept 50-016/99-01 on 990614-17.No Violations Noted. Major Areas Inspected:Mgt & Control,Decommissioning Support Activities,Industry Safety & Radiological Safety IR 05000341/19990071999-06-0101 June 1999 Insp Rept 50-341/99-07 on 990402-0515.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support IR 05000341/19990041999-05-26026 May 1999 Insp Rept 50-341/99-04 on 990503-07.No Violations Noted. Major Areas Inspected:Radiological Emergency Response Preparedness Program,Aspect of Plant Support IR 05000341/19990081999-04-29029 April 1999 Partially Withheld (Ref 10CFR73.21) Insp Rept 50-341/99-08 on 990405-09.No Violations Noted.Major Areas Inspected: Physical Protection Program,Aspect of Plant Support IR 05000341/19990031999-04-23023 April 1999 Insp Rept 50-341/99-03 on 990218-0401.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Engineering,Maint & Plant Support ML20205P1751999-04-14014 April 1999 Insp Rept 50-341/99-06 on 990315-19.No Violations Noted. Major Areas Inspected:Licensee Plant Support Performance Re Gaseous & Liquid Effluents,Liquid Waste Processing,Esf Filtration & CR Heating Ventilation & Air Conditioning IR 05000341/19990051999-03-19019 March 1999 Insp Rept 50-341/99-05 on 990308-11.No Violations Noted. Major Areas Inspected:Reviewed Fire Protection Program,An Aspect of Plant Support IR 05000341/19990021999-03-0808 March 1999 Insp Rept 50-341/99-02 on 990111-29.Violations Noted.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000341/19980151999-02-22022 February 1999 Errata to Insp Rept 50-341/98-15.Rept Incorrectly Documented That Loose Internal Sleeving on Turbine Control Valve Caused Power Oscillations Greater than 10% During Plant Operation IR 05000341/19980191999-01-21021 January 1999 Insp Rept 50-341/98-19 on 981110-990104.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20198D5671998-12-0707 December 1998 Insp Rept 50-341/98-15 on 980922-1109.Noncited Violations Were Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000341/19980171998-11-16016 November 1998 Insp Rept 50-341/98-17 on 980909-1021.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage 6 IR 05000341/19980181998-10-30030 October 1998 Insp Rept 50-341/98-18 on 981006-08.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants IR 05000341/19980131998-10-20020 October 1998 Insp Rept 50-341/98-13 on 980730-0921.No Violations Noted. Major Areas Inspected:Aspects Oflicensee Operations, Engineering,Maint & Plant Support IR 05000341/19980161998-10-0606 October 1998 Insp Rept 50-341/98-16 on 981014-18.No Violations Noted. Major Areas Inspected:Alara Planning & Controls for Sixth Refueling Outage,Internal Exposure Monitoring,Radiological Surveys & Posting & Radiation Worker Performance IR 05000016/19980071998-09-30030 September 1998 Insp Rept 50-016/98-07 on 980909-11.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Industrial Safety & Radiological Safety IR 05000341/19980121998-09-0101 September 1998 Insp Rept 50-341/98-12 on 980619-0803.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000341/19980081998-07-14014 July 1998 Insp Rept 50-341/98-08 on 980504-0618.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support IR 05000341/19980101998-06-29029 June 1998 Insp Rept 50-341/98-10 on 980608-12.No Violations Noted. Major Areas Inspected:Plant Support & Evaluation of Licensee Performance During Station Biennial Exercise of Emergency Plan IR 05000341/19980111998-06-25025 June 1998 Insp Rept 50-341/98-11 on 980608-12.No Violations Noted. Major Areas Inspected:Radiological Controls for Spent Fuel Pool Clean Out Project IR 05000341/19980091998-06-0404 June 1998 Insp Rept 50-341/98-09 on 980511-15.No Violations Noted. Major Areas Inspected:Aspects of Licensee Performance Re Physical Security for Facility IR 05000341/19980061998-06-0303 June 1998 Insp Rept 50-341/98-06 on 980317-0427.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19980031998-05-11011 May 1998 Insp Rept 50-341/98-03 on 971221-980316.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20247D4511998-05-0606 May 1998 Insp Rept 50-341/98-07 on 980406-09.Violations Noted.Major Areas Inspected:Plant Support IR 05000016/19980061998-04-21021 April 1998 Insp Rept 50-016/98-06 on 980324-26.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities & Radiological Safety ML20216E7901998-04-10010 April 1998 Insp Rept 50-341/98-05 on 980320-0406.Violations Noted: Failure to Demonstrate Reactor Protection Sys Trip Function Units & Isolation Actuation Trip Units within Response Time Limit of at Least Once Per 18 Months IR 05000341/19980041998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support ML20217K2821998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000341/19970161998-02-0505 February 1998 Insp Rept 50-341/97-16 on 981108-0105.Noncited Violation Identified.Major Areas Inspected:License Operations,Maint, Engineering & Plant Support IR 05000341/19970171998-01-21021 January 1998 Insp Rept 50-341/97-17 on 971201-05.No Violations Noted. Major Areas Inspected:Conduct of Operations,Operator Training & Qualification & Miscellaneous Operations Issues ML20202H8581998-01-0303 January 1998 Insp Rept 50-341/97-14 on 970923-1107.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000341/19970141998-01-0202 January 1998 Insp Rept 50-341/97-14 on 970923-1107.