UNITED STATES rch 3, 2010

SUBJECT:

ANNUAL ASSESSMENT LETTER - FERMI POWER PLANT, UNIT 2 (05000341/2010001)

Dear Mr. Davis:

On February 10, 2010, the NRC staff completed its performance review of Fermi Power Plant, Unit 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the Security Cornerstone review and resultant inspection plan.

Overall, Fermi Unit 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several special and infrequently performed inspection procedures (IPs) which include: IP 60854.1, "Preoperational Testing of Independent Spent Fuel Storage Facility Installations at Operating Plants"; IP 60855.1,

"Operation of an Independent Spent Fuel Storage Installation at Operating Plants"; IP 92702,

"Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders";

and IP 92709, "Licensee Strike Contingency Plans." The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43 Enclosure: Fermi Inspection/Activity Plan cc w/encl: Distribution via ListServ

Fermi Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site ISFSI - ISFSI INSPECTION 2 01/01/2010 05/31/2010 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 05/01/2010 07/31/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 03/29/2010 04/02/2010 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment STRIKE - STRIKE CONTINGENCY - OPS/MAINT/RP 2 03/29/2010 06/04/2010 IP 92709 Licensee Strike Contingency Plans TI - TEMPORARY INSTRUCTION 2515/180 1 05/20/2010 05/20/2010 IP 2515/180 Inspection of Procedures and Processes for Managing Fatigue BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3 06/07/2010 06/11/2010 IP 7111401 Exercise Evaluation 06/07/2010 06/11/2010 IP 71151-EP01 Drill/Exercise Performance 06/07/2010 06/11/2010 IP 71151-EP02 ERO Drill Participation 06/07/2010 06/11/2010 IP 71151-EP03 Alert & Notification System OL PREP - FERMI INIT PREP - AUG. 2010 3 08/09/2010 08/13/2010 IP 92702 Followup On Corrective Actions For Violations And Deviations 08/09/2010 08/13/2010 W90219 OL - INITIAL EXAM - AUG 2010 - FERM BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 08/23/2010 08/27/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 08/23/2010 08/27/2010 IP 71124.02 Occupational ALARA Planning and Controls 08/23/2010 08/27/2010 IP 71151-BI01 Reactor Coolant System Activity 08/23/2010 08/27/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness 08/23/2010 08/27/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent OL EXAM - FERMI INIT EXAM - AUG. 2010 3 08/30/2010 09/03/2010 W90219 OL - INITIAL EXAM - AUG 2010 - FERM BI ENG - ENGINEERING INSERVICE INSPECTION 1 10/24/2010 11/11/2010 IP 7111108G Inservice Inspection Activities - BWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 11/01/2010 11/05/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 11/01/2010 11/05/2010 IP 71124.02 Occupational ALARA Planning and Controls BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 11/29/2010 12/03/2010 IP 71124.05 Radiation Monitoring Instrumentation BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 03/28/2011 04/01/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS

Fermi Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 03/28/2011 04/01/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 03/28/2011 04/01/2011 IP 71124.02 Occupational ALARA Planning and Controls BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 2 04/18/2011 04/22/2011 IP 7111402 Radiological Environmental Monitoring Program 04/18/2011 04/22/2011 IP 7111403 Emergency Response Organization Augmentation Testing 04/18/2011 04/22/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/18/2011 04/22/2011 IP 71151-EP01 Drill/Exercise Performance 04/18/2011 04/22/2011 IP 71151-EP02 ERO Drill Participation 04/18/2011 04/22/2011 IP 71151-EP03 Alert & Notification System BI ENG - TRIENNIAL FIRE PROTECTION INSPECTION 3 04/18/2011 05/20/2011 IP 7111105T Fire Protection [Triennial]

BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 06/13/2011 06/17/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 06/13/2011 06/17/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 06/13/2011 06/17/2011 IP 71124.04 Occupational Dose Assessment