C.K. McCoy Southem Noeloor We President Operating Company.Inc.
.o -
Vtyle Project 40 inverness renter Parkway P0. Box 1295 Buminghant Alabama 35201 Tel 205 992.7122 Fax 205 9920403 SOUTHERN h COMPANY Energ toServe hurWorld" 4
November 11, 1997 LCV-0965-J Docket Nos.
50-424 50-425 II. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTilLY OPERATING REPORT Enclosed are the October,1997, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
Sincerely, C&'
C. K. hicCoy CKht/JLL Enclosures cc:
Southern Nuclear Oneratine Comnany hir. J. B. Deasley, Jr.
/h hir. hi. Sheibani NORMS
[
U. S. Nuclear Reculatory Commission j
hir. L. A. Reps, Regional Administrator l
y; Mr L. L Wheeler, Senior Project hianager, NRR
\\
- Senior Resident inspector, Vogtle 9711190045 971031 "
PDR ADOCK05000g4
\\\\\\t\\\\ppRRE%\\
y
,, ='.
1, 4l s-ENCLOSURE 1 VOOTLE ELECTRIC GENERA 11NG PLANT - UNIT I MONTilLY OPERATING REPORT FOR OCTOBER 1997
- i
. TAIll_It OF CONTEbllS NARRATIVE REPORT-
- Page V1 1 OPERATING DATA REPORT Page VI 2 A\\ ERAGE DAILY POWER IEVEL Page VI 3 j
Uh.lTSilVTDOWNS AND POWER REDilCTIONS Page Vl 4 i
tm -
i
+
e
+-
i 9
f r
y *'
y e
f g
go
-yW
- a p w-~g---y.,w y---we,y, w w w.f re--.,,,--,g-%,.3.-[
y
,y,
,gy,,_
,.g.,,_
k NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE:
November 3,1997 COMPLETED BY: T. S. Hargis TELEPHONE:
(706) 826-3469 I
October 01 00.00 Unit defueled. Reactor Vessel Cover installed with RCS drained for RCP work.
October 08 18:31 Entered Mode 6 commenced core reload.
October.12 19:58 Core Reload Completed.
October 14 17:38 Reector Vessel Head set.
October 16 04:54 Reector Vessel Hood Tensioning Complete, Entered Mode 5.
October 18 15.00 Entered Mode 4
. October'18 23:38 Entered Mode 3 l
October 20 22:34 Entered Mode 2 October 21 00:39 Reactor Critical-Octobei'22 00:24 Entered Mode 1 October 22 07:22 Main Generator tied to grid.
October 22 21:12 Generator tripped for Turbine Overspeed Testing.
October 22 22:58 Main Generator tied to grid.
October 29 06:44 Unit at 100% power.
October 31 23:59 Unit at 100% power with no operating problems.
E b
h s
k y
V1 1 -
s r.4' r, -
nv.',m.,:
mm,,
w..,
,w r,
.n..
.u,,v.
n.~.m'a
,,w,
-w v.
~
.. _. _ =. _ _ _ _ -
t i
4 OPERATING DATA REPORT DOCKET NO. 50-424 DATE: November 3,1997 i
COMPLETED BY: T. S. Hargis TELEPHONE:
(706) 826 3469 OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 1
- 2. REPORT PERIOD:
Oct 97 l'
- 3. LICENSED THERMAL POWER (MWt):
3065
- 4. NAMEPLATE RATING (GROSS MWe):
1215
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1169
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe).
1216
- 7. MAXIMUM DEPENDABLE CAPAC11Y (NET MWe):
1162
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA 9, POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:
NA THIS MONTH YR. TO DATE CUMULATIVE 11, HOURS IN REPORTING PERIOD:
745 7296 91345
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
264.4 5793.2 79508.0
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 t
- 14. HOURS GENERATOR ON-LINE:
231.9 5705.3 78210.8 1
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 16, GROSS THERMAL ENERGY GENERATED (MWH):
678343 20054915 266479223
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
227096 6872234 90097359
- 18. NET ELEC ENERGY GENERATED (MWH):
209326 6537834 85730039 t
19 REACTOR SERVICE FACTOR 35.5 %
79.4 %
87.0%
~ 20. REACTOR AVAILABILITY FACTOR 35.5 %
79.4 %
87.0 %
i
- 31. UNIT SERVICE FACTOR:
31.1 %
78.2 %
85.6 %
- 25. UNIT AVAILABILITY FACTOR:
31.1 %
78.2%
85.6%
- 83. UNIT CAPACITY FACTOR (USih3 MDC NET):
24.2 %
77.1 %
83.7 %
- 24. UNIT CAPACITY FACTOR (USING DER NET):
24.0 %
76.7%
83.1 %
- 35. UNIT FORCED OUTAGF RATE:
0.0%
5.3%
4.6%
i
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 0 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Planned Maintenance Outage: Decemt;3r 5, 2 Days
- 37. IF SHUT.NWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA l
4 L
)
V12
,_--n..-.