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970151997-11-0404 November 1997 Insp Rept 50-341/97-15 on 971008-10.No Violations Noted. Major Areas Inspected:Plant Support Performance Re mid-cycle Outage Chemistry,Alara Planning & Implementation & Radiation Worker Practices ML20198N3291997-10-29029 October 1997 Insp Rept 50-341/97-11 on 970804-1010.Violations Noted. Major Areas Inspected:Review & Assess Engineering & Technical Support at Plant IR 05000341/19970131997-10-27027 October 1997 Insp Rept 50-341/97-13 on 970811-0922.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000341/19970121997-09-25025 September 1997 Insp Rept 50-341/97-12 on 970804-06.No Violations Noted. Major Areas Inspected:Exam Procedures & Representative Records,Observations of Activities & Interviews W/Staff & Conduct of Security & Safeguards Activities IR 05000341/19970101997-09-25025 September 1997 Insp Rept 50-341/97-10 on 970630-0812.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970071997-08-26026 August 1997 Insp Rept 50-341/97-07 on 970508-0630.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20149K8691997-07-0101 July 1997 Insp Rept 50-341/97-03 on 970320-0509.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Plant Support IR 05000341/19970091997-06-26026 June 1997 RP Insp Rept 50-341/97-09 on 970602-06.No Violations Noted. Major Areas Inspected:Plant Support Performance Re Chemistry,Effluents & Environ Monitoring ML20148N1471997-06-19019 June 1997 Insp Rept 50-341/97-05 on 970512-30.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000341/19970081997-06-13013 June 1997 Insp Rept 50-341/97-08 on 970519-23.No Violations Noted. Major Areas Inspected:Review of Physical Security Program Performance IR 05000341/19970041997-06-13013 June 1997 Insp Rept 50-341/97-04 on 970310-14 & 0512-16.No Violations Noted.Major Areas Inspected:Review of Representative Post Job ALARA Reviews,Radiation Exposure Data & self-assessments from 1996 Refueling Outage ML20140D3521997-06-0202 June 1997 Insp Rept 50-341/97-02 on 970201-0319.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970061997-05-21021 May 1997 Insp Rept 50-341/97-06 on 970428-0502.No Violations Noted. Major Areas Inspected:Insp Included Review of Radiological Emergency Response Preparedness Program 1999-08-06
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000341/19990171999-10-21021 October 1999 Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted. Major Areas Inspected:Incident Involving Loaded Firearm in Protected Area Identified on 990922 & Being Considered as Noncited Violation IR 05000341/19990111999-10-0707 October 1999 Insp Rept 50-341/99-11 on 990724-0908.Two NCVs Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19990101999-08-10010 August 1999 Insp Rept 50-341/99-10 on 990619-0723.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19990061999-08-0606 August 1999 Insp Rept 50-341/99-06 on 990712-0716.No Violations Noted. Major Areas Inspected:Review of Various Aspects of Licensee Chemistry & Radiation Protection Programs,Specifically in Listed Areas IR 05000341/19990091999-07-12012 July 1999 Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Operations IR 05000016/19990011999-06-30030 June 1999 Insp Rept 50-016/99-01 on 990614-17.No Violations Noted. Major Areas Inspected:Mgt & Control,Decommissioning Support Activities,Industry Safety & Radiological Safety IR 05000341/19990071999-06-0101 June 1999 Insp Rept 50-341/99-07 on 990402-0515.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support IR 05000341/19990041999-05-26026 May 1999 Insp Rept 50-341/99-04 on 990503-07.No Violations Noted. Major Areas Inspected:Radiological Emergency Response Preparedness Program,Aspect of Plant Support IR 05000341/19990081999-04-29029 April 1999 Partially Withheld (Ref 10CFR73.21) Insp Rept 50-341/99-08 on 990405-09.No Violations Noted.Major Areas Inspected: Physical Protection Program,Aspect of Plant Support IR 05000341/19990031999-04-23023 April 1999 Insp Rept 50-341/99-03 on 990218-0401.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Engineering,Maint & Plant Support ML20205P1751999-04-14014 April 1999 Insp Rept 50-341/99-06 on 990315-19.No Violations Noted. Major Areas Inspected:Licensee Plant Support Performance Re Gaseous & Liquid Effluents,Liquid Waste Processing,Esf Filtration & CR Heating Ventilation & Air Conditioning IR 05000341/19990051999-03-19019 March 1999 Insp Rept 50-341/99-05 on 990308-11.No Violations Noted. Major Areas Inspected:Reviewed Fire Protection Program,An Aspect of Plant Support IR 05000341/19990021999-03-0808 March 1999 Insp Rept 50-341/99-02 on 990111-29.Violations Noted.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000341/19980151999-02-22022 February 1999 Errata to Insp Rept 50-341/98-15.Rept Incorrectly Documented That Loose Internal Sleeving on Turbine Control Valve Caused Power Oscillations Greater than 10% During Plant Operation IR 05000341/19980191999-01-21021 January 1999 Insp Rept 50-341/98-19 on 981110-990104.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20198D5671998-12-0707 December 1998 Insp Rept 50-341/98-15 on 980922-1109.Noncited Violations Were Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000341/19980171998-11-16016 November 1998 Insp Rept 50-341/98-17 on 980909-1021.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage 6 IR 05000341/19980181998-10-30030 October 1998 Insp Rept 50-341/98-18 on 981006-08.