dzorgia Power company 40 inverness Ca'ter Parkway Post Offee Box 1P95 Birmingham, Alabama 35201 Telephone 205 992-7122 GeorgiaPower Vic P es dent, Nuclear Vogtle Project CCt0ber 9, 1996 LCV-0757-I Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the September 1996, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with Technical Specification 6.S.1.5.
Sincerely, C. K. McCoy CKM/JLL Enclosures cc:
Georgia Power Compiny n
Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuclear RegulatorV Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L,. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle 5
t t
\\
\\
] f)-
9610160305 960930 PDR ADOCK 05000424 R
PDR l
I j
ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR SEPTEMBER 1996 TABLE OF CONTENTS NARRATIVE REPORT Page Vl-1 OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page Vl-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 p
.. _.. ~ -..,,,..,... -.... -.. ~ ~ -. _,...
~....
NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE:
OCTOBER 1,1996 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706)826-4104 SEPTEMBER 01 00:00 UNIT ONE AT 100% POWER WITH NO OPERATING PROBLEMS.
SEPTEMBER 30 23:59 UNIT ONE AT 100% POWER WITH NO OPERATING PROBLEMS.
i i
I t
i l
l l
l d
V1 1 i
..- _ - ~.
OPERATING DATA REPORT DOCKET NO. 50-424 l
DATE: OCTOBER 1,1996 l-COMPLETED BY: G. L. HOOPER l
TELEPHONE:
(706) 826-4104 1
OPERATING STATUS
- 9. UNIT NAME:
VEGP UNIT 1
- 2. REPORT PERIOD:
Sep-96
- 3. LICENSEDTHERMAL POWER (MWt):
3565
- 4. NAMEPLATE RATING (GROSS MWe):
1215 i
S. DESIGN ELECTRICAL RATING (NET MWe):
1169
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1216
(
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe)-
1162
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL. TO WHICH RESTRICTEF, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION,IF ANY.
NA THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
720 6575 81840 12 NUMBER OF HOURS REACTOR WAS CRITICAL:
720.0 5056.3 71522.5
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE:
720.0 4981.1 70323.5
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 i
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
2565318 17277503 238679237
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
875228 5878221 80550748
- 18. NET ELEC. ENERGY GENERATED (MWH):
836008 5592621 76635028
- 19. REACTOR SERVICE FACTOR 100.0 %
76.9 %
87.4 %
- 20. REACTOR AVAILABILITY FACTOR 100.0 %
76.9 %
87.4 %
21, UNIT SERVICE FACTOR:
100.0 %
75.8 %
85.9 %
- 22. UNIT AVAILABILITY FACTOR:
100.0 %
75.8 %
85.9%
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
99.9 %
73.2 %
83.8 %
24, UNIT CAPACITY FACTOR (USING DER NET):
99.3 %
72.8 %
83.2 %
- 25. UNIT FORCED OUTAGE RATE:
0.0%
7.6%
4.6%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE 27;lF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA l
1 I
i V1-2
-. - ~.... _ _. -. -. -
\\
1 UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:
OCTOBER 1,1996 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706)826-4104 1
i i
1 i
l DAY Net MW 1.......
1161 i
l 2...
1159 1
3......
1158 4.......
1156 5.
1155 6..
1152 7.
1153 8.
1150 9...
1152 10..........
1158 11.
1161 12...
1160 13...
1164
- 14...
1171
- l 15.
1170
- 16.....
'1155 1 7...........
1151 18...
1168
- 19..
1172
- 20.
1172
- 21..
1166
- 22.
1166
- l 2 3........
1166
- 24..........
1164
- 25..,..........
1162
- 2 6.............
1160 l
27...........
1156 28......
1158 29 1167 *
' 30..
1170
- t
V1-3
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 DATE: OCTOBER 1,1996 UNIT NAME:
VEGP UNIT 1 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 REPORT MONTH Sep-96 R
M S
E E
Y T
A T
LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION O
O REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE NA NA NA NA NA' NA NA NA NA NA P: FORCED REASON:
METHOD:
EVENTS R$~PdINED INVOLVE
~
S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2-MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3-AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RES" +, TION 4-CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINih - & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN) l V1-4 1
ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR SEPTEMBER 1996 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4
_ - _ _.. _ _ _ _. _ ~..
NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:
OCTOBER 1,1996 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826 4104 SEPTEMBER 01 00:00 UNIT TWO AT 88% POWER, COASTDOWN IN PROGRESS.
SEPTEMBER 06 20:00 UNIT TWO STARTED LOAD REDUCTION FOR REFUELING OUTAGE.
SEPTEMBER 08 00:29 UNIT TWO MANUALLY TRIPPED TURBINE.
SEPTEMBER 08 00:38 UNIT TWO ENTERED MODE 2.
SEPTEMBER 08 01:02 MANUAL REACTOR TRIP, UNIT TWO ENTERED MODE 3.
