ML20211Q503
Jump to navigation
Jump to search
ML20211Q503 | |
Person / Time | |
---|---|
Site: | Waterford ![]() |
Issue date: | 10/09/1997 |
From: | Murray B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
To: | Dugger C ENTERGY OPERATIONS, INC. |
Shared Package | |
ML20211Q507 | List: |
References | |
50-382-97-20, NUDOCS 9710220323 | |
Download: ML20211Q503 (5) | |
See also: IR 05000382/1997020
Text
{{#Wiki_filter:_ _ _ _ _ _ - _ _ _ - _ _ _ _ _ - _ _ _ _ _
so UNI T i D S'l AT E S , * , NUCLE AR REGULATORY COMMISSION .l ) annos w \(2.f 5 ,m m a na. a omve sum e AR LING T ON. I r.4 AS 10011 BCtd ^*** October 9, 1997 Charles M. Dugger Vice President Operations Waterford 3 Entergy Operations, Inc. P.O. Box R Killona, Lcuisiana 70060 SUBJECT: NRC INSPECTION REPORT 50 382/97-20 AND NOTICE OF VIOLATION Dear Mr. Dugger: An NRC inspection was conducted September 22-26,1997, at your Watarford Steam Electric Station, Unit 3, reactor f acility. The enclosed report presents the scope and results of that inspection. The inspector found that a good radiation protection program was implemented. However, two violations were identified involving radiation area access control and the control of licensed material. These violations are cited in the raciosed Notice of Violation (Notice) and the circumstances surrounding the violations are described in detailin the enclosed report. Please note that you are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. The NRC will use your response, in part, to determine whether further enforcement action is necessary to ensure compliar.ce with regulatory requirements, in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosure, and your response will be placed in the NRC Public Document Room (PDR). To the extent possible, your respense should not incluoe any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without radaction. Should you have any questions concerning this inspection, we will be pleaud to discuss them with you. Sincerely, ?A Blaine Murray, Chief Plant Support Branch
,
Division of Reactor Safety
1
Docket No.: 50-382 License No.: NPF 38 i 9710220323 971009 gi {{$%l@\k= kh,k PDR ADOCK 05000382 *'L G PDR N - ._ _ _ _______ _ ___._____
._ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ - . . _ . .. .. Entergy Operations, Inc. -2- Enclosures: 1. Notice of Violation 2. NRC Inspection Report 50 382/97 20 cc wa r.nclosures: Executive Vice President and Chief Operating Officer Entergy Operations, Inc. P.O. Box 31995 Jackson, Mississippi 39286 1995 Vice President, Operations Support Entergy Operations, Inc. P.O. Box 31995 Jackson, Mississippi 39286 1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc. P.O. Box B Killona, Louisiana 70066 Manager - Licensing Manager Waterford 3 SER Entergy Operatio.is, Inc. P.O. Box B Killona, Louisiana 70066 Chairman
'
Louisiana Public Service Commission One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Director, Nuclear Safety & Regulatory Affairs Waterford 3 SES Entergy Operations, Inc. P.O. Box B Killona, Louisiana 70066 . _ )
. . . . . . . ..
$
.* Entergy Operations, Inc. 3- William H. Spell, Administrator Louisiana Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884 2135 Parish President St. Charles Parish P.O. Box 302 Hahnville, Louisiana 70057 C Mr. William A. Cross Bethesda Licensing Office 3 Metro Center Suite 610 Bethesda, Maryland 20814 Winston & Ltrawn 1400 L Street, N.W. Washington, D.C. 20005 3502 . _ )
- - _ - _ _ _ _ - _ - _ _ _ _ _
/ ..
~ .0 Entergy Operations, Inc, -4- E Mail report to T. Frye (TJF) E-Mail report to T. Hiltz (TGH) E Mail report to NRR Event Tracking System (IPAS) E Mail report to Document Control Desk (DOCDESK) bec to DCD (IEOG) bec distrib. by RIV: , Regional Administrator Resident inspector DRS Director DP.S Deputy Director DRP Director DRS-PSB Branch Chief (DRP/D) MIS System Project Engineer (DRP/D) RIV F.e Branch Chief (DRP/TSS) ( l' DOCUMENT NAME: G:\ REPORTS \WT720RP.GLG To receive copy of document. indicate in bor. *C' . Copy enthout enclosures *E* = Copy wie enclosures *N' - No copy , l RS:PSB l ' C:PSB C:P46),ld.,/, C:PSB 3 GLGuerrallmb 13 BMurray j) PHafrpA /// BMurray D 10T} /97 10fl97 10f/W/ i 10/Q'97 _ ,, OFFICIAL fy6RD COPY m..e.n,31 -- - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . _ _ _ . _ . _ - _..A- --
_ _ _ _ _ _ _ _ .
. ..
. Entergy Operations, Inc. -4- E Mail report to T. Frye (TJF) E-Mail report to T. Hiltz (TGH) E-Mail report to NRR Event Tracking System (IPAS) E Mail report to Document Control Desk (DOCDESK) bec to DCD (IE06) bec distrib. by RIV: Regional Administrator ha.ent inspector DRS Director DRb Deputy Director DRP Director DRS-PSB Branch Chief (DRP/D) MIS System Project Engineer (DRP/D) RIV File Branch Chief (DRP/TSS) DOCUMENT NAME: G:\ REPORTS \WT720RP.GLG re receive copy of document,indicata in bes: *C" . Copy wthout ancioswes *E* . Copy wii enclosws:"N* No copy , RS:PSB C:PSB C:PE}6 l ,i, /, C:PSB (s GLGuerra/Imb 6 BMurray j') PHairrp/L ff/ BMurray D 10/1/97 10/7/97 ' ,104 /W/ 10/CV97 - OFFICIAL EqdRD COPY I
% .. ----________---_-__-_-_-___-_-_-____--__-_-___--___-_ }}