ML20134H348
| ML20134H348 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/31/1997 |
| From: | Hooper G, Mccoy C GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| LCV-0965, LCV-965, NUDOCS 9702110256 | |
| Download: ML20134H348 (12) | |
Text
- -
-... ~. _
Geor,gia Power Company l
40 invemess Center Parkway Post Office Box 1295 l
Birminbham. Alabama 35201 Telephone 205 992-7122 i
Georgia Power C.K.McCoy the souttKyn obctnc sg1em Vice President. Nuclear
)
vogtle Project February 6, 1997 LCV-0965 1
Docket Nos. 50-424 5
50-425 1
U. S. Nuclear Regulatory Commission 4
{
ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT 1
MONTHLY OPERATING REPORT i
Enclosed are the January 1997, monthly operating reports for Vogtle Electric Generating 1
Plant (VEGP) Units I and 2. These reports are submitted in accordance with the Improved Technical Specification 5.6.4.
Sincerely, I
C. K. McCoy CKM/JLL
\\
Enclosures
\\
l cc:
Georgia Power Company b}\\
I Mr. J. B. Beasley, Jr.
Mr. M. Sheibani
/g NORMS y
U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle 1
9702110256 970131 PDR ADOCK 05000424 4
PDR g
R
ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR JANUARY 1997 TABLE OF CONTENTS i
NARRATIVE REPORT Page Vl-1 OPERATING DATA REPORT Page VI-2
~!
i AVERAGE DAILY POWER LEVEL Page VI-3 l
UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 1
1 l
)
i l
I l.
-~.-~,._m
NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE:
February 3,1997 l
COMPLETED BY: G. L. Hooper TELEPHONE:
(706)826-4104 January 01 00:00 Unit at 100% power with no operating problems.
JInuary 31 23:59 Unit at 100% power with no operating problems.
V1-1
OPER/
,ATA REPORT DOCKET NO. 50-424 DATE: February 3,1997 COMPLETED BY: G. L. Hooper TELEPHONE:
(706) 826-4104 OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 1
- 2. REPORT PERIOD:
Jan-97
- 3. LICENSED THERMAL POWER (MWt):
3565
- 4. NAMEPLATE RATING (GROSS MWe):
1215
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1169
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1216
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1162
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:
NA THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744 744 84793
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
744.0 744.0 74458.8
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE:
744.0 744.0 73249.5
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
2648498 2648498 249072806
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
919820 919820 84144945
- 18. NET ELEC. ENERGY GENERATED (MWH):
880680 880680 80072885
- 19. REACTOR SERVICE FAC7 JR 100.0 %
100.0 %
87.8 %
- 20. REACTOR AVAILABILITY FACTOR 100.0 %
100.0 %
87.8 %
- 21. UNIT SERVICE FACTOR:
100.0 %
100.0 %
86.4 %
- 22. UNIT AVAILABILITY FACTOR:
100.0 %
100.0 %
86.4 %
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
101.9 %
101.9 %
84.4 %
- 24. UNIT CAPACITY FACTOR (USING DER NET):
101.3 %
101.3 %
83.8 %
- 25. UNIT FORCED OUTAGE RATE:
0.0%
0.0%
4.5%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
)
Maintenance, March 28,9 days
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA 1
l l
l V12 l
.-.. -. - -. -.. - - _. - ~ -.- - _. -
.... - - _ - -. -. -.. ~
l i
UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:
February 3,1997
.i COMPLETED BY: G. L. Hooper 3
TELEPHONE:
(706) 826-4104 l
1 1
1 1
DAY Net MW 1..
1180
- 2.
1179
- I 3...
1173
- J 4.
1173
- 5..
1173
- 6-1182
- 7-1185
- 1 8.
1187
- 9; 1187
- 10....
1188
- 11.
1187
- 12.
1188
- i 13 '......
1187
- 14...
1188
- 1 1 5...........
1186
- 16.
1184
- 1 17.
1189 *
}
18 1189
- l 19....
1189
- 1 20.
1187
- 21.
1185
- 22 =
1180 *
~
23 -..
1180
- 24 :
1178
- 25..
1182
- 26..
1188
- 27.
1183
- l 28.
1180
- 29 1187
- 30.
1188
- 31....
