ML20095E020

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1995 for Vogtle Electric Generating Plant
ML20095E020
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/30/1995
From: Hooper G, Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-0564-K, LCV-564-K, NUDOCS 9512140130
Download: ML20095E020 (12)


Text

.

Georgia Power Company

..g 6

40 inverness Center Parkway Post Office Box 1295 Bemengham. Alabama 35201 8

Telephone 205 877 7122 i

C.K.McCoy Georeia Power o

Vice President. Nuclear Voptle Protect the Southern elucinc system December 8, 1995 LCV-0564-K Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission

)

ATTN: Document Control Desk Washington, D. C. 20555 i

Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the November 1995, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units I and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.

Sincerely, 4

4 C. K. McCoy CKM/JLL Enclosures cc:

Georgia Power Comoany Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C R. Ogle, Senior Resident Inspector, Vogtle

' 9512140130 951130

^

hv' PDR ADOCK 05000424 R

PDR i

ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR NOVEMBER 1995 TABLE OF CONTENTS NARRATIVE REPORT Page Vl-1 OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 4

i i

t NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE:

DECEMBER 1,1995 i

COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 NOVEMBER 01 00:00 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

NOVEMBER 27 09:00 UNIT 1 BEGAN POWER REDUCTION TO 97% FOR PERFORMANCE OF END OF LIFE MODERATOR TEMPERATURE COEFFICIENT TEST.

NOVEMBER 27 17:38 UNIT 1 RETURNED TO 100% POWER. TESTING COMPLETED.

NOVEMBER 30 23:59 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

I 1

i l

l i

j V1-1

. _ _ ~

l

\\

j 4

OPERATING DATA REPORT DOCKET NO. 50424,

DATE:

DECEMBER 1.1995 COMPLETED BY: G. L HOOPER l

TELEPHONE:

(706) 826-4104 l

OPERATING STATUS

1. UNIT NAME:

' VEGP UNIT.1 l

2. REPORT PERIOD:

NOVEMBER 1995.

3. LICENSED THERMAL POWER (MWt):

3565-

4. NAMEPLATE RATING (GROSS MWe):

1215

~ 5. DESIGN ELECTRICAL RATING (NET MWe):

1169

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1216

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1162.

' 8.~ IF CHANGES OCCUR IN CAPACITY RATINGS.

(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

.NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION, IF ANY:

NA THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

720 8016 74521

12. NUMBER OF HOURS REACTOR WAS CRITICAL:-

720.0 7957.6'

'65722.2

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

720.0 7877.6 64598.4

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0

. 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

2564913 27957704 218751005

17. GROSS ELEC. ENERGY GENERATED (MWH):

884817 9528538 73755225'

18. NET ELEC. ENERGY GENERATED (MWH):

846947 9105838 70164285 119. REACTOR SERVICE FACTOR '

100.0 %

99.3 %

88.2 %

)

20. REACTOR AVAILABILITY FACTOR.

.100.0 %

99.3 %

88.2 %

21. UNIT SERVICE FACTOR:

100.0 %

98.3 %

86.7% -

22. UNIT AVAILABILITY FACTOR:

100.0 %

98.3 %

86.7 %

23. UNIT CAPACITY FACTOR (USING MDC NET):

101.2 %

97.8 %

84.6 %

- 24. UNIT CAPACITY FACTOR (USING DER NET):

100.6 %

97.2 %

84.0 %

25. UNIT FORCED OUTAGE RATE:

0.0%

0.8%

4.4%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUELING,03/03/96,31 DAYS

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA 1

V1-2

... ~..-. --

UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:

DECEMBER 1,1995 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 DAY Net MW 1...........

1166

  • 2..................

1154 3..................

1159 4...............

1163

  • 5.................

1182

  • 6...................

1182

  • 7..............

1169

  • 8..............

1180

  • 9....................

1184

  • 10.................

1178

  • 11....

1172

  • 12..................

1184

  • 13...........

1181

  • 14................

1180

  • 15...................

1182

  • 16.............

1180

  • 17......

1182

  • 18...............

1180

  • 19..

1177

  • 20..............

1178

  • 21..................

1179

  • 22................

1183

  • 23.......

1181

  • 24...............

1182

  • 25...............

1183

  • 26....

1180

  • 27.

1167

  • 28...........

1166

  • 29...

1172

  • 30................

1181 *

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS 1

V1-3

. - ~ -- - ---

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 DATE:

DECEMBER 1,1995 UNIT NAME:

VEGP UNIT 1 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706)8264 104

]

4 REPORT MONTH NOVEMBER 1995 R

M S

E E

Y T

A T

LICENSEE SC Y

S H

EVENT TO COMPONENT CAUSE & CORRECTIVE P

DURATION O

O REPORT ED CODE ACTION TO NO.

