IR 05000341/1986021

From kanterella
Jump to navigation Jump to search
Partially Withheld Reactive Physical Security Insp Rept 50-341/86-21 on 860623-27 & 0707-11 (Ref 10CFR73.21). Noncompliance Noted:Failure to Implement Required Compensatory Measures for Degraded Vital Area Barrier
ML20212B822
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/04/1986
From: Creed J, Kniceley J, Madeda T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20212B808 List:
References
50-341-86-21, NUDOCS 8608070244
Download: ML20212B822 (2)


Text

h

,

i e

U. S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-341/86021 Docket No. 50-341 License No. NPF-33 Safeguards Group IV Licensee: Detroit Edison Company 2200 Second Avenue Detroit, MI 48226 Facility Name:

Enrico Fermi Atomic Power Plant Inspection At:

Plant Site Inspection Conducted: June 23-27 and July 7-11, 1986 Date of Previous Physical Security Inspection: April 28 to May 30, 1986 Type of Inspection: Reactive Physical Security Inspection b Yhv4.4 l

?l'll%

Inspectors:

m T.J/c'yadeda Date '

Physi al Security Inspector

}(, b bg Sh J. R. Knicelet Date Physical Security Inspector Approved By:

[# lex /,,L /~

f/t//tr 6 J. R. Creed, Chfsf Date/

Safeguards Section Inspection Summary Inspection on June 23-27 and July 7-11, 1986 (Report No. 50-341/86021)

Areas Inspected:

Reviewed licensee corrective action on previously identified violations and open items; reviewed licensee progress on the ieclementation of their Nuclear Security Improvement Program (NSIP); and evaluated licensee action to a Confirmatory Action Letter dated May 30, 1986.

Enclosure contains 8608070244 860804 PDR ADOCK 05000341

-

O Upon separation this PDR page is Decontrolled A

-

-_

\\

.

. !,

s Results: The licensee was found to be in compliance with NRC requirements within the areas examined during the inspection except as noted below.

a.

Safeguards Information:

Safeguards Information requirements were not complied with pertaining to security storage container.

b.

Compensatory Measures:

Failure to implement required compensatory measures for a degraded vital area barrier.

In addition, seventeen previously identified violations and open items were closed based on NRC review of licensee's corrective measures.

(Details: UNCLASSIFIED )

Enclosure contains Upon separation this page is Decontrolled 2