U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-341/86014(DRSS)
Docket No. 50-341 License No. NPF-33 Safeguards Group IV Licensee: Detroit Edison Company 2200 Second Avenue Detroit, MI 48226 Facility Name: Enrico Fermi Atomic Power Plant Inspection At: Plant Site Inspection Conducted: April 19 - May 22,1986 onsite May 29-30, 1986 in NRC Region III office Date of Previous Physical Security Inspection: March 10-14 and 25, 1986 Type of Inspection: Announced Reactive Physical Security Inspection Inspectors:
hoff,A _
6//7/76
,,
~
M deda Date T. J./'c Phys 4 Security Inspector S.$. QN 6 fnSlato G. L. Pirtle Date Physical Security Inspector Approved By:
b i.
6 /Gl%
G. L. Pirtle, Acting Chief Date Safeguards Section Inspection Summary Inspection on April 19 - May 30, 1986 (Report No. 50-341/86014(DRSS))
Areas Inspected:
Include Security Plan and Implementing Procedures; Management Effectiveness; Security Organization; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys and Combinations; Physical Barriers - Protected and Vital Areas; Security System Power Supply; Lighting; Compensatory Measurr ; Assessment Aids; Access Control - Personnel, Packages and Vehicles; Detection Aids - Protected and Vital Areas; Alarm Stations and Communications. The inspectors also reviewed the status of licensee's corrective actions or measures to resolve several "open items" identified in previous inspection reports.
Enclosure Contains SAFEGUARDSINFORMATION 860702014e86062}4g Won Separation Ns ADOCK 0500D Page is Decontrolled PDR PDR
. -.,_
.. -
__
. _ - -
__
_
__
_
. _.. - _ _
_
_ - _.
,
,
7--
..
Results: The licensee was found to be in compliance with NRC requirements within the areas examined during the inspection except as noted below.
Compensatory Measures:
Failure to implement adequate compensatory measures for a degraded vital area barrier.
Access Control - Personnel:
Failure to adequately implement a portion of the employee security screening program.
Access Control - Vehicles:
Failure to properly search a vehicle.
In addition, two open items were identified and twelve previously identified items were closed based on NRC review of licensee's corrective measures. One open item pertained to an analysis of false alarms for an intrusion detection system; the other item pertained to inadequate searches. A Confirmatory Action Letter pertaining to this item was issued on March 30, 1986.
Enclowro ContaIns SAFEGUARDS filFORMATION Upon separation This Page is Decontrolled 2