ML20100F207

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1996 for Vogtle Electric Generating Plant Units 1 & 2
ML20100F207
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/31/1996
From: Hooper G, Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-0727, LCV-727, NUDOCS 9602200337
Download: ML20100F207 (12)


Text

Georgia Power Company 40 invern)ms Center Parkway 4

  • 'N Post Off.c Box 1295 Birmingharn. Alabama 35201 Teiephone 205 877-7122 L

C. K. McCoy Georgia Power Wce Presdent. Nuclear Vogtse Protect the sout'rern ek:trc system February 8, 1996 l

LCV-0757 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the January 1996, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.

Sincerely,

,/

C. K. McCoy CKM/JLL Enclosures cc:

Georgia Po ver Compa_n_y Mr. J. B. Ileasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr.1. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident inspector, Vogtle 21004g 9602200337 960131 PDR ADOCK 05000424 fg2.f R

PDR

'I t

1 l

'. m 5

ENCLOSUREl VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTliLY OPERATING REPORT FOR JANUARY 1996 TABLE OF CONTENTS l

~ NARRATIVE REPORT Page Vl-1 OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SIlUTDOWNS AND POWER REDUCTIONS Page VI-4 l

i i

l 1

_ -.. _,. -._ -.. _ _. _. _ _. _...._.~. _ _ -

.-_.m____.._.__

j NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE:

FEBRUARY 1,1996 l.

COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 JANUARY 01 00:00 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

l JANUARY 31 23:59 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

i l

i I

t I

h P

+

f E

f i

i t

t

}

E l

I l

i i

F l

V1-1 1

t l

I' I

b

,c- -.,.

I OPERATING DATA REPORT DOCKET NO. 50-424 DATE:

FEBRUARY 1,1996 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 OPERATING STATUS

1. UNIT NAME:

VEGP UNIT 1

2. REPORT PERIOD:

JANUARY 1996

3. LICENSED THERMAL POWER (MWt):

3565

4. NAMEPLATE RATING (GROSS MWe):

1215

5. DESIGN ELECTRICAL RATING (NET MWe):

1169

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1216

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1162

)

l

8. IF CHANGES OCCUR IN CAPACITY RATINGS l

(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA i

9. POWER LEVEL TO WHICH RESTRIC: 0, IF ANY (NET MWe):

NO RESTRICTIONS

- 50. REASONS FOR RESTRICTION,IF ANY:

NA THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

744 744 76009

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

744.0 744.0 B7210.2

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

744.0 744.0 66086.4

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

2650608 2650608 224052342

17. GROSS ELEC. ENERGY GENERATED (MWH):

917048 917048 75589575

18. NET ELEC. ENERGY GENERATED (MWH):

877918 877918 71920325

19. REACTOR SERVICE FACTOR 100.0 %

100.0 %

88.4 %

i

20. REACTOR AVAILABILITY FACTOR 100.0 %

100.0 %

88.4 %

21. UNIT SERVICE FACTOR:

100.0 %

100.0 %

86.9 %

22. UNIT AVAILABILITY FACTOR:

100.0 %

100.0 %

86.9 %

23. UNIT CAPACITY FACTOR (USING MDC NET):

101.5 %

101.5 %

85.0%

24. UNIT CAPACITY FACTOR (USING DER NET):

100.9 %

100.9 %

84.4%

25. UNIT FORCED OUTAGE RATE:

0.0%

0.0%

4.3%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)

REFUELING,03/03/96,31 DAYS

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA i

V1-2

UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:

FEBRUARY 1,1996 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 DAY Net MW 1................

1176

  • 2..

1169

  • 3.........

1180

  • 4.................

1184

  • 5..................

1183

  • 6................

1181

  • 7..................

1185

  • 8.

1184

  • 9...............

1183

  • 10................

1182 *'

11....................

1183

  • 12..............

1181

  • 13; 1182
  • 14.

1178

  • 15.....................

1177

  • 16......

1183

  • 17...............

1181

  • 18..................

1168

  • 19........

1180

  • 20................

1186

  • 21...........

1185

  • 22.................

1182

  • 23....................

1179

  • 24...

1176

  • 25.................

1184

  • 2 6............

1175

  • 27.............

1177

  • 28..

1184

  • 29.................

1182

  • 30........

1177

  • 31....................

1173 *

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS V1-3 I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 DATE:

FEBRUARY 1,1996 UNIT NAME:

VEGP UNIT 1 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 REPORT MONTH JANUARY 1996 R

M S

E E

Y T

A T

LICENSEE SC

'~

Y S

H EVENT TO COMPONENT CAUSE & CORRECTIVE P

DURATION O

O REPORT ED CODE ACTION TO NO.