1186
- l l
i i
v i
i i
-i k
V1-3
1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 DATE: February 3,1997 UNIT NAME:
VEGP UNIT 1 COMPLETED BY: G. L. Hooper TELEPHONE:
(706) 826-4104 REPORT MONTH Jan-97 R
M S
E E
Y T
A T
LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION O O
REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA NA F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2-MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3-AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY REuTRICTION 4-CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
V1-4
F ENCLOSURE 2 l
l VOC fLE ELECTRIC GENERATING PLANT - UNIT 2 l
MONTHLY OPERATING REPORT FOR JANUARY 1997 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 l
AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4 l
t
i l
1 t
NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:
February 3,1997 l
COMPLETED BY; G. L. Hooper TELEPHONE:
(706)826-4104 Jinuary 01 00:00 Unit at 100% power with no operating problems.
Jinuary 31 23:59 Unit at 100% power with no operating problems.
)
l V2-1
i i
l OPERATING DATA REPORT DOCKET NO. 50-425 DATE: February 3,1997 l
COMPLETED BY: G. L. Hooper 4
TELEPHONE:
(706) 826-4104 OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 2
- 2. REPORT PERIOD:
Jan-97
- 3. LICENSED THERMAL POWER (MWt):
3565
- 4. NAMEPLATE RATING (GROSS MWe):
1215
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1169 l
S. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1216 i
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1162 1
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:
NA i
THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744 744 67537
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
744.0 744.0 60807.8
- 93. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE:
744.0 744.0 60143.2
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
2650701 2650701 203619744
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
923783 923783 69412481
- 18. NET ELEC. ENERGY GENERATED (MWH):
886033 886033 66161931
- 99. REACTOR SERVICE FACTOR 100.0 %
100.0%
90.0 %
- 20. REACTOR AVAILABILITY FACTOR 100.0 %
100.0%
90.0 %
- 31. UNIT SERVICE FMTOR:
100.0 %
100.0%
89.1 %
- 22. UNIT AVAILABILITY FACTOR:
100.0 %
100.0 %
89.1 %
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
102.5 %
102.5 %
86.6 %
- 24. UNIT CAPACITY FACTOR (USING DER NET):
101.9 %
101.9 %
86.5 %
- 35. UNIT FORCED OUTAGE RATE:
0.0%
0.0%
1.7%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
None
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA i
V2-2
i UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 POWER LEVEL DATE:
February 3,1997 COMPLETED BY: G. L. Hooper TELEPHONE:
(706) 826-4104 DAY Net MW 1.
1188
- 2.
1187
- 3.
1180
- 4.
1181
- 5.
1181
- 6.
1190
- 7.
1193
- 8.
1195
- 9.
1195*
10.
1194
- 11.
1196
- 12.
1197
- 13.
1197
- 14.
1199
- 15.
1194
- 16.
1191
- 17.
1195
- 18.
1193*
19.
1195
- 20.
1192
- 21.
1192
- 22.
1187
- 23.
1185
- 24.
1185
- 25.
1187
- 26.
1194
- 27.
1189
- 28.
1185
- 29.
1194
- 30.
1195
- 31 1194 *
l V2-3
i i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE: February 3,1997 UNIT NAME:
VEGP UNIT 2 COMPLETED BY: G. L. Hooper TELEPHONE:
(70G) 826-4104 REPORT MONTH Jan-97 R
M S
l E
E Y
T A
T LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION O
O REPORT ED CODE ACTION TO Nb DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE i
NA NA NA NA NA NA NA NA NA NA I
i F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLVE l
S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL A GREATER THAN 20%
i l
B-MAINTENANCE OR TEST 2-MANUAL SCRAM REDUCTION IN AVERAGE l
C-REFUEL.ING 3-AUTO. SCRAM DAILY POWER LEVEL FOR l
D-REGULATORY RESTRICTION 4-CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION f
F-ADMINISTRATIVE 9-OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN) 1 l
1 l
l V2-4
..._...__.__.___m..._.m_-______._
l.
l l
1 ENCLOSURE 3 i
VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 CHALLENGES TO PORY OR SAFETY VALVES i
DOCKET NOS. 50-424,50-425 DATE:
February 3,1997 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706)826-4104 EVENT DATE TAG NO.
TYPE DESCRIPTION i
i NA NA NA NA i
f 4
,.=
-