t UNIT 1 AVERAGE CAlLY -
DOCKET NO. 50-424 i
POWER LEVEL DATE:
November 3,1997 l
COMPLETED BY: T. S. Hargis TELEPHONE:
(706)826 3469 -
- I i
6 i
s DAY t et M W i
1................
O 2..................
0 l
3...................
O y
4...............
0 5..................
O 6...................
0 7...................
0 8..............
0 9...............
0 10.............
O I
1 1...,...........
O 12...............
0 1 3..............
0 14.................
0 15...........
0 16.................
0 17................
0 18.................
0 4
19.................
0 20.................
0 21..............
0 2 2..............
90 23..................
359 r
24................
678 1
?$......,........,
882 26..............-.
1084 27.................
1154 2 8..............
1166
- 29..................
1184
- 30..................
1181 31...............
1181 *
9
)
V13 1
+
er,- d
-r+e
.r-
-,w.
.=---&,
,.~,.ew m*,s.,7,wv,-..,.ewi-w w
w..,
e.
n.,%v r-y w sig
,,, ~ + -,
aw..
n--v e.w a=*ww+-
r
~7
+
r,-
.--+=-tw.,
ev---
i UNIT SHUTDOW4 AND POWER REDUCTIONS DOCKET NO. 50-424 DATE: November 3,1997 4
UNIT NAME:
VEGP UNIT 1 COMPLETED BY: T. S. Hargis i
TELEPHONE.
(706) 826-3469 REPORT MONTH Oct-97 l
R M
S E
E Y
T A
T LICENSEE SC
'Y S
H EVENT-TO COMPONENT C AUSE & CORRECTIVE -
P-DURATION O
O REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER M E (SUBCODE)
PREVENT RECURRENCE 97 3 9/7 S
$11.3 C
4 NA ZZ 777777 SEE BGLOW 97-4 10/22 S
1.8 8
1 NA TA TRB SEE BELOW FIFONCED REXbdN:
MsTADU:
EViNf5YnFONT50 INVDLVi~
S: SCHEDULED A EOUIPMENT FAILURE (EXPLAIN) 1 MANUAL A GREATER THAN 20%
B MAINTENANCE OR TEST 2 MANUAL SCRAM REDUCTION IN AVERAGE C REFUEllNG 3-AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 CONTINUATIONS THE PRECEDING 24 HOURS.
t E OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F ADMINISTRATIVE 9-OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN)
EVENT 97 3
- Cause; Scheduled refueling outage Corrective action: Guide Tube Support Pin Replacement.
Cntical patti was; Complete steam generator eddy current testing on #2 and #4.
R: load fuel, install upper internals, and reinstall reactor vessel head. Tension cnd complete reassembly. Begin heatup mod mode accension from mode 5 to Mode 1.
Perform appropriate functional testing in each mode, raise power after entenng Mode 1, perform turbine testing, and close breaker, EVENT.97 4 Cause: Turbine overspeed Tnp Test Corrective Actiorn Turbine test completed and unit retumed to service.
i f
V14
ENCLOSURE 2 VOOTLE ELECTRIC GENERATING PLANT UNIT 2 MONTilLY OPERATING REPORT FOR OCTollER 1997 TAllLII OF CONTENTS NARRATIVE REPORT Page V2 1 OPERATING DATA REPORT Page V2 2
- AVERAGE DAILY IOWER LEVEL Page V2 3 UNIT SilOTDOWNS AND POWER REDUCTIONS Page V2 4
i NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:
November 3,1997 COMPLETED BY: T. S. Hargis TELEPHONE:
(706) 026 3469 October 01 00.00 Unit at 100% power with no operating problems.
October 31 2359 Unit at 100% power with no operating problems.