DATE E

(HOURS)

N D

NUMBER ME (SUBCODE)

PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA NA F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3-AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 -CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 -OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

I V1-4

I

)

ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTIILY OPERATING REPORT FOR JANUARY 1996 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 I

OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3

)

UNIT S11UTDOWNS.AND POWER REDUCTIONS Page V2-4 P

i j

)

h NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:

FEBRUARY 1,1996 ~

COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 l

l JANUARY 01 00:00 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

JANUARY 31 23:59 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS, I

t i

\\

\\

i a

\\

i i

i q

l i

k j

s-V2-1

__j

OPERATING DATA REPORT DOCKET NO. 50-425 DATE:

FEBRUARY 1,1996 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 OPERATING STATUS

1. UNIT NAME:

VEGP UNIT 2

2. REPORT PERIOD:

JANUARY 1996

3. LICENSED THERMAL POWER (MWt):

3565

4. NAMEPLATE RATING (GROSS MWe):

1215

5. DESIGN ELECTRICAL RATING (NET MWe):

1169

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1210

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1162

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION, IF ANY:

NA THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

744 744 58753

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

744.0 744.0 52860.5

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

744.0 744.0 52243.5

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

2650834 2650834 176104949

17. GROSS ELEC. ENERGY GENERATED (MWH):

923334 923334 59946636

18. NET ELEC. ENERGY GENERATED (MWH):

885484 885484 57123746

19. REACTOR SERVICE FACTOR 100.0 %

100.0 %

90.0 %

20. REACTOR AVAILABILITY FACTOR 100.0 %

100.0 %

90.0 %

21. UNIT SERVICE FACTOR:

100.0 %

100.0 %

88.9 %

22. UNIT AVAILABILITY FACTOR:

100.0 %

100.0 %

88.9 %

23. UNIT CAPACITY FACTOR (USING MDC NET):

102.4 %

102.4 %

86.3%

24. UNIT CAPACITY FACTOR (USING DER NET):

101.8 %

101.8 %

86.3 %

25. UNIT FORCED OUTAGE RATE:

0.0%

0.0%

1.9%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP :

NA V2-2

I

~

UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 i

POWER LEVEL DATE:

FEBRUARY 1,1996 COMPLETED BY: G. L. HOOPER i

TELEPHONE:

(706) 826-4104 i

i 4

1 DAY Net MW j

1..................

1187

  • l 2...............

1179

  • j 3......

1188

  • i 4.................

1193

  • 5..................

1193

  • i I

6.................

1189

  • 4 7..

1193

  • i 8...............

1197

  • i 9...

1191

  • i 10...............

1194

  • 1 1.........

1195

  • 12...............

1194

  • 13................

1194

  • 14.

1190

  • 15.................

1188 *

{

16.............

1186

  • 17.............

1191

  • 1 8..............

1178

  • 19.......

1189

  • 1 20.

1194

  • 21.................

1193

  • 22...............

1194

  • 2 3.....,.......

1191

  • 24.................

1187 *

-25..................

1194

  • 26..

118ts*

27........

1188

  • 2 8.............

1194

  • 4 2 9............

1193

  • 30......

1190

  • 31....

1185

  • i
  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS V2-3

l o

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO, 50-425 1

DATE:

FEBRUARY 1,1996 UNIT NAME:

VEGP UNIT 2 COMPLETED BY; G. L. HOOPER TELEPHONE:

(706)826-4104 REPORT MONTH JANUARY 1996 R

M S

i E

E Y

T A

T LICENSEE SC l

l Y

S H

EVENT TO COMPONENT CAUSE & CORRECTIVE P

DURATION O

O REPORT ED CODE ACTION TO

- NO, DATE E

(HOURS)

N D

NUMBER ME (SUBCODE)

PREVENT RECURRENCE J

NA NA NA NA NA NA NA NA NA NA l

F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE l

C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) l i

V2-4 I

i d

ENCLOSURE 3 3

VOGTLE ELECTRIC GENERATING PLANT-UNITS I AND 2 CIIALLENGES TO PORY OR SAFETY VALVES 1

DOCKET NOS. 50-424,50-425 I

DATE:

FEBRUARY 1,1996 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 i

i i

EVENT DATE TAG NO.

TYPE DESCRIPTION

_i NA NA NA NA r

}

.