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants IR 05000341/19980131998-10-20020 October 1998 Insp Rept 50-341/98-13 on 980730-0921.No Violations Noted. Major Areas Inspected:Aspects Oflicensee Operations, Engineering,Maint & Plant Support IR 05000341/19980161998-10-0606 October 1998 Insp Rept 50-341/98-16 on 981014-18.No Violations Noted. Major Areas Inspected:Alara Planning & Controls for Sixth Refueling Outage,Internal Exposure Monitoring,Radiological Surveys & Posting & Radiation Worker Performance IR 05000016/19980071998-09-30030 September 1998 Insp Rept 50-016/98-07 on 980909-11.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Industrial Safety & Radiological Safety IR 05000341/19980121998-09-0101 September 1998 Insp Rept 50-341/98-12 on 980619-0803.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000341/19980081998-07-14014 July 1998 Insp Rept 50-341/98-08 on 980504-0618.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support IR 05000341/19980101998-06-29029 June 1998 Insp Rept 50-341/98-10 on 980608-12.No Violations Noted. Major Areas Inspected:Plant Support & Evaluation of Licensee Performance During Station Biennial Exercise of Emergency Plan IR 05000341/19980111998-06-25025 June 1998 Insp Rept 50-341/98-11 on 980608-12.No Violations Noted. Major Areas Inspected:Radiological Controls for Spent Fuel Pool Clean Out Project IR 05000341/19980091998-06-0404 June 1998 Insp Rept 50-341/98-09 on 980511-15.No Violations Noted. Major Areas Inspected:Aspects of Licensee Performance Re Physical Security for Facility IR 05000341/19980061998-06-0303 June 1998 Insp Rept 50-341/98-06 on 980317-0427.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19980031998-05-11011 May 1998 Insp Rept 50-341/98-03 on 971221-980316.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20247D4511998-05-0606 May 1998 Insp Rept 50-341/98-07 on 980406-09.Violations Noted.Major Areas Inspected:Plant Support IR 05000016/19980061998-04-21021 April 1998 Insp Rept 50-016/98-06 on 980324-26.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities & Radiological Safety ML20216E7901998-04-10010 April 1998 Insp Rept 50-341/98-05 on 980320-0406.Violations Noted: Failure to Demonstrate Reactor Protection Sys Trip Function Units & Isolation Actuation Trip Units within Response Time Limit of at Least Once Per 18 Months IR 05000341/19980041998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support ML20217K2821998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000341/19970161998-02-0505 February 1998 Insp Rept 50-341/97-16 on 981108-0105.Noncited Violation Identified.Major Areas Inspected:License Operations,Maint, Engineering & Plant Support IR 05000341/19970171998-01-21021 January 1998 Insp Rept 50-341/97-17 on 971201-05.No Violations Noted. Major Areas Inspected:Conduct of Operations,Operator Training & Qualification & Miscellaneous Operations Issues ML20202H8581998-01-0303 January 1998 Insp Rept 50-341/97-14 on 970923-1107.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000341/19970141998-01-0202 January 1998 Insp Rept 50-341/97-14 on 970923-1107.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970151997-11-0404 November 1997 Insp Rept 50-341/97-15 on 971008-10.No Violations Noted. Major Areas Inspected:Plant Support Performance Re mid-cycle Outage Chemistry,Alara Planning & Implementation & Radiation Worker Practices ML20198N3291997-10-29029 October 1997 Insp Rept 50-341/97-11 on 970804-1010.Violations Noted. Major Areas Inspected:Review & Assess Engineering & Technical Support at Plant IR 05000341/19970131997-10-27027 October 1997 Insp Rept 50-341/97-13 on 970811-0922.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000341/19970121997-09-25025 September 1997 Insp Rept 50-341/97-12 on 970804-06.No Violations Noted. Major Areas Inspected:Exam Procedures & Representative Records,Observations of Activities & Interviews W/Staff & Conduct of Security & Safeguards Activities IR 05000341/19970101997-09-25025 September 1997 Insp Rept 50-341/97-10 on 970630-0812.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970071997-08-26026 August 1997 Insp Rept 50-341/97-07 on 970508-0630.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20149K8691997-07-0101 July 1997 Insp Rept 50-341/97-03 on 970320-0509.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Plant Support IR 05000341/19970091997-06-26026 June 1997 RP Insp Rept 50-341/97-09 on 970602-06.No Violations Noted. Major Areas Inspected:Plant Support Performance Re Chemistry,Effluents & Environ Monitoring ML20148N1471997-06-19019 June 1997 Insp Rept 50-341/97-05 on 970512-30.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000341/19970081997-06-13013 June 1997 Insp Rept 50-341/97-08 on 970519-23.No Violations Noted. Major Areas Inspected:Review of Physical Security Program Performance IR 05000341/19970041997-06-13013 June 1997 Insp Rept 50-341/97-04 on 970310-14 & 0512-16.No Violations Noted.Major Areas Inspected:Review of Representative Post Job ALARA Reviews,Radiation Exposure Data & self-assessments from 1996 Refueling Outage ML20140D3521997-06-0202 June 1997 Insp Rept 50-341/97-02 on 970201-0319.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19970061997-05-21021 May 1997 Insp Rept 50-341/97-06 on 970428-0502.No Violations Noted. Major Areas Inspected:Insp Included Review of Radiological Emergency Response Preparedness Program 1999-08-06
