MONTHYEARML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 ML20199B6301997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H5991997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216H6071997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Vogtle Electric Generating Plant ML20210K5081997-07-31031 July 1997 Monthly Operating Repts for July 1997 for VEGP ML20140D7301997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Vogtle Electric Generating Plant ML20141D8531997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Vogtle Electric Generating Plant Units 1 & 2 ML20137T6191997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Vogtle Electric Generating Plant ML20136G3471997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Vogtle Electric Generating Plant Units 1 & 2 ML20134H3481997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20133F6551996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Vogtle Electric Generating Plant,Unit 1 & 2 ML20132B9671996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20134K7361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Vogtle Electric Generating Plant,Units 1 & 2 ML20128N1541996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Vogtle Electric Generating Plant,Units 1 & 2 ML20117N1731996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20116J3461996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20115E9821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Vogtle Electric Generating Plant ML20112H6411996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20111B2461996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20101R0251996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Vogtle Electric Generating Plant ML20100R2701996-02-29029 February 1996 Monthly Operating Repts for Feb 1995 for Vogtle Electric Generating Plant ML20100F2071996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20096C3051995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Vogtle Electric Generating Plant,Units 1 & 2 ML20095E0201995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Vogtle Electric Generating Plant ML20094J0741995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Vogtle Electric Generating Plant Units 1 & 2 ML20093F5031995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Vogtle Electric Generating Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20217K8041999-09-30030 September 1999 Rev 1 to Vegp,Unit 2 Cycle 7 Colr ML20217K7741999-09-30030 September 1999 Rev 1 to Vegp,Unit 1 Cycle 9 Colr ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20196F9711999-05-31031 May 1999 Owner Rept for ISI for Vogtle Electric Generating Plant, Unit 1 Eighth Maint/Refueling Outage ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20206A6561999-04-21021 April 1999 Safety Evaluation Authorizing Licensee Re Rev 9 to First 10-year ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20205A9581999-03-31031 March 1999 Rev 0 to VEGP Unit 1 Cycle 9 Colr ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H3951999-02-15015 February 1999 Rev 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20209H4091999-02-15015 February 1999 Rev 1 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20202H9851999-01-29029 January 1999 Safety Evaluation Accepting Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant,Unit 1 ML20199F8041999-01-13013 January 1999 Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198S1781998-12-31031 December 1998 SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2 ML20196E5221998-12-0101 December 1998 Rev 8 to ISI-P-014, ISI Program for VEGP-2 ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20236Q3051998-06-30030 June 1998 Owner'S Rept for ISI for Sixth Maint/Refueling Outage of Vogtle Electric Generating Plant,Unit 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20154Q9721998-04-20020 April 1998 10CFR50.59(B) Rept of Facility Changes,Tests & Experiments for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H7181998-04-0101 April 1998 Corrected Page 5 to 980324 SER Re Relief Requests Associated W/Second 10-year Interval Insp program.RR-21 in Error in That Component,Suction Damper Inadvertently Omitted. Corrected Page 7 of Technical Ltr Rept Also Encl ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217Q1301998-03-31031 March 1998 Rev 0 to Vepc Unit 2 Cycle 7,COLR ML20217B8831998-03-24024 March 1998 SER Accepting Relief Request RR-5,RR-19,RR-20,RR-21,RR-23 & RR-24 for Second 10-yr Interval ISI Program Plan ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H9551998-02-23023 February 1998 SER Denying Quality Assurance Program Description Change for Vogtle Electric Generating Plant,Units 1 & 2 ML20203E4831998-02-11011 February 1998 Rev 1 to Vogtle Electric Generating Plant,Units 1 & 2 Second Ten-Yr Interval Pump Inservice Test Program ML20198T1211998-01-31031 January 1998 Owners Rept for Inservice Inspection for Seventh Maintenance/Refueling Outage ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20199E5431998-01-31031 January 1998 Rev 3 to WCAP-14720, Vogtle Units 1 & 2 Spent Fuel Rack Criticality Analysis W/Credit for Soluble Boron ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203C2811997-12-0909 December 1997 Safety Evaluation Authorizing Request for Relief of Second 10 Yr Interval Inservice Insp Program ML20202B7881997-12-0101 December 1997 Rev 8 to ISI-P-006, ISI Program for Gpc Vogtle Electric Generating Plant Unit 1 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 1999-09-30
[Table view] |
Text
.
