ML20117N173

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1996 for Vogtle Electric Generating Plant Units 1 & 2
ML20117N173
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/31/1996
From: Hooper G, Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-0757-H, LCV-757-H, NUDOCS 9609180387
Download: ML20117N173 (12)


Text

.

Georgia Power Company 40 inverress Center Parkway 11 4

' Post Off:ce Bon 1295

. Birmingham Alabama 35201 a

Telephone 205 877 7122 a-GeorgiaPower c.x.uccoy Vee President. Nuclear Vogtte Propct the southern electic system September 12, 1996 LCV-0757-H v

'f Docket Nos. 50-424 50-425 l

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the August 1996, monthly operating reports for Vogtle Electric Generating l

Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.

Sincerely, C.K McCoy CKM/JLL Enclosures cc:

Georgia Power Company Mr. J, B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle 1T0r-

,30,1,03,,,30,31 PDR ADOCK 05000424 R

PDR y

l ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR AUGUST 1996 TABLE OF CONTENTS j

1 NARRATIVE REPORT Page Vl-1 1

j OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page Vl-3 l

UNIT SHUTD0%M AND POWER REDUCTIONS Page VI-4

]

1 I

4 1

I

)

1 N

l 5

l 4

e m,

l i

NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE:

SEPTEMBER 3,1996 COMPLETED BY: G. L. IlOOPER TELEPHONE:

(706) 826-4104 l

AUGUST 01 00:00 UNIT ONE AT 100% POWER WITH NO OPERATING PROBLEMS.

AUGUST 31 23:59 UNIT ONE AT 100% POWER WITH NO OPERATING PROBLEMS.

4 l

l V1-1

OPERATING DATA REPORT DOCKET NO. 50424 DATE: SEPTEMBER 3,1996 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 OPERATING STATUS

1. UNIT NAME:

VEGP UNIT 1

2. REPORT PERIOD:

Aug-96

3. LICENSED THERMAL POWER (MWt):

3565

4. NAMEPLATE RATING (GROSS MWe):

1215

5. DESIGN ELECTRICAL RATING (NET MWe):

1169

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1216

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1162

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION,IF ANY:

NA THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

744 5855 81120

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

744.0 4336.3 70802.5

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

744.0 4261.1 69603.5

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

2651013 14712185 236113919

17. GROSS ELEC. ENERGY GENERATED (MWH):

901892 5002993 79675520

18. NET ELEC. ENERGY GENERATED (MWH):

862442 4756613 75799020

19. REACTOR SERVICE FACTOR 100.0 %

74.1 %

87.3%

20. REACTOR AVAILABILITY FACTOR 100.0 %

74.1 %

87.3%

21. UN!T SERVICE FACTOR:

100.0 %

72.8 %

85.8 %

22. UNIT AVAILABILITY FACTOR:

100.0 %

72.8%

85.8%

23, UNIT CAPACITY FACTOR (USING MDC NET):

99.8 %

69.9 %

83.7%

24. UNIT CAPACITY FACTOR (USING DcR NET):

99.2 %

69.5%

83.1%

25. UNIT FORCED OUTAGE RATE:

0.0%

8.8%

4.6%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA V1-2

UNIT 1 - AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:

SEPTEMBER 3.1996 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706)826 4104 l

DAY Net MW 1.

1161 2.

1159 3.

1160 4.

1157 5.

1158 6.

1160 7.

1159 8.

1160 9.

1160 10..

1158 11.

1159 12.

1156 13.

1160 14.

1164

  • 15..

1163

  • 16..

1160 17.

1158 18.

1159 19.

1158 20.

1155 21.

1160 22.

1160 23.

1159 24..

1156 25.

1161 26..

1159 27.

1159 28.

1158 29 1158 30 1160 31 1161

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS V1-3

e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 DATE: SEPTEMBER 3,1996 UNIT NAME:

VEGP UNIT 1 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706)826-4104 i

REPORT MONTH Aug-96 i

i R

M S

l E

E Y

T A

T LICENSEE SC Y

S H

EVENT TO COMPONENT CAUSE & CORRECTIVE P

DURATION O.O REPORT E D CODE ACTION TO NO.

DATE E

(HOURS)

N D

NUMBER M E (SUBCODE)

PREVENT RECURRENCE i

NA NA NA NA

'NA NA NA NA NA NA i

i i

F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL A GREATER THAN 20%

4 B-MAINTENANCE OR TEST 2-MANUAL SCRAM REDUCTION IN AVERAGE i

C-REFUELING 3-AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4-CONTINUATIONS THE PRECEDING 24 HOURS.

s E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

V1-4

-. - - =

l l

l ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTliLY OPERATING REPORT FOR AUGUST 1996 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SilUTDOWNS AND POWER REDUCTIONS Page V2-4

l e

NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:

SEPTEMBER 3,1996 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706)8264104 AUGUST 01 00:00 UNIT TWO AT 100% POWER WITH NO OPERATING PROBLEMS.