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000341/19990171999-10-21021 October 1999 Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted. Major Areas Inspected:Incident Involving Loaded Firearm in Protected Area Identified on 990922 & Being Considered as Noncited Violation IR 05000341/19990111999-10-0707 October 1999 Insp Rept 50-341/99-11 on 990724-0908.Two NCVs Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19990101999-08-10010 August 1999 Insp Rept 50-341/99-10 on 990619-0723.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20210Q4191999-08-10010 August 1999 Notice of Violation from Insp on 990619-0723.Violation Noted:Within 2 Hours of Removing Div 1 Diesel Generator 11 from Svc Licensee Failed to Verify That Components Depending on Div 2 Diesel Were Operable IR 05000341/19990061999-08-0606 August 1999 Insp Rept 50-341/99-06 on 990712-0716.No Violations Noted. Major Areas Inspected:Review of Various Aspects of Licensee Chemistry & Radiation Protection Programs,Specifically in Listed Areas ML20210J2201999-07-23023 July 1999 Notice of Violation from Insp on 990524.Violation Noted: on 980920 Kf Enoch Engaged in Deliberate Misconduct That Caused Licensee to Be in Violation of Condition of License IR 05000341/19990091999-07-12012 July 1999 Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Operations IR 05000016/19990011999-06-30030 June 1999 Insp Rept 50-016/99-01 on 990614-17.No Violations Noted. Major Areas Inspected:Mgt & Control,Decommissioning Support Activities,Industry Safety & Radiological Safety IR 05000341/19990071999-06-0101 June 1999 Insp Rept 50-341/99-07 on 990402-0515.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support IR 05000341/19990041999-05-26026 May 1999 Insp Rept 50-341/99-04 on 990503-07.No Violations Noted. Major Areas Inspected:Radiological Emergency Response Preparedness Program,Aspect of Plant Support IR 05000341/19990081999-04-29029 April 1999 Partially Withheld (Ref 10CFR73.21) Insp Rept 50-341/99-08 on 990405-09.No Violations Noted.Major Areas Inspected: Physical Protection Program,Aspect of Plant Support IR 05000341/19990031999-04-23023 April 1999 Insp Rept 50-341/99-03 on 990218-0401.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Engineering,Maint & Plant Support ML20205P1751999-04-14014 April 1999 Insp Rept 50-341/99-06 on 990315-19.No Violations Noted. Major Areas Inspected:Licensee Plant Support Performance Re Gaseous & Liquid Effluents,Liquid Waste Processing,Esf Filtration & CR Heating Ventilation & Air Conditioning IR 05000341/19990051999-03-19019 March 1999 Insp Rept 50-341/99-05 on 990308-11.No Violations Noted. Major Areas Inspected:Reviewed Fire Protection Program,An Aspect of Plant Support IR 05000341/19990021999-03-0808 March 1999 Insp Rept 50-341/99-02 on 990111-29.Violations Noted.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions ML20207J1531999-03-0808 March 1999 Notice of Violation from Insp on 990111-29.Violation Noted: as of Jan 1999,calculation DC-0367, Design Calculations for RHR Sys, Rev 6,incorrectly Concluded That Stated Item Would Occur IR 05000341/19980151999-02-22022 February 1999 Errata to Insp Rept 50-341/98-15.Rept Incorrectly Documented That Loose Internal Sleeving on Turbine Control Valve Caused Power Oscillations Greater than 10% During Plant Operation IR 05000341/19980191999-01-21021 January 1999 Insp Rept 50-341/98-19 on 981110-990104.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20198D5671998-12-0707 December 1998 Insp Rept 50-341/98-15 on 980922-1109.Noncited Violations Were Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000341/19980171998-11-16016 November 1998 Insp Rept 50-341/98-17 on 980909-1021.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage 6 PNO-III-98-055, on 981113,licensee Shut Unit Down to Repair Steam Leak from Reactor Feedwater Check Valve.Valve Is SR & Would Provide Containment Isolation Function Under Accident Conditions1998-11-13013 November 1998 PNO-III-98-055:on 981113,licensee Shut Unit Down to Repair Steam Leak from Reactor Feedwater Check Valve.Valve Is SR & Would Provide Containment Isolation Function Under Accident Conditions IR 05000341/19980181998-10-30030 October 1998 Insp Rept 50-341/98-18 on 981006-08.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants PNO-III-98-048, on 981008,Detroit Edison Declared Alert Based on Operator Rept of Smoke & Fire Alarm Coming from EDG 12 Control Panel in Switchgear Room.Operator Tripped EDG 12, Opened Output Breaker & Left Switchgear Room1998-10-21021 October 1998 PNO-III-98-048:on 981008,Detroit Edison Declared Alert Based on Operator Rept of Smoke & Fire Alarm Coming from EDG 12 Control Panel in Switchgear Room.Operator Tripped EDG 12, Opened Output Breaker & Left Switchgear Room IR 05000341/19980131998-10-20020 October 1998 Insp Rept 50-341/98-13 on 980730-0921.No Violations Noted. Major Areas Inspected:Aspects Oflicensee Operations, Engineering,Maint & Plant Support IR 05000341/19980161998-10-0606 October 1998 Insp Rept 50-341/98-16 on 981014-18.No Violations Noted. Major Areas Inspected:Alara Planning & Controls for Sixth Refueling Outage,Internal Exposure Monitoring,Radiological Surveys & Posting & Radiation Worker Performance IR 05000016/19980071998-09-30030 September 1998 Insp Rept 50-016/98-07 on 980909-11.