ENC 1OSURE ,
OPERATING DATA REPORT DOCKET NO. 50-424 UNIT voetle 1 DATE 5-4-87 COMPLETED BY S.C. Dilworth TELEPHONE (404)724-8114, ext.3870 OPERATING STATUS
- 1. REPORTING PERIOD: Aoril 1987 GROSS NOURS IN REPORTING PERIOD: 720
- 2. CUnaFMTLY AUTHORIZED POWER LEVEL (IGit): 3411 MAX. DEPMD. CAPACITY (lefe-Met): 1069
[ DESIGN ELECTRICAL RATING (tefe-Net): 1101
- 3. POWER LEVEL TO %AllCM RESTRICTED (IF ANY) (tele-Net) : 870
- 4. nFasnaK POR RESTRICTION (IF ANY): Plant in Startup/P er As onTegt Pgs
- 5. BRRIBER OF NOURS REACTOR WAS CRITICAL 546.9 926.4 926.4
- 6. REACTOR RESERVE SNUTDOWII NOURS n/A 0 o 466.1 521.1 521.1
- 7. NOURS GENERATOR Ott LINE UNIT RESERVE SNUTDOWN NOURS N/A O O 8.
797,491.7 866_?'i7.7 866,257.7
- 9. GROSS TNERMAL ENERGY GENERATED (MWH) 220,823 227.310 227.310
- 10. CROSS ELECTRICAL ENERGY GENERATED (MWH) 184.233 184.?11 184.233
- 11. NET ELECTRICAL ENERGY CENERATED (MWH) q' % R [kIMOCK268 B7043o
-f 05000424 PDR
l 1
I i
' OPERATING DATA REPORT (continued) i THIS MONTH YR TO DATE CLMULATIVE 1
76.0 76.0 76.0 j 12. REACTOR SERVICE FACTOR l 76.0 76.0 76.0 J 13. REACTOR AVAIIABILITY Fm 64.7 64.7 64.7
- 14. UNIT SERVICE FACTOR 64.7 64.7 64.7
- 15. UNIT AVAIIABILITY FACTOR UNIT CAPACITY FACTOR (Using MDC) 23.94 23.44 9194 l 16.
UNIT CAPACITY FACTOR (Using Design mie) 23.24 23.24 23.24 j 17.
" 32.82 30.41 30.41
- 18. UNIT FORCED OUTAGE RATE
! 19. SHUTDOWNS SCHEDULE OVER NEXT 6 MONTH j (TYPE, DATE, AND DURATION OF EACH): N/A 05/01/87 I 20. IF SHUTDOWN A'I END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
I
- 21. UNITS IN TEST STATUS (PRIOR TO COletERCIAL OPERATION):
1 FORECAST ACHIEVED l
INITIAL CRITICALITY 3/9/87 3/9/87 i
i 3/14/87 3/27/87 INITIAL ELECTRICITY COMMERCIAL OPERATION 6/01/87 3
l i
k
i r
LINIT SilVTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 t
REPORT MONTil April 1987 UNIT NAME Vontle I DATES-4-87 COMPLETED BY S.C. Dilworth TELEP110NE (404) 724-8114, !
~
ext. 3870 Method of Licensee Systeg Component cause & Corr.
Reason 2 1
l No. Date Type Duration Shutting Event Code Code 5 Action to
- (Hours) Down Report (If Prevent Reactor (3 Applicable) Recurrence i
- 1 4-5 F 68.6 A 3 87-012 EL GEN See Additional j 2 4-8 S 14.6 B 1 N/A ZZ ZZZZZZ Sheets j m 3 4-10 F 13.5 A 3
- SJ LCV d, 4 4-11 F 94.4 A 3
- SJ LCV 5 4-24 S 11.3 B 1 N/A ZZ ZZZZZZ i 6 4-27 F 18.3 A 5 N/A TA XXXXXX j 7 4-29 F 33.9 A or G 3
i 1 2 3 4
- F: Forced Reason: Method: IEEE 805-1983 l S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance of Test 2-Manual Scram 5 C-Refueling 3-Automatic Scram IEEE 803A-1983 D-Regulatory Restriction 4-Continuations E-Operator Training & Lic. Exam. 5-Load Reduction Attachment yes X no
) F-Administrative 9-Other (Explain) Number of pages 2
- C-Operational Error (Explain)
H-Other (Explain)
- LER number to be assigned
)
, UNIT SHUTDOWNS & POWER REDUCTIONS ( Continutd )
A - Cause / B - Corrective Action To Prevent Recurrence 11 A. Main Generator Fault caused Generator / Turbine Trip and Subsequent Secondary Oscillations. Ground Relay was tripped.