DATE E

(HOURS)

N D

NUMBER ME (SUBCODE)

PREVENT RECURRENCE

}

NA NA NA NA NA NA NA NA NA NA F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST.

2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR i

D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

T 4

i V1-4 i

. ~. - _ -.. _ -

~

l l

ENCL,OSURE 2 i

VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 -

MONTHLY OPERATING REPORT FOR NOVEMBER 1995

)

TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 l

UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4 I

l

~

q

NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:

DECEMBER 1,1995 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 NOVEMBER 01 00:00 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

NOVEMBER 30 23:59 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

V2-1

t l

OPERATING DATA REPORT DOCKET NO. 50-425 i

l DATE:

DECEMBER 1,1995

't COMPLETED BY: G. L. HOOPER

.i TELEPHONE:

(706) 826-4104'

)

l l

OPERATING STATUS

1. UNIT NAME:

VEGP UNIT 2 l

' 2. REPORT PERIOD:

NOVEMBER 1995 '

3. LICENSED THERMAL POWER (MWt):

3565 i

4. NAMEPLATE RATING (GROSS MWe):

1215

5. DESIGN ELECTRICAL RATING (NET MWe):

1169 G. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1216

' 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

.1162

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS L

10. REASONS FOR RESTRICTION, IF ANY:

NA l'

THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

720 8016 57265

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

720.0 7224.8-51372.5 13, REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0

. 0.0 l

14. HOURS GENERATOR ON-LINE:

720.0 7165.3' 50755.5'

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0

' O.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

2565212 25270758 170829386

17. GROSS ELEC. ENERGY GENERATED (MWH):

890952 8661303

.58109999-

18. NET ELEC. ENERGY GENERATED (MWH):

854372 8283503 55362579

19. REACTOR SERVICE FACTOR -

100.0 %

90.1 %

89.7 %

' 20. REACTOR AVAILABILITY FACTOR 100.0 %

90.1 %

89.7 %

21. UNIT SERVICE FACTOR:

100.0 % ~

89.4 %

88.6 %

22. UNIT AVAILABILITY FACTOR:

100.0 %

89.4 %

88.6 %

l

23. UNIT CAPACITY FACTOR (USING MDC NET):

102.1 %

88.9 %

85.9 %

24. UNIT CAPACITY FACTOR (USING DER NET):

101.5 %

88.4 %

85.9 %

25. UNIT FORCED OUTAGE RATE:

0.0%

0.6%

2.0%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

3 NONE

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP :

NA l

i V2-2 L

_._,_......~.._. _.._._.

h UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 I

POWER LEVEL DATE:

DECEMBER 1,1995 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104-i 4

DAY Net MW 1......

1178

  • 2..............

1170

  • 3.............

1174

  • 4.....

1190

  • 5............

1192 *

'6........

1189

  • 7.................

1177

  • 8...

1188

  • 9..................

1191

  • 10...........

1185

  • 11....

1183

  • i 12.................

1191

  • 13.....

1192

  • 14...............

1191

  • i 15......

1193

  • 16.............

1192

  • 17....

1193

  • 18=

1191

  • 19.

1187

  • 20.......

1186

  • 21.....

1187

  • 22...

1191

  • l 2 3..............

1188

  • l

. 24...

1189

  • 25=

1189

  • 26...............

1186

  • 27-1183
  • i 28..................

1178

  • l 29....................

1185

  • 30....................

1193 *

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS

+

6 V2-3 g

I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE:

DECEMBER 1,1995 i

UNIT NAME:

VEGP UNIT 2 COMPLETED BY: G. L. HOOPER REPbRT MONTH NOVEMBER 1995 I

R M

S E

E Y

T A

T LICENSEE SC Y

S H

EVENT TO COMPONENT CAUSE & CORRECTIVE P

DURATION O

O REPORT ED CODE ACTION TO NO.

DATE E

(HOURS)

N D

NUMBER ME (SUBCODE)

PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA NA j

F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLVE i

S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) '

1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3-AUTC SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) i l

V2-4

ENCLOSURE 3 VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 CIIALLENGES TO PORY OR SAFETY VALVES DOCKET NOS. 50-424,50-425 DATE:

DECEMBER 1,1995 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 EVENT DATE TAG NO.

TYPE DESCRIPTION NA NA NA NA

_ _ _ _ _. _ _ _ _