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Industrial Safety & Radiological Safety ML20154D1361998-09-30030 September 1998 Notice of Violation from Insp on 980304-0702.Violation Noted:On 980213,individual Failed to Contact Radiation Protection Dept for Appropriate Radiological Briefing IR 05000341/19980121998-09-0101 September 1998 Insp Rept 50-341/98-12 on 980619-0803.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20236R1251998-07-15015 July 1998 Notice of Violation from Insp Completed on 970922.Violation Noted:Licensee Made Revs to Procedures as Described in Safety Analysis Rept W/O Receiving Prior Commission Approval IR 05000341/19980081998-07-14014 July 1998 Insp Rept 50-341/98-08 on 980504-0618.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support ML20236Q9241998-07-14014 July 1998 Notice of Violation from Insp on 980504-0618.Violation Noted:Operators Were Making Changes to Facility by Defeating Various Control Room Annunciators W/O Performing Written Safety Analysis Rept IR 05000341/19980101998-06-29029 June 1998 Insp Rept 50-341/98-10 on 980608-12.No Violations Noted. Major Areas Inspected:Plant Support & Evaluation of Licensee Performance During Station Biennial Exercise of Emergency Plan IR 05000341/19983011998-06-29029 June 1998 NRC Operator Licensing Exam Rept 50-341/98-301OL(including Completed & Graded Tests) for Tests Administered on 980406- 0520.Six Applicants Were Administered Exam,Two Failed Written Exam,Two Failed Operating Exam & One Failed Both IR 05000341/19980111998-06-25025 June 1998 Insp Rept 50-341/98-11 on 980608-12.No Violations Noted. Major Areas Inspected:Radiological Controls for Spent Fuel Pool Clean Out Project IR 05000341/19980091998-06-0404 June 1998 Insp Rept 50-341/98-09 on 980511-15.No Violations Noted. Major Areas Inspected:Aspects of Licensee Performance Re Physical Security for Facility IR 05000341/19980061998-06-0303 June 1998 Insp Rept 50-341/98-06 on 980317-0427.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19980031998-05-11011 May 1998 Insp Rept 50-341/98-03 on 971221-980316.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20247D4371998-05-0606 May 1998 Notice of Violation from Insp on 980406-09.Violation Noted: on 980120,two Mechanical Maint Staff Entered North Reactor Water Cleanup Room,Locked High Radiation Area,W/O Stay Time Tracking & Deviation Not Authorized by Radiation Protection ML20247D4511998-05-0606 May 1998 Insp Rept 50-341/98-07 on 980406-09.Violations Noted.Major Areas Inspected:Plant Support IR 05000016/19980061998-04-21021 April 1998 Insp Rept 50-016/98-06 on 980324-26.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities & Radiological Safety ML20216E7901998-04-10010 April 1998 Insp Rept 50-341/98-05 on 980320-0406.Violations Noted: Failure to Demonstrate Reactor Protection Sys Trip Function Units & Isolation Actuation Trip Units within Response Time Limit of at Least Once Per 18 Months ML20217K2821998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support ML20217K2681998-03-31031 March 1998 Notice of Deviation from Insp on 971113-980226.Deviation Noted:Licensee Stored Irradiated Fuel in West Fuel Preparation Machine in Sf Pool Oversight on 971114-15 & 971115-17,resulting in Only 20.5 Feet Water Above Top of Sf ML20217K2531998-03-31031 March 1998 Notice of Violation from Insp on 971113-980226.Violation Noted:Inspector Identified That on 971115,licensee Removed Multiple Fuel Rods from Irradiated Fuel Bundle YJ7119,up to Four at One Time,During Failed Fuel Insp Activities IR 05000341/19980041998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support ML20216B5451998-03-0404 March 1998 Notice of Violation from Insp on 970804-1010.Violation Noted:Analysis Did Not Consider All Scenarios in Providing Bases for Determination That USQ Did Not Exist IR 05000341/19970161998-02-0505 February 1998 Insp Rept 50-341/97-16 on 981108-0105.Noncited Violation Identified.Major Areas Inspected:License Operations,Maint, Engineering & Plant Support PNO-III-98-015, on 980201,reactor Scrammed from 96% Power Following Trip of Main Turbine.Main Turbine Trip Resulted from Main Generator Load Rejection Protective Signal. Investigation Continuing1998-02-0404 February 1998 PNO-III-98-015:on 980201,reactor Scrammed from 96% Power Following Trip of Main Turbine.Main Turbine Trip Resulted from Main Generator Load Rejection Protective Signal. Investigation Continuing IR 05000341/19970171998-01-21021 January 1998 Insp Rept 50-341/97-17 on 971201-05.No Violations Noted. Major Areas Inspected:Conduct of Operations,Operator Training & Qualification & Miscellaneous Operations Issues ML20202H8531998-01-0303 January 1998 Notice of Violation from Insp on 970923-1107.Violation Noted:On 971027 W/Edg 14 Inoperable,Licensee Identified That Operators Failed to Perform Verification Checks in SR 4.8.1.1.1 at Least Once Per Eight Hours 1999-08-06
[Table view] |
Inspection Report - Fermi - 1998006 |
---|
|
|
Text
.
U.S. NUCLEAR REGULATORY COMMISSION REGIONlli Docket No.: 50-016 License No.: DPR-9 Report No.: 50-016/98006(DNMS)
Licensee: Detroit Edison Company Facility: Enrico Fermi Unit 1 Location: 6400 North Dixie Highway Newport, MI 48166 Dates: March 24-26,1998 Inspectors: John House, Senior Radiation Specialist Peter Lee, Radiation Specialist Approved by: Bruce L. Jorgensen, Chief Decommissioning Branch Division of Nuclear Materials Safety 9804240287 980421 PDR ADOCK 05000016 G PDR
.
