IR 05000341/2001003
| ML020860327 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/15/2002 |
| From: | Ring M NRC/RGN-III/DRP/RPB1 |
| To: | O'Connor W Detroit Edison |
| References | |
| IR-01-003 | |
| Download: ML020860327 (23) | |
Text
March 15, 2001
SUBJECT:
FERMI INSPECTION REPORT 50-341/01-03(DRP)
Dear Mr. OConnor:
On February 16, 2001, the NRC completed an inspection at your Fermi 2 reactor facility. The enclosed report documents the inspection findings which were discussed on February 16, 2001, with Mr. Fessler and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and to compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, the inspectors identified one issue involving inadequate high pressure coolant injection system procedures which was categorized as being of very low safety significance (GREEN). This issue involved one violation of NRC requirements.
However, because of the very low safety significance of the issue and because it has been entered into your corrective action program, the NRC is treating this issue as a Non-Cited Violation in accordance with Section VI.A.1 of the NRCs Enforcement Policy. If you deny the non-cited violation, you should provide a response with the basis for your denial within 30 days of the date of this inspection report, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, Region III, the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001 and the NRC Resident Inspector at the Fermi facility.
W. OConnor, Jr.
-2-In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark A. Ring, Chief Reactor Projects Branch 1 Docket No. 50-341 License No. NPF-43 Enclosure:
Inspection Report 50-341/01-03(DRP)
cc w/encl:
N. Peterson, Director, Nuclear Licensing P. Marquardt, Corporate Legal Department Compliance Supervisor R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Monroe County, Emergency Management Division Emergency Management Division MI Department of State Police