ML20140D730
| ML20140D730 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/31/1997 |
| From: | Hargis T, Mccoy C SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| LCV-0965-E, LCV-965-E, NUDOCS 9706110074 | |
| Download: ML20140D730 (12) | |
Text
',
C. K. McCoy S:uth2rn Nucle:r i
Vice President Opertting C:mp ny,Inc.
Vogtle Project 40 invemess Center Paikway i
P.O Box 1295 I
Birmingham. Alabama 35201 Tel 205.992.7122 Fax 205 992.0403 k
SOUTHERN L COMPANY Energy toServe nurWorld" June 6, 1997 LCV-0965-E j
Docket Nos.
50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT j
MONTIILY OPERATING REPORT Enclosed are the May 1997, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units I and 2. These reports are submitted in accordance with the Improved Technical Specification 5.6.4.
l Sincerely, 0.O C. K. McCoy CKM/JLL Enclosures cc:
Southern Nuclear Oncratina Company Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuclear Reaulatory Commission Mr. L. A. Reyes, Regional Administrator
,b
("
I Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle i
110013 lillOl.llOl.lll.Oll.Oll. loll. loll.li 9706110074 970531 PDR ADOCK 05000424 R
l i
ENCLOSURE 1 l
VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR MAY 1997 l
TABLE OF CONTENTS l
NARRATIVE REPORT Page VI-l l'
OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page V t-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 I
l l
l r
e l
l
\\
NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE:
JUNE 2,1997 COMPLETED BY: T. S. Hargis TELEPHONE:
(706)826-3469 M y 0100:00 Unit in Mode 2 at 2% power, startup in progress.
May 02 01:22 Entered Mode 1 M;y 02 11:57 Generator tied to grid May 04 03:24 Unit returned to 100% power.
M:y 31 23:59 Unit at 100% power with no operating problems.
4 V1-1
2 4
OPERATING DATA REPORT DOCKET NO. 50-424 DATE: JUNE 2,1997 COMPLETED BY: T. S. Hargis TELEPHONE:
(706) 826-3469 OPERATING STATUS 4
4
- 1. UNIT NAME:
VEGP UNIT 1
- 2. REPORT PERIOD:
May-97
- 3. LICENSED THERMAL POWER (MWt):
3565 i,
- 4. NAMEPLATE RATING (GROSS MWe):
1215 l'
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1169
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1216 j
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1162
^
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:
NA THIS MONTH YR. TO DATE CUMULATIVE l
- 11. HOURS IN REPORTING PERIOD:
744 3623 87672
.~
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
744.0 3176.9 76891.7
{
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 4
- 14. HOURS GENERATOR ON-LINE:
708.1 3121.9 75627.3
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
2489873 11011185 257435493
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
853748 3796540 87021665
- 18. NET ELEC. ENERGY GENERATED (MWH):
814488 3610720 82802925
- 19. REACTOR SERVICE FACTOR 100.0 %
87.7 %
87.7 %
2
- 20. REACTOR AVAILABILITY FACTOR 100.0 %
87.7 %
87.7 %
- 21. UNIT SERVICE FACTOR:
95.2 %
86.2 %
86.3 %
- 22. UNIT AVAILABILITY FACTOR:
95.2 %
86.2 %
83.3%
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
94.2 %
85.8 %
84.3 %
- 24. UNIT CAPACITY FACTOR (USING DER NET):
93.6 %
85.3 %
83.7%
- 25. UNIT FORCED OUTAGE RATE:
4.8%
9.3%
4.7%
i
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling Outage, September 7,35 days
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA j
V1-2
.... =. - -. _. _
_m._
._.......___..._m.__...
s i
i UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:
JUNE 2,1997 COMPLETED BY: T. S. Hargis TELEPHONE:
(706) 826-3469 i
4 DAY Net MW 1.
0 2..
180 l
3.....
1004 4.
1177 *
}
5, 1178
- i 6...
1171
- 7..
1176
- l-8.
1171
- 9.
1165
- 10..
1180
- 11.
1180
- 12.
1176
- 13.
1175
- 14.
1175
- 15..
1168
- 16.
1179
- 17.
1176
- 18.
1170
- 19..
1162
- 20.
1160 21.
1169
- I 22..
1175
- 23.
1172
- 24.
1168
- 25..
1164
- i 26.
1159 27.
1171
- 28, 1179
- 29.
1174
- 30 1171
- 31 1164
- i
V1-3
)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 J
DATE: JUNE 2,1997 UNIT NAME:
VEGP UNIT 1 COMPLETED BY: T. S. Hargis TELEPHONE:
(706) 826-3469 i
s REPORT MONTH May-97 R
M S
E E
Y T
A T
LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE
)
{
P DURATION O
O REPORT ED CODE ACTION TO
- NO.'
DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE j
97-2 4/19 F
35.9 8
4 NA TB GEN See Below 4
s 1
F: FORCED REASON:
METHOD:
EVENTS RsFORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2-MANUAL SCRAM REDUCTION IN AVERAGE
+
C-REFUELING 3-AUTO. SCRAM DAILY POWER LEVEL FOR i
D-REGULATORY RESTRICTION 4-CONTINUATIONS THE PRECEDING 24 HOURS.
l E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION l
l F-ADMINISTRATIVE 9-OTHER (EXPLAIN)
{
i G-OPERATIONAL ERROR (EXPLAIN) i H-OTHER (EXPLAIN)
I i
1 1
j EVENT _9Z-2 i
. CAUSEL Forced Outage to investigate a generator hydrogen seal ground.
i F
CORRECIIVEACTJOR This event is a continuation of the April nineteenth event. All corrective actions were completed in April. Unit startup was completed in May. The unit was returned to 100% power.
4 k
[
4
/
i a
V1-4
,-e
~-
4
ENCLOSURE 2 V0GTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR MAY 1997 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3
' UNIT SilUTDOWNS AND POWER REDUCTIONS Page V2-4 i
NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:
JUNE 2,1997 COMPLETED BY: T. S. Hargis TELEPHONE:
(706) 826-3469
)
May 0100:00 Unit at 100% power with no operating problems.
i M:y 30 20:15 Initiated power descent to 65% for replacement of isophase duct cooler fan bearing.
M:y 3100:00 Unit at 65% power.
May 3110:03 initiated power ascent.
Mry 3123:59 Unit at 98% power ascending to 100% power.
i 4
I 4
V2-1
~.. -
]
2 1
4 L
OPERATING DATA REPORT DOCKET NO. 50425 DATE: JUNE 2,1997 COMPLETED BY: T. S. Hargis TELEPHONE:
(706) 826-3469 OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 2
- 2. REPORT PERIOD:
May-97
- 3. LICENSED THERMAL POWER (MWt):
3565
- 4. NAMEPLATE RATING (GROSS MWe):
1215 i
. 5. DESIGN ELECTRICAL RATING (NET MWe):
1169 i
t
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1216
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1162
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:
NA THIS MONTH YR. TO DATE CUMULATIVE 4
- 11. HOURS IN REPORTING PERIOD:
744 3623 70416
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
744.0 3623.0 63686.8 3
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 j
- 14. HOURS GENERATOR ON-LINE:
744.0 3623.0 63022.2 i
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 j
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
2630761 12887181 213856224
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
906858 4463264 72951962
- 18. NET ELEC ENERGY GENERATED (MWH):
869398 4280534 69556432
- 19. REACTOR SERVICE FACTOR 100.0 %
100.0 %
90.4 %
5
- 20. REACTOR AVAILABILITY FACTOR 100.0 %
100.0 %
90.4 %
l
- 21. UNIT SERVICE FACTOR:
100.0 %
100.0 %
89.5 %
- 22. UNIT AVAILABILITY FACTOR:
100.0 %
100.0 %
89.5%
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
100.6 %
101.7 %
87.2 %
- 24. UNIT CAPACITY FACTOR (USING DER NET):
100.0 %
101.1 %
87.1 %
- 25. UNIT FORCED OUTAGE RATE:
0.0%
0.0%
1.7%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
None
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA V2-2
... = _ _..... -.. _.
_ _ _ _... -. _.. _. _.. -. _ -.. _ _. _. - _. _ ~.
_... _. _.. _ _.. _ ~ _
i i
1
.a 4
1 i
r UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 POWER LEVEL DATE:
JUNE 2,1997 i
COMPLETED BY: T. S. Hargis TELEPHONE:
(706) 826-3469 l
i f
DAY Net MW 1.
1172
- i I
2.
1177
- 3...
1174
- i 4....
1185 *-
5 1186
- 2' 6...
1177
- 7.
1183
- 8.
1181
- I 9.
1171
- l l
10.
1187
- I 11 1187
- I 12.
1184
- l
{
13.
1182
- 14.
1182
- 15..
1174 *
'1 16..
1186
- 1 17.
1183
- j 18..
1177
- 19.
1168
- l 20..
1166
- 21.
1176
- 22...
1183
- 23...
1181
- 24.
1175
- 25.
1173
- 4 26.
1166
- i 27.
1178
- i i
28 1187
- l 2 9.....
1180
- j-30.
1132 1
31 913 1
)
j
V2-3
a UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE: JUNE 2,1997 UNIT NAME:
VEGP UNIT 2 COMPLETED BY: T, S. Hargis TELEPHONE:
(706) 826-3469 REPORT MONTH May-97 R
M S
E E
Y T
A T
LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION O
O REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE 97-1 5/30 F
0.0 B
5 NA EL FAN See below F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLVE i
S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3-AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4-CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
ElfENT_97-1 CAUSELDerated to repair isophase bus duct cooling fan bearing.
CORBEGIIVEACIlON: Bearing was replaced and unit power ascension is in progress.
V2-4
. of 3
ENCLOSURE 3 VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 i
CHALLENGES TO PORV OR SAFETY VALVES DOCKET NOS. 50424,50-425 DATE:
JUNE 2,1997 COMPLETED BY: T. S. Hargis TELEPHONE:
(706)826-3469 i
EVENT DATE TAG NO.
TYPE DESCRIPTION NA NA NA NA l
i 2
-