Notice of Violation from Insp on 980406-09.Violation Noted: on 980120,two Mechanical Maint Staff Entered North Reactor Water Cleanup Room,Locked High Radiation Area,W/O Stay Time Tracking & Deviation Not Authorized by Radiation Protection
ML20247D437
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/06/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20247D417 List:
References
50-341-98-07, 50-341-98-7, NUDOCS 9805150039
Download: ML20247D437 (2)


Text

--_ __ _ __ _ _ _ _ _ _ -_

NOTICE OF VIOLATION Detroit Edison Company Docket No. 50-341 Enrico Fermi, Unit 2 - Facility License No. NPF-43 During an NRC inspection conducted April 6-9,1998, a violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC 4

- Enforcement Actions," NUREG-1600, the violation is listed below:

Technical Specification 6.8.1 requires that written procedures be established, i.

Implemented, and maintained covering activities recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.

Regulatory Guide 1.33, Appendix A, recommends that safety-retated activities covered

by written procedures include radiation protection procedures for access control to radiation areas including a Radiation Work Permit (RWP) system.

Fermi 2 Radiation Protection Conduct Manual, MRP04, Revision 4, " Accessing and Working in the Radiologically Restricted Area," step 4.5.4 requires that staff sign the access sheet to acknowledge understanding and compliance with RWP instructions and step 4.5.4.a. requires that staff not deviate from the RWP unless specific authorization is obtained from Radiation Protection.

a. Instruction 3.C. of RWP 98-1048, Ravision 2 " Room Cooler PMs, Lube RWCU Motors, Change 'B' Pump Oil, Adjust RHR Hanger, Repair P11F193 Reachrod, 1 Rework P11F342, Repair / Replace 'A' Pump Union, and Replace RTD and Cable," requires stay time tracking for entry into locked high radiation areas.
b. Instruction 2. of RWP 98-1016, Revision 0, " Lube Oil Systems: Maintenance, Repairs, Surveillance, Filter Change-out, and Component Cleaning," requires that radiation protection be present for a system breach.

Contrary to the above;

a. On January 20,1998, two mechanical maintenance staff entered the north reactor water cleanup room, a locked high radiation area, without stay time tracking, and this deviation was not authorized by Radiation Protection.
b. On March 30,1998, a mechanical maintenance worker breached the lube oil system and removed the N3000F048A valve without radiation protection being present, and this deviation was not authorized by Radiation Protection.

This is a Severity Level IV violation (Supplement IV). 4 I

Pursuant to the provisions of 10 CFR 2.201, the Detroit Edison Company is hereby required to j

submit a written statemt>nt or explanation to the U.S. Nuclear Regulatory Commission, ATTN

i Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, ,

Region lil, and a copy to the NRC Resident inspector at the facility that is the subject of this >

l Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).

9805150039 980506 PDR 0 ADOCK 0500fYJ41 P,DR 1

a

=

r Notice of Violation 2 This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation or severity level, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response.

if an adequate response is not received within the time specified in this Notice, an ordo 3r a demand for information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. I Where good cause is shown, consideration will be given to extending the response time.

- If you contest this enforcement action, you should also provide a copy of your response to the

! Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, l DC 20555-0001.

' Because your response will be placed in the NRC PubGc Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction. If personal privacy or proprietary information  !

is necessary to provide an acceptable response, then please provide a bracketed copy of your l response that identifies the information that should be protected and a redacted copy of your I

response that deletes such information if you request withhoI@ag of such material, you MU11 l specifically identify the portions of your response that you seek to t, ave withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.

Dated at Lisle, Illinois this 6 th day of May 1998 l