V21
1 I
OPERATING DATA REPORT DOCKET NO. 50-425 DATE: November 3,1997 COMPLETED BY: T. S. Hargis TELEPHONE:
(706) 826-3469 1
OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 2
- 2. REPORT PERIOD:
Oct 97
- 3. LICENSED THERMAL POWER (MWt):
3565 i
- 4. NAMEPLATE RAllNG (GROSS MWe):
1215
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1169
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1216
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1162
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHirli RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS i
- 10. REASONS FOR RESTRICTION, IF ANY:
NA THIS MONTH '
YR. TO DATE CUMULATIVE
- 11. HOURS !N REPORTING PERIOD:
745 7296 74089
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
745.0 7296.0 67359.8
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE:
745.0 7296.0 66695.2
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 10. GROSS THERMAL ENERGY GENERATED (MWH):
2li54064 25971745 22694078C
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
9!7197 8946940 77435638
- 18. NET ELEC. ENERGY GENERATED (MWH):
876317 8572570 73848468
- 19. REACTOR SERVICE FACTOR 100.0 %
100.0 %
90.9% -
- 80. REACTOR AVAILABILITY FACTOR 100.0 %
100.0 %
90.9 %
- 81. UNIT SERVICE FACTOR:
100.0 %
100.0 %
90.0 %
- 33. UNIT AVAILABILITY FACTOR:
100.0 %
100.0 %
90.0%
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
101.3 %
101.1 %
87.9 %
- 34. UNIT CAPACITY FACTOR (USING DER NET):
100.6 %
100.5%
87.8 %
- 35. UNIT FORCED OUTAGE RATE:
0.0% -
0.0%
1.6%
- 26. SHUTDOWNS SCHEDULCD OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling Outage: March 8,1998,35 Days
- 87, IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP NA I
l e
~
V2 2 l
NU"*#1'%
T T
Tv-pp ----
p p
9 g
7,
9 l
UNIT 2 AVERAGE DAILY DOCKET NO. 50425 POWER LEVEL DATE:
November 3,1997 COMPLETED BY: T. S. Hargis TELEPHONE:
(706)826-3469 DAY Net MW 1.
1175
- 2...
1180
- 3....
1183
- 4.
1174
- 5....
1170
- 6.....
1170*
7...........
1169
- 8..
4.
1169
- 9...
1170*
10..
1170
- 11....
1169
- 12..
1169
- 13.
116't
- 14...
1167*
- 15......
1176
- 16..
1183
- 17..
1183
- 18....
1177
- 19....
1179
- 20...
1180
- 21..
1177
- 22..
1180
- 23.....
1187
- 24.
1181
- 2 5..
1175*
26....
1172*
27.
1179
- 28.
1189
- 29 1187*
30.
1185
- 31 1184 *
V2-3
..- t I
s" l
UNIT SHU1 DOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE: November 3,1997 UNIT NAME:
VEGP UNIT 2 COMPLETED BY: T. S. Har91s TELEPHONE:
(706)826 3469 REPORT MONTH Oct 97 l
R M
S E
E Y
l T
A T
LICENSEE SC Y
S H
EVENT TO UOMPONENT CAUSE & CORRECTIVE l
P DURATION O O
REPORT.ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER ME
. (SUSCODE)
PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA-NA FIF6R6sb REX ~ SON:
M5TITD'D:
nVsNTS R5126RTfD INVOLVE ~
~~
S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3-AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F ADMINISTRATIVE 9-OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN) r H-0THER (EXPLAIN) i E
I I
V2-4 1
-e--
y
,r---
.r-r m' v r m~r*e--=-----t-i=-e+eri--r-2-++in is e
,e'-
w w
-r,
+
i-*=i-- -+ " - -
-er-w-*
~
.._.... - ~ -.
... ~. - - -. - -.
e L
t I
f
' ENCLOSURE 3 V0GTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2
- CHALLENOES TO PORY OR SAFETY VALVES t
DOCKET NOS. 50-424.50-425 i
DATE:
November 3,1997 t
COMPLETED BY: T. S. Hargis TELEPHONE:
(706)826 3469
- 1 i
f 4
r i
i EVENT DATE TAG NO.
TYPE' DESCRIPTION
~
NA NA NA NA e
w l
n 4
Y I
-t' t
9
--m m -
v
,* pe,y gw-gwe'
.-y9s e,
a-y-.-s-----r-yw[-.1r.-
--4,,,
-'w-~..,w[,',ww..
r-
,,w,=-,,w,.
- vy
,.e
..n-.,...
,.y
.wr
,, - h b,. w
-.,-[
w-e w, y'y