EXECUTIVE SUMMARY Enrico Fermi Unit 1 NRC inspection Report 50-016/98006(DNMS)
This routine decommissioning inspection covered aspects of licensee management and control, decommissioning support activities, and radiological safet e Overall, the licensee has maintained the Fermi 1 facility in good condition. The facility 3 has been shut down for over 25 years and is in SAFESTOR. With the reactor defueled I and no fuel on site, radiological safety concerns are limite j Eacility Management and Control e The organizational structure and staffing levels of the facility appeared capable of conducting the decommissioning and industrial safety projects underway, o Planning and safety reviews for the asbestos abatement and sodium removal projects were very good. Outside consultants with expertise in these fields were brought in to manage these evolution e An effective self-assessment program was being implemente * Fire protection planning and support appeared to be well establishe Decommissioning Suncort Activities
- The licensee does not plan to decommission the site until the 2025 time frame. Minimal decommissioning work is underway. Some decommissioning work was done at shutdown in 1972. Current emphasis is on the asbestos and sodium removal project fladiological Safetv e Independent surveys by the NRC inspectors, and smear samples collected and analyzed by the NRC, confirmed dose-rates measured by the licensee and showed there was no removable activit e The Radiation Protection Program was effective in implementing the requirements of the decommissioning plan and the license. The Fermi 1 facility effectively uses portions of the Fermi 2 Radiation Protection Progra *
.
Report Details Summarv of Plant Activities The Fermi i facility is in SAFESTOR, the reactor is defueled and no fuel is on site. Few radiological concerns exist for the licensee. The facility has been shut down for over 25 year In preparation for final decommissioning, two major industrial safety projects are underway, asbestos abatement and sodium removal. Licensee management appears to be expending adequate resources on the planning and execution of these project .0 Facility Management and Control General The Fermi i facility is presently in a SAFESTOR condition and final decommissioning will not occur until the 2025 time frame when the Fermi 2 facility is tentatively scheduled I'
for shutdown and decommissioning, Tne reactor is defueled and no fuel remains on site. The only radioactivity associated with the facility is contamination which resulted from the operating phase of the reactor. As the bulk of the contamination is sealed in the reactor vessel, the radiological issues at the Fermi 1 facility are relatively minor. The estimated total curie inventory at present is less than 300 Curies and by 2025 is expected to be less than 100 Curies based on decay, The inspectors reviewed ongoing as well as planned future plant activities and discussed these activities with licensee representatives in order to assess overall facility management and controls. Specific events and findings are detailed in the sections l belo .2 Organization. Management and Cost Controls Insoection Scope (36801)
The inspectors reviewed the licensee's systems for overall management and control of the decommissioning process. The licensee's organization, staffing, and qualifications, including those for the contracted workforce, were also reviewed and evaluated to verify that licensing commitments were being met. Reference was made to the requirements detailed in the Technical Specification Observations and Findings Design change proposals for the Fermi i facility can be proposed by any member in Nuclear Generation or on the Review Committee. All change proposals must have a safety evaluation (10 CFR 50.59 review)if they involve systems discussed in the licensing basis documents. Change proposals are first reviewed by the Custodian and Radiological Engineer, and are then submitted to the Review Committee for approva Following approval, the change proposal can be implemente The licensee has established a set of Excellence Goals for 1998 and has developed strategies for implementing these goals. The goals / strategies focus on employee safety, work planning and scheduling, employee performance in meeting regulatory requirements, cost control, minimizing impact on Fermi 2 and addressing public
.
.
concerns. The two industrial safety projects that are currently underway, asbestos abatement and sodium removal, are part of this pla The organizational structure of Fermi 1 is headed by a Custodian, who is responsible for management of the Fermi i facility and serves as the leader of the clean up projec The Custodian reports to the Nuclear Assessment Manager for the Fermi 2 site. The facility staff is composed of a Field Engineer, a Radiation Protection Engineer, a Consultant for the Sodium Removal Project, a Consultant for the Asbestos Removal Project, a Technician who worked at Fermi 1 when it was operating, a Licensing and information Specialist, clerical support, and trained Radiation Worker Discussions with members of the cleanup team indicsi'd that they were very knowledgeable in their subject areas. Two of the team members had extensive work experience with the Fermi 1 facility when it was operationa c. Conclusions The licensee's organization appeared to be effectively structured for planning and managing those activities that contribute to the overall decommissioning of the facilit The presence of two staff members with Fermi 1 operational knowledge provides important background information (corporate memory). No concerns were note .3 Safety Reviews. Design Changes and Modifications a. Inspection Scope (37801)
The inspectors examined the licensee's safety review program to ascertain that the '
program was effective at identifying potential unreviewed safety questions in accordance with 10 CFR 50.59. The licensee is working on two major industrial safety projects. The first project is asbestos removal from reactor system components, which is underwa The second project is in the planning stages and involves removal of residual sodium and sodium / potassium metal from tanks and piping systems. The inspectors reviewed the sodium project in some detail; this is an unusual and chemically hazardous evolution which also presents a small radiation release risk but is much more significant as a fire or explosion hazard. The asbestos project poses no major safety risk to plant systems and is commonly performed in industr b. Observations and Findings The Fermi 1 reactor was cooled using liquid sodium as the heat transfer medium. Part of the final shutdown process involved draining the sodium and sodium / potassium from the primary and secondary systems, supporting systems and the sodium / potassium systems. The bulk of the sodium and sodium / potassium metal was removed from the site. Not all of the metal could be removed from the reactor vessel, tanks and piping systems because of their design. The licensee is estimating the amount of sodium and sodium / potassium that remains in the various systems and plans to remove it chemically under controlled conditions. From a review of project documents and discussions with I licensee representatives, including the consultant retained to oversee the project, the licensee's safety review was conservative and had addressed the safety hazards expected to be encountered. The major safety issue involves the evolution of hydrogen gas which would be vented to the atmosphere. The possibility of a hydrogen burn does exist, and could compromise system integrity resulting in a small release of radioactive
-
.