SEPTEMBER 09 03:58 UNIT TWO ENTERED MODE 4.
SEPTEMBER 09 11:33 UNIT TWO ENTERED MODE 5.
SEPTEMBER 13 13:27 UNIT TWO ENTERED MODE 6.
SEPTEMBER 16 13:14 UNIT TWO CORE OFFLOAD STARTED.
SEPTEMBER 18 22:43 UNIT TWO CORE OFFLOAD COMPLETED, ENTERED DEFUELED MODE.
SEPTEMBER 27 23:19 UNIT TWO ENTERED MODE 6, CORE LOAD IN PROGRESS.
SEPTEMBER 30 23:59 UNIT TWO IN MODE 6 CORE LOAD IN PROGRESS.
l l
l l
l l
i V2-1 l
l
OPERATING DATA REPORT DOCKET NO. 50-425 DATE: OCTOBER 1,1996 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706)826 4104 OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 2
- 2. REPORT PERIOD:
Sep-96
- 3. LICENSED THERMAL POWER (MWt):
3565
- 4. NAMEPLATE RATING (GROSS MWe):
1215
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1169
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1216
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1162
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:
NA THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
720 6575 64584
- 12. NUMBER OF HOURS REACTOR WAS CRIT! CAL:
169.0 6024.0 58140.5
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE:
168.5 6023.5 57523.0
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
489969 21057914 194512029
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
162628 7231526 66254828
- 18. NET ELEC. ENERGY GENERATED (MWH):
148898 6906456 63144718
- 19. REACTOR SERVICE FACTOR 23.5%
91.6 %
90.0 %
- 20. REACTOR AVAILABILITY FACTOR 23.5%
91.6 %
90.0%
- 21. UNIT SERVICE FACTOR:
23.4%
91.6 %
89.1 %
- 22. UNIT AVAILABILITY FACTOR:
23.4 %
91.6 %
89.1 %
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
17.8%
90.4 %
86.5 %
- 24. UNIT CAPACITY FACTOR (USING DER NET):
17.7%
89.9 %
86.5%
- 25. UNIT FORCED OUTAGE RATE:
0.0%
0.0%
1.7%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: OCTOBER 12,1996 V2-2 m--
UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 POWER LEVEL DATE:
OCTOBER 1,1996 COMPLETED BY.: G. L. HOOPER TELEPHONE:
(706)8264104 DAY Net MW
- 1..
1011 I
2.
992 3.
982 4.
961
'5.
941 6.
922-7.
623 8.
0 9.
0 10.
0 11 0
12.
0 13.
0 14.
0 15.
0 16.
0 17.
0 18.
0 19.
0 20.
0 21.
0 22...
0 23.
0 24.
0 I
25.
0 26..
0 27.
0 28..
0 29 0
30 O
i V2-3
~
1 1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 l
DATE: OCTOBER 1,1996 UNIT NAME:
VEGP UNIT 2 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 REPORT MONTH Sep96 l
R M
S E
E Y
T A
T LICEk.C S C Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION O
O REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE 96-3 9/8 S
551.5 C
2 NA ZZ Z77777 SEE BELOW F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2-MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3-AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4-CONTINUATIONS THE PRECEDING 24 HOURS.
j E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN) i l
H-OTHER (EXPLAIN)
EVENT _9fh3 l
CAUSELSCHEDULED REFUELING OUTAGE CORRECINEACIl0N; NO MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE WAS PERFORMED CRIIlCALEATILWAS:_ ROD DROP TESTING, COOLDOWN TO 200 DEG. F, RCS CLEANUP, COOLDOWN TO TO 110 DEG. F, MAIN GENERATOR INSPECTION, VESSEL DISASSEMBLY AND PREPARATION FOR HEAD l
LIFT, REMOVAL OF REACTOR VESSEL HEAD AND INTERNALS, CORE OFFLOAD, GUIDE TUBE SUPPORT PIN UT, REACTOR COOLANT PUMP CHANGEOUT, STEAM GENERATOR EDDY CURRENT TESTING, B l
TRAIN DIESEL GENERATOR INSPECTION, FILL LOOPS AND PERFORM REACTOR FOSAR, RELOAD i
FUEL AND VERIFY CORE, B TRAIN ESFAS TESTING l
l l
V2-4 l
p...~,....
.~.
.. -..... ~ _.
. -.. -.. -.. ~.
l i,,
- j.
s, ;>
ENCLOSURE 3 VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 CHALLENGES TO PORY OR SAFETY VALVES l
DOCKET NOS. 50-424,50-425 DATE:
OCTOBER 1,1996 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706)826-4104 4
l l
EVENT i
DATE' TAG NO.
TYPE DESCRIPTION 1
NA NA NA NA i
i I
l l
i t
l l
l i
i l
2 a
r l