ML20094J074

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1995 for Vogtle Electric Generating Plant Units 1 & 2
ML20094J074
Person / Time
Site: Vogtle  
Issue date: 10/31/1995
From: Hooper G, Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-0564-J, LCV-564-J, NUDOCS 9511150094
Download: ML20094J074 (12)


Text

.

Georgia Power Company 40 invemess Center Parkway 1

Post Offce Box 1295 Birmingham. Alabama 35201 Telephone 205 877-7122 Georgia Power C.K.McCoy Vce President. Nuclear Vogtle Prosect the souttern electrc system November 10, 1995 LCV-0564-J Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the October 1995, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with Technical i

Specification 6.8.1.5.

Sincerely, C. K. McCoy CKM/JLL Enclosures cc: Georgia Power Company Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C R. Ogle, Senior Resident Inspector, Vogtle u~.-

V.

., ",,j qpll 9511150094 951031 gI PDR ADOCK 05000424 R

PDR

..__=

l l

l ENCLOSURE 1 1

VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR OCTOBER 1995 TABLE OF CONTENTS NARRATIVE REPORT Page Vl-1 OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SHUTDOWNS AND. POWER REDUCTIONS Page VI-4 i

l l

. -.. - - ~

l NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE:

NOVEMBER 1,1995 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 l

OCTOBER 01 00:00 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

OCTOBER 22 16:04 UNIT 1 DERATED TO 97% TO REMOVE MSR'S A AND C FROM SERVICE TO REPAIR A STEAM LEAK.

OCTOBER 23 23:17 UNIT 1 MSR'S RETURNED TO SERVICE. UNIT 1 RETURNED TO 100% POWER.

OCTOBER 31 23:59 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

l j

V1-1

OPERATING DATA REPORT DOCKET NO. 50-424 DATE:

NOVEMBER 1,1995 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 OPERATING STATUS

1. UNIT NAME:

VEGP UNIT 1

2. REPORT PERIOD:

OCTOBER 1995

3. LICENSED THERMAL POWER (MWt):

3565

4. NAMEPLATE RATING (GROSS MWe):

1215

5. DESIGN ELECTRICAL RATING (NET MWe):

1169

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1216

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1162

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION, IF ANY:

NA THIS MONTH YR. TO D)7.

CUMULATIVE

11. HOURS IN REPORTING PERIOD:

745 3.3 73801

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

745.0 7237.6 65002.2 1

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

745.0 7157.6 63878.4

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

2651520 25392791 213186092

17. GROSS ELEC. ENERGY GENERATED (MWH):

905458 8643721 72870408

18. NET ELEC. ENERGY GENERATED (MWH):

866568 8258891 E9317338

19. REACTOR SERVICE FACTOR 100.0 %

99.2 %

88.1 %

20. REACTOR AVAILABILITY FACTOR 100.0 %

99.2 %

88.1 %

21. UNIT SERVICE FACTOR:

100.0 %

98.1 %

86.6 %

28. UNIT AVAILABILITY FACTOR:

100.0 %

98.1 %

86.6 %

23. UNIT CAPACITY FACTOR (USING MDC NET):

100.1 %

97.4 %

84.5 %

24. UNIT CAPACITY FACTOR (USING DER NET):

99.5 %

96.8 %

83.8 %

25. UNIT FORCED OUTAGE RATE:

0.0%

0.9%

4.5%

26. SHUTDOWNS SCHEDULED OVE'1 THE NEXT 6 MONTHS (TY PE, DATE, AND DURATION OF EACH):

REFUELING,03/03/96,29 DAYS

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA

?

V1-2 e

UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 4

POWER LEVEL' DATE:

NOVEMBER 1,1995

)

COMPLETED BY: G. L. HOOPER J

TELEPHONE:

(706) 826-4104 i

l DAY Net MW 1..............

1164

  • l 2..............

1158

\\

l 3.............

1156 4..................

1144 l

5................

1143 6..

1154 7...........

1158 8......

1167

  • 9................

1166

  • 10......

1161 1 1...........

1160 12...............

1162

  • 13..

1155 14.................

1155 15.............

1176

  • 16...

1177

  • 17................

1173

  • i t!..........,...

1171

  • 19.................

1167

  • 20.............

1166

  • 21....................

1177

  • 22................

1161 j

23.....

1135 24..................

1164

  • 25...

1163

  • 26..

1173

  • 27.................

1157 28.

1170

  • 29.

1176

  • 30.