B. Discrepancy Card (DC# 1-87-1065) was initiated on Generator to correct Generator Fault. A time delay relay has been put into the circuitry for the Generator field ground relay to avoid tripping I of this relay on a spurious fault indication.
!2 A. Manual Shutdown Test using the remote shutdown panel. This was part of Start-up Test Program procedure 1-600-08.
B. N/A - due to Start-up Test.
13 A. Reactor trip due to steam generator lo-lo level. The level change was due to a malfunction of a check valve on the main feedwater pump "A" discharge line and the malfunction of a motor operated valve on the discharge of the MFW pump "A".
B. Corrective actions taken were to adjust the packing of the MFW pump "A" discharge MOV and to replace the hinge pin for the disc on the check valve.
Sh A. Reactor trip due to steam generator #1 low-low level trip. Trip was caused by a controller for MFRV #2 being wired incorrectly.
B. Corrective action was taken to reconfigure MFRV #2 consistent with the other MFRVs.
LS A. Reactor Reduction in power to 20%, generator off line to repair EHC leak.
B. EHC leak was repaired and tested.
!6 A. Turbine Trip on high vibration. Rx Power was reduced to 20%.
B. EHC repairs were initiated.
E-3a
UNIT SHUTDOWNS & POWER REDUCTIONS ( Continued )
11 A. Rx Trip on OTAT and OPAT. Pressurizer high pressure and pressurizer low pressure bistables tripped.
B. Replaced a defective card in the 7300 panel.
E-3b
' O AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-424 UNIT NO. Vogtle 1 DATE 5-4-87 COMPLETED BY s,c. Dilworth TELEPHONE _
(404) 724-8114, ext. 3870 MONTH April 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Nec) 248 17 409 1
18 421 2 241 _
253 19 423 3
287 20 427 4
21 441 5 116 0 22 701 6
0 23 706 7
0 24 146 8
131 25 556 9
26 632 10 78 27 217 11 o 28 507 12 0 0 29 423 13 30 0 14 0 31 N/A 15 270 _,
16 410 E-4
Georgi 2 Pbw:t Company -
. Atlant2. Georgia 30308 '
Telephone 404 5266526 Malling Address:-
Pbst Office Box 4545 Atlanta, Georgia 30302 -
Georgia Power L T.Gucws tin southern elettic systren Manager Nuclear Safety and Licensing. ,
, SL-2489 0080m X7GJ17-V510 May 7,1987 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 MONTHLY OPERATING REPORT Gentlemen:
Enclosed is the Monthly Operating Report for Plant Vogtle Unit 1 for April , 1987. This report is submitted pursuant to the requirements of Technical Specification Section 6.8.1.5.
Sincerely, f&w L. T. Gucwa JAE/lm
Enclosure:
- 1. Operating Data Report
- 2. Unit Shutdowns and Power Reductions
- 3. Average Daily Unit Power Level c: (see next page)
Y
\\
Georgia Power A U. S. Nuclear Regulatory Commission May 7, 1987 Page Two c: Georaia Power Comoany Mr. R. E. Conway Mr. J. P. O'Reilly Mr. G. Bockhold, Jr.
Mr. J. F. D'Amico Mr. C. W. Hayes GO-NORMS Southern Comoany Services Mr. R. A. Thomas Mr. J. A. Bailey Shaw. Pittman. Potts & Trowbridag Mr. B. H. Churchill, Attorney-at-Law Troutman. Sanders. Lockerman & Ashmore Mr. A. H. Domby, Attorney-at-Law U. S. Nuclear Regulatory Commission Dr. J. N. Grace, Regional Administrator Ms. M. A. Miller, Licensing Project Manager, NRR (2 copies)
Mr. J. F. Rogge, Senior Resident Inspector-Operations, Vogtle NRC Document Control Desk Georaians Aaainst Nuclear Energy Mr. D. Feig Ms. C. Stangler 0080m