material to the atmosphere or lake. As this project is still in the planning stage, progress will be followed in future inspection The major safety aspect of the asbestos removal project involves the medical hazards of asbestos to workers. Radiological contamination is of minor significance. The work is performed by asbestos trained workers under the Fermi 2 Radiation Work Permit system. The NRC does not regulate asbestos remova c. Conclusions The licensee had performed adequate safety reviews and was conservative in the planning of major facility changes. No concerns were note .4 Self-Assessment. Auditing _and Corrective Actions a. Inspection Scope (40801)
The licensee's controls for identifying, resolving and preventing issues that degrade safety or quality were examined, including self-assessments, auditing, and corrective action b. Observations and Findings l
The inspectors reviewed an audit (#97-02) of the Fermi 1 facility which was conducted '
by the Audit Subcommittee in accordance with the Fermi 1 Administrative Controls and Surveillance Procedures Manual, Revision 11, Section 1.5.5.1. The audit covered the physical condition of the facility including the exterior portion of the restricted area and intemal areas of the site buildings. Cover gas pressure for sodium systems was reviewed, as were surveillance data for liquid waste tanks along with surveillance data required by the Technical Specifications. The audit was broad in scope and addressed the major nonradiological aspects of the facility. A separate assessment of the radiological program for Fermi 1 is discussed in Section 3.2. The inspectors discussed the audit findings with the facility Custodian and the corrective actions being taken to address those finding A Condition Assessment Resolution Document (CARD) was reviewed. The CARD system is a Fermi 2 corrective action program which was adopted by Fermi 1 and is a '
mechanism for employees to identify and pose solutions for problems. The CARD document was the result of an evaluation by Fermi 1 and 2 personnel of future radwaste shipments and concluded that Fermi i should have its own procedural guidance for low level radwaste shipments. The action taken was to draft procedures. This program appeared to be capable of addressing problems as they occu c. Conclusions The licensee's self-assessment program for the Fermi 1 facility appeared to be effective. No concerns were note I l
l l
. Decommissioning Performance and Status Review at Permanently Shut Down Reactors a. IDSpection Scope (71801)
The inspectors toured the facility and evaluated the fire protection syste .
b. Observations and Findings All areas were generally clean and well maintained for a facility that had been shut down for about 25 years. The areas were adequately posted and controlled. No combustible materials were observed. Fire protection is under the Fermi 2 program including fire extinguisher inspections and hydrant testing. At present there is no formal program for Fermi 1. Additional Class D extinguishers have been added to the Steam Generator building, the Na/K building, and at the entrance to the Fuel and Repair Buildin Extemal hydrants which are part of the Fermi 1 general service water system would provide water for fighting fire. Two electrical pumps and a diesel backup pump provide water pressure. The Fermi 2 fire brigade responds to the Fermi 1 facility. Backup fire protection is available from the Frenchtown Fire Departmen c. Conclusions i The licensee's fire protection program appeared well developed and established to meet the existing hazards given the lack of combustible materials in the facilit .0 Decommissioning Support Activities Maintenance and Surveillance (62801)
With the facility in a SAFESTOR condition, maintenance activities are at a minimum and are generally being conducted in connection with the asbestos abatement and sodium removal projects. See Section 1.3. Surveillances are primarily radiologicalin scope and are discussed in Section .2 Cold weather Preparations (71714)
The inspector determined that most of the buildings are unheated; however, there are no water lines in the protected portion of the facilit .0 Radiological Safety 3.1 Radiological Safety Staffing Inspection Scope (83750)
Staffing levels along with the organizational structure (See Section 1.2.b) for the Fermi 1 facility were reviewe b. Observations and Findings The Radiological Safety program is managed by a radiological engineer who has extensive experience and a degree in Health Physics. Radiation protection job coverage is provided by the Fermi 2 Radiation Protection (RP) Staff which provides
-
.
general RP support for the Fermi 1 facility. Organization and staffing met the needs of the facilit .2 Radiological Safety Audits a. Inspection Scope (83750)
The inspectors reviewed the results of the 1997 audit of the Radiation Safety progra b. OhseIyations and Findings The audit scope covered those areas of interest for the limited radiological hazards present in the Fermi 1 facility including radiation postings, survey instrument calibration and radiation work permits (RWP). No concerns were note .3 External and Internal Exposure Control a. Inspection Scope (83750)
The inspectors reviewed the dosimetry program and worker dose history records to determine the extent of radiation exposure to worker b. Observations and Findings All dosimetry is controlled through the Fermi 2 dosimetry program. The dosimetry program includes both thermoluminescent dosimeters (TLDs) and self-reading ,
dosimeters. TLDs are issued quarterly and the program is NVLAP certified. A review of dosimetry records for the past year indicated that workers received approximately 2 millirem, which indicated that the source term for the Fermi 1 facility is small. The low dose also indicated good job planning, work practices and attention to the ALARA program. There was no evidence of intemal exposures due to intakes of radioactive material during the past yea .4 Surveys and Monitoring a. Inspection Scone (83Z50)
The inspectors reviewed selected direct radiation survey and smear results for the past year. The inspectors also performed general area dose rate measurements and prepared three smears in selected locations to determine if any loose contamination was present, b. Observations and Findings Facility surveys had been performed quarterly as required. A review of selected records from the past year indicated that area dose rates were minimal and were on the order of .
'
a few millirem per hour or less. Contamination levels were very low, less than 500 I
disintegrations per minute (dpm) per 100 square centimeters of beta / gamma activit The smears taken by the NRC showed no activity, and general area dose rates I l
measured by the inspectors were consistent with the licensee's measurement l 7 l I
l
-
.