AUGUST 11 20:20 UNIT TWO BEGAN DERATE TO INVESTIGATE INLEAKAGE IN CONDENSER "A" EAST WATER 80X.

AUGUST 14 23:59 UNIT TWO RETURNED TO 100% POWER AFTER PLUGGING TEN CONDENSER TUBES AND REPLACING ONE FAILED PLUG.

AUGUST 19 22:30 UNIT TWO BEGAN COASTDOWN FOR REFUELING OUTAGE.

AUGUST 31 23:59 UNIT TWO AT 88% POWER, COASTDOWN IN PROGRESS.

V2-1

I OPERATING DATA REPORT DOCKET NO. 50-425 DATE: AUGUST 1,1996 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706)826-4104 OPERATING STATUS

1. UNIT NAME:

VEGP UNIT 2

2. REPORT PERIOD:

Aug-96

3. LICENSED THERMAL POWER (MWt):

3565

4. NAMEPLATE RATING (GROSS MWe):

1215

5. DESIGN ELECTRICAL RATING (NET MWe):

1169

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1216

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1162

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION,IF ANY:

NA THIS MONTH YR. TO DATE CUMULATIVE

.11. HOURS IN REoORTING PERIOD:

744 5855 63864

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

744.0 5855.0 57971.5

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

744.0 5855.0 57354.5

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

2552746 20567945 194022060

17. GROSS ELEC. ENERGY GENERATED (MWH):

867484 7068898 66092200

18. NET ELEC. ENERGY GENERATED (MWH):

829224 6757558 62995820

19. REACTOR SERVICE FACTOR 100.0 %

100.0 %

90.8 %

20. REACTOR AVAILABILITY FACTOR 100.0 %

100.0 %

90.8 %

21. UNIT SERVICE FACTOR:

100.0 %

100.0 %

89.8%

22. UNIT AVAILABILITY FACTOR:

100.0%

100.0 %

89.8 %

23. UNIT CAPACITY FACTOR (USING MDC NET):

95.9 %

99.3 %

87.3 %

24. UNIT CAPACITY FACTOR (USING DER NET):

95.3%

98.7 %

87.3 %

25. UNIT FORCED OUTAGE RATE:

0.0%

0.0%

1.7%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

REFUELING,09/08/96,30 DAYS

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA V2-2

I l

l UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 POWER LEVEL DATE:

SEPTEMBER 3,1996 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 DAY Net MW 1.

1161 2.

1160 3.

1161 4.

1159 5.

1161 6.

1164

  • 7.

1162

  • 8.

1163

  • 9.

1164

  • 10.

1162

  • 11.

1147 12.

919 13.

927 14.

1035 15.

1156 16.

1164

  • 17.

1165

  • 18.

1165

  • 19.

1163

  • 20.

1150 21.

1141 22.

1139 t

23.

1126 24,

1112 25.

1101 26.

1087 27.

1078 28.

1059 29 1041 30.

1038 31 1021

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS V2-3

O l

l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 1

DATE: SEPTEMBER 3,1996

)

UNIT NAME:

VEGP UNIT 2 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 REPORT MONTH Aug-96 R

M S

i E

E Y

T A

T LICENSEE SC Y

S H

EVENT TO COMPONENT CAUSE & CORRECTIVE P

DURATION O

O REPORT E D CODE ACTION TO i

NO. lDATE E

(HOURS)

N D

NUMBER ME (SUBCODE)

PREVENT RECURRENCE l

i I' NA NA NA NA NA NA NA NA NA NA l

i L

REASON:

METHOD:

EVENTS REPORTED INVOLVE F: FORCED S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2-MANUAL SCRAM REDUCTION IN AVERAGE t

C-REFUELING 3-AUTO. SCRAM.

DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4-CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION

{

F-ADMINISTRATIVE 9-OTHER (EXPLAIN) l G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) l l

l

~

e l

i V2-4

. i

ENCLOSURE 3 VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 CIIALLENGES TO PORY OR SAFETY VALVES DOCKET NOS. 50-424,50-425 DATE:

SEPTEMBER 3,1996 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706)826-4104 EVENT DATE TAG NO.

TYPE DESCRIPTION 1

NA NA NA NA j

i

_