1177

  • 31...

1173 *

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS V1-3

- _ - ~

l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.' 50-424 DATE:

NOVEMBER 1,1995 UNIT NAME:

VEGP UNIT 1 -

COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 REPORT MONTH OCTOBER 1995 R

M S

l E

E Y

T A

T LICENSEE SC Y

S H

EVENT-TO COMPONENT CAUSE & CORRECTIVE P

DURATION O

O REPORT-ED CODE ACTION TO -

NO.

DATE E

(HOURS)

N D

NUMBER ME (SUBCODE)

PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA NA F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER TEAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS, THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 -OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) 1 V1-4 l

l

ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR OCTOBER 1995 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWEk LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4 I

i

.... - ~. _. _. _.. _... _. _... _

NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:

NOVEMBER 1,1995

)

COMPLETED BY: G. L. HOOPER

)

TELEPHONE:

(706) 826-4104 OCTOBER 01 00:00 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

OCTOBER 31 23:59 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

l l

V2-1

~

s

~

OPERATING DATA REPORT DOCKET NO. 50-425 DATE:

NOVEMBER 1,1995 COMPLETED BY: G. L. HOOPER I

TELEPHONE:

(706) 826-4104

- OPERATING STATUS

1. UNIT NAME:

VEGP UNIT 2

2. REPORT PERIOD:

OCTOBER 1995

3. LICENSED THERMAL POWER (MWt):

3565 I

4. NAMEPLATE RATING (GROSS MW3):

1215

5. DESIGN ELECTRICAL RATING (NET MWe):

1169

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1216

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1162

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION, IF ANY:

NA THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

745 7296 56545

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

745.0 6504.8 50652.5

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

745.0 6445.3 50035.5

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

2654328 22705546 168264174

17. GROSS ELEC. ENERGY GENERATED (MWH):

912937 7770351 57219047

18. NET ELEC. ENERGY GENERATED (MWH):

875017 7429131 54508207

19. REACTOR SERVICE FACTOR 100.0 %

89.2 %

89.6%

20. REACTOR AVAILABILITY FACTOR 100.0 %

89.2 %

89.6 %

21. UNIT SERVICE FACTOR:

100.0 %

88.3 %

88.5 %

22. UNIT AVAILABILITY FACTOR:

100.0 %

88.3 %

88.5 %

23. UNIT CAPACITY FACTOR (USING MDC NET):

101.1 %

87.6 %

85.7 %

24. UNIT CAPACITY FACTOR (USING DER NET):

100.5 %

87.1 %

85.6 %

25. UNIT FORCED OUTAGE RATE:

0.0%

0.7%

2.0%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP :

NA V2-2

s G

UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 POWER LEVEL DATE:

NOVEMBER 1,1995 COMPLETED BY: G. L. HOOPER -

TELEPHONE:

(706) 826-4104 DAY Net MW 1..........

1161 2...

1168

  • 3.....

1169

  • 4.......

1159 5......

1157 6..

1168

  • 7.............

1171

  • 8..................

1178

  • 9....

1174

  • 10..

1170

  • 1 1.........

1167

  • 12....

1169

  • 13......

1161 14..

1159 15................

1182

  • 16.

1184

  • 17......

1184

  • 18.........

1179

  • j 19..............

1180

  • 2 0.............

1179 *

)

21..

1187

  • 22.......

1186

  • 23.

1180

  • 24.......

1174

  • 25.....

1175

  • 2G.....

1183

  • 27...

1171

  • 28.....

1179

  • 29..

1186

  • 30....

1186

  • 31....

1184 *

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS V2-3 i

i

4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE:

NOVEMBER 1,1995 UNIT NAME:

VEGP UNIT 2 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 REPORT MONTH OCTOBER 1995 R

M S

E E

Y T

A T

LICENSEE SC Y

S H

EVENT TO COMPONENT CAUSE & CORRECTIVE P

DURATION O

O REPORT ED CODE ACTION TO r

NO.

.DATE E

(HOURS)

N D

NUMBER ME (SUBCODE)

PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA NA F: FORCED

' REASON:

METHOD:

EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHEP. (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) i 1

l 2

V2-4

,o i

ENCLOSURE 3 VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 CHALLENGES TO PORY OR SAFETY VALVES DOCKET NOS. 50-424,50-425 DATE:

NOVEMBER 1,1995 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 EVENT DATE TAG NO.

TYPE DESCRIPTION NA NA NA NA 1

I