All personnel leaving potentially contaminated areas were required to survey themselves at the exit points using survey instruments brought into the area for this purpose. The inspectors observed individuals using the exit point survey instruments and performed exit surveys on themselves when exiting the restricted area. No problems were note .5 As-Low-As-Reasonably-Achievable ALARA) Inspection Scope (83750)
The inspectors discussed the ALARA program for the Fermi 1 facility with licensee representative Observations and Findings The Fermi 2 ALARA program is used for Fermi 1. Radiation work permits (RWP) are reviewed by the Fermi 2 Radiation Protection ALARA supervisor. Two RWPs are in routine use for Fermi 1, General and Routine Specific. These RWPs cover routine tours surveillances, escorting, inspections and minor equipment repairs. Other, more complex job's performed in the restricted area would be performed on a special RWP which would be reviewed by the Fermi 2 RP ALARA supervisor. These two RWPs were reviewed by the inspectors and appeared to be adequate for their intended us .6 Environmental Monitoring Inspection Scope (84750)
The inspectors reviewed the most recent environmental survey Observations and Findings Radiological environmental monitoring for Fermi 1 was discontinued in 1996 as a result of the implementation of Amendment No.11 which was granted by the NRC. The change states that environmental surveillances are not required until discharge of liquid radiological effluents is commenced. At present, there are no liquid releases from the Fermi 1 facility. If a discharge is planned, environmental monitoring would be initiate Fermi 2 maintains an environmental monitoring program which can detect radiological releases from Fermi 1. A review of environmental data from late 1996 indicated that there had been no detectable releases of radioactive materials to the environment from the Fermi 1 facilit .7 Solid Radioactive Waste Inspection Scope (86750)
The inspectors toured the restricted area to determine if the licensee was storing j l
radioactive waste in accordance with the regulation Observations and Findings No radioactive waste was observed during the facility tour. A licensee representative i stated that very little rad waste had been generated since the last radwaste shipment in !
December 190 l l
l
I .
, Iransportation of Radioactive Materials Inspection Scope (86750)
The inspectors reviewed the shipping documentation for a recent radioactive shipment made by Fermi 1 in Deccmbe.- 1997. The inspectors also interviewed the individual responsible for ensLring that the shipments were made in compliance with NRC and DOT requiremer.ts, Observations and Findings The Fermi 1 facility makes radioactive waste shipments under the Fermi 2 radwaste transportation program. Documentation for the December 1997 radwaste shipment was reviewed and discussed with the Fermi 2 Supervisor of Radwaste Shipping. Waste samples had been sent to an off site laboratory for analyses and the waste had been shipped to a vendor for processing and eventual disposal. The vendor had provided the licensee (who was the shipper of record) with a letter stating that there were no discrepancies in the shipment. Shipping documentation was very good and indicated that the shipments had been made in compliance with the applicable NRC and Department of Transportation (DOT) requirements.
l fladiological Safety Conclusions The radiological safety program appeared to be effective in implementing the requirements for the Licensee's SAFESTOR program and the limited decommissioning / industrial safety work being undertaken. Portions of the Fermi 2 program were being effectively used. The inspectors had no concerns about the Fermi i radiological safety progra l l Exit Meeting Summary l The ins ctors presented the inspection results to members of licensee management at the conclusivi of the inspection on March 26,1998, and during a telephone call on April 16,199 The licensee acknowledged the findings presented. The licensee did not identify any of the documents or process reviewed by the inspectors as proprietar .
PARTIAL LIST OF PERSONS CONTACTED
- +L. Goodman, Director, Fermi 1 (Custodian)
- D. Williams, Assistant Radiation Protection Manager
- E. Kokosky, Superintendent, Radiation Protection and Chemistry
- C. Nunn, Office Specialist, Fermi 1
- J. Couillard, Radiological Engineer, Fermi 1
- D. Cates, Asbestos Consultant, Fermi 1
- E. Madsen, Licensing Specialist, Fermi 1
- W. O'Connor, Manager Nuclear Assessment K. Berry, Sodium Consultant, Fermi 1 D. Swindle, Field Engineer, Fermi 1 D. Janssens, Technician, Fermi 1 B. Weber, Supervisor, Radwaste Shipping
- Denotes those attending the exit meeting on March 26,199 + Denotes those present during the telephone call on April 16,199 LIST OF PROCEDURES USED IP 36801: Organization, Management, and Cost Controls at Permanently Shutdown l Reactors I IP 37801: Safety Reviews, Design Changes, and Modifications at Permanently Shutdown l Reactors j IP 62801: Maintenance and Surveillance at Permanently Shutdown Reactors i
'
IP 71714: Cold Weather Preparations IP 71801: Decommissioning Performance and Status Review at Permanently Shutdown Reactors IP 40801: Self-Assessment, Auditing and Corrective Action at Permanently Shutdown Reactors IP 83750: Occupational Radiation Exposure IP 84750: Radioactive Waste Treatment, and Effluent, and Environmental Monitoring
'
IP 86750: Solid Radioactive Waste Management and Transportation of Radioactive Materials
10
.
<
,
.
LIST OF ACRONYMS USED ALARA As-Low-As-Reasonably-Achievable CFR Code of Federal Regulations EDG Emergency Diesel Generator IFl Inspection Follow up item IP Inspection Procedure IR Inspection Report LER Licensee Event Report Na/K NaK (Sodium / Potassium)
NRC Nuclear Regulatory Commission RP Radiation Protection URI Unresolved item VIO Violation WO